View
1
Download
0
Category
Preview:
Citation preview
HOUMA, LA
Overview The Louisiana Percent for Art Program seeks artists or artist teams to submit qualifications to design and implement an interior installation of original design for LUMCON’s Blue Works located in the Port of Terrebonne in Houma, Louisiana. A successful proposal for this project would include digital, kinetic, or technological components, however full proposals are not required at this time; please submit only those materials described in the submission requirements section. This commission is open nationally to professional artists 18 and over.
Deadline November 18, 2020 10:59 PM CT
Submission Requirements Application materials must be received on 11/18/2020 by 10:59 PM CT. Items required include:
• Résumé • Letter of Interest & Artist
Statement • Three (3) professional
references • Six (6) images of original
completed artwork
Project Budget $80,000 (all-inclusive)
PUBLIC ART OPPORTUNITY
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
2
Project Background About LUMCON’s Blue Works
In the Port of Terrebonne lies Blue Works, a new 27,000 square foot building and expansion of LUMCON (Louisiana Universities Marine Consortium). Through this new, collaborative technology space, Blue Works aims to restore passion and commitment to ocean and coastal exploration and science. The mission of LUMCON’s Blue Works is the build capacity, knowledge, and passion at the intersection of blue science and technology to find innovative solutions and train the next generation of innovators.
The expansion of LUMCON will also better fulfill their mission to:
• Connect through collaboration between academia, agencies, and corporations as well as citizens, students, and specialists.
• Enrich by engaging all those who come through its doors and by making STEM available to everyone.
• Transform by providing the technological and engineering space and culture to allow creative and innovative ideas to become reality.
The unemployment of the region around LUMCON is consistently higher than the national average. Inspiring students early in the educational pipeline for careers in Blue STEM will ultimately lead to workforce development and economic growth. Blue Works seeks to be the first point in this pipeline and provide a regional asset to support other STEM initiatives. Blue Works also seeks to leverage regional expertise in engineering and technology developed out of the energy sector to provide coastal and ocean solutions. Blue Works also allows Louisiana to secure, maintain, and expand its historically and internationally prominent role in ocean and coastal research, both in the Gulf of Mexico and abroad.
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
3
Project Background cont’ The Building and Spaces
Public access to all the spaces listed below is essential to the mission and vision of Blue Works. Blue Works seeks to create a space where people can freely use tools and supplies to create and invent projects that are personal and unique to them.
• Welcome – Reception and welcome area , exhibit space, informal interaction spaces, meeting rooms and conference spaces
• Learn – Library, zoological laboratory, technical laboratory, maker spaces, 3-D print laboratory, research laboratories
• Work – Office suites, records, IT
About the Art Installation
The installation should capture the mission and core values of Blue Works (found on next page). The installation should also marry coastal and ocean with digital, computational, technological, and engineering themes. Artists are greatly encouraged to utilize kinetic and light elements to convey a sense of movement and energy. The installation will be located in the atrium/front lobby area. It is envisioned that the piece will cover the wooden wall on page 6. The piece should ideally serve to generate awe and excitement to all that enter Blue Works.
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
4
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
Project Background cont’ Blue Works Core Values
INTERACTION AND VISIBILITY LEARNING AND RESEARCH ON DISPLAY,
TRANSPARENT, AND OPEN
FLEXIBILITY ADAPTIVE SPACES AND SOLUTIONS
SPACE FOR DISCOVERY
EXPRESSION AND EXCITEMENT ARE EMBODIED IN THE BUILDING, EDUCATION, RESEARCH, AND CULTURE
RESILIENCY
BUILDING DURABILITY IN THE MARINE ENVIRONMENT, WORKING ON SOLUTIONS FOR MORE RESILIENT COMMUNITIES
HIGH PERFORMING
EFFICIENT AND RESPONSIBLE DESIGN, HIGH PRODUCTIVITY THROUGH PLAYFULNESS AND COLLABORATION
INTEGRATION
BUILDING, DOCK, AND CAMPUS AS SINGLE UNITY HORIZONTAL AND VERTICAL COLLABORATION
TO CONNECT, ENRICH, AND TRANSFORM
A VISIBLE ASSET TO THE COMMUNITY, STATE, AND GLOBE
5
6
Budget The budget listed is inclusive of all costs associated with the project, and commensurate with the intended scale, including but not limited to: research, professional consultations, formal reports from licensed structural and electrical engineers where appropriate, a long-term care and maintenance report from a licensed professional conservator, materials, fabrication, transportation, travel, insurance, installation (including lighting if applicable), photography and documentation of the artwork and crediting plaque (to be installed by artist).
Eligibility This commission is open to professional artists 18 and over, regardless of race, color, religion, national origin, gender identification, military status, sexual orientation, marital status, or physical ability.
Artist teams may apply and must designate one artist as the lead contact. All artists must have a minimum of five (5) years of demonstrated professional visual art experience (NOT STUDENT WORK). Examples of work submitted must be original, recently completed artwork (within the last 10 years).
The application, including all examples of work and supporting documents are considered the artist’s official “submission.” If any information submitted by the artist or artist’s representative, including all supporting documents, is found fraudulent the submission will be disqualified.
Scope of Work Artist(s) are expected to create an installation that will not only serve as a focal point but will also provide an artistic element to the space upon entering the building.
The development and design for the installation should:
• Consider the elements of the site as a source of design ideas. • Consider the building and the area surrounding the artwork and its intended uses as
described in this call. • Reflect Blue Works main and core values. • Be durable, sturdy, stable, suitable for the climate conditions, resistant to UV damage, and
safe for public interaction.
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
7
Submission Requirements Application materials must be received by November 18th at 10:59 PM CT via Call for Entry (CAFÉ) system available online at www.callforentry.org.
The CAFÉ system will remain open until 10:59 PM CT on November 18, 2020 but staff will only be available for assistance until 5:00 PM CT (weekends and holidays may affect this time). Applicants are encouraged to apply early to reduce risk of technical difficulties. Incomplete or late submissions will not be accepted for any reason. Items required shall include the following:
• Résumé/CV: Chronological resume demonstrating a minimum of five (5) years of professional visual art experience (NOT STUDENT WORK). If submitting as a team, a current résumé should be submitted for each team member (Compiled into one document). A biography will not be accepted in place of a résumé. • Letter of Interest & Artist Statement: Provide a brief statement summarizing your methods of working, interest in this project, and availability to participate in the design and implementation of the project. If submitting as a team, only one letter of interest and artist statement is needed however, this can be a collaborative effort among team members. • References: Include the names and current contact information for three (3) individuals with whom you have worked, collaborated, or who have commissioned your work in the past. References will be contacted for artists invited to develop a proposal for the commission. • Work samples: Upload six (6) images of your original completed commissions, not proposals, which demonstrate your qualifications for the project. 3-D models, sketches, or drawings will not be accepted. You must include the title, medium, dimensions, project budget (price), year completed, location, and a description. The value must be indicated in US dollars. Each image must contain only one view of the work. Multiple views per image or unexecuted conceptual projects will not be considered, and may disqualify your submission.
Image specifications: JPG, PNG - Maximum size per image 5MB, total 30MB.
*Slides, emailed prints, or any physical submissions will NOT be accepted.
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
8
Selection Process & Evaluation Criteria An Art Selection Committee (the Committee) may include (but is not limited to) representatives from the Louisiana Office of Facility Planning & Control, the architectural firm that designed the facility, representatives from LUMCON, professional artist(s), and the State Arts Council will review all eligible artist submissions.
Submissions are evaluated by the following criteria:
• Artistic excellence and originality as evidenced by the representations of past work images and other supporting materials.
• Appropriateness of artist’s medium, style, and previous experience as they relate to the project goals and setting
• Experience with projects of a similar scale and scope • Ability to create site specific or site reactive works • Availability to participate in the design and implementation of the project as required • Special consideration will be given to Louisiana artists, as defined by La.
R.S.25:9000.1(E) • The committee may also take into consideration when selecting artists whether or not
an artist is already represented in the state’s collection.
Notifications and Proposals Notifications will be issued no later than the end of January 2020. A full timeline will be provided to those finalists who have been shortlisted.
This is a call for submission of samples of previous work and qualifications only. If selected to develop a proposal for one of the commissions, you will be contacted by Percent for Art program staff with further details about the site, concept and scope. Finalists will be invited to attend two (2) meetings: a mandatory site visit to view the space and meet with the committee, and an optional presentation of the artist’s proposal before the committee.
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
9
The proposal must include the concept, materials, size, weight, installation requirements, details of maintenance, and budget. The proposal must also include a maquette or digital renderings as appropriate, which shows the physical volume of the space and allows for multiple perspectives of the artwork within the space. All proposal documents, including the maquette and renderings, will become property of the State of Louisiana and will be used for educational and/or promotional purposes of the program. Each finalist’s proposal and/or maquette may be exhibited for Committee and community consideration. An honorarium/ proposal fee of $1,500 will be paid to finalists to offset expenses associated with development of proposals and travel to present to the Committee.
NOTE: "The Percent for Art Program and the Artist Selection Committee reserves the right to change, modify, or revise the Call to Artists, in part or whole, at any time before the submittal deadline without prior notice. Any change, modification or revision will be on https://www.crt.state.la.us/cultural-development/arts/percent-for-art/call-to-artists/index. The Percent for Art Program and the Artist Selection Committee also reserves the right to reject any or all applications or proposals, to reject any finalist, or to terminate the selection process for any project without prior notice." The Louisiana Percent for Art Program was established by law in the 1999 legislative session. The law specifies that on projects using more than $2,000,000.00 in state funds, one percent (1%) of the expenditure for construction or renovation of a state building shall be for works of art by artists and craftsmen for the building or its grounds.
This program is administered by the Office of Cultural Development /Division of the Arts, in the Department of Culture Recreation and Tourism of the State of Louisiana, in collaboration with the Division of Administration and the Office of Facility Planning and Control.
Contact Information Please direct inquiries about the Percent for Art Program or this project to:
Scott Finch Director, Percent for Art Program 225-342-8176 sfinch@crt.la.gov
April Baham Project Manager, Percent for Art Program 225-342-6083 abaham@crt.la.gov
Website: www.louisianaarts.org
CALL FOR ARTISTS – REQUEST FOR QUALIFICATIONS DEADLINE: 11/18/2020
STAND IN ARTWORK
LECTURE HALL ENTRY; SEENEXT IMAGE FOR MILLWORKAESTHETIC
ROW OF NOZZLEDIFFUSERS; SEEELEVATION
WATER TANK FORROBOTICS TESTING
VIEW FROM FRONT ENTRY
LECTURE HALL ENTRY ISSIMILAR MILLWORK DETAIL TOTHIS: ACOUSTIC WALL COVERWITH PAINTED WOOD SLATS
VIEW AT LECTURE HALL
HP
HP
HP
HP
HP
HP
HP
HP
HP
HP
GYPSUM BOARD CEILING
CLARIFICATION OF SYMBOLS REFLECTED CEILING PLAN
1. CONTRACTOR SHALL VERIFY AND COORDINATE THE LOCATION OF ALL FIXTURES/ DEVICES INDICATED WITH THE MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, ALARM AND SPECIAL DEVICES. NOTIFY ARCHITECT OF DISCREPENCIES/ CONFLICTS.
2. THE LOCATION OF ALL DEVICES TO BE INSTALLED IN FLOORS, ON WALLS AND CEILINGS, ASSOCIATED WITH MECHANICAL, ELECTRICAL, FIRE PROTECTION, SECURITY, AND OTHER SUCH SYSTEMS INLCUDING ACCESS PANELS, NOT SPECIFICALLY INDICATED ON THE DRAWINGS BUT PART OF THE CONSTRUCTION CONTRACT, SHALL BE APPROVED BY THE ARCHITECT. FAILURE TO RECEIVE APPROVAL SHALL BE CAUSE FOR REMOVAL AND RELOCATION AT NO COST TO THE OWNER.
3. ALL SYMBOLS APPEARING IN THIS LISTING MAY NOT NECESSARILY BE SHOWN ON REFLECTED CEILING PLAN OR BE APPLICABLE TO THIS PROJECT.
ACOUSTIC TECTUM PANEL
LINEAR LIGHTING FIXTURE
LINEAR WALL WASHER
SURFACE MOUNT FIXTURE
2x2 ACOUSTICAL CEILING TILE
RETURN VENT
SUPPLY VENT
ACOUSTIC WOOD CEILING PANEL
2x5 ACOUSTICAL CEILING TILE
RETURN VENT
SUPPLY VENT
4" RECESSED DOWNLIGHT
4" RECESSED WALL WASHER
LAB SERVICE DISTRIBUTION PANEL
STRUCTURAL HANGPOINTS, SEE 10/S6.3
10" DOWNLIGHT
LINEAR DIFFUSER
12345678
10
9
9.1
9.3
1.2
11
12
13
14
B
13.1
A
C
9'-0" 8'-0"8'-0"
9'-0"
9'-0"9'-0"
RESEARCH 1216
STO.217
RECORDSTORAGE
219
LIBRARY +COLLABORATION
220
26'-6
"12
'-6"
4.00°
11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 4'-0" 7'-0"
88'-0"
7.50°
7.50°
30.00°
44'-0"
11'-0"
11'-0"
11'-0"
4'-0"
7'-0"
EXPOSED TO STRUCTURE
39'-0"
6'-6"
EQ
EQ
ELEV.
9'-0"
4'-0
"
4'-0" 4'-0"
CENTER LIGHTS ON TILE
EQEQ
EQ EQ
6'-0" 6'-0"
4'-0
"4'
-0"
EQEQ
4'-0"4'-0"
4'-0"4'-0"
EQEQ
EQEQ
OFFICE203
OFFICE204
OFFICE205
OFFICE208
OFFICE207
STO.212
RR210
JAN.209
RR211
CAFE214
CORRIDOR 2213
STAIR 1206
9'-0"
9'-0"
9'-0"
9'-0"9'-0"
8'-0"
EQ EQ
CENTER CORRIDOR LIGHTS
IN BOTH DIRECTIONS
TYP.6'-0"
3'-11"
7'-1"
5'-6"
5'-6"
3'-11"
6'-3 1/2"
9 1/2"5'-6"
5'-6" 2'-6"2'-6"
2'-6"2'-6"
2'-6"2'-6"
A.2
A.8
CENTER PENDANTS OVER TABLE AND
BETWEEN BAFFLES
CENTER CEILING GRID ON CENTER WINDOW
D
MANUAL WINDOW SHADE (12 24 00)TYP. AT ALL WINDOWS (08 51 13)
39'-0
"
22'-6"
9'-3"
29'-9"
4.00°
9.2
68.9
148.8
4'-0" 4'-0"
ALIGN WELCOME AREA CEILING TO CAFE9'-0" ABOVE SECOND FLOOR
9'-0"
ZON
EM
ECH
.
ZONEM
ECH.
6'-3 1/2"
168.8
178.8
178.8
SIM
7.50°
7.50°
MOTORIZED WINDOW SHADE (12 24 00)
10'-0
"4'
-11"
4'-1
1"10
'-0"
6'-3
"
10'-0
"4'
-11"
4'-1
1"10
'-0"
COLOR CHANGING LIGHTINGFIXTURE (DIV 26)
2'-6"
ATRIUM OPEN TO ABOVE
MOTORIZED WINDOW SHADE (12 24 00)
TYP.8 BAFFLES/BAY
EQEQEQEQEQEQEQ
11'-0" 11'-0" 11'-0"
EXPOSED TO STRUCTURE
CEN
TER BAFFLES/TR
ACKS
14'-8 1/2"
CENTER BAFFLES/TRACKS
12'-2"
ACP-2
ACP-2
2'-0"4'-5"2'-0"
6'
R 3'-6"
8'
9' LENGTH
7'
8'-6"
5'
4'
7'-2"
LARGECONFERENCE
221
EQ EQEQ EQ
LED ARTWORK,N.I.C.
ACB-1
ACB-1
ACP-2
METAL WALL PANEL TYPE 2 (07 42 12)
METAL WALL PANEL TYPE 2 (07 42 12)
METAL WALL PANEL TYPE 2 (07 42 12)
PROJECTION SCREENS (11 52 13)
158.8
158.8
UN
DER
SID
E O
F SO
FFIT
ABO
VE
UNDERSIDE OF
SOFFIT ABOVE
TYP.8 BAFFLES/BAY
CORRIDOR 1218
4'-8"
3'-10"
3'-10"
6'-1"
CENTER OVER TABLE BELOW
3'-1
1 1/
2"9'
-6"
108.8
58.9
PROJECTOR (DIV 26)
STAIR 2215
12'-1"12'-1"
UNDERSIDE OF STAIR LANDING
REFERENCE DESIGNATIONS FOR FINISH TYPESACP-1
METAL PANEL TYPE 1 (07 42 12)COLOR 1
CLARIFICATION OF METAL PANEL COLORS
METAL PANEL TYPE 1 (07 42 12)COLOR 2
METAL PANEL TYPE 2 (07 42 12)COLOR 1
METAL PANEL TYPE 2 (07 42 12)COLOR 2
NTATE OF LO U I I AA
R TEG I ST ERED ARCH I T EC
S
REG. NO. 3454
M EARK J. R I PPL
S
EskewDumezRipple365 CANAL STREET, SUITE 3150NEW ORLEANS, LOUISIANA 70130
EDR PROJECT NO. |
© Eskew+Dumez+RippleA Professional Corporation
REVISIONS
PROJECT ISSUE DATE |
DRAWN BY |
The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work by Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.
8/12
/202
0 10
:37:
24 A
MC
:\PR
OJE
CTS
\RVT
2019
\180
62.2
_AR
CH
_R19
_Loc
alH
RA.
rvt
10.2
CONSTRUCTIONDOCUMENTS
SECOND FLOOR PLAN - REFLECTEDCEILING
LUMCON HOUMA MARINE CAMPUS
DICKSON ROAD, HOUMA, LA
18062
2020
05 JUN 2020
LEVISON
1/8" = 1'-0"5.1SECOND FLOOR PLAN - REFLECTED CEILING1 N
ACB-1 ACOUSTICAL CEILING BAFFLE 09 51 00ACP-1 ACOUSTICAL CEILING PANEL (CLASSROOMS) 09 51 00ACP-2 ACOUSTICAL CEILING PANEL (UNDER
BALCONIES)09 55 63
ACP-3 ACOUSTICAL CEILING PANEL (LECTURE HALL) 09 55 63CPT-1 CARPET TILE (BLUE TEXTURE) 09 68 13CPT-2 CARPET TILE (GREY FIELD) 09 68 13CPT-3 CARPET TILE (LECTURE HALL) 09 68 13MKBD-1 MARKERBOARD (AT CLASSROOMS) 10 11 00MTL-1 PERFORATED METAL SHEET (PAINTED BLUE) 05 70 00P-1 PAINT (WHITE) 09 91 23P-2 PAINT (GREY) 09 91 23P-3 PAINT (BRIGHT BLUE) 09 91 23P-4 PAINT (DARK BLUE) 09 91 23P-5 PAINT (STRUCTURE) 09 91 23P-6 PAINT (CEILING BLUE) 09 91 23PC-1 POLISHED CONCRETE 03 35 11PLAM-1 PLASTIC LAMINATE 06 41 00PLAM-2 PLASTIC LAMINATE 06 41 00PLAM-3 PLASTIC LAMINATE 06 41 00RB-1 RUBBER BASE (LIGHT) 09 65 00RB-2 RUBBER BASE (DARK BLUE) 09 65 00RT-1 RUBBER TILE (AT STAIR TREADS ONLY) 09 65 00SC-1 SEALED CONCRETE 03 35 11SSF-1 QUARTZ COUNTERTOP (RESTROOMS) 12 35 33SSF-2 RESIN COUNTERTOP (CLASS/LABS) 12 35 33SSF-3 QUARTZ COUNTERTOP (CAFE) 12 36 00SSF-4 QUARTZ SURFACE COUNTERTOP (LIBRARY) 12 36 00SSF-5 SOLID SURFACE COUNTERTOP (WHITE) 12 36 00TL-1 CERAMIC TILE (RR WALLS) 09 30 00TL-2 CERAMIC TILE (CAFE BACKSPLASH) 09 30 00WB-1 WOOD BASE 06 20 00WC-1 DIGITAL GRAPHIC VINYL WALL COVERING 09 72 00WC-2 ACOUSTIC WALL COVERING 09 72 00WCP-1 WOOD CEILING PANEL 09 51 26WD-1 WOOD VENEER 06 41 00
UP
1. UNLESS OTHERWISE INDICATED, ALL INTERIOR PARTITION DIMENSIONS ARE FACE TO FACE TO FINISH SURFACES.
2. UNLESS OTHERWISE INDICATED ON FLOOR PLANS(S) OR REFLECTED CEILING PLAN(S), ALL CEILING HEIGHTS ARE 9'-0"
3. FOR ROOM FINISH SCHEDULE, FRAME AND DOOR SCHEDULE, CLARIFICATION OF REFERENCE DESIGNATION FOR INTERIOR PARTITIONS, REFER TO SHEET 3.1
4. ALL DIMENSIONS SHOWN AT EXISTING CONDITIONS ARE PLUS OR MINUS AND SHOULD BE VERIFIED, IF NECESSARY, ON THE PROJECT SITE.
5. UNLESS INDICATED OTHERWISE, ALL EXPOSED STRUCTURE AT BUILDING INTERIOR TO BE PAINTED P-5.
GENERAL NOTES
F.E.C
F.E.C
F.E.C
F.E
RECESSED FIRE EXTINGUISHER CABINET (10 44 00)
SEMI-RECESSED FIRE EXTINGUISHER CABINET (10 44 00)
SURFACE MOUNTED FIRE EXTINGUISHER CABINET (10 44 00)
WALL HUNG FIRE EXTINGUISHER (10 44 00)
CLARIFICATION OF SYMBOLS FIRE EXTINGUISHER
1
5.14
2345678
10
99.1
9.3
1.2
11
12
13
14
B
13.1
11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0"
A
11'-0"
11'-0"
11'-0"
11'-0"
39'-0
"
ZOO LAB107
MAKER LAB 1114
7.50°
7.50°
30.00°
88'-0"
35.4
35.4
15.4
15.4
5.27
91'-9" C
4.00°
8.2
1
8.11
9.11
LECTURE HALL103
STO.104
STAIR 2115
RECEPTION100
WELCOMEAREA101
111
002
22 0
8.6 59.411
26.1
107A 107B 114 115A
7 7/8"5 3/4"
1'-0
"
5.22
STAIR 1106
7.42
8.1
35
46
8.2
5
8.2
3
5.2
8.1 2
6.64
5.12
5.11
25.4
25.4
5.15
15.3
45.3
25.3
35.3
11'-6
"
ZOO LAB.WORKSPACE
108
/2 7.1
/1 7.2SEE
SEE
45'-6"
1'-4 7/8"
1'-4 7/8"
1'-4 7/8"
10 0
2
4
F.E.C.
17 1
x 550
11 7/8"
8"
12 500
1'-5
"
9"
22 0
10 5/8"
10"
22 0 22 022 0 22 0
10"
10"
42 501
42 50142 501
42 501
10 500
22 0
10 500
22 0
22 0 22 0
10'-1 3/8"
8 5/
8"
10 1/8"
10"
8" 8" 13'-8" 8"
103
108
112126
104
EXHIBIT102
10 5/8"
10"
A.2
A.8
/6 6.10
SEE
/1 6.9SEE
/2 6.9SEE
/2 6.10SEE
/2 6.10
SEE
/5 6.10SEE
F.E.C.
F.E.C.
4' - 0"
20'-0
"
39'-9 1/4"
41'-5 5/8"
10 1
10 1
41'-5
3/4
"
26'-6
"12
'-6"
5.21
8
SLOPE DOWN
1:12 MAX
4'-0"
7'-0"
4'-0" 7'-0"
1.111
16.1
6'-6"
29'-9"
9'-3"
9'-6
"11
'-0"
11'-0
"7'
-6"
2'-2 1/4" 2'-2 1/4"
1'-11 3/4"
D
22'-6"
4.00°
6.128
36.1
9.2
7.50°
7.50°
1'-4
7/8
"
1'-4 7/8"
2.50°
2.50°
2.50°2.50°
2.50°2.50°
2.50°2.50°
2.50°
2.50°
2.50°
2.50°
TYP.2'-9"
30.00°
NEW BLDG.F.F.E. = 13'-0"
1.117
102B
006
22 0
10' - 6"
8' - 0"
SLOPE DOWN
1:12 MAX
SLOPE DOWN
1:12 MAX
TYP.2'-9"
1'-5"
9 5/8"
F.E.C. 10 1
1'-3" 1'-3"1'-3" 1'-3"
1'-0"P4
P4
P4
BEHIND WOOD MEMBERS
PLYWOOD SHEATHING
BEHIND WOOD M
EMBERS
PLYWOOD SHEATHING
22 0
BEHIND WOOD M
EMBERS
PLYWOOD SHEATHING
SLOPE DOWN
1:50 MAX
SLOPE DOWN
1:50 MAX
SLOPE DOWN
1:50 MAX
8"
5' - 6"
6.123
6
6.64
6.65
6.119
6.118
6.64
6.66
1'-1 3/4"
4'-10 1/2"
P4
2' - 6"
2' - 6"
4' - 0"
13' - 0"12' - 11 3/4"
12' - 11 3/4"13' - 0"
98.8
ROV TANK
STAINLESS STEEL GUARDRAIL(05 73 16)
LOADING/LAYDOWN
001
MEN'S RR111
WOMEN'S RR112
2'-0
"
2'-0
"
1'-10"1'-10"
15
16
17
18
12'-8 3/4"
17'-5 3/8"
17'-6 7/8"
2.00°
1'-3 5/8"
10'-3 5/8"
9.4
LOUVER (DIV 23)
NO SMOKINGBUILDING PLAQUE (10 14 00)
NO SMOKINGBUILDING PLAQUE (10 14 00)
001
EQUIPMENT PLATFORM
WHEELCHAIR LIFTS (14 42 00)
10 1/8"
10 1
100A
100B
102A
FIRE-RATE EXT. WALL FOR 10' (REFERENCE UL# U419)
10'-0"
1'-0"
6'-10 7/8" 6'-10 7/8"
STAINLESS STEEL GUARDRAIL (05 73 16)
105'-0"
STAINLESS STEEL GUARDRAIL (05 73 16)
105'-3"
21.11
SIM
21.11
SIM
2.42
106A
16.2
SIM
16.2
SIM
16.2
SIM
36.1
SIM
115B
/3 6.10SEE
/4 6.10SEE
y 550
z 0
106B1'-6"
CLARIFICATION OF REFERENCE DESIGNATIONS
NTATE OF LO U I I AA
R TEG I ST ERED ARCH I T EC
S
REG. NO. 3454
M EARK J. R I PPL
S
EskewDumezRipple365 CANAL STREET, SUITE 3150NEW ORLEANS, LOUISIANA 70130
EDR PROJECT NO. |
© Eskew+Dumez+RippleA Professional Corporation
REVISIONS
PROJECT ISSUE DATE |
DRAWN BY |
The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work by Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.
8/12
/202
0 10
:36:
24 A
MC
:\PR
OJE
CTS
\RVT
2019
\180
62.2
_AR
CH
_R19
_Loc
alH
RA.
rvt
2.1
CONSTRUCTIONDOCUMENTS
FIRST FLOOR PLAN
LUMCON HOUMA MARINE CAMPUS
DICKSON ROAD, HOUMA, LA
18062
2020
05 JUN 2020
ALLEN
1/8" = 1'-0"1.11FIRST FLOOR1 N
P4 FLOOD VENTS (08 95 43)
ALIGN
REF.
UP
DN
1. UNLESS OTHERWISE INDICATED, ALL INTERIOR PARTITION DIMENSIONS ARE FACE TO FACE TO FINISH SURFACES.
2. UNLESS OTHERWISE INDICATED ON FLOOR PLANS(S) OR REFLECTED CEILING PLAN(S), ALL CEILING HEIGHTS ARE 9'-0"
3. FOR ROOM FINISH SCHEDULE, FRAME AND DOOR SCHEDULE, CLARIFICATION OF REFERENCE DESIGNATION FOR INTERIOR PARTITIONS, REFER TO SHEET 3.1
4. ALL DIMENSIONS SHOWN AT EXISTING CONDITIONS ARE PLUS OR MINUS AND SHOULD BE VERIFIED, IF NECESSARY, ON THE PROJECT SITE.
5. UNLESS INDICATED OTHERWISE, ALL EXPOSED STRUCTURE AT BUILDING INTERIOR TO BE PAINTED P-5.
GENERAL NOTES
F.E.C
F.E.C
F.E.C
F.E
RECESSED FIRE EXTINGUISHER CABINET (10 44 00)
SEMI-RECESSED FIRE EXTINGUISHER CABINET (10 44 00)
SURFACE MOUNTED FIRE EXTINGUISHER CABINET (10 44 00)
WALL HUNG FIRE EXTINGUISHER (10 44 00)
CLARIFICATION OF SYMBOLS FIRE EXTINGUISHER
12345678
10
99.1
9.3
1.2
11
12
13
14
B
13.1
A
OFFICE203
OFFICE204
OFFICE205
OFFICE208
OFFICE207
11'-0"
11'-0"
11'-0"
11'-0"
44'-0"
11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0" 11'-0"7.50°
7.50°
LARGECONFERENCE
221
RESEARCH 1216
RECORDSTORAGE
219
LIBRARY +COLLABORATION
220
SMALL CONF202
BREAK ROOM200
OPEN TO BELOW
OPEN TO BELOW
35.4
35.4
15.4
15.4
88'-0"
30.00°
5.27
C8.2
1
8.3
8.11
STO.217
CAFE214
STO.212
JAN.209
RR210
RR211
217
202
8.6 5
26.1
216A 216B 215
2.43
5.22
7.43
5.2
8.1 2
5
6
8.68
59.3
8.3
8.3
7
98
CORRIDOR 1218
CORRIDOR 2213
5.12
5.11
25.4
25.4
15.3
45.3
25.3
35.3
8.2
5
STAIR 1206
STAIR 2215
/3 7.1
/2 7.2SEE
SEE
17 0
10 450
22 0 22 0 22 0
22 0
22 0 10 110 1
22 0
10 1 22 0
10 450
22 022 0
17'-1
0"
1'-0"
22 0
10 45110 451
6.63
6.65
6.62
INFORMALCOLLABORATION
250
9.46
9.41
9.37
1'-0
" 10"
10 5/8"
10"
22 0
10"
10"
10 5/8" 10 5/8"
EQ1'-9 1/4" EQ
1'-4"EQ1'-4"10
"
1'-8"
2'-0
1/4
"8
5/8"
10'-6 1/4"
8 5/
8"
7 5/8"9 7/8" 7 5/8"
8 5/
8"
1'-5
"
7 5/8" 9 7/8"7 7/8"6 5/8"
42 45142 451
42 50142 501
42 501
42 501
1'-0 3/4"
22 0
22 010 1
219
221
A.2
A.8
1'-4 7/8"
1'-4 7/8"
1'-4 7/8"
/2 6.9SEE
/1 6.9SEE
/7 6.8SEE/6 6.8SEE/5 6.8SEE
/4 6.8SEE
/3 6.8
SEE
/2 6.8
SEE
/1 6.8
SEE
/9 6.8SEE
/8 6.8
SEE
F.E.C.
F.E.C.
11'-8
5/8
"
4.00°
1'-4
7/8
"
5.21
20'-0
"
41'-5 5/8"
16.1
4'-0" 7'-0"
4'-0"
7'-0"
10 45012 500
22 0 22 0
22 0
13 451
9'-6
"11
'-0"
11'-0
"
2'-0"
2'-0"
5'-1 1/2"
8'-10"
8'-10"
2'-2 1/4" 2'-2 1/4"
1'-11 3/4"
D
22 0
17 1
17 0
10 1
26'-6
"12
'-6"
39'-0
"
22'-6"
9'-3"
29'-9"
39'-0"
6'-6"
4.00°
4"
4"
8.66
6.613
6.1
9.2
1'-4 7/8"
41'-5
3/4
"
TYP.2'-9"2.50°
2.50°2.50°
2.50°2.50°
2.50°2.50°
2.50°
2.50°
2.50°
2.50°
TYP.2'-9"
2.50°
30.00°
203
204
205
208207
210
209
212
211
8.92
8.91
8.93
8.94
8.3
10
7.50°
7.50°
2'-1" 1'-2 3/4"10 5/8"10 5/8"
1'-5 3/4"
2'-1"
22 0
1'-3"
1'-4"
1'-6 7/8"
14'-5"
8" 10"
P-5
11
VERTICAL COUNTER SUPPORTS; SEE 5/9.3
6.64
6.64
6.64
6.66
6.119
6.118
6.62
6.61
8
6
K TYPE F.E. UNDER
CABINET
STAINLESS STEEL GUARDRAIL(05 73 16)STAINLESS STEEL GUARDRAIL(05 73 16)
STAINLESS STEEL GUARDRAIL(05 73 16)
8 1/4"
1'-6"
2'-4"
1'-6"2'-0"
2'-0"
2'-0
"
2'-0"
PROVIDE
BLOCKING AT TV
WALL
PROVIDE BLOCKING AT TV
6'-5"
3'-7"
213
42 451LOUVER (DIV 23)
FIRE-RATE EXT. WALL FOR 10' (REFERENCE UL# U419)
10'-0"
1'-0"
ROOF ABOVE
ROOF ABOVE
6'-10 7/8" 6'-10 7/8"
2061
6.2
SIM
16.2
SIM
16.2
SIM
36.1
SIM
/3 6.9SEE
8.3
12
ARC LENGTH26'-1"
NTATE OF LO U I I AA
R TEG I ST ERED ARCH I T EC
S
REG. NO. 3454
M EARK J. R I PPL
S
EskewDumezRipple365 CANAL STREET, SUITE 3150NEW ORLEANS, LOUISIANA 70130
EDR PROJECT NO. |
© Eskew+Dumez+RippleA Professional Corporation
REVISIONS
PROJECT ISSUE DATE |
DRAWN BY |
The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work by Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.
8/12
/202
0 10
:36:
30 A
MC
:\PR
OJE
CTS
\RVT
2019
\180
62.2
_AR
CH
_R19
_Loc
alH
RA.
rvt
2.2
CONSTRUCTIONDOCUMENTS
SECOND FLOOR PLAN
LUMCON HOUMA MARINE CAMPUS
DICKSON ROAD, HOUMA, LA
18062
2020
05 JUN 2020
ALLEN
1/8" = 1'-0"5.1SECOND FLOOR1 N
FRAME AND DOOR SCHEDULE1. UNLESS OTHERWISE NOTED, ALL DOORS SHALL BE 1-3/4" THICK AND ALL FRAMES SHALL BE HOLLOW METAL.
2. FOR UNDERCUTTING AND/OR DOOR GRILLS, REFER TO HVAC FLOOR PLANS.
3. FIRE RATING FOR OPENING IS INDICATED IN MINUTES.4. REFER TO SPECIFICATION SECTION 08 11 13 FOR INFORMATION REGARDING HM (HOLLOW METAL) FRAMES AND DOORS.
NOTES:
WIDTHHE
IGH
T
A
2"
SE
E S
CH
ED
ULE
C
2"SEE SCHEDULE
2"
2"
SE
E S
CH
ED
ULE
DE
SE
E S
CH
ED
ULE
SEE SCHEDULE
2 1
/2"
SE
E S
CH
ED
ULE
2 1/2"
SEE SCHEDULE
2 1/2"
5"
VA
RIE
S1
0"
5"VARIES5"
B
2"3'-0"2"2"3'-0"2"
2"
SE
E S
CH
ED
ULE
LG-1
REFERENCE DESIGNATIONS FORGLASS TYPES (08 81 00)
NOTE: UNLESS OTHERWISE INDICATEDALL GLASS SHALL BE IG-1 INSULATING GLASS
CLARIFICATION OF REFERENCE DESIGNATIONS FOR INTERIOR PARTITIONS
FIRE RATING IN HOURS."S" INDICATES SMOKE PARTITION.
PARTITION TYPE
STC RATING (IF APPLICABLE)10 772
GENERAL NOTES PERTAINING TO INTERIOR PARTITIONS
UNLESS OTHERWISE INDICATED IN THE FOLLOWING "CLARIFICATION OF REFERENCE DESIGNATIONS FOR INTERIOR PARTITIONS" OR OTHERWISE INDICATED ELSEWHERE ON THE "DRAWINGS", ALL INTERIOR PARTITIONS ARE GYPSUM BOARD AND METAL STUDS AND ARE TO BE CONSTRUCTED AS LISTED BELOW.
1. ALL METAL STUDS SHALL BE 3 5/8" DEEP AND MINIMUM 25 GAUGE. (FOR PARTITIONS REQUIRING HEAVIER GAUGE STUDS, SEE SPECIFICATION SECTION 09 21 16 OR DESCRIPTIONS BELOW).
2. ALL METAL STUDS SHALL BE SPACED 16" O.C.
3. ALL METAL STUDS SHALL EXTEND FROM FLOOR TO UNDERSIDE OF FLOOR OR ROOF ABOVE.
4. ALL METAL STUDS SHALL HAVE ONE LAYER OF GYPSUM BOARD ON EACH SIDE OF STUD.
5. ALL GYPSUM BOARD SHALL BE MOLD-RESISTANT, TYPE X AND 5/8” THICK.
6. ALL GYPSUM BOARD, ON WALLS, SHALL TERMINATE AT THE UNDERSIDE OF GYPSUM BOARD CEILINGS AND MINIMUM OF 6" ABOVE OTHER TYPE CEILINGS. WHERE CEILINGS DO NOT OCCUR, GYPSUM BOARD SHALL EXTEND TO THE UNDERSIDE OF FLOOR OR ROOF ABOVE.
7. ALL COMPONENTS OF FIRE RATED, SMOKE BARRIER, OR STC RATED PARTITION SYSTEMS SHALL EXTEND TO THE UNDERSIDE OF FLOOR OR ROOF ABOVE.
8. PARTITION SYSTEMS INDICATED TO HAVE STC RATINGS SHALL INCORPORATE SOUND ATTENUATION BLANKETS AND ACOUSTIC SEALANT TO ACHIEVE THE REQUIRED RATING. REFERENCE SPECIFICATION SECTION 09 21 16.
9. IF CONCRETE MASONRY UNITS ARE INDICATED, UNITS SHALL BE 7 5/8" THICK AND SHALL EXTEND FROM FLOOR TO UNDERSIDE OF FLOOR OR ROOF ABOVE.THE THICKNESS OF PARTITIONS SHOWN ARE FINISH SURFACE TO FINISH SURFACE EXCLUDING THIN-SET CERAMIC TILE.
10. REFER TO SPECIFICATION SECTION 09 21 16 FOR GLASS MAT-FACED GYPSUM BOARD REQUIREMENTS IN WET AREAS.
11. WET AREAS WILL BE DEFINED AS: WALLS SUPPORTING SINKS, TOILETS AND URINALS, AND SHOWER AND TUB SURROUNDS, INCLUDING SHOWER CEILINGS.
12. WHERE A REFERENCE DESIGNATION IS NOT INDICATED ON THE FLOOR PLANS, THE PARTITION TYPE SHALL BE TYPE 10.0.
NTATEOF LO U I
I AA
R TEG
I ST ERED ARCH I T
EC
S
REG. NO. 3454
M
EARKJ. R I PPL
S
EskewDumezRipple365 CANAL STREET, SUITE 3150NEW ORLEANS, LOUISIANA 70130
EDR PROJECT NO. |
© Eskew+Dumez+RippleA Professional Corporation
REVISIONS
PROJECT ISSUE DATE |
DRAWN BY |
The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work by Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.
8/1
2/2
02
0 1
0:4
5:3
6 A
MC
:\P
RO
JE
CT
S\R
VT
20
19\1
80
62.2
_A
RC
H_
R19
_LocalH
RA
.rvt
3.1
CONSTRUCTIONDOCUMENTS
SCHEDULES
LUMCON HOUMA MARINE CAMPUS
DICKSON ROAD, HOUMA, LA
18062
2020
05 JUN 2020
LEVISON
DOORNUMBER TYPE
FRAME DOOR
FIRERATING
STCRATING
HARDWARESET REMARKS
OPENING
MATERIAL FINISHDETAIL
NUMBER DOOR (OR OPENING) DESCRIPTION MATERIAL FINISHWIDTH HEIGHT001 SEE 4.2 3'-0" 7'-0" HM P-2 1/3.6 FLUSH HOLLOW METAL DOOR HM P-2 4.0
002 E 8'-0" 12'-0" ALUM MNFR 6-9 / 3.6 OVERHEAD COILING DOOR ALUM 22.0
006 SEE 4.2 3'-0" 7'-0" HM P-2 1/3.6 FLUSH HOLLOW METAL DOOR HM P-2 2.0 EXIT ONLY
100A SEE 1/6.10 6'-0" 8'-10" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE - IMPACTRATED
ALUM & GLASS 1.0
100B SEE 1/6.10 6'-0" 8'-10" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE - IMPACTRATED
ALUM & GLASS 1.0
102A SEE 2/6.10 6'-0" 8'-10" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE - IMPACTRATED
ALUM & GLASS 1.0
102B SEE 2/6.10 6'-0" 8'-10" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE - IMPACTRATED
ALUM & GLASS 1.0
103 C 6'-0" 9'-0" WD P-2 4/3.6 FLUSH HOLLOW METAL DOOR WD P-2 45 5.0
104 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD P-2 60 8.0
106A B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD P-2 60 7.0
106B SEE 1/6.11 3'-0" 6'-8" HM P-1 FLUSH WOOD DOOR HM P-1 60
107A SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
107B SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
108 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 20.0
111 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 19.0
112 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 19.0
114 SEE 3/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 15.0
115A SEE 5/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 60 23.0 IN FIRE RATED GLASS SYSTEM
115B SEE 4.2 3'-0" 7'-0" HM P-2 7/6.12 FLUSH HOLLOW METAL DOOR HM P-2 2.0 EXIT ONLY
126 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 10.0
202 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
203 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
204 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
205 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
206 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 60 7.0
207 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
208 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
209 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 11.0
210 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 21.0
211 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 21.0
212 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 60 8.0
213 D 3'-0" 9'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 18.0
215 SEE 5/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 60 23.0 IN FIRE RATED GLASS SYSTEM
216A SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
216B SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
217 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 60 45 10.0
219 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 60 8.0
221 D 3'-0" 9'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 18.0
301A SEE 7/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 16.0
301B SEE 7/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 16.0
303 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
304 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
305 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
306 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD 60 7.0
307 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
308 D 3'-0" 7'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 17.0
309 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 21.0
310 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 21.0
311 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 60 8.0
312 D 3'-0" 9'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 18.0
313A B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 45 13.0
313B C 6'-0" 8'-10" HM WC-1/P-2 1/3.6 FLUSH HOLLOW METAL DOOR HM WC-1/P-2 45 12.0 WC-1 AT INFORMAL COLLAB.,P-2 AT MECH.
315 SEE 5/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 60 23.0 IN FIRE RATED GLASS SYSTEM
316A SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
316B SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
317 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 60 45 11.0
318 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR WD MATCH TO WD-1 60 45 11.0
319A SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
319B SEE 1/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 14.0
320A SEE 3/8.6 3'-0" 8'-9 1/2" ALUM MNFR MNFR ALUMINUM AND GLASS STOREFRONT ENTRANCE ALUM & GLASS 15.0
320B E 6'-0" 7'-0" ALUM MNFR 5 / 3.6 OVERHEAD COILING DOOR ALUM 22.0
320C E 6'-0" 7'-0" ALUM MNFR 5 / 3.6 OVERHEAD COILING DOOR ALUM 22.0
322 D 3'-0" 9'-0" HM P-2 1/3.6 STILE AND RAIL WOOD DOOR WD / GLASS MATCH TO WD-1 45 18.0
323 B 3'-0" 7'-0" HM P-2 1/3.6 FLUSH WOOD DOOR HM P-2 60 9.0
3/8" = 1'-0"FRAME AND DOOR TYPES1
IG-1 CLEAR INSULATING GLASS - IMPACT RATED
IG-3 CLEAR INSULATING GLASS - IMPACT RATED
LG-1 CLEAR TEMPERED LAMINATED FLOAT-GLASS
MG-1 CLEAR TEMPERED FLOAT-GLASS
FINISH SCHEDULENO. ROOM NAME FLOOR BASE WALL ACCENT WALL CEILING COMMENTS
LOADING
001 LOADING/ LAYDOWN SC-1 RB-1 P-1 NONE
006 STAIR 1 SC-1 RB-1 P-1 NONE
FIRST FLOOR
100 RECEPTION PC-1 WB-1 P-2 SEE RCP
101 WELCOME AREA PC-1 WB-1 P-1 SEE ELEVATIONS WDCP-1; SEERCP
102 EXHIBIT PC-1 WB-1 P-1 SEE RCP SEE SHEET 10.1
103 LECTURE HALL CPT-3 WB-1 P-2 SEE ELEVATIONS ACP-3
104 STO. SC-1 RB-1 P-1 ACP-1
106 STAIR 1 SC-1 RB-1 P-1 NONE
107 ZOO LAB PC-1 RB-1 P-1 P-2 ACP-1 ACCENT AT WEST WALL
108 ZOO LAB. WORKSPACE PC-1 RB-1 P-1 P-2 ACP-1 ACCENT AT WEST WALL
109 RR VESTIBULE PC-1 WB-1 P-1 GYP; P-1
111 MEN'S RR PC-1 COVE TRIM P-1 & TL-1 GYP; P-1 TILE UP TO 7'-0", PAINTED GYP. ABOVE
112 WOMEN'S RR PC-1 COVE TRIM P-1 & TL-1 GYP; P-1 TILE UP TO 7'-0", PAINTED GYP. ABOVE
114 MAKER LAB 1 PC-1 RB-1 P-1 SEE ELEVATIONS ACP-1
115 STAIR 2 PC-1 RB-1 P-1 NONE
126 JAN. SC-1 RB-1 P-1 NONE
SECOND FLOOR
200 BREAK ROOM CPT-1 RB-2 P-2 ACB-1 (SEE RCP)
202 SMALL CONF CPT-1 RB-2 P-2 SEE ELEVATIONS ACB-1 (SEE RCP)
203 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
204 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
205 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
206 STAIR 1 SC-1 RB-1 P-1 NONE
207 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
208 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
209 JAN. SC-1 RB-1 P-1 NONE
210 RR PC-1 COVE TRIM P-1 & TL-1 GYP; P-1 TILE UP TO 7'-0", PAINTED GYP. ABOVE
211 RR PC-1 COVE TRIM P-1 & TL-1 GYP; P-1 TILE UP TO 7'-0", PAINTED GYP. ABOVE
212 STO. CPT-2 RB-1 P-1 ACP-1
213 CORRIDOR 2 CPT-2 RB-1 P-1 P-3 ACP-2 SEE SHEETS 2.4, 8.3
214 CAFE PC-1 RB-1 SEE ELEVATIONS GYP; P-1
215 STAIR 2 PC-1 RB-1 P-1 NONE
216 RESEARCH 1 PC-1 RB-1 P-1 SEE ELEVATIONS ACP-1
217 STO. SC-1 RB-1 P-1 ACP-1
218 CORRIDOR 1 PC-1 RB-1 P-1 ACP-2; P-2
219 RECORD STORAGE PC-1 RB-1 P-1 ACP-1
220 LIBRARY + COLLABORATION CPT-2 RB-1 P-1 SEE ELEVATIONS ACP-1 SEE SHEET 8.3 FOR SPECIAL FINISHES
221 LARGE CONFERENCE CPT-1 RB-2 P-2 SEE ELEVATIONS ACB-1 (SEE RCP)
250 INFORMAL COLLABORATION PC-1 RB-1 P-1
THIRD FLOOR
300 OPEN WORKSTATIONS CPT-1 RB-2 P-2 SEE ELEVATIONS ACB-1 (SEE RCP)
301 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
303 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
304 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
305 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
306 STAIR 1 SC-1 RB-1 P-1 NONE
307 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
308 OFFICE CPT-2 RB-1 P-1 P-2 (SEE SHEET 2.4) ACP-1
309 RR PC-1 COVE TRIM P-1 & TL-1 GYP; P-1 TILE UP TO 7'-0", PAINTED GYP. ABOVE
310 RR PC-1 COVE TRIM P-1 & TL-1 GYP; P-1 TILE UP TO 7'-0", PAINTED GYP. ABOVE
311 IT CPT-2 RB-1 P-1 ACP-1
312 CORRIDOR 4 CPT-2 RB-1 P-1 P-3 ACP-3 SEE SHEETS 2.4, 8.3
313 MECHANICAL SC-1 RB-1 P-1 NONE
314 INFORMAL COLLABORATION PC-1 RB-1 WC-1 WDCP-1; SEERCP
WC-1 AT ALL WALLS AND DOOR
315 STAIR 2 PC-1 RB-1 P-1 NONE
316 RESEARCH 2 PC-1 RB-1 P-1 SEE ELEVATIONS ACP-1
317 STO. SC-1 RB-1 P-1 ACP-1
318 STO. SC-1 RB-1 P-1 ACP-1
319 FAB. LAB PC-1 RB-1 P-1 ACP-1
320 MAKER LAB 2 PC-1 RB-1 P-1 SEE ELEVATIONS ACP-1
321 CORRIDOR 3 PC-1 RB-1 P-1 ACP-2; P-2
322 3D LAB CPT-1 RB-2 P-2 SEE ELEVATIONS ACB-1 (SEE RCP)
323 MECHANICAL CLOSET PC-1 RB-1 P-1
TYPE FIRE RATING STC RATING ACOUSTICS TEST DEPTH Description
10 0 4 7/8" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 3 5/8" METAL STUDS
10 0 45 SA-870717 4 7/8" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 3 5/8" METAL STUDS
10 0 50 RAL-TL-90-166 4 7/8" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 3 5/8" METAL STUDS
10 1 4 7/8" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 3 5/8" METAL STUDS - UL# U419
10 1 4 7/8" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 3 5/8" METAL STUDS - UL# U419
10 1 45 RAL-TL-11-068 4 7/8" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 3 5/8" METAL STUDS - UL# U419
12 0 45 SA-870717 7 1/4" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 6" METAL STUD
12 0 50 RAL-TL-90-166 7 1/4" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 6" METAL STUD
12 1 7 1/4" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 6" METAL STUDS - UL# U419
13 1 45 SA-870717 9 1/4" ONE LAYER OF GYPSUM BOARD ON BOTH SIDES OF 8" METAL STUDS - UL# U419
17 0 50 USG-840817 8 1/2" TWO LAYERS OF GYPSUM BOARD ON EACH SIDE OF 6" METAL STUD
17 1 55 SA-800421 8 1/2" TWO LAYERS OF GYPSUM BOARD ON EACH SIDE OF 6" METAL STUD - UL# U419
20 0 3" ONE LAYER OF FIBER CEMENT BOARD ON ONE SIDE OF 2 1/2" METAL STUDS, EXPOSED STUDS THE OTHER SIDE
22 0 4 1/4" ONE LAYER OF GYPSUM BOARD ON ONE SIDE OF 3 5/8" METAL STUDS, EXPOSED STUDS THE OTHER SIDE
22 0 4 1/4" ONE LAYER OF GYPSUM BOARD ON ONE SIDE OF 3 5/8" METAL STUDS, EXPOSED STUDS THE OTHER SIDE
41 1 4 5/8" ONE LAYER OF GYPSUM BOARD ON ONE SIDE, ONE LAYER OF 1" GYPSUM SHAFT LINER PANEL ON OTHER SIDE OF4" METAL C-H STUD - UL# U415; SYSTEM A
42 1 8 1/4" TWO LAYERS OF GYPSUM BOARD ON ONE SIDE, ONE LAYER OF 1" GYPSUM SHAFT LINER PANEL ON OTHER SIDEOF 6" METAL C-H STUD - UL# U415; SYSTEM A
42 1 45 8 1/4" TWO LAYERS OF GYPSUM BOARD ON ONE SIDE, ONE LAYER OF 1" GYPSUM SHAFT LINER PANEL ON OTHER SIDEOF 6" METAL C-H STUD - UL# U415; SYSTEM A
42 1 50 RAL-OT-04-019 8 1/4" TWO LAYERS OF GYPSUM BOARD ON ONE SIDE, ONE LAYER OF 1" GYPSUM SHAFT LINER PANEL ON OTHER SIDEOF 6" METAL C-H STUD - UL# U415; SYSTEM A
x 0 55 RAL-TL-90-166 8 3/8" TWO LAYERS OF GYPSUM BOARD ON EACH SIDE OF 6" METAL STUD
y 0 55 8 3/8" TWO LAYERS OF GYPSUM BOARD ON EACH SIDE OF 6" METAL STUD
z 0 5" ONE LAYER OF GYPSUM BOARD ON ONE SIDE OF 3 5/8" METAL STUDS, EXPOSED STUDS THE OTHER SIDE
FINISH LEGENDmark material spec. ref color manufacturer model # dimensions pattern
BASE
WB-1 WOOD BASE 06 20 00 P-2 4" HIGH TYP. x 3/4" THICK, NOMINAL
CASEWORK
PLAM-1 PLASTIC LAMINATE 06 41 00 LINEN WILSONART D427-60
PLAM-2 PLASTIC LAMINATE 06 41 00 HARVEST MAPLE WILSONART 7953-38
PLAM-3 PLASTIC LAMINATE 06 41 00 NORDIC LINEN WILSONART 5015-38
WD-1 WOOD VENEER 06 41 00 OLIVEWOOD (CONTROLSAMPLE)
M. BOHLKE VENEER CORP. REFER TO ARCHITECT'S CONTROL SAMPLE FLAT CUT
CEILING
ACB-1 ACOUSTICAL CEILING BAFFLE 09 51 00 04 LIGHT GREY TURF STRAIGHT
ACP-1 ACOUSTICAL CEILING PANEL (CLASSROOMS) 09 51 00 WHITE ARMSTRONG ULTIMA+; MICROLOOK 90 SUPRAFINE GRID 24" X 24" GRID
ACP-2 ACOUSTICAL CEILING PANEL (UNDER BALCONIES) 09 55 63 P-5 ARMSTRONG TECTUM TEGULAR, SUSPENDED GRID SEE RCP SEE RCP
ACP-3 ACOUSTICAL CEILING PANEL (LECTURE HALL) 09 55 63 CUSTOM: P-6 ARMSTRONG CALLA VECTOR 24" X 24" SEE RCP
P-6 PAINT (CEILING BLUE) 09 91 23 BLUE SHERWIN WILLIAMS SW6517 REGATTA
WCP-1 WOOD CEILING PANEL 09 51 26 CHERRY, PLAIN SLICEDVENEER
9WOOD 3100 ACOUSTIC PLANK SEE RCP SEE RCP
COUNTER
SSF-1 QUARTZ COUNTERTOP (RESTROOMS) 12 35 33 NORTH CASCADES WILSONART Q4035
SSF-2 RESIN COUNTERTOP (CLASS/LABS) 12 35 33 GRAY DURCON INC.
SSF-3 QUARTZ COUNTERTOP (CAFE) 12 36 00 COASTAL WILSONART Q4036
SSF-4 QUARTZ SURFACE COUNTERTOP (LIBRARY) 12 36 00 INDIGO SWIRL CORIAN
SSF-5 SOLID SURFACE COUNTERTOP (WHITE) 12 36 00 DESIGNER WHITE WILSONART D354SL
FLOOR
CPT-1 CARPET TILE (BLUE TEXTURE) 09 68 13 COAST SHAW BEYOND TILE 5T218 15456 12" X 48"
CPT-2 CARPET TILE (GREY FIELD) 09 68 13 PEAK SHAW ESCAPE ULTRALOC 5A242 15506 72" X 72" PATTERN REPEAT MONOLITHIC
CPT-3 CARPET TILE (LECTURE HALL) 09 68 13 CLIFF SHAW BEYOND ULTRALOC 5A243 15530 MONOLITHIC
PC-1 POLISHED CONCRETE 03 35 11 SEE FLOORFINISH PLAN
RT-1 RUBBER TILE (AT STAIR TREADS ONLY) 09 65 00 VAPOR GREY TARKETT RUBBER FLOOR - SOLID COLOR - RAISED ROUND SEE SHEET 7.3 RAISED ROUND
SC-1 SEALED CONCRETE 03 35 11
MILLWORK
MTL-1 PERFORATED METAL SHEET (PAINTED BLUE) 05 70 00 SW9178 IN THE NAVY MCNICHOLS SEE MILLWORK SHEETS 1/8RD; 3/16" STG.
WALL
MKBD-1 MARKERBOARD (AT CLASSROOMS) 10 11 00 WHITE CLARIDGE LCS3 PORCELAIN MARKER WALLS WITH FIXED MARKER TRAY
P-1 PAINT (WHITE) 09 91 23 SW7006 EXTRA WHITE SHERWIN WILLIAMS
P-2 PAINT (GREY) 09 91 23 SW9136 LULLABY SHERWIN WILLIAMS
P-3 PAINT (BRIGHT BLUE) 09 91 23 SW6803 DANUBE SHERWIN WILLIAMS
P-4 PAINT (DARK BLUE) 09 91 23 SW9178 IN THE NAVY SHERWIN WILLIAMS
P-5 PAINT (STRUCTURE) 09 91 23 SW6226 LANGUID BLUE SHERWIN WILLIAMS
RB-1 RUBBER BASE (LIGHT) 09 65 00 VAPOR GREY JOHNSONITE 23 VAPOR GREY CG TRADITIONAL 4" 1/8 TOELESS
RB-2 RUBBER BASE (DARK BLUE) 09 65 00 NAVY BLUE JOHNSONITE 18 NAVY BLUE TRADITIONAL 4" 1/8 TOELESS
TL-1 CERAMIC TILE (RR WALLS) 09 30 00 COBALT BRIGHT CONCEPT SURFACES PENNY ROUNDS 12" X 12" PATTERN REPEAT MOSAIC
TL-2 CERAMIC TILE (CAFE BACKSPLASH) 09 30 00 ESPRESSO DALTILE QH85 2"X8" VERTICAL BOND
WC-1 DIGITAL GRAPHIC VINYL WALL COVERING 09 72 00
WC-2 ACOUSTIC WALL COVERING 09 72 00 CLOUD DESIGNTEX 6646-404 63" WIDTH MONOLITHIC
REFERENCE DESIGNATIONS FOR FINISH TYPESACP-1
P-1
P-2BEYOND
OPEN TO CORRIDOR
BEYOND
P-5
WC-1
WOOD MEMBER (06 20 00)
WB-1
P-5 P-5
STAINLESS STEEL GUARDRAIL(05 73 16)
WD-1
P-5
1"8'
-9"
1"6'-5 1/2"4'-0"4'-0"
1'-4" 4"8"8"1'-4" 8"8"4" ALIGN WOOD MEMBER TO FACE OF WALL
EXTENTS OF PLYWOOD SHEATHING17'-3 1/4"
LEVEL 5 FINISH
88.8
23.6
68.8
78.8
23.6
LOUVER (DIV 23)
LIGHTING FIXTURE (DIV 26)
P-1
P-1WD-1
DIFFUSER (DIV 23)
WB-1
STAINLESS STEEL GUARDRAIL (05 73 16)
P-5
P-5
6'-10" 4'-4" 4'-4" 4'-4" 4'-4" 4'-4" 4'-4"
10'-6
"
4"
LED ARTWORK,N.I.C.
LEVEL 5 FINISH
LIGHTING FIXTURE (DIV 26)
P-5
WB-1
18.8
PROJECTION SCREENS (11 52 13)
LIGHTING FIXTURE (DIV 26)
WOOD MEMBER (06 20 00)
8.83
PROJECTION SCREENS (11 52 13)
PROJECTOR (DIV 26)PROJECTOR (DIV 26)
28.8
WC-2
P-5
WB-1
ALUMINUM STOREFRONT (08 43 13)
EQEQEQEQEQ
8"8"4"4"8"1'-4"8"8"1'-4"8"1'-4"
PROJECTION SCREENS (11 52 13)
LIGHTING FIXTURE (DIV 26)
WOOD MEMBER (06 20 00)
/1 6.10SEEFOR CURTAIN WALLDIMENSIONS
CURTAIN WALL MULLIONSALIGN WOOD MEMBER TO
EXTE
NTS
OF
PLYW
OO
D S
HEA
THIN
G10
'-11"
EXTENTS OF PLYWOOD SHEATHING27'-10" 1
6.12
26.12
WOOD MEMBER (06 20 00)
8"8"4"4"8"2'-0"
PROJECTION SCREENS (11 52 13)
PROJECTOR (DIV 26)PROJECTOR (DIV 26)
WC-2
P-5
WB-1
18.8
38.8
EQ EQ EQ EQ EQ EQ EQ EQ EQ
1'-3" 10 WOOD MEMBERS EVENLY SPACED 1'-3"
1'-4"1'-4"1'-4"8" 8" 1'-4"1'-4" 1'-4"4" 8"8" 8"8"1'-4"8" 4"4" 8"4" 8" 8"
WOOD MEMBER (06 20 00) PROJECTION SCREENS (11 52 13)
MOTORIZED WINDOW SHADE(12 24 00)
LIGHTING FIXTURE (DIV 26)
EXTE
NTS
OF
PLYW
OO
D S
HEA
THIN
G10
'-11"
EXTENTS OF PLYWOOD SHEATHING38'-3"
PROJECTOR (DIV 26)
P-5
8.82
WB-1
38.8
PROJECTION SCREENS (11 52 13)
18.8
PROJECTOR (DIV 26)
NTATE OF LO U I I AA
R TEG I ST ERED ARCH I T EC
S
REG. NO. 3454
M EARK J. R I PPL
S
EskewDumezRipple365 CANAL STREET, SUITE 3150NEW ORLEANS, LOUISIANA 70130
EDR PROJECT NO. |
© Eskew+Dumez+RippleA Professional Corporation
REVISIONS
PROJECT ISSUE DATE |
DRAWN BY |
The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work by Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.
8/12
/202
0 10
:37:
09 A
MC
:\PR
OJE
CTS
\RVT
2019
\180
62.2
_AR
CH
_R19
_Loc
alH
RA.
rvt
8.1
CONSTRUCTIONDOCUMENTS
INTERIOR ELEVATIONS - FIRSTFLOOR
LUMCON HOUMA MARINE CAMPUS
DICKSON ROAD, HOUMA, LA
18062
2020
05 JUN 2020
ALLEN
ACB-1 ACOUSTICAL CEILING BAFFLE 09 51 00ACP-1 ACOUSTICAL CEILING PANEL (CLASSROOMS) 09 51 00ACP-2 ACOUSTICAL CEILING PANEL (UNDER
BALCONIES)09 55 63
ACP-3 ACOUSTICAL CEILING PANEL (LECTURE HALL) 09 55 63CPT-1 CARPET TILE (BLUE TEXTURE) 09 68 13CPT-2 CARPET TILE (GREY FIELD) 09 68 13CPT-3 CARPET TILE (LECTURE HALL) 09 68 13MKBD-1 MARKERBOARD (AT CLASSROOMS) 10 11 00MTL-1 PERFORATED METAL SHEET (PAINTED BLUE) 05 70 00P-1 PAINT (WHITE) 09 91 23P-2 PAINT (GREY) 09 91 23P-3 PAINT (BRIGHT BLUE) 09 91 23P-4 PAINT (DARK BLUE) 09 91 23P-5 PAINT (STRUCTURE) 09 91 23P-6 PAINT (CEILING BLUE) 09 91 23PC-1 POLISHED CONCRETE 03 35 11PLAM-1 PLASTIC LAMINATE 06 41 00PLAM-2 PLASTIC LAMINATE 06 41 00PLAM-3 PLASTIC LAMINATE 06 41 00RB-1 RUBBER BASE (LIGHT) 09 65 00RB-2 RUBBER BASE (DARK BLUE) 09 65 00RT-1 RUBBER TILE (AT STAIR TREADS ONLY) 09 65 00SC-1 SEALED CONCRETE 03 35 11SSF-1 QUARTZ COUNTERTOP (RESTROOMS) 12 35 33SSF-2 RESIN COUNTERTOP (CLASS/LABS) 12 35 33SSF-3 QUARTZ COUNTERTOP (CAFE) 12 36 00SSF-4 QUARTZ SURFACE COUNTERTOP (LIBRARY) 12 36 00SSF-5 SOLID SURFACE COUNTERTOP (WHITE) 12 36 00TL-1 CERAMIC TILE (RR WALLS) 09 30 00TL-2 CERAMIC TILE (CAFE BACKSPLASH) 09 30 00WB-1 WOOD BASE 06 20 00WC-1 DIGITAL GRAPHIC VINYL WALL COVERING 09 72 00WC-2 ACOUSTIC WALL COVERING 09 72 00WCP-1 WOOD CEILING PANEL 09 51 26WD-1 WOOD VENEER 06 41 00
3/8" = 1'-0"2.1NORTH ELEVATION
AT WELCOME AREA 1011
3/8" = 1'-0"2.1SOUTH ELEVATION
AT WELCOME AREA 10123/8" = 1'-0"2.1
SOUTH EAST ELEVATIONAT LECTURE HALL 1035
3/8" = 1'-0"2.1NORTH WEST ELEVATION
AT LECTURE HALL 1036
3/8" = 1'-0"2.1NORTH EAST ELEVATION
AT LECTURE HALL 1033
3/8" = 1'-0"2.1SOUTH WEST ELEVATION
AT LECTURE HALL 1034
WC-2
P-5
ACOUSTICAL CEILING PANEL (09 51 00)
WOOD MEMBER (06 20 00)
11"
EDGE TRIM (09 51 00)
MOTORIZED WINDOW SHADE (12 24 00)WOOD BLOCKING (06 10 00)
1'-2"
LIGHTING FIXTURE (DIV 26)WOOD BLOCKING (06 10 00)
GYPSUM BOARD (09 21 16)METAL STUDS (09 21 16)
PLYWOOD SHEATHING (06 10 00)BEHIND WOOD MEMBERS
3 1/2"
WOOD BLOCKING (06 10 00)METAL STUDS (09 21 16)
PROJECTION SCREENS (11 52 13)
GYPSUM BOARD (09 21 16)
A
3'-0
3/4
"
3'-0
"
3/4"
4"
SOLID SURFACE COUNTERTOP (12 36 00)SSF-1
METAL STUDS (09 21 16)
PLASTIC LAMINATE BASE (06 41 00)
1/2"1'-8 1/4"
GYPSUM BOARD (09 21 16)
SEE
ELEV
ATIO
NS
CAS
EWO
RK
AT M
AKER
LAB
S
C
P-5
P-5
12'-3
"
STEEL FRAMING (05 12 00)
STEEL FRAMING (05 12 00)
FIBER MARINE ROPE (05 50 00)
END HOOK FITTING (05 50 00)
TURNBUCKLE (05 50 00)
LOW PROFILE BRACKET (05 50 00)
WOOD BLOCKING (06 10 00)
END HOOK FITTING (05 50 00)
HOOK BRACKET (05 50 00)3/8 STEEL PLATE (05 50 00)
ALIGN ROPE END WITH BOTTOM OF BEAM
1'-6
1/4
"10
'-3 3
/4"
5"
P-5
EDGE TRIM (09 51 00)
HOT ROLLED, BLACKENED
BOTTOM OF BAFFLE AT 10'-0" A.F.F.
DUCTWORK (DIV 23)
SEE STRUCTURALSTEEL BEAM (05 12 00)
ACB-1
FIRST FLOOR13'-0"
P-6
LIGHTING FIXTURE (DIV 26)
METAL STUDS (09 21 16)
GYPSUM BOARD (09 21 16)
CARPET TILE (09 68 13)
WOOD BLOCKING (06 10 00)
WC-2
P-5
3 1/2"
10'-2
"4"
3/4"
EDGE TRIM (09 51 00)
WOOD MEMBER (06 20 00)
WB-1
1'-2"
P-5
METAL STUDS (09 21 16)
GYPSUM BOARD (09 21 16)PROJECTION SCREENS (11 52 13)
LIGHTING FIXTURE (DIV 26)WOOD BLOCKING (06 10 00)
ACOUSTICAL CEILING PANEL (09 51 00)EDGE TRIM (09 51 00)
WC-2
WOOD MEMBER (06 20 00)
11"
WOOD BLOCKING (06 10 00)
3 1/2"
1'-2"
1112
128.8
ALIGN TO CORRIDOR OPENING BEYOND
17'-3 1/4"
4"4"8"4" 4"8"4"8" 4"1'-0"8"4"8" 4"8"4"8" 4"4"8"8"4"4" 2"4"8"4"
EQ EQ EQ EQ EQ
8" 4" 4" 8" 4"1'-0"1'-0" 1'-0"8"4"4"8" 8"8"4" 4"8"4"4"1'-0" 8"8"4"
6 1/
2"6
1/2"
2"
2"
5'-6 5/8"11'-0"8 5/8"
ALIGN PLATE TO WALL/ CARPET
2"FIBER MARINE ROPE (05 50 00)
3/8 STEEL PLATE (05 50 00)
FIBER MARINE ROPE (05 50 00)
3/8 STEEL PLATE (05 50 00)CROSS BRACING ABOVE
8.4
3
P-5
HOT ROLLED, BLACKENED
HOT ROLLED, BLACKENED
PER MANUF.8 5/8"
GYPSUM BOARD CEILING (09 21 16)
LIGHTING FIXTURE (DIV 26)
WOOD BLOCKING (06 10 00)
MOTORIZED WINDOW SHADE (12 24 00)
WOOD BLOCKING (06 10 00)
PROJECTION SCREENS (11 52 13)
1'-6
"2'
-0"
WAT
ER L
EVEL
3'-0
"
TRANSPARENT ACRYLIC;ATTACHMENT DETAILS BY MANUFACTURER
STAINLESS STEEL TANK;DETAILS BY MANUFACTURER
REFERENCE DESIGNATIONS FOR FINISH TYPESACP-1
BOTTOM OF BAFFLE AT 10'-0" A.F.F.
BOTTOM OF TRACK LIGHT NO LOWER THAN 10'-0" A.F.F.
ACB-1
SEE RCP FOR SPACING
UNISTRUT (09 51 00)P-5
9 3/
8"
EQ EQ
LIGHTING FIXTURE (DIV 26)
SPEAKER, N.I.C.ALIGN TO BOTTOM OF BAFFLES AND CENTER BETWEEN BAFFLES
FIRST FLOOR13'-0"
4"8'
-11"
1/2"3 1/2"
GYPSUM BOARD (09 21 16)
PLYWOOD SHEATHING (06 10 00)
WC-2
P-5WOOD PANELING (06 20 00)
WB-1
9'-3
"
4"
3/4"
1/2"
3 1/
2"4"
3/4"
GYPSUM BOARD (09 21 16)
METAL STUDS (09 21 16)
WOOD MEMBER (06 20 00)
WC-2
P-5
PLYWOOD SHEATHING (06 10 00)
4"1/
2"3
1/2"
3/4"
GYPSUM BOARD (09 21 16)PLYWOOD SHEATHING (06 10 00)
WC-2WOOD PANELING (06 20 00)
P-5
ALIGN
EDGE TRIM (09 51 00)EDGE TRIM (09 51 00)
ACP-2
STEEL BEAM (05 12 00)
METAL STUD KICKER (09 21 16)METAL STUDS (09 21 16)
GYPSUM BOARD (09 21 16)
L BEAD (09 21 16)
WCP-1
CONCRETE SLAB (03 30 00)
P-1
WCP-1
1'-6
"
ACP-2
GYPSUM BOARD (09 21 16)
METAL STUDS (09 21 16)
L BEAD (09 21 16)
METAL STUD KICKER (09 21 16)
STEEL BEAM (05 12 00)
DIFFUSER (DIV 23)
DUCTWORK (DIV 23)
9'-0" A.F.F.
P-1
NTATE OF LO U I I AA
R TEG I ST ERED ARCH I T EC
S
REG. NO. 3454
M EARK J. R I PPL
S
EskewDumezRipple365 CANAL STREET, SUITE 3150NEW ORLEANS, LOUISIANA 70130
EDR PROJECT NO. |
© Eskew+Dumez+RippleA Professional Corporation
REVISIONS
PROJECT ISSUE DATE |
DRAWN BY |
The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work by Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.
8/12
/202
0 10
:37:
17 A
MC
:\PR
OJE
CTS
\RVT
2019
\180
62.2
_AR
CH
_R19
_Loc
alH
RA.
rvt
8.8
CONSTRUCTIONDOCUMENTS
INTERIOR DETAILS
LUMCON HOUMA MARINE CAMPUS
DICKSON ROAD, HOUMA, LA
18062
2020
05 JUN 2020
ALLEN1 1/2" = 1'-0"8.1
DETAIL SECTION AT COVE AT SHADEAT LECTURE HALL 10323" = 1'-0"8.2
TYP. DETAIL AT PROJECTOR SCREENAT MAKER LAB 11441 1/2" = 1'-0"8.2
DETAIL AT WINDOW SILLAT LIB. & MAKER LAB5
1 1/2" = 1'-0"8.4DETAIL THRU SCREEN WALL
AT OPEN WORKSTATIONS 30012
1 1/2" = 1'-0"10.2TYP. BAFFLE HANGING DETAIL14
1 1/2" = 1'-0"8.1TYP. DETAIL SECTION AT COVE
AT LECTURE HALL 10311 1/2" = 1'-0"8.1TYP. DETAIL AT COVE AT PROJECTOR
AT LECTURE HALL 1033
1" = 1'-0"2.3ENLARGED PLAN AT SCREEN WALL
AT OPEN WORKSTATIONS 30013
1 1/2" = 1'-0"9.1TYP. DETAIL AT COVE LIGHT16 10.1 1 1/2" = 1'-0"10.2
DETAIL AT SHADE/PROJ. SCREENAT LARGE CONF. 22117
1 1/2" = 1'-0"2.1DETAIL AT ROV TANK9
ACB-1 ACOUSTICAL CEILING BAFFLE 09 51 00ACP-1 ACOUSTICAL CEILING PANEL (CLASSROOMS) 09 51 00ACP-2 ACOUSTICAL CEILING PANEL (UNDER
BALCONIES)09 55 63
ACP-3 ACOUSTICAL CEILING PANEL (LECTURE HALL) 09 55 63CPT-1 CARPET TILE (BLUE TEXTURE) 09 68 13CPT-2 CARPET TILE (GREY FIELD) 09 68 13CPT-3 CARPET TILE (LECTURE HALL) 09 68 13MKBD-1 MARKERBOARD (AT CLASSROOMS) 10 11 00MTL-1 PERFORATED METAL SHEET (PAINTED BLUE) 05 70 00P-1 PAINT (WHITE) 09 91 23P-2 PAINT (GREY) 09 91 23P-3 PAINT (BRIGHT BLUE) 09 91 23P-4 PAINT (DARK BLUE) 09 91 23P-5 PAINT (STRUCTURE) 09 91 23P-6 PAINT (CEILING BLUE) 09 91 23PC-1 POLISHED CONCRETE 03 35 11PLAM-1 PLASTIC LAMINATE 06 41 00PLAM-2 PLASTIC LAMINATE 06 41 00PLAM-3 PLASTIC LAMINATE 06 41 00RB-1 RUBBER BASE (LIGHT) 09 65 00RB-2 RUBBER BASE (DARK BLUE) 09 65 00RT-1 RUBBER TILE (AT STAIR TREADS ONLY) 09 65 00SC-1 SEALED CONCRETE 03 35 11SSF-1 QUARTZ COUNTERTOP (RESTROOMS) 12 35 33SSF-2 RESIN COUNTERTOP (CLASS/LABS) 12 35 33SSF-3 QUARTZ COUNTERTOP (CAFE) 12 36 00SSF-4 QUARTZ SURFACE COUNTERTOP (LIBRARY) 12 36 00SSF-5 SOLID SURFACE COUNTERTOP (WHITE) 12 36 00TL-1 CERAMIC TILE (RR WALLS) 09 30 00TL-2 CERAMIC TILE (CAFE BACKSPLASH) 09 30 00WB-1 WOOD BASE 06 20 00WC-1 DIGITAL GRAPHIC VINYL WALL COVERING 09 72 00WC-2 ACOUSTIC WALL COVERING 09 72 00WCP-1 WOOD CEILING PANEL 09 51 26WD-1 WOOD VENEER 06 41 00
1 1/2" = 1'-0"10.2TYP. DETAIL AT BAFFLE AND TRACK LIGHTS15
1 1/2" = 1'-0"8.1DETAIL AT WOOD WALL
AT WELCOME AREA 10161 1/2" = 1'-0"8.1DETAIL AT WOOD WALL END
AT WELCOME AREA 1018 1 1/2" = 1'-0"8.1DETAIL AT WOOD WALL CORNER
A WELCOME AREA 10171 1/2" = 1'-0"2.3DETAIL AT WELCOME AREA SOFFIT
SECOND FLOOR10
1 1/2" = 1'-0"4.1DETAIL AT COLLAB. SOFFIT
THIRD FLOOR11
Recommended