Oswego Riverbank Stabilization

Preview:

DESCRIPTION

Oswego Riverbank Stabilization. C&S ENGINEERS, INC. Oswego Riverbank Stabilization. Pre-construction condition. Oswego Riverbank Stabilization. Soil/Rock interface at river’s edge. Oswego Riverbank Stabilization. Pre-construction condition: concrete fill. Oswego Riverbank Stabilization. - PowerPoint PPT Presentation

Citation preview

Oswego Riverbank Stabilization

C&S ENGINEERS, INC

Oswego Riverbank Stabilization

Pre-construction condition

Oswego Riverbank Stabilization

Soil/Rock interface at river’s edge

Oswego Riverbank Stabilization

Pre-construction condition: concrete fill

Oswego Riverbank Stabilization

Pre-construction: Salmon anglers

Oswego Riverbank Stabilization

Hayward Baker 2’ Diameter Auger

Oswego Riverbank Stabilization

Hayward Bayer auger and casing for rock sockets

Oswego Riverbank Stabilization

Augered rock socket for soldier pile

Oswego Riverbank Stabilization

Cores from rock sockets

Oswego Riverbank Stabilization

Concrete placement to anchor soldier piles

Oswego Riverbank Stabilization

Installation of lagging panels

Oswego Riverbank Stabilization

Soldier piles and lagging panels

Oswego Riverbank Stabilization

Hayward Baker drilling for rock anchor tiebacks

Oswego Riverbank Stabilization

Tieback Anchor Drilling

Oswego Riverbank Stabilization

1.25” diameter rock anchors

Oswego Riverbank Stabilization

Completed wall

Oswego Riverbank Stabilization

Completed wall

Oswego Riverbank Stabilization

Looking northwest over Varick Dam

Oswego Riverbank Stabilization

Sidewalk, capbeam, railing, and protective screening

Oswego Riverbank Stabilization

Oswego Riverbank Stabilization

Oswego Riverbank Stabilization

Oswego Riverbank Stabilization