Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and
RIM Plantation Scheme
Volume-II
(Annexures)
Office of the Conservator of Forests, Bilaspur Himachal Pradesh Forest Department (Shimla)
Submitted By:
M/s N.H. Consulting Pvt. Ltd., New Delhi, India
January’ 2012
N.H. Consulting Pvt. Ltd (ISO 9001: 2008 and ISO 14001: 2004 Certified Company) F-131/1 First Floor
Pragati Bhawan, Mohammadpur Near Bhikaji Cama Place New Delhi -66 India Tel. 011-26174580 / 41718184
Website: www.consultingnhc.com E-mail : nhc10@hotmail.com : info@consultingnhc.com
January’ 2012
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. i
Annexure - I
Data Sheet for Recording of GPS Location of Plantations
Division – Bilaspur Range - Bilaspur
Sl. No. Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
1. Afforestation 2005-06
DPF Chamyon Chamyon Sadar Bilaspur 5-Ha. N31023.243’ E076
0 51.259’ 2336 Ft. Center
Point
2. Afforestation 2005-06
DPF Chamyon Chamyon Sadar Bilaspur 15 Ha. N31023.155’ E076
0 51.279’ 2344 Ft. Center
Point
3. Afforestation 2006-07
DPF Chamyon –II Chamyon Sadar Bilaspur 21-Ha. N310 23.424’ E076
0 51.918’ 2424 Ft. Entry
Point
4. Afforestation 2006-07
DPF Karsi Chamyon Sadar Bilaspur 20-Ha. N310 51.411’ E076
0 51.249’ 2562 Ft. Entry
Point
5. Afforestation 2006-07
DPF Chamyon Jamthal Sadar Bilaspur 19-Ha. N310 23.425’ E076
0 51.426’ 2420 Ft. Entry
Point
6. Afforestation 2006-07
DPF JamThal Chamyon Sadar Bilaspur 11 Ha. N310 20.560’ E76
0 52.289’ 3325 Ft. Center
Point
7. Rim Plantation 2006-07
DPF Chamyon Jamthal Sadar Bilaspur 20-Ha. N310 23.444’ E076
0 51.423’ 2443 Ft. Entry
Point
8. Down Stream Treatment. 2006-07
DPF First Part Jamthal
Jamthal Sadar Bilaspur 15-Ha. N31024.450’ E076
0 52.555’ 1876 Ft. Entry
Point
9. Down Stream Treatment 2006-07
DPF Jamthal Jamthal Sadar Bilaspur 20-Ha. N310 24.360’ E076
0 51.585’ 1934 Ft. Entry
Point
10.
Afforestation 2007-08
DPF Chamyon - III Chamyon Sadar Bilaspur 13-Ha. N31022.166’ E076
0 51.210’ 2897 Ft. Center
Point
11. Afforestation 2007-08
DPF Chamyon –IV Chamyon Sadar Bilaspur 13-Ha. N31021.292’ E076
0 51.284’ 2446 Ft. Center
Point
12. Afforestation 2007-08
DPF Chamyon Jamthal Sadar Bilaspur 13-Ha. N31023’17.4” E076
0 51’47.5” 2331 Ft. Entry
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. ii
Sl. No. Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
13. Afforestation 2007-08
DPF Chamyon Chamyon Sadar Bilaspur 13-Ha. N31022’49.2” E076
0 51’30.7” 2391Ft. Center
Point
14. Down Stream Treatment 2007-08
DPF Jamthal Part 1 Jamthal Sadar Bilaspur 15 Ha. N31024’35.3’’ E076
0 52’30.0’ 1949 Ft. Center
Point
15. Dawn Stream Treatment 2007-08
DPF Jamthal I Jamthal Sadar Bilaspur 15-Ha. N310 24’59.9” E076
0 52’54.5” 1800 Ft. Entry
Point
16. Down Stream Treatment 2007-08
DPF First Part Jamthal
Jamthal Sadar Bilaspur 15-Ha. N31024’38.0” E076
0 52’30.7” 1838 Ft. Entry
Point
17. Afforestation 2008-09
DPF First Part Jamthal
Jamthal Sadar Bilaspur 13-Ha. N310 23.253’ E076
0 51.654’ 2359 Ft. Entry
Point
18. Rim Plantation 2009-10
UF Kasol Chamyon Sadar Bilaspur 4 Ha. N310 22.235’ E076
0 51.584’ 2570 Ft. Center
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. iii
Division - Karsog
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
1.
2. Afforestation 2004-05
D-72 Reshtadhar C-III Kanda Pangna Karsog 10 Ha. N31010.912’ E077
004.459’ 6105 Ft.. Center Point
3. Afforestation 2004-05
D-171 Dopha Dopha Karsog Karsog 5 Ha. N31025.389’ E077
012.721’ 6840 Ft.. Center Point
4. Afforestation 2004-05
D-201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31019.901’ E077
014.914’ 4356 Ft.. Center Point
5. Afforestation 2004-05
D -242 Buna Taben Seri Karsog 5 Ha. N31021.210’ E077
021.066’ 3760 Ft.. Center Point
6. Afforestation 2004-05
D -241 Kandloo Taben Seri Karsog 5 Ha. N31022.466’ E077
019.40.8’ 4745 Ft.. Center Point
7. Afforestation 2004-05
O D -Makra Sarahan Seri Karsog 13 Ha. N31023.333’ E077
021.307’ 5027 Ft.. Center Point
8. Afforestation 2004-05
D -228 Bhandashish C (v)
Chauridhar
Seri Karsog 5 Ha. N31022.196’ E077
019.175’ 4123 Ft.. Center Point
9. Afforestation 2004-05
D- 183 MKB Mahadev ki Banouni
Mamail Karsog Karsog 7 Ha. N31022.360’ E077
013.245’ 4192 Ft.. Center Point
10. Afforestation 2004-05
D 2497 Sarahan- CI Sarahan Seri Karsog 5 Ha. N31022.290’ E077
022.270’ 4668 Ft.. Center Point
11. Afforestation 2004-05
D- Ganu C-II Nari Seri Karsog 10 Ha. N31020.413’ E077
020.126’ 4185 Ft.. Center Point
12. Afforestation 2004-05
D- Ganu C-II Nari Seri Karsog 5 Ha. N31019.501’ E077
018.986’ 5450 Ft.. Entry Point
13. Afforestation 2004-05
D-175 Pehran Ghalaych Karsog Karsog 8 Ha. N31024.667’ E077
014.271’ 7553 Ft.. Center Point
14. Afforestation 2004-05
D- 222 Pog Nari Seri Karsog 5 Ha. N31019.984’ E077
019.794’ 3620 Ft.. Center Point
15. Afforestation 2004-05
D- 213 Nehrinal Nehrinal Seri Karsog 6 Ha. N31018.414’ E077
017.944’ 5758 Ft.. Center Point
16. Afforestation 2004-05
D- 193 Katach Bhanera Karsog Karsog 7 Ha. N31021’36.6” E077
015’29.0” 4784 Ft. Center Point
17. Afforestation D-199 Dhamiyara Khashoul Karsog Karsog 8 Ha. N31020.496’ E077
014.354’ 3879 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. iv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2004-05
18. Afforestation 2004-05
D-72 Resthadhar –III Kanda Pangna Karsog 10 Ha. N31019.354’ E077
004.718’ 5834 Ft. Center Point
19. Afforestation 2004-05
D-74 Parvain Blindi Pangna Karsog 10 Ha. N31017’96.2’’ E077
003’39.8’’ 2416 Ft. Center Point
20. Afforestation 2004-05
D-101 Nandoo Tattapani Pangna Karsog 10 Ha. N31015’03.6’’ E077
008’81.3’’ 3040 Ft. Center Point
21. Afforestation 2004-05
D- 101 Nandoo Tattapani Pangna Karsog 10 Ha. N31015’13.3’’ E077
008’82.1’’ 3168 Ft. Center Point
22. Afforestation 2004-05
D-103 Talehan Talehan Pangna Karsog 10 Ha. N31016.595’ E077
009.408’ 4643 Ft. Center Point
23. Afforestation 2004-05
OD 236 Pathraivi Pathraivi Seri Karsog 8 Ha. N31029’18.4” E 077
0 21’07.6" 7200 Ft.. Entry Point
24. Afforestation 2004-05
D 242 Buna Taben Seri Karsog 5 Ha. N31021.210’ E077’21.066’ 3760 Ft.. Entry Point
25. Afforestation 2004-05
OD Makra Sarahan Seri Karsog 13 Ha. N31023.038’ E077’21.307’ 5024 Ft.. Entry Point
26. Afforestation 2004-05
D 247 Sarahan C-I Sarahan Seri Karsog 5 Ha. N31022.290’ E077’22.290’ 4668 Ft. Entry Point
27. Afforestation 2004-05
D 213 Nehrinal Nehrinal Seri Karsog 6 Ha. N31018.414’ E077’17.944’ 5758 Ft. Center Point
28. Afforestation 2004-05
D 222 Pog Nanj Seri Karsog 5 Ha. N31019.894’ E077’19.794’ 3620 Ft. Center Point
29. Afforestation 2004-05
D 233 Richni Richhni Seri Karsog 7 Ha. N31024.337” E077
0 15.218” 6841 Ft. Entry Point
30. Afforestation 2004-05
D 219 Ganu C Ii Dhamoon Seri Karsog 6 Ha. N31019.29.2” E077
018.58.2” 3238 Ft. Entry Point
31. Afforestation 2004-05
D 228 Bhundashil C-V Chauridhar
Seri Karsog 5 Ha. N31022.196’ E077’19.175’ 4123 Ft. Center Point
32. Afforestation 2004-05
D Ganu C -II Nanj Seri Karsog 5 Ha. N31019.501’ E077’18.986’ 5450 Ft. Center Point
33. Afforestation 2004-05
D 104 Besta Talehan Pangna Karsog 10 Ha. N31016.499’ E077
0 10.340’ 4192 Ft. Entry Point
34. Afforestation D 100 Ghangar Tattapani Pangna Karsog 10 Ha. N31015.040’ E077
0 08.824’ 2339 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. v
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2004-05
35. Afforestation 2004-05
ND 131 Parnot Perlig Karsog Karsog 10 Ha. N31016003’ E077
0 1339.3’ 3225 Ft.. Entry Point
36. Afforestation 2004-05
D 86 Lochar Alsindi Pangna Karsog 8 Ha. N31017.127’ E077
0 06.433’ 3763 Ft.. Entry Point
37. Afforestation 2004-05
ND 283 Raidhar Chora Magroo Karsog 4 Ha. N31027.599' E077
013.288’ 7350 Ft. Entry Point
38. Afforestation 2004-05
ND 289 Ghanidhar Seri Mangarh
Magroo Karsog 4 Ha. N3108 2.846' E077
0 18.322” 6909 Ft. Entry Point
39. Afforestation 2004-05
OD 255 Sagarh Malrog Magroo Karsog 3 Ha. N31024.561' E077
0 20.427' 7169 Ft. Entry Point
40. Afforestation 2004-05
OD 265 khotu Shaggage Magroo Karsog 4 Ha. N31027.409’ E077
0 17.775’ 5363 Ft.. Entry Point
41. Afforestation 2004-05
OD 294 Danount Seri Mangarh
Magroo Karsog 6 Ha. N31030.386’ E077
0 17.441’ 8880 Ft.. Entry Point
42. Afforestation 2004-05
OD 297 Surhi Seri Mangarh
Magroo Karsog 4 Ha. N31030.982’ E077
0 17.941’ 8752 Ft.. Entry Point
43. Afforestation 2004-05
OD 278 Nadaun Lassi Magroo Karsog 3 Ha. N31029.798’ E077
0 16.741’ 7692 Ft.. Entry Point
44. Afforestation 2004-05
OD 256 Jagol Mahog Magroo Karsog 3 Ha. N31025.084’ E077
0 20.641’ 6198 Ft.. Entry Point
45. Afforestation 2004-05
N D 259 Lotala Katanda Magroo Karsog 3 Ha. N31025.440’ E077
0 18.055’ 7222 Ft.. Entry Point
46. Afforestation 2005-06
O D 255 Sgach Mahog Magroo Karsog 13 Ha. N31026.276’ E077
0 20.045’ 5334 Ft.. Center Point
47. Afforestation 2005-06
OD 278 Nadaun Lassi Magroo Karsog 9 Ha. N31029.374’ E077
0 17.130’ 7545 Ft.. Center Point
48. Afforestation 2005-06
OD 297 Surhi Seri Mangarh
Magroo Karsog 10 Ha. N31030.477’ E077
0 17.615’ 8828 Ft.. Center Point
49. Afforestation 2005-06
OD 264 khotu Shaggagi Magroo Karsog 6 Ha. N31027.384’ E077
0 17.889’ 5459 Ft.. Entry Point
50. Afforestation 2005-06
OD 279 Nadaun Lassi Magroo Karsog 3 Ha. N31028.036’ E077
0 17.641’ 6252 Ft.. Entry Point
51. Afforestation D 278 Nadoon Lassi Magroo Karsog 10 Ha. N31030’04.1” E077
0 16’30.6” 8006 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. vi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2005-06
52. Afforestation 2005-06
D 259 Latta C IV Katanda Magroo Karsog 13 Ha. N31025.223' E077
0 18.033’ 7460 Ft. Entry Point
53. Afforestation 2005-06
D 278 Nadaun Lassi Magroo Karsog 10 Ha. N31030.173' E077
0 16.366” 8750 Ft. Entry Point
54. Afforestation 2005-06
ND 283 Raidhar Chora Magroo Karsog 3 Ha. N31027.351' E077 13.278' 6393 Ft. Entry Point
55. Afforestation 2005-06
D-199 Dhamiyara Kashoul Karsog Karsog 5 Ha. N31020.102' E077
0 14.498' 4720 Ft.. Entry Point
56. Afforestation 2005-06
OD 167 Baju Sanarli Karsog Karsog 10 Ha. N31024.396’ E077
0 11.009’ 6988 Ft.. Entry Point
57. Afforestation 2005-06
OD 124 Kalontha Mahaunag
Karsog Karsog 10 Ha. N31017.449' E077
0 12.353' 6419 Ft.. Entry Point
58. Afforestation 2005-06
ND 201 Aglidhar Mehendi Karsog Karsog 5 Ha. N31019.502’ E077
0 15.156’ 4332 Ft.. Entry Point
59. Afforestation 2005-06
D 207 Gandhoi Mehendi Karsog Karsog 10 Ha N31019.016’ E077
015.038’ 4528 Ft.. Entry Point
60. Afforestation 2005-06
D 101 Nandoo Tattapani Pangna Karsog 10 Ha. N31015.040’ E077
0 08.824’ 3152 Ft.. Entry Point
61. Afforestation 2005-06
D 100 Ghangar Tattapani Pangna Karsog 7 Ha. N31014.223’ E077
0 07.746’ 2371 Ft.. Entry Point
62. Afforestation 2005-06
D 63 Panyaroo Balar Pangna Karosg 4 Ha. N31021.022’ E077
0 06.445’ 6266 Ft. Entry Point
63. Afforestation 2005-06
D 72, Restadhar Kanda Pangna Karsog 4 Ha. N31019’54.8” E077
0 04’27.3” 6596 Ft. Entry Point
64. Afforestation 2005-06
D 74 Parvain Bilindi Pangna Karsog 8 Ha. N31017.833” E077
0 03.642” 2540 Ft.. Entry Point
65. Pasture Dev. 2005-06
Nehrinal Nehrinal Seri Karsog 7 Ha. N31018’11.4” E077
0 18’18.4” 5830 Ft.. Entry Point
66. Afforestation 2005-06
D 61 Sorsan Balar Pangna Karosg 5 Ha. N31020’0.11" E077
0 08’09.0" 6121 Ft. Entry Point
67. Afforestation 2005-06
OD 247 Sarahan Sarahan Seri Karsog 5 Ha. N31021’13.0” E077
0 21’46.0” 4608 Ft.. Entry Point
68. Afforestation D 101 Nandoo Tattapani Pangna Karsog 7 Ha. N31015.119” E077
0 08.857” 3379 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. vii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2005-06
69. Afforestation 2005-06
D 219 Ganu C -II Dhamoon Seri Karsog 6 Ha. N31019.41.3’ E077’18.82.4’ 5420 Ft. Center Point
70. Afforestation 2005-06
D 214 Jhunjhun Nehrinal Seri Karsog 5 Ha. N31018.38.2’ E077’18.67.0’ 5445 Ft. Center Point
71. Afforestation 2005-06
D 214 Jhunjhun Nehrinal Seri Karsog 12 Ha. N31019.44.3’ E077’19.57.8’ 5645 Ft. Center Point
72. Afforestation 2005-06
D 222 Pog Nanj Seri Karsog 2 Ha. N31020.48.6’ E077’19.49.0’ 5480 Ft. Center Point
73. Afforestation 2005-06
D 222 Pog Nanj Seri Karsog 5 Ha. N31019.71.5’ E077’19.94.8’ 3533 Ft. Center Point
74. Afforestation 2005-06
D 222 Pog Nanj Seri Karsog 5 Ha. N31020.03.6’ E077’19.17.4’ 4255 Ft. Center Point
75. Afforestation 2005-06
D 250 Bagridhar Sarahan Seri Karsog 3 Ha. N31023.77.7’ E077’22.28.4’ 4277 Ft. Entry Point
76. Afforestation 2005-06
D 245 Firnoo Taben Seri Karsog 5 Ha. N31025.31.4’ E077’21.54.2’ 2627 Ft.. Entry Point
77. Afforestation 2005-06
D 241 Kandloo C-II (B) Taben Seri Karsog 12 Ha. N31022.36.7’ E077’19.38.6’ 4204 Ft.. Entry Point
78. Afforestation 2005-06
OD 237 Kathanda Pathraeivi Seri Karsog 13 Ha N310 2518.5" E077
0 1707.6' 7180 Ft.. Entry Point
79. Afforestation 2005-06
ND 245 Firno Taben Seri Karsog 5 Ha. N310 2132.6' E077
0 2155.8' 2519 Ft.. Entry Point
80. Afforestation 2005-06
D-103 Talehan Talehan Pangna Karsog 4 Ha. N31016’423’ E077
008’893’ 4379 Ft. Center Point
81. Afforestation 2005-06
D-105 Khadain Talehan Pangna Karsog 15 Ha. N31016’435’ E077
010’775’ 4170 Ft. Center Point
82. Afforestation 2005-06
D-105 Khadain Talehan Pangna Karsog 10 Ha. N31016’470’ E077
010’402’ 4438 Ft. Center Point
83. Afforestation 2005-06
D 208 Bhundashill Chauridhar
Seri Karsog 5 Ha. N3102142.8” E077
0 1759.0” 5840 Ft.. Entry Point
84. Afforestation 2005-06
D222 Pog Nanj Seri Karsog 2 Ha. N3102009.9” E077
0 1924.3” 3952 Ft.. Entry Point
85. Afforestation OD 233 Richhni (B) Richhni Seri Karsog 10 Ha. N31023.54.2’ E077’14.48.2’ 6192 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. viii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2005-06
86. Afforestation 2005-06
D- 98 Kidia Tattapani Pangna Karsog 5 Ha. N31015’35.0’’ E077
005’87.4’’ 2502 Ft. Center Point
87. Afforestation 2005-06
D-76 Kapdyals Alsindi Pangna Karsog 10 Ha. N31016.635’ E077
004.967’ 3361 Ft. Center Point
88. Afforestation 2005-06
D-79 Moharoo Blindi Pangna Karsog 5 Ha. N31018’37.2’’ E077
006’50.8’’ 5536 Ft. Center Point
89. Afforestation 2005-06
D-74 Parvain-I Blindi Pangna Karsog 10 Ha. N31017’76.0’’ E077
004’61.2’’ 3152 Ft. Center Point
90. Afforestation 2005-06
D-74 Parvain – II Blindi Pangna Karsog 10 Ha. N31017’96.5’’ E077
003’54.9’’ 2358 Ft. Center Point
91. Afforestation 2005-06
D-73 Gharlal –C-II Kanda Pangna Karsog 10 Ha. N31020.296’ E077
003.494’ 5081 Ft. Center Point
92. Afforestation 2005-06
D-73 Gharlal –C-II Kanda Pangna Karsog 13 Ha. N31020.325’ E077
003.548’ 4932 Ft. Center Point
93. Afforestation 2005-06
D-73 Gharlal –C-II Kanda Pangna Karsog 10 Ha. N31020.507’ E077
003.678’ 5165 Ft. Center Point
94. Afforestation 2005-06
D-72 Resthadhar–II Kanda Pangna Karsog 10 Ha. N31019.257’ E077
005.035’ 5887 Ft. Center Point
95. Pasture Development 2005-06
D-73 Gharlal Kanda Pangna Karsog 10 Ha. N31020’27.2’’ E077
003’94.0’’ 5632 Ft. Center Point
96. Afforestation 2005-06
D-62 Kunas Balar Pangna Karsog 5 Ha. N31021’80.2’’ E077
006’71.6’’ 4320 Ft. Center Point
97. Afforestation 2005-06
D-61 Shorshan Shorshan Pangna Karsog 5 Ha. N31019’99.5’’ E077
008’14.2’’ 5718 Ft. Center Point
98. Afforestation 2005-06
D-175 Pehran Ghalaych Karsog Karsog 7 Ha. N31024’637’ E077
014’592’ 7321 Ft.. Center Point
99. Afforestation 2005-06
D- 214 Jhunjhun Nehrinal Seri Karsog 5 Ha. N31018.382’ E077
018’67.7’ 5445 Ft.. Center Point
100. Afforestation 2005-06
D- 214 Jhunjhun Nehrinal Seri Karsog 12 Ha. N31019.443’ E077
019.578’ 5645 Ft.. Entry point
101. Afforestation 2005-06
D- 222 Pog Nari Seri Karsog 5 Ha. N31020.036’ E077
019.174’ 4255 Ft.. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. ix
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
102. Afforestation 2005-06
D- 222 Pog Nari Seri Karsog 5 Ha. N31019.715’ E077
019.948’ 3533 Ft.. Center Point
103. Afforestation 2005-06
D- 222 Pog Nari Seri Karsog 15 Ha. N31020.316’ E077
020.040’ 4269 Ft.. Center Point
104. Afforestation 2005-06
D- 222 Pog Nari Seri Karsog 2 Ha. N31020.486’ E077
019.490’ 5480 Ft.. Entry Point
105. Afforestation 2005-06
D 250 Bagridhar Sarahan Seri Karsog 5 Ha. N31023.277’ E077
022.284’ 4277 Ft.. Center Point
106. Afforestation 2005-06
D -241 Kandloo Taben Seri Karsog 10 Ha. N31022.181’ E077
020.087’ 4204 Ft. Center Point
107. Afforestation 2005-06
O.D 233 Richhni CI (b) Richhni Seri Karsog 10 Ha. N31023.542’ E077
014.482’ 6192 Ft. Center Point
108. Afforestation 2005-06
D -245 Firnoo Taben Seri Karsog 5 Ha. N31021.324’ E077
021.542’ 2627 Ft. Center Point
109. Afforestation 2005-06
O D 137 Nagaltha Mahonag Karsog Karsog 20 Ha. N31019’24.7’’ E077
014’06.3’’ 3475 Ft. Center Point
110. Afforestation 2005-06
D 136 Parlog Part-I Parlog Karsog Karsog 17 Ha. N31016.722’ E077
016.419’ 3244 Ft.. Center Point
111. Afforestation 2005-06
N D 136 Parlog Part-II Parlog Karsog Karsog 10 Ha. N31016.181’ E077
016.866’ 2747 Ft.. Center Point
112. Afforestation 2006-07
N D 136 Parlog Parlog Karsog Karsog 25 Ha. N31016.539’ E077
016.414’ 3265 Ft. Center Point
113. Afforestation 2006-07
D- 12 Bhayana Surahi Pangna Karsog 10 Ha. N31023.230’ E077
005.975’ 6404 Ft. Center Point
114. Afforestation 2006-07
O D 137 Nagaltha Mahonag Karsog Karsog 5 Ha. N31019’20.2’’ E077
013’16.0’’ 4512 Ft. Center Point
115. Afforestation 2006-07
O D 124 Kalountha Mahonag Karsog Karsog 15 Ha. N31018’12.2’’ E077
013’34.8’’ 6214 Ft. Center Point
116. Afforestation 2006-07
D -241 kandloo Taben Seri Karsog 10 Ha. N31022.181’’ E077
020.087’' 4393 Ft. Center Point
117. Afforestation 2006-07
D -242 Buna Taben Seri Karsog 10 Ha. N31021.187’’ E077
020’55.6’’ 3648 Ft. Center Point
118. Afforestation 2006-07
D -245 Firnoo Taben Seri Karsog 5 Ha. N31021.314’ E077
021’51.7’ 2659 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. x
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
119. Afforestation 2006-07
D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.060’ E077
018.013’ 7097 Ft. Center Point
120. Afforestation 2006-07
D-234 Sundroo Katkosh Seri Karsog 10 Ha. N31024.205’ E077
017.007’ 6307 Ft. Center Point
121. Afforestation 2006-07
D 249 Makra Sarahan Seri Karsog 5 Ha. N31022.467’ E077
021’20.2’’ 5282 Ft. Center Point
122. Afforestation 2006-07
D 251 Kaveri Sarahan Seri Karsog 10 Ha. N31023.110’ E077
022’65.8’ 3934 Ft.. Center Point
123. Afforestation 2006-07
D- 213 Nihrinal Naharnal Seri Karsog 10 Ha. N31018.662’ E077
017’841’ 5408 Ft.. Entry Point
124. Afforestation 2006-07
D-207 Majod Mehendi Karsog Karsog 11 Ha. N31018’657’ E077
016’256’ 5708 Ft.. Center Point
125. Afforestation 2006-07
D-201 Aglidhar Mehandi Karsog Karsog 7 Ha. N31019’862’ E077
014’912’ 4368 Ft.. Center Point
126. Afforestation 2006-07
D-137 Dopha CII (b) Dopha Karsog Karsog 21 Ha. N31025’44.7’’ E077
014’13.3’’ 6764 Ft. Center Point
127. Afforestation 2006-07
D-80 Kanda Blindi Pangna Karsog 20 Ha. N31019’166’ E077
007’058’ 5545Ft. Center Point
128. Afforestation 2006-07
D-73 Gharlal – CII Kanda Pangna Karsog 20 Ha. N31019’689’ E077
003’986’ 5710 Ft. Center Point
129. Afforestation 2006-07
D-93 Thogi Tattapani Pangna Karsog 10 Ha. N31015’33.2’’ E077
004’83.9’’ 2828 Ft. Center Point
130. Afforestation 2006-07
D- 101 Nandoo Tattapani Pangna Karsog 15 Ha. N31015’06.4’’ E077
008’79.8’’ 3008 Ft. Center Point
131. Afforestation 2006-07
D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017.182’ E077
006.425’ 395 Ft. Center Point
132. Afforestation 2006-07
D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017.030’ E077
005.773’ 3752 Ft. Center Point
133. Afforestation 2006-07
D 234 Sundroo Katkosh Seri Karsog 10 Ha. N31024.205’ E077’17.074’ 6307 Ft.. Entry Point
134. Afforestation 2006-07
D 208 Bhundashill Chauridhar
Seri Karsog 10 Ha. N310 21.404’ E 077
0 18.061’ 5980 Ft.. Entry Point
135. Afforestation 2006-07
OD 233 Richchni Richhni Seri Karsog 10 Ha. N310 24.337’ E 077
0 15.231’ 7616 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
136. Afforestation 2006-07
D-103 Talehan Talehan Pangna Karsog 20 Ha. N31016.206’ E077
008.805’ 4690 Ft. Center Point
137. Afforestation 2006-07
D-176 Kapdyal Alsindi Pangna Karsog 20 Ha. N31016.235’ E077
004.135’ 3230 Ft. Center Point
138. Afforestation 2006-07
D-104 Besta Talehan Pangna Karsog 20 Ha. N31016.834’ E077
009.758’ 4737 Ft. Center Point
139. Afforestation 2006-07
D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.060’ E077’18.013’ 7097 Ft.. Entry Point
140. Afforestation 2006-07
D 237 Katanda Taben Seri Karsog 5 Ha. N31022.466’ E077’19.408’ 4745 Ft.. Entry Point
141. Afforestation 2006-07
D 249 Makra Sarahan Seri Karsog 5 Ha. N31022.590’ E077’21.384’ 4652 Ft.. Entry Point
142. Afforestation 2006-07
D 242 Buna Taben Seri Karsog 10 Ha. N31021.187’ E077’20.556’ 3648 Ft.. Entry Point
143. Afforestation 2006-07
D 245 Firnoo Taben Seri Karsog 5 Ha. N31021.314’ E077’21.517’ 2659 Ft.. Entry Point
144. Afforestation 2006-07
D 222 Pog Nanj Seri Karsog 10 Ha. N31020.413’ E077’20.126’ 4185 Ft. Center Point
145. Afforestation 2006-07
D 249 Makra Sarahan Seri Karsog 5 Ha. N31022.467’ E077’21.202’ 5283 Ft.. Entry Point
146. Afforestation 2006-07
D 251 Kaveri Sarahan Seri Karsog 10 Ha. N31023.110’ E077’27.658’ 3934 Ft. Entry Point
147. Afforestation 2006-07
D 213 Nehrinal Nehrinal Seri Karsog 10 Ha. N31018.662’ E077’17.841’ 5405 Ft. Center Point
148. Afforestation 2006-07
D 167 Baju (III) Sanarli Karsog Karsog 7 Ha. N31024.379’ E077
0 10.422’ 7171 Ft.. Entry Point
149. Afforestation 2006-07
ND 264 Khatu Shagagi Magroo Karsog 5 Ha. N31027.883” E077
0 10.057’ 5680 Ft. Entry Point
150. Afforestation 2006-07
D 170 Tikar Karsog C II b
Sanarli Karsog Karsog 7 Ha N31024.471’ E077
0 11.194’ 6256 Ft.. Entry Point
151. Afforestation 2006-07
D 279 Nadaun Lassi Magroo Karsog 10 Ha. N31028.521' E077
0 17.233' 7730 Ft. Entry Point
152. Afforestation 2006-07
D 74 Parvain Bilindi Pangna Karsog 30 Ha. N31017.705’ E077
0 03.809’ 2790 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
153. Afforestation 2006-07
D 105 Khadni Talehan Pangna Karsog 10 Ha. N31016.402’ E077
0 10.809’ 4000 Ft.. Entry Point
154. Afforestation 2006-07
D 106 Bhoura Takhan Pangna Karsog 10 Ha. N31016.504’ E077
0 12.305’ 4192 Ft.. Entry Point
155. Afforestation 2006-07
D 95 Jeori Tattapani Pangna Karsog 10 Ha. N31015.010’ E077
0 05.481’ 2348 Ft.. Entry Point
156. Afforestation 2006-07
D 259 Lotla Katanda Magroo Karsog 10 Ha. N31025.319' E077
0 18.129’ 1743 Ft. Entry Point
157. Afforestation 2006-07
OD 283 Raidhar Chaura Magroo Karsog 10 Ha. N31027.093’ E077
0 19.132’ 5251 Ft.. Entry Point
158. Afforestation 2006-07
OD 283 Raidhar Chaura Magroo Karsog 15 Ha. N31027.739’ E077
0 19.557’ 4902 Ft.. Entry Point
159. Afforestation 2006-07
OD 294 Danount Seri Mangarh
Magroo Karsog 10 Ha. N31030.348’ E077
0 17.338’ 9040 Ft.. Entry Point
160. Afforestation 2006-07
OD 278 Nadaun Lassi Magroo Karsog 15 Ha. N31029.658’ E077
0 17.297’ 8531 Ft.. Entry Point
161. Afforestation 2006-07
N D 257 Jagol Mahog Magroo Karsog 5 Ha. N31025.089’ E077
0 20.112’ 7286 Ft.. Entry Point
162. Afforestation 2006-07
O D 253 Sagach Mahog Magroo Karsog 10 Ha. N31024.986’ E077
0 19.944’ 7526 Ft.. EntryPoint
163. Afforestation 2006-07
D 259 Lotla Katanda Magroo Karsog 10 Ha. N31025.460’ E077
0 18.165’ 7062 Ft.. Entry Point
164. Afforestation 2006-07
OD 297 Danount Seri Mangarh
Magroo Karsog 15 Ha. N31031.529’ E077
0 18.426’ 9260 Ft.. Entry Point
165. Afforestation 2006-07
OD 289 Ghami Dhar Seri Mangarh
Magroo Karsog 10 Ha. N 31028.914’ E077
0 18.233’ 7312 Ft.. Entry Point
166. Afforestation (2007-08)
D 16 Suket Begli Pangna Karsog 10 Ha. N31023.826’ E077’07.107’ 5570 Ft. Center Point
167. Afforestation 2007-08
D 203 Thach C II Mehendi Karsog Karsog 15 Ha. N31022.056’ E 077
0 17.462’ 6064 Ft.. Entry Point
168. Afforestation 2007-08
135 Fafan Parlog Karsog Karsog 5 Ha. N31016.007” E 077
0 14.592’ 4227 Ft.. Entry Point
169. Afforestation 2007-07
D 222 Pog Nanj Seri Karsog 40 Ha. N31020.226’ E077’11.906’ 4125 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xiii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
170. Afforestation 2007-08
D 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N31018.507’ E077’17.661’ 5996 Ft. Center Point
171. Afforestation 2007-08
D 213 Nehrinal Nehrinal Seri Karsog 20 Ha. N31018.314’ E077’17.552’ 6082 Ft. Center Point
172. Afforestation 2007-08
D 249 Makra Sarahan Seri Karsog 10 Ha. N31023.096’ E077’21.291’ 5177 Ft.. Entry Point
173. Afforestation 2007-08
D 222 Pog Nanj Seri Karsog 15 Ha. N31020.316’ E077’20.040’ 4269 Ft. Center Point
174. Afforestation (2007-08)
D 230 Chabar Chauridhar
Seri Karsog 10 Ha. N31022.792’ E077’18.395’ 4639 Ft. Center Point
175. Afforestation (2007-08)
D 241 Kandloo Taben Seri Karsog 10 Ha. N31022.181’ E077’20.087’ 4393 Ft.. Entry Point
176. Afforestation (2007-08)
D 241 Kandloo Pokhi Seri Karsog 20 Ha. N31022.106 ‘ E077’19.533’ 3728 Ft.. Entry Point
177. Afforestation 2007-08
D 249 Makra Sarahan Seri Karsog 2 Ha. N31022.481’ E077
0 21.271’ 5536 Ft.. Entry Point
178. Afforestation 2007-08
D-103 Talehan Talehan Pangna Karsog 20 Ha. N31016.599’ E077
009.162’ 4015 Ft. Entry Point
179. Afforestation 2007-08
D 234 Sundro Katash Seri Karsog 5 Ha. N31023'31.2” E077
0 17' 09.0" 6089 Ft.. Entry Point
180. Afforestation 2007-08
D-104 Besta Talehan Pangna Karsog 20 Ha. N31016.831’ E077
009.976’ 5130 Ft. Center Point
181. Afforestation 2007-08
D-107 Gumma Talehan Pangna Karsog 10 Ha. N31015.828’ E077
011.593’ 4185 Ft. Center Point
182. Afforestation 2007-08
D 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N310 18’25.3” E077
0 17’56.6” 5740 Ft.. Entry Point
183. Afforestation 2007-08
D 213 Nehrinal Nehrinal Seri Karsog 11 Ha. N310 18’21.2” E77
0 16’48.5” 5612 Ft.. Entry Point
184. Afforestation 2007-08
D- 101 Nandoo Tattapani Pangna Karsog 15 Ha. N31015’16.5’’ E077
008’66.2’’ 2851 Ft. Center Point
185. Afforestation 2007-08
D-74 Jeouri Tattapani Pangna Karsog 10 Ha. N31015’34.9’’ E077
005’16.3’’ 3222 Ft. Center Point
186. Afforestation 2007-08
D-94 Tattapani Tattapani Pangna Karsog 10 Ha. N31015’31.8’’ E077
005’41.0’’ 3059 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xiv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
187. Afforestation 2007-08
D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017’19.5’ E077
006’02.0’ 3799 Ft. Center Point
188. Afforestation 2007-08
D-77 Gujrodhar Alsindi Pangna Karsog 10 Ha. N31016’89.8’ E077
004’79.6’ 3205 Ft. Center Point
189. Afforestation 2007-08
D-73 Gharlal C-II Kanda Pangna Karsog 15 Ha. N31019.431’ E077
004.214’ 5356 Ft. Center Point
190. Afforestation 2007-08
D-79 Parvain Blindi Pangna Karsog 15 Ha. N31017’93.3’’ E077
004’80.7’’ 3574 Ft. Center Point
191. Afforestation 2007-08
N D 167 Bajhu C III Sanarli Karsog Karsog 10 Ha. N31024.149’ E077
010.513’ 6484 Ft.. Center Point
192. Afforestation 2007-08
D-208 Majod Mehendi Karsog Karsog 20 Ha. N31018.175’ E077
017.129’ 5845 Ft.. Center Point
193. Afforestation 2007-08
D-198 Dhamiyara Khashoul Karsog Karsog 12 Ha. N31020.143’ E077
014.533’ 3990 Ft.. Center Point
194. Afforestation 2007-08
D-207 Gandhoi Mehendi Karsog Karsog 18 Ha. N31019.119’ E077
015.084’ 4795 Ft.. Center Point
195. Afforestation 2007-08
D-207 Gandhoi Mehendi Karsog Karsog 25 Ha. N31018.772’ E077
015.866’ 5364 Ft.. Center Point
196. Pasture Development 2007-08
D-207 Gandhoi –CII Mehendi Karsog Karsog 10 Ha. N31018.892’ E077
015.602’ 5290 Ft.. Center Point
197. Afforestation 2007-08
D- 211 Sainjh Nehrinal Seri Karsog 10 Ha. N31018.923’ E077
017.735’ 5902 Ft.. Center Point
198. Afforestation 2007-08
D 236 Pathreavi Pathreavi Seri Karsog 10 Ha. N31024.160’ E077
016.112’ 6633 Ft. Center Point
199. Afforestation 2007-08
D -245 Firnoo Taben Seri Karsog 10 Ha. N31021.441’ E077
021’24.7’ 4035 Ft. Center Point
200. Afforestation 2007-08
D- 214 Jhunjhun Nehrinal Seri Karsog 30 Ha. N31019.507’ E077
019.252’ 5074 Ft.. Entry point
201. Afforestation 2007-08
D -252 Naganal Gowalpur Seri Karsog 10 Ha. N31024.023’ E077
0’21.388’ 5657 Ft. Center Point
202. Afforestation 2007-08
D 128 Kashoul Parlog Karsog Karsog 15 Ha. N31016.252’ E077
013.103’ 5002 Ft. Center Point
203. Afforestation N D 135 Fafan Parlog Karsog Karsog 10 Ha. N31016.233’ E077
015.484’ 3956 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2007-08
204. Afforestation 2007-08
N D 136 Parlog Parlog Karsog Karsog 8 Ha. N31016.990’ E077
016.385’ 2784 Ft. Center Point
205. Afforestation 2007-08
D- 127 Kashoul Parlog Karsog Karsog 25 Ha. N31016.211’ E077
013.833’ 3414 Ft. Center Point
206. Afforestation 2007-08
D- 16 Chattri-Suket Begli Pangna Karsog 10 Ha. N31023.826’ E077
007.107’ 5570 Ft. Center Point
207. Afforestation 2007-08
D-72 Reshtadhar CII Kanda Pangna Karsog 10 Ha. N31020.114’ E077
005.558’ 5334 Ft. Center Point
208. Pasture Development 2007-08
D 241 Kandloo Taben Seri Karsog 5 Ha. N31022.389’ E077°19.385’ 4128 Ft.. Entry Point
209. Afforestation 2007-08
ND 242 Boona Tabben Seri Karsog 5 Ha. N31025’08.1” E077
0 17’97.7” 3212 Ft.. Entry Point
210. Afforestation 2007-08
D 76 Kapdyal Tattapani Pangna Karsog 15 Ha. N31016.514” E077
0 04.386’ 2614 Ft.. Entry Point
211. Afforestation 2007-08
D 100 Ghanger Tattapani Pangna Karsog 5 Ha. N31014.271” E077
0 07.859’ 2345 Ft.. Entry Point
212. Afforestation 2007-08
D 96 Shoj Tattapani Pangna Karsog 10 Ha. N31015.648’ E077
0 04.958’ 3971 Ft.. Entry Point
213. Afforestation 2007-08
D 17 Chattri Suket Pangna Pangna Karsog 10 Ha. N31023.786’ E077
0 07.005’ 5568 Ft. Entry Point
214. Afforestation 2007-08
D 80 Kanda Bilindi Pangna Karsog 20 Ha. N31019.090’ E077
0 07.004’ 5600 Ft. Entry Point
215. Afforestation 2007-08
D 198 Dhamiyara Kashoul Karsog Karsog 17 Ha. N31019.908’ E077
0 10.277’ 4326 Ft. Entry Point
216. Afforestation 2007-08
D 133 Parnot Parlog Karsog Karsog 12 Ha N31016.156’ E077
0 13.180’ 4105 Ft. Entry Point
217. Pasture Dev. 2007-08
135 Fafan Mahaunag
Karsog Karsog 10 Ha N31018.111’ E077
0 12.573’ 4793 Ft. Entry Point
218. Afforestation 2007-08
D 173 Dopha Dopha Karsog Karsog 11 Ha. N31025.547' E077
0 14.077' 6550 Ft.. Entry Point
219. Afforestation 2007-08
D 124 Kolontha Mahaunag
Karsog Karsog 5 Ha. N31017.473' E077
0 12.406' 6518 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xvi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
220. Afforestation 2008-09
D 170 Tikar Karsog Sanarli Karsog Karsog 10 Ha. N31025.598’ E077
0 14.063’ 5702 Ft.. Entry Point
221. Afforestation 2008-09
D 87 Sarahan Alsindi Pangna Karsog 5 Ha. N31016.489’ E077
0 05.880’ 3401 Ft.. Entry Point
222. Afforestation 2008-09
D 20 Humginalla Pangna Pangna Karsog 6 Ha. N31024.645’ E077
0 07.465’ 5792 Ft.. Entry Point
223. Afforestation 2008-09
D 247 Sarahan Sarahan Seri Karsog 5 Ha. N31023.492’ E077°22.345’ 4595 Ft. Entry Point
224. Afforestation 2008-09
D 249 Makra Sarahan Seri Karsog 3 Ha. N31023.577’ E077°20.573’ 6137 Ft.. Entry Point
225. Afforestation 2008-09
D 249 Makra Sarahan Seri Karsog 6 Ha. N31022.412’ E077°21.007’ 6051 Ft.. Entry Point
226. Afforestation 2008-09
D 252 Naganal Gowalpur Seri Karsog 7 Ha. N31024.170’ E077°21.433’ 5382 Ft.. Entry Point
227. Afforestation 2008-09
D 252 Naganal Gowalpur Seri Karsog 3 Ha. N31024.189’ E077°21.464’ 5401 Ft.. Entry Point
228. Afforestation 2008-09
D 245 Firnoo Taben Seri Karsog 13 Ha. N31021.571’ E077°21.58.0’ 3984 Ft.. Entry Point
229. Afforestation 2008-09
D 231 Shiladhar Seri Seri Karsog 5 Ha. N31022.332’ E077°17.276’ 5855 Ft. Center Point
230. Afforestation 2008-09
D-105 Khadain Talehan Pangna Karsog 15 Ha. N31016.276’ E077
011.233’ 4739 Ft. Center Point
231. Afforestation 2008-09
D-175 Chatkar Alsindi Pangna Karsog 10 Ha. N31016.270’ E077
004.630’ 3272 Ft. Entry Point
232. Afforestation 2008-09
D-107 Gumma Talehan Pangna Karsog 10 Ha. N31015.713’ E077
011.769’ 4160 Ft. Entry Point
233. Afforestation 2008-09
D-106 Gumma Talehan Pangna Karsog 20 Ha. N31015.585’ E077
011.909’ 4087 Ft. Center Point
234. Afforestation 2008-09
D-106 Bhaura Talehan Pangna Karsog 10 Ha. N 31015.235’ E077
012.314’ 3228 Ft. Center Point
235. Afforestation 2008-09
D 249 Makra Sarahan Seri Karsog 4 Ha. N31023.359’ E077
021.210’ 6531 Ft.. Entry Point
236. Afforestation 2008-09
D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.086’ E077°17.484’ 6787 Ft.. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xvii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
237. Afforestation 2008-09
D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.040’ E077°17.598’ 7033 Ft.. Entry Point
238. Afforestation 2008-09
D 236 Pathreavi Pathreavi Seri Karsog 2 Ha. N31024.523’ E077°15.44.0’ 7081 Ft.. Entry Point
239. Afforestation2008-09
D 238 Gadpara Pokhi Seri Karsog 7 Ha. N31024.355’ E077°18.45.3’ 5993 Ft.. Entry Point
240. Afforestation 2008-09
D 239 Drawal Pokhi Seri Karsog 5 Ha. N31023.199’ E077°18.351’ 5760 Ft.. Entry Point
241. Afforestation 2008-09
D 240 Behal Pokhi Seri Karsog 7 Ha. N31025.300’ E077°17.101’ 6080 Ft.. Entry Point
242. Afforestation 2008-09
D 235 Dhurmu Katkosh Seri Karsog 5 Ha. N31023.305’ E077°17.074’ 4252 Ft.. Entry Point
243. Afforestation 2008-09
D—72 Reshtadhar CII Kanda Pangna Karsog 6 Ha. N31020’11.8’’ E077
005’129’’ 5324 Ft. Center Point
244. Afforestation 2008-09
D-72 Reshtadhar CII Karadal Pangna Karsog 10 Ha. N31020’33.7’’ E077
004’75.2’’ 4899 Ft. Center Point
245. Afforestation 2008-09
D-72 Gharlal CI Kanda Pangna Karsog 16 Ha. N31020’19.0’’ E077
004’15.1’’ 5696 Ft. Center Point
246. Afforestation 2008-09
D-73 Gharlal CII Kanda Pangna Karsog 18 Ha. N31020’28.4’’ E077
003’90.0’’ 5744 Ft. Center Point
247. Afforestation 2008-09
D-73 Gharlal Kanda Pangna Karsog 26 Ha. N31020’46.5’’ E077
004’19.7’’ 4912 Ft. Center Point
248. Afforestation 2008-09
U-2 Belend I&II Balar Pangna Karsog 30 Ha. N31021’27.0’’ E077
006’71.8’’ 4560 Ft. Center Point
249. Afforestation 2008-09
D-61 Shorshan (CII) Shorshan Pangna Karsog 10 Ha. N31021’05.1’’ E077
007’73.6’’ 4550 Ft. Center Point
250. Afforestation 2008-09
D- 39 Tikkar Begli Pangna Karsog 5 Ha. N31024.213’ E077
008.905’ 6064 Ft. Entry Point
251. Afforestation 2008-09
D- 39 Shill Ghoshal Pangna Karsog 5 Ha. N31024.428’ E077
010.395’ 7041 Ft. Center Point
252. Afforestation 2008-09
D-1 Mahag Surahi Pangna Karsog 5 Ha. N31023.303’ E077
005.661’ 6727 Ft. Center Point
253. Afforestation 2008-09
D-22 Chadanident Katachi Pangna Karsog 4 Ha. N31025’91.9’’ E077
007’45.2’’ 6483 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xviii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
254. Afforestation 2008-09
D- 40 Baju Ghoshal Pangna Karsog 5 Ha. N31024.024’ E077
010.003’ 6622 Ft. Center Point
255. Afforestation 2008-09
D 134 Mangam Parlog Karsog Karsog 5 Ha. N31015.410’ E077
014.559’ 2752 Ft. Center Point
256. Afforestation 2008-09
D- 131 Parnot Parlog Karsog Karsog 5 Ha. N31015.889’ E077
013.975’ 3285 Ft. Center Point
257. Afforestation 2008-09
D 137 Nagaltha Mahonag Karsog Karsog 30 Ha. N31019.301’ E077
013.563’ 3731 Ft. Center Point
258. Afforestation 2008-09
D-161 Dumahal Kakahan Karsog Karsog 10 Ha. N31021.420’ E077
010.339’ 6208 Ft. Center Point
259. Afforestation 2008-09
D -241 Kandloo Taben Seri Karsog 9 Ha. N31022.521’ E077
019.533’ 4934 Ft. Center Point
260. Afforestation 2008-09
D -241 Kandloo Taben Seri Karsog 3 Ha. N31022.205’ E077
019.43.3’ 4105 Ft. Center Point
261. Afforestation 2008-09
D -241 Kandloo Taben Seri Karsog 4 Ha. N31022.530’ E077
020.056’ 4937 Ft. Center Point
262. Afforestation 2008-09
D -241 Kandloo Taben Seri Karsog 5 Ha. N31022.514’ E077
019.552’ 4947 Ft. Center `Point
263. Afforestation 2008-09
D -241 Kandloo Taben Seri Karsog 3 Ha. N31022.317’ E077
019.451’ 4054 Ft. Center Point
264. Afforestation 2008-09
D 249 Makra Sarahan Seri Karsog 4 Ha. N31023.462’ E077
021.023’ 6617 Ft. Center Point
265. Afforestation 2008-09
D -230 Chabar Chauridhar
Seri Karsog 10 Ha. N31022.646’ E077
018.074’ 5002 Ft.. Center Point
266. Afforestation 2008-09
D -23 Chabar Chauridhar
Seri Karsog 10 Ha. N31022.792’ E077
018.395’ 4639 Ft.. Center Point
267. Afforestation 2008-09
D- 222 Pog Nari Seri Karsog 10 Ha. N31020.371’ E077
019.565’ 4944 Ft.. Entry Point
268. Afforestation D- 229 Ganu C-II Chamoon Seri Karsog 6 Ha. N31019.418’ E077
018.824’ 5420 Ft.. Center Point
269. Afforestation 2008-09
D- 222 Pog Nari Seri Karsog 8 Ha. N31020.215’ E077
020.045’ 4093 Ft.. Center Point
270. Afforestation 2008-09
D -227 Charog Khanda Seri Karsog 7 Ha. N31020.705’ E077
017.777’ 5875 Ft.. Entry Point
271. Afforestation D- 211 Sainjh Nehrinal Seri Karsog 18 Ha. N31018.629’ E077
017.449’ 5978 Ft.. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xix
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2008-09
272. Afforestation 2008-09
D- 211 Sainjh Nehrinal Seri Karsog 2 Ha. N31018.523’ E077
017.230’ 5833 Ft.. Center Point
273. Afforestation 2008-09
D- 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N31018.331’ E077
018.437’ 5590 Ft.. Entry Point
274. Afforestation 2008-09
D-176 Gahalaych Ghalaych Karsog Karsog 10 Ha. N31024.758’ E077
014.260’ 6646 Ft.. Center Point
275. Afforestation 2008-09
D-188 Kandi Kashal Karsog Karsog 5 Ha. N31020.796’ E077
016.053’ 6570 Ft.. Center Point
276. Afforestation 2008-09
D-172 Dopha C(v) Dopha Karsog Karsog 10 Ha. N31025.725’ E077
012.250’ 6484 Ft.. Center Point
277. Afforestation 2008-09
D-208 Majod Mehendi Karsog Karsog 10 Ha. N31018.118’ E077
017.035’ 5954 Ft.. Center Point
278. Afforestation 2008-09
D-199 Dhamiyara Kashoul Karsog Karsog 5 Ha. N31020’10.5” E077
014’47.6” 4873 Ft. Center Point
279. Afforestation 2008-09
D-204 Sanahro Mehendi Karsog Karsog 10 Ha. N31019.690’ E077
016.151’ 4961 Ft.. Center Point
280. Afforestation 2008-09
D-202 Paraladarthu Mehendi Karsog Karsog 10 Ha. N31019’52.4’’ E077
015’10.6’’ 4710 Ft. Center Point
281. Afforestation 2008-09
D-5.5 Janol Karadal Pangna Karsog 10 Ha. N31021’22.7’’ E077
007’78.8’’ 4886 Ft. Center Point
282. Afforestation 2008-09
D-74 Parvain –I Blindi Pangna Karsog 15 Ha. N31017’79.5’’ E077
005’16.4’’ 4208 Ft. Center Point
283. Afforestation 2008-09
D-74 Parvain –II Blindi Pangna Karsog 20 Ha. N31017’73.6’’ E077
005’15.9’’ 4272 Ft. Center Point
284. Afforestation 2008-09
D-74 Parvain –III Blindi Pangna Karsog 10 Ha. N31017’63.0’’ E077
005’08.1’’ 4198 Ft. Center Point
285. Afforestation 2008-09
D-74 Parvain Blindi Pangna Karsog 20 Ha. N31017’79.7’’ E077
004’42.7’’ 2976 Ft. Center Point
286. Afforestation 2008-09
D-74 Parvain Blindi Pangna Karsog 5 Ha. N31018’41.9’’ E077
003’16.1’’ 2633 Ft. Center Point
287. Afforestation 2008-09
D-79 Moharoo Blindi Pangna Karsog 5 Ha. N31018’36.3’’ E077
006’50.1’’ 5564 Ft. Center Point
288. Afforestation D-80 Kanda Blindi Pangna Karsog 30 Ha. N31018.341’ E077
006.458’ 5584 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xx
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2008-09
289. Afforestation 2008-09
D- 101 Nandoo -II Tattapani Pangna Karsog 10 Ha. N31015’16.3’’ E077
008’60.0’’ 2691 Ft. Center Point
290. Afforestation 2008-09
D- 101 Nandoo Tattapani Pangna Karsog 30 Ha. N31014’63.2’’ E077
008’74.4’’ 3014 Ft. Center Point
291. Afforestation 2008-09
D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017.205’ E077
006.530’ 4050 Ft. Entry Point
292. Afforestation 2008-09
D-86 Lochar Alsindi Pangna Karsog 5 Ha. N31017.050’ E077
005.875’ 3875 Ft. Entry Point
293. Afforestation 2008-09
D-86 Lochar Alsindi Pangna Karsog 25 Ha. N31016.815’ E077
005.844’ 3664 Ft. Entry Point
294. Afforestation 2008-09
D-75 Chatkar Alsindi Pangna Karsog 10 Ha. N31016.624’ E077
005.041’ 3299 Ft. Center Point
295. Afforestation 2008-09
D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31016.659’ E077
004.575’ 3180 Ft. Entry Point
296. Afforestation 2008-09
D-76 Kapdyal Alsindi Pangna Karsog 5 Ha. N31016.651’ E077
004.445’ 3270 Ft. Center Point
297. Afforestation 2008-09
D-76 Kapdyal Alsindi Pangna Karsog 5 Ha. N31016.866’ E077
004.829’ 3310 Ft. Center Point
298. Afforestation 2008-09
D-76 Kapdyal Alsindi Pangna Karsog 10 Ha. N31016.232’ E077
005.102’ 3210 Ft. Center Point
299. Afforestation 2008-09
D-104 Basta Talehan Pangna Karsog 15 Ha. N31016.964’ E077
010.307’ 4831 Ft. Center Point
300. Afforestation 2008-09
D-104 Besta Talehan Pangna Karsog 25 Ha. N31017.144’ E077
010.545’ 5386 Ft. Entry Point
301. Afforestation 2008-09
D 245 Firnoo Tabben Seri Karsog 9 Ha. N 310 21.326’ E077
0 21.558’ 3936 Ft.. Entry Point
302. Afforestation 2008-09
D 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N31018.331’ E077°17.437’ 5590 Ft. Center Point
303. Afforestation 2008-09
D 227 Charog Khadra Seri Karsog 7 Ha. N31020.705’ E077°17.777’ 5875 Ft. Center Point
304. Afforestation 2008-09
D 222 Pog Nanj Seri Karsog 10 Ha. N31020.371’ E077’19.565’ 4944 Ft. Center Point
305. Afforestation D 211 Sainjh Nehrinal Seri Karsog 18 Ha. N31018.629’ E077’17.441’ 5978 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2008-09
306. Afforestation 2008-09
D 211 Sainjh Nehrinal Seri Karsog 2 Ha. N31018.523’ E077’17.230’ 5833 Ft. Center Point
307. Afforestation 2008-09
D 211 Sainjh Nehrinal Seri Karsog 10 Ha. N31018.923’ E077’17.735’ 5902 Ft. Center Point
308. Afforestation 2008-09
D 40 Baju Ghushal Pangna Karsog 5 Ha. N31024.008’ E077
0 10.204’ 6051 Ft.. Entry Point
309. Afforestation 2008-09
D 39 Shill Ghoshal Pangna Karsog 6 Ha. N310 24.609’ E077
0 10.405’ 6336 Ft.. Entry Point
310. Afforestation 2008-09
D 19 Shalog Shalog Pangna Karsog 4 Ha. N310 24.008’ E077
0 10.204’ 6016 Ft.. Entry Point
311. Afforestation 2008-09
D 101 Nandoo Tattapani Pangna Karsog 20 Ha. N310 15.146’ E077
0 08.696’ 2960 Ft.. Entry Point
312. Afforestation 2008-09
D 249 Makra Sarahan Seri Karsog 4 Ha. N3102335.9’ E077
0 21.210’ 4531 Ft.. Entry Point
313. Afforestation 2008-09
D 72 Reshtadhar Kanda Pangna Karosg 10 Ha. N 31021.057’ E077
0 06.160’ 4384 Ft.. Entry Point
314. Afforestation 2008-09
D 72, Reshtadhar 2 Kanda Pangna Karsog 6 Ha. N31020.047’ E077
0 05.096’ 5747 Ft. Entry Point
315. Afforestation 2008-09
D 109 Ghawla Talehan Pangna Karsog 10 Ha. N31017.309’ E077
0 11.44’ 4521 Ft.. Entry Point
316. Afforestation 2008-09
D99 Braker Tattapani Pangna Karsog 15 Ha. N31015.146’ E077
0 07.982’ 3433 Ft.. Entry Point
317. Afforestation 2008-09
D 161 Dumehi Kamand Karsog Karsog 10 Ha. N31021.390’ E077
0 10.387’ 6073 Ft.. Entry Point
318. Afforestation 2008-09
D 176 Galaych Galaych Karsog Karsog 10 Ha. N31024.593’ E077
0 14.066’ 5046 Ft.. Entry Point
319. Afforestation 2008-09
D 40 Baju Ghoshal Pangna Karsog 5 Ha. N31024.024’ E077°10.003’ 6622 Ft. Center Point
320. Afforestation 2008-09
D 39 Tikkar Begli Pangna Karsog 5 Ha. N31024.213’ E077°08.905’ 6064 Ft. Center Point
321. Afforestation 2008-09
D 39 Shill Ghoshal Pangna Karsog 6 Ha. N31024.428’ E077°10.395’ 7041 Ft. Center Point
322. Afforestation D 39 Shill Ghoshal Pangna Karsog 5 Ha. N31024.402’ E077°10.545’ 7160 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2009-10
323. Afforestation 2009-10
D 40 Baju Ghoshal Pangna Karsog 5 Ha. N31023.949’ E077°10.261’ 6398 FT. Center Point
324. Afforestation 2009-10
D 24 Barnog Katachi Pangna Karsog 6 Ha. N31025.708’ E077
0 07.879’ 6736 Ft.. Entry Point
325. Afforestation 2009-10
D 19 Shalog Shalog Pangna Karsog 5 Ha. N31025.154’ E977
0 07.003’ 6220 Ft.. Entry Point
326. Afforestation 2009-10
D 80 Kanda Bilindi Pangna Karsog 5 Ha. N31018.341' E077
006.367’ 5670 Ft.. Entry Point
327. Afforestation 2009-10
D 105 Khandain Talehan Pangna Karsog 30 Ha. N31016.406’ E077
0 10.890’ 4464 Ft.. Entry Point
328. Afforestation 2009-10
D 8 Panyaroo Surahi Pangna Karsog 5 Ha. N31022.105’ E077
0 06.809’ 4960 Ft.. Entry Point
329. Afforestation 2009-10
D 64 Salana Degoh Balar Pangna Karosg 5 Ha. N31021.095’ E077
066.023’ 5307 Ft. Entry Point
330. Afforestation 2009-10
D 247 Sarahan Sarahan Seri Karsog 5 Ha. N31022.130’ E077
0 22.160’ 4553 Ft.. Entry Point
331. Afforestation 2009-10
OD 247 Sarahan Sarhan Seri Karsog 5 Ha. N31022.070’ E077
0 22.386’ 4518 Ft.. Entry Point
332. Afforestation 2009-10
D 222 Pog Nahi Seri Karsog 5 Ha. N31020.101’ E077
0 19.229’ 3916 Ft.. Entry Point
333. Afforestation 2009-10
D 222 Pog Nanj Seri Karsog 5 Ha. N31020.215’ E077’20.095’ 4093 Ft. Center Point
334. Afforestation 2009-10
D-105 Bhouri Talehan Pangna Karsog 20 Ha. N 31016.273’ E077
011.665’ 5331 Ft. Center Point
335. Afforestation 2009-10
D-107 Gumma Talehan Pangna Karsog 20 Ha. N31016.143’ E077
011.508’ 5371 Ft. Top Entry
Point
336. Afforestation 2009-10
D-99 Braker Tattapani Pangna Karsog 5 Ha. N31015’32.1’’ E077
007’83.3’’ 3507 Ft. Center Point
337. Afforestation 2009-10
D-86 Lochar Alsindi Pangna Karsog 7 Ha. N31016.587’ E077
006.305’ 3952 Ft. Center Point
338. Afforestation 2009-10
D-64 Salana Degoh Balar Pangna Karsog 5 Ha. N31021’24.5’’ E077
006’01.6’’ 5008 Ft. Center Point
339. Afforestation D-72 Resthadhan Kanda Pangna Karsog 5 Ha. N31018.935’ E077
005.295’ 5915 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxiii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2009-10
340. Afforestation 2009-10
D-72 Resthadhan –A Kanda Pangna Karsog 15 Ha. N31019.426’ E077
004.506’ 5560 Ft. Center Point
341. Afforestation 2009-10
D-73 Gharlal –C-II Kanda Pangna Karsog 5 Ha. N31019.968’ E077
003.858’ 5389 Ft. Center Point
342. Afforestation 2009-10
D-74 Parvain Blindi Pangna Karsog 5 Ha. N31018’33.9’’ E077
003’10.5’’ 2448 Ft. Center Point
343. Afforestation 2009-10
D-39 Shill Ghoshal Pangna Karsog 5 Ha. N31024.402’ E077
010.545’ 7160 Ft. Center Point
344. Afforestation 2009-10
D-40 Baju Ghoshal Pangna Karsog 5 Ha. N31023.949’ E077
010.261’ 6398 Ft. Center Point
345. Afforestation 2009-010
D- 40 Humginala Pangna Pangna Karsog 6 Ha. N31024.470’ E077
007.110’ 5750 Ft. Center Point
346. Afforestation 2009-10
D-27 Mahasu Machroot Pangna Karsog 6 Ha. N31025’27.0’’ E077
008’71.5’’ 5955 Ft. Center Point
347. Afforestation 2009-10
D-30 Begalimandi Machroot Pangna Karsog 5 Ha. N31025’05.5’’ E077
008’56.7’’ 5542 Ft. Center Point
348. Afforestation 2009-10
D-198 Dhamiyara Khashoul Karsog Karsog 10 Ha. N31020’25.7” E077
015’07.8” 5046 Ft. Center Point
349. Afforestation 2009-10
D-202 Paraladarthu Mehendi Karsog Karsog 12 Ha. N31019’54.4’’ E077
015’21.6’’ 4774 Ft. Center Point
350. Afforestation 2009-10
D-207 Gandhoi Mehendi Karsog Karsog 11 Ha. N31019.125’ E077
015.083’ 4818 Ft.. Center Point
351. Afforestation 2009-10
D-172 Dopha Dopha Karsog Karsog 10 Ha. N31025’22.4’’ E077
013’40.7’’ 6256 Ft. Center Point
352. Afforestation 2009-10
D-175 Pehran Ghalaych Karsog Karsog 5 Ha. N31025.017’ E077
014.651’ 4425 Ft.. Center Point
353. Afforestation 2009-10
D- 183 MKB Mahadev ki Banouri
Mamail Karsog Karsog 15 Ha. N31022.081’ E077
014.069’ 4460 Ft. Center Point
354. Afforestation 2009-10
D- 187 Kelodhar Sarahanda
Bhenera Karsog Karsog 10 Ha. N31021’51.5” E077
015’12.6” 4652 Ft. Center Point
355. Afforestation 2009-10
D-176 Ghalaych Ghalaych Karsog Karsog 3 Ha. N31024.413’ E077
014.263’ 6803 Ft.. Entry Point
356. Afforestation D-171 Dopha Dopha Karsog Karsog 10 Ha. N31025.073’ E077
012.985’ 6863 Ft.. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxiv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2009-10
357. Afforestation 2009-10
D-162 Kajhol Kakahan Karsog Karsog 5-Ha. N31022’11.8’’ E077
010’47.4’’ 6048 Ft. Center Point
358. Afforestation 2009-10
D-155 Batauli Kamand Karsog Karsog 5 Ha. N31020’18.3’’ E077
012’37.8’’ 4864 Ft. Center Point
359. Afforestation 2009-10
D-170 Tikkar Karsog Sanarli Karsog Karsog 5 Ha. N31024.649’ E077
011.135’ 6841 Ft.. Center Point
360. Afforestation 2009-10
D-138 Bagbokhari Mahaunag
Karsog Karsog 40Ha. N31090’01.3’’ E077
014’05.5’’ 4934 Ft. Center Point
361. Afforestation 2009-10
D 137 Nagaltha Mahaunag
Karsog Karsog 20 Ha. N31019’24.4’’ E077
014’06.0’’ 3507 Ft. Center Point
362. Afforestation 2009-10
D 119 Mehram Mahaunag
Karsog Karsog 5 Ha. N31019’32.3’’ E077
010’30.7’’ 5820 Ft. Center Point
363. Afforestation 2009-10
D 144 Kashmir Sapnot Karsog Karsog 5 Ha. N31019’39.4’’ E077
010’35.5’’ 5680 Ft. Center Point
364. Afforestation 2009-10
D 111 Bagshar Bagshar Karsog Karsog 5 Ha. N31019’17.3’’ E077
008’41.1’’ 6019 Ft. Center Point
365. Afforestation 2009-10
D- 133 Hiru Parlog Karsog Karsog 10 Ha. N31016.654’ E077
013.666’ 3804 Ft. Center Point
366. Afforestation 2009-10
D- 134 Mangam Parlog Karsog Karsog 5 Ha. N31016.007’ E077
015.261’ 3205 Ft. Center Point
367. Afforestation 2009-10
D-106 Bhaura Talehan Pangna Karsog 5 Ha. N31015.266’ E077
012.523’ 2881 Ft. Center Point
368. Afforestation 2009-10
D- 134 Mangam Parlog Karsog Karsog 10 Ha. N31015.957’ E077
015.222’ 3290 Ft. Center Point
369. Afforestation 2009-10
OD 247 Sarahan Sarahan Seri Karsog 5 Ha. N31022’40.0” N 31
0 21’22.5” 4515 Ft. Entry Point
370. Afforestation 2009-10
D 124 Kolontha Mahaunag
Karsog Karsog 5 Ha. N31017.435' E077
0 12.209’ 5920 Ft. Entry Point
371. Afforestation 2009-10
138 Bag Bhokhari Mahaunag
Karsog Karsog 10 Ha N31019.082' E077
0 13.290' 4812 Ft. Entry Point
372. Afforestation 2010-11
B 207 Ghandoi Mehendi Karsog Karsog 9 Ha. N31019’07.3’’ E077
0 15’04.1” 4630 Ft. Entry Point
373. Afforestation D- 133 Hiru Parlog Karsog Karsog 13 Ha. N31017.246’ E077
013.178’ 6568 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2010-11
374. Afforestation 2010-11
D- 128 Kashoul Parlog Karsog Karsog 20 Ha. N31016.453’ E077
012.907’ 4846 Ft. Center Point
375. Afforestation 2010-11
D- 134 Mangan Parlog Karsog Karsog 15 Ha. N31015.786’ E077
014.145’ 3152 Ft. Center Point
376. Afforestation 2010-11
D -226 Khadra Khadra Seri Karsog 8 Ha. N31020.136’ E077
017.771’ 6112 Ft. Center Point
377. Afforestation 2010-11
D-222 Pog Nari Seri Karsog 3- Ha. N31020.489’ E077
019.370’ 5445 Ft. Top Entry
Point
378. Afforestation 2010-11
D- 214 Jhunjhun Nehrinal Seri Karsog 10 Ha. N31019.313’ E077
019.435’ 4935 Ft.. Center Point
379. Afforestation 2010-11
D- 214 Jhunjhun Nehrinal Seri Karsog 20 Ha. N31017.971’ E077
017.267’ 6290 Ft.. Center Point
380. Afforestation 2010-11
D- 214 Jhunjhun Nehrinal Seri Karsog 2 Ha. N31019.635’ E077
019.735’ 5243 Ft. Center Point
381. Afforestation 2010-11
D-208 Majod Mehendi Karsog Karsog 20 Ha. N31018.535’ E077
017.412’ 5821 Ft. Center Point
382. Afforestation 2010-11
D 236 Pathraeivi Pathraeivi Seri Karsog 5 Ha N31024’52.0" E 077
0 15’56.3" 7088 Ft. Entry Point
383. Afforestation 2010-11
D 249 Makra Sarahan Seri Karsog 2 Ha. N31022.451’ E077°21.243’ 5280 Ft. Entry Point
384. Afforestation 2010-11
D 226 Khadra Khadra Seri Karsog 8 Ha. N31020.936’ E077°17.771’ 6112 Ft. Center Point
385. Afforestation 2010-11
D 222 Pog Khadra Seri Karsog 3 Ha. N31020.48.9’ E077°19.37.0’ 5445 Ft. Center Point
386. Afforestation 2010-11
D 214 Jhunjhun Nehrinal Seri Karsog 20 Ha. N31017.97.1’ E077°17.26.7’ 6290 Ft. Center Point
387. Afforestation 2010-11
D 214 Jhunjhun Nehrinal Seri Karsog 10 Ha. N31019.31.3’ E077°19.43.5’ 4935 Ft. Center Point
388. Afforestation 2010-11
D 222 Pog Nahj Seri Karsog 1 Ha. N31020’29.4” E077
0 19’17.9” 5142 Ft. Entry Point
389. Afforestation 2010-11
D 73 Gharlal Kanda Pangna Karsog 12 Ha. N31020’10.9” E077
004’57.5” 5002 Ft. Entry Point
390. Afforestation D 90 Mahita 2 Alsnidi Pangna Karsog 5 Ha. N31016.267’ E077
0 05.437’ 3216 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxvi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2010-11
391. Afforestation 2010-11
D 1 Mahog Surahi Pangna Karsog 5 Ha. N31023.710’ E077
0 05.454’ 6048 Ft. Entry Point
392. Afforestation 2010-11
D72 Reshtadhar Kanda Pangna Karsog 5 Ha. N31021.794’ E077
0 0.6.753’ 4428 Ft. Entry Point
393. Afforestation 2010-11
D 62 Kunash Balar Pangna Karsog 5 Ha. N31019.058’ E077
0 05.370’ 5552 Ft. Entry Point
394. Afforestation 2010-11
Alyash Alsindi Pangna Karsog 10 Ha. N31017.075’ E077
0 07.004’ 5568 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxvii
Rim Plantation
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
395. Rim Pltn 2004-05
D 170 Tikkar Karsog
Sanarli Karsog Karsog 5 Ha. N 310 25’10.6" E 077
011’04.7” 6320 Ft. Entry Point
396. Rim Plantation 20005-06
D-92 Sorour Tattapani Pangna Karsog 5 N 31015’14.9’’ E077
003’84.3’’ 2089 Ft. Center Point
397. Rim Plantation 2005-06
D- 101 Nandoo Tattapani Pangna Karsog 10 N 31015’94.0’’ E077
007’94.1’’ 4000 Ft. Center Point
398. Rim Plantation 2005-06
D- 101 Nandoo Tattapani Pangna Karsog 43 N 31015’74.1’’ E077
008’94.7’’ 4089 Ft. Center Point
399. Rim Plantation 2005-06
D- 101 Ghangar Tattapani Pangna Karsog 7 N 31014’19.0’’ E077
007’51.3’’ 1952 Ft. Center Point
400. Rim Plantation 2005-06
U. F. Thinu Balh Tattapani Pangna Karsog 8 N 31013’93.0’’ E077
008’33.2’’ 2137 Ft. Center Point
401. Rim Plantation 2005-06
D -99 Braker Tattapani Pangna Karsog 5 N 31014’74.7’’ E077
008’26.4’’ 2265 Ft. Center Point
402. Rim Plantation 2005-06
U. F. Thalli Tattapani Pangna Karsog 5 N 31014’27.7’’ E077
007’87.8’’ 2096 Ft. Center Point
403. Rim Plantation 2005-06
D – 98 Kidia Tattapani Pangna Karsog 5 N 31015’22.4’’ E077
005’92.1’’ 2441 Ft. Center Point
404. Rim Plantation 2005-06
D- 98 kidia Tattapani Pangna Karsog 30 N 31015’19.8’’ E077
005’94.7’’ 2499 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxviii
Pasture Development
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
405. Pasture Dev. 2004-05
OD 137 Nagaltha Mahaunag Karsog Karsog 5 Ha. N310 17.264' E 077
0 14.280’ 6352 Ft. Entry Point
406. Pasture Development 2005-06
OD 255 -IV Sagach Mahog Magroo Karsog 5 Ha. N 310 25.598’ E077
020.047’ 6563 Ft. Entry Point
407. Pasture Development 2005-06
OD 283 Raidhar khotu
Chaura Magroo Karsog 10 Ha. N 310 27.211’ E077
0 18.826’ 5321 Ft. Entry Point
408. Pasture Development 2005-06
OD 278 Nadun Lassi Magroo Karsog 10 Ha. N 310 30.314’ E077
0 17.218’ 8928
Ft.. Entry Point
409. Pasture Development 2005-06
OD 278 Nadun Lassi Magroo Karsog 10 Ha. N 310 30.166’ E077
0 17.173’ 8780 Ft. Top Entry
point
410. Pasture Development 2005-06
D 241 kandloo Taben Seri Karsog 5 Ha. N31022.400’ E077’19.440’ 4492 Ft. Entry Point
411. Pasture Development 2005-06
D-106 Bhaura Talehan Pangna Karsog 10 Ha. N 31014.950’ E077
012.387’ 3202 Ft. Center Point
412. Pasture Development 2005-06
D-106 Bhaura Talehan Pangna Karsog 20 Ha. N 31015.004’ E077
011.609’ 2320 Ft. Center Point
413. Pasture Development 2005-06
D-76 Kapdyals Alsindi Pangna Karsog 10 Ha. N 31016.396’ E077
004.662’ 3070 Ft. Entry Point
414. Pasture Development 2005-06
D-74 Parvain Blindi Pangna Karsog 10 Ha. N 31017’70.8’’ E077
003’78.4’’ 2601 Ft. Center Point
415. Pasture Development 2005-06
D-198 Dhamiyara Kashoul Karsog Karsog 10 Ha. N 31020.946’ E077
014.646’ 4250 Ft. Center Point
416. Pasture D 249 Makra Sarahan Seri Karsog 5 Ha. N 31022.590’ E077
021.384’ 4652 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxix
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
Development 2005-06
417. Pasture Development 2005-06
D 233 Richhni Richhni Seri Karsog 8 Ha. N 31024.359’ E077
014.497’ 7174 Ft. Center Point
418. Pasture Development 2005-06
D 233 Richhni Richhni Seri Karsog 13 Ha. N 31024.013’ E077
016.129’ 6000 Ft. Center Point
419. Pasture Development 2005-06
N D- 131 Parnot Parlog Karsog Karsog 10 Ha. N 31016.111’ E077
013.854’ 3096 Ft. Center Point
420. Pasture Development 2005-06
D -241 Kandloo Taben Seri Karsog 5 Ha. N 31022.400’ E077
019.440’ 4492 Ft. Center Point
421. Pasture Development 2006-07
N D 255 Sagach Mahog Magroo Karsog 15 Ha. N 310 25.669’ E077
0 19.961’ 6400 Ft. Entry Point
422. Pasture Dev. 2007-08
ND 283 Raidhor Chaura Magroo Karsog 5 Ha. N 310 27.111’ E077
0 18.530’ 5450 Ft. Center Point
423. Pasture Development 2007-08
OD 283 Raidhar Chaura Magroo Karsog 5 Ha. N 310 27.229’ E077
0 18.893’ 5424 Ft. Center Point
424. Pasture Development 2007-08
OD 278 Nadur Lassi Magroo Karsog 20 Ha. N 310 29.603’ E077
0 17.494’ 8457 Ft. Entry Point
425. Pasture Dev. 2007-08
ND 283 Raidhor Chawra Magroo Karsog 5 Ha. N 310 27.142 E 077
0 18.880’ 5496 Ft. Entry Point
426. Pasture Dev. 2007-08
D 133 Hiru Parlog Karsog Karsog 9 Ha. N 310 17’32.4” E 077
0
13’52.7” 6470 Ft. Entry Point
427. Pasture Dev. 2007-08
NB 247 Sarahan Sarahan Seri Karsog 5 Ha. N 310 22’22.5” E 077
0
22’14.0” 4620 Ft. Entry Point
428. Pasture Development 2007-08
D 247 Sarahan CII Sarahan Seri Karsog 5 Ha. N 31022.375’ E077
022.755’ 4519 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxx
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
429. Pasture Development 2007-08
D 247 Sarahan C -VI
Sarahan Seri Karsog 10 Ha. N 31022.591’ E077
022.862’ 4455 Ft. Center Point
430. Pasture Development 2007-08
D 250 Bagridhar Sarahan Seri Karsog 10 Ha. N 31023.259’ E077
022.141’ 4421 Ft. Center Point
431. Pasture Development 2007-08
D -241 Kandloo Taben Seri Karsog 5 Ha. N 31022.379’ E077
019.385’ 1290 Ft. Center Point
432. Pasture Development 2007-08
D-138 Bagbokhari Mahonag Karsog Karsog 20 Ha. N 31019’07.5’’ E077
014’05.5’’ 4483 Ft. Center Point
433. Pasture Development 2007-08
D-137 Nagaltha Mahonag Karsog Karsog 30 Ha. N 31019’27.2’’ E077
014’13.0’’ 3817 Ft. Center Point
434. Pasture Development 2007-08
O D- 136 Parlog Parlog Karsog Karsog 15 Ha. N 31016.438’ E077
016.884’ 2652 Ft. Center Point
435. Pasture Development 2007-08
N D- 134 Magam Parlog Karsog Karsog 20 Ha. N 31016.072’ E077
014.845’ 4553 Ft. Center Point
436. Pasture Development 2007-08
D 252 Naganal Gowalpur Seri Karsog 10 Ha. N31024.023’ E077°21.388’ 5657 Ft. Entry Point
437. Pasture Development 2007-08
D 247 Sarahan C-II Sarahan Seri Karsog 5 Ha. N31022.375’ E077°22.750’ 4519 Ft. Entry Point
438. Pasture Development 2007-08
D 247 Sarahan C-IV
Sarahan Seri Karsog 10 Ha. N31022.59.1’ E077°22.86.2’ 4455 Ft. Entry Point
439. Pasture Development 2007-08
D 250 Bagridhar Sarahan Seri Karsog 10 Ha. N31023.259’ E077°22.145’ 4421 Ft. Entry Point
440. Pasture Dev. 135 Fafan Porlog Karsog Karsog 0 5 Ha. N 310 16.007’ E 077
0 14.592’ 4227 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2007-08
441. Pasture Development 2008-09
D-104 Besta Talehan Pangna Karsog 25 Ha. N 31016.630’ E077
010.224’ 4756 Ft. Center Point
442. Pasture Development 2008-09
D-105 Kadain Talehan Pangna Karsog 5 Ha. N 31016.237’ E077
010.593’ 3772 Ft. Center Point
443. Pasture Development 2008-09
D-73 Gharlol Kanda Pangna Karsog 10 Ha. N 31020’27.5’’ E077
003’96.0’’ 5728 Ft. Center Point
444. Pasture Development 2008-09
D-27 Mahasu Machroot Pangna Karsog 10 Ha. N 31025’74.0’’ E077
009’11.3’’ 6476 Ft. Center Point
445. Pasture Development 2008-09
D- 131 Parnot Parlog Karsog Karsog 15 Ha. N 31018.074’ E077
013.867’ 3485 Ft. Center Point
446. Pasture Development 2008-09
D- 133 Hiru Parlog Karsog Karsog 20 Ha. N 31016.779’ E077
013.550’ 4143 Ft. Center Point
447. Pasture Development 2008-09
D-38 Bakaran Begli Pangna Karsog 5 Ha. N 31025’63.5’’ E077
009’09.0’’ 6400 Ft. Center Point
448. Pasture Development 2008-09
D-74 Parvain Blindi Pangna Karsog 35 Ha. N 31017’74.6’’ E077
004’14.3’’ 2806 Ft. Center Point
449. Pasture Development 2008-09
D- 101 Nandoo Tattapani Pangna Karsog 10 Ha. N 31014’58.3’’ E077
008’55.0’’ 2851 Ft. Center Point
450. Pasture Development 2008-09
D-86 Kapdyals Alsindi Pangna Karsog 10 Ha. N 31016.625’ E077
005.533’ 3008 Ft. Center Point
451. Pasture Dev. 2008-09
D 134 Magan Porlog Karsog Karsog 5 Ha. N 310 15.320’ E 077
0 14.469’ 3075 Ft. Entry Point
452. Pasture D-106 Besta Talehan Pangna Karsog 15 Ha. N 31016.439’ E077
009.320’
4123 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
Development 2008-09
453. Pasture Dev. 2009-10
D 214 Jhunjhun Nehrinal Seri Karsog 20 Ha. N 310 17.593’ E 077
0 18.340’ 5676 Ft. Entry Point
454. Pasture Development 2009-10
D- 12 Bhayana Surahi Pangna Karsog 5 Ha. N 31023.676’ E077
005.854’ 6096 Ft. Entry Point
455. Pasture Development 2009-10
D- 183 MKB Mahadev ki Banouni
Mamail Karsog Karsog 8- Ha. N 31022’38.3” E077
013’35.5” 4313 Ft. Center Point
456. Pasture Development 2010-11
D-137 Nagaltha Mahonag Karsog Karsog 10 Ha. N 31019’25.9’’ E077
013’59.7’’ 3590 Ft. Center Point
457. Pasture Dev. 2010-11
D 133 Hiru Parlog Karsog Karsog 5 Ha. N 310 16’10.7” E 077
0
14’48.0” 4819 Ft. Entry Point
458. Pasture Dev. 2010-11
D - 175 Pehran Galaych Karsog Karsog 10 Ha. U 310 25’01.1" E 077
014’23.6” 6048 Ft. Entry Point
459. Pasture Development 2010-11
D -245 Firnoo Taben Seri Karsog 2 Ha. N 31021.274’ E077
021.113’ 3900 Ft. Center Point
460. Pasture Development 2010-11
D -252 Naganal Taben Seri Karsog 4 Ha. N 31022.140’ E077
020.049’ 4003 Ft. Center Point
461. Pasture Development 2010-11
D 249 Makra Sarahan Seri Karsog 2 Ha. N 31022.455’ E077
021.243’ 5280 Ft. Center Point
462. Pasture Development 2010-11
D -254 Sushan Gowalpur Seri Karsog 2 Ha. N 31024.021’ E077
021.288’ 6201 Ft. Center Point
463. Pasture Development 2010-11
D- 185 MKB Mahadev ki Banouni
Mamail Karsog Karsog 6 Ha. N 31022’24.9” E077
014’14.5” 4774 Ft. Center Point
464. Pasture Development
D-175 Pehran Ghalaych Karsog Karsog 10 Ha. N 31025.031’ E077
013.651’ 4417
Ft.. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxiii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft..)
Point of Location Reading
2010-11
465. Pasture Development 2010-11
D-207 Gandoli Mehendi Karsog Karsog 10 Ha. N 31019.132’ E077
015.507’ 4693
Ft.. Center Point
466. Pasture Development 2010-11
D-138 Bagbokhari Mahonag Karsog Karsog 20 Ha. N 31018’52.4’’ E077
014’11.5’’ 5126 Ft. Center Point
467. Pasture Development 2010-11
D- 136 Parlog Parlog Karsog Karsog 10 Ha. N 31016.098’ E077
014.295’ 4970 Ft. Center Point
468. Pasture Development 2010-11
D- 128 Kashout Parlog Karsog Karsog 12 Ha. N 31016.214’ E077
012.981’ 5203 Ft. Center Point
469. Pasture Development 2010-11
D-208 Majod Mehendi Karsog Karsog 10 Ha. N 31018.235’ E077
017.212’ 5724 Ft. Center Point
470. Pasture Development 2010-11
D 233 Richhni Katkosh Seri Karsog 8 Ha. N31024.359’ E077°14.497’ 7174 Ft. Entry Point
471. Pasture Development 2010-11
D 245 Firnoo Taben Seri Karsog 2 Ha. N31021.274’ E077°21.113’ 3900 Ft. Entry Point
472. Pasture Development 2010-11
D 241 kandloo Taben Seri Karsog 4 Ha. N31022.145’ E077°20.049’ 4003 Ft. Entry Point
473. Pasture Development 2010-11
D 254 Sushan Gowalpur Seri Karsog 2 Ha. N31024.021’ E077°21.288’ 6201 Ft. Entry Point
474. Pasture Development
D 233 Richhni Katkosh Seri Karsog 13 Ha. N31024.013’ E077°16.129’ 6000 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxiv
Division – Kunihar
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
475. Afforestation 2004-05
D 8 Trot Labrath Darlaghat Kunihar 7 Ha. N31019.344’ E076
057.292’ 3285 Ft. Center
Point
476. Afforestation 2006-07
D-3 Bajrail Kandhar Darlaghat Kunihar 5 Ha. N31021.156’ E076
054.537’ 3412 Ft. Center
Point
477. Afforestation 2006-07
D 8 Trot Labrath Darlaghat Kunihar 10 Ha. N31021.226’ E076
057.764’ 3006 Ft. Center
Point
478. Afforestation 2006-07
D 10 Banola Labrath Darlaghat Kunihar 5 Ha. N31021.098’ E076
055.885’ 5924 Ft. Center
Point
479. Afforestation 2006-07
U 17 Matrech Labrath Darlaghat Kunihar 10 Ha. N31018.490’ E076
055.526’ 4900 Ft. Center
Point
480. Afforestation 2007-08
U 14 Sehnali Kandhar Darlaghat Kunihar 8 Ha. N31021.426’ E076
054.579’ 4350 Ft. Center
Point
481. Afforestation 2007-08
D 3 Bajrail Kandhar Darlaghat Kunihar 10 Ha. N31021.545’ E076
054.538‘ 2105 Ft. Center
Point
482. Afforestation 2007-08
U 9 Suin Kandhar Darlaghat Kunihar 15 Ha. N31020.991’ E076
054.661’ 3150 Ft. Center
Point
483. Afforestation 2007-08
D 5 Kathpol Labrath Darlaghat Kunihar 10 Ha. N31021.526’ E076
055.495’ 4880 Ft. Center
Point
484. Afforestation 2007-08
U 20 Ghour Labrath Darlaghat Kunihar 10 Ha. N31019.633’ E076
056.792’ 2317 Ft. Center
Point
485. Afforestation 2007-08
D 5 Kathpol Labrath Darlaghat Kunihar 10 Ha. N31019.255’ E076
055.315’ 5284 Ft. Center
Point
486. Afforestation 2007-08
U 9-Skor Labrath Darlaghat Kunihar 7 Ha. N310 18.668’ E076
056.581’ 4551 Ft. Center
Point
487. Afforestation 2008-09
U 18 Labrath Labrath Darlaghat Kunihar 20 Ha. N31018.320’ E076
056.519’ 5949 Ft. Center
Point
488. Afforestation 2008-09
D 9 Skor Labrath Darlaghat Kunihar 25 Ha. N 31018.690’ E076
057.002’ 3977 Ft. Center
Point
489. Afforestation 2008-09
U 13 Kandhar Kandhar Darlaghat Kunihar 15 Ha. N31020.122’ E076
054.534’ 3618 Ft. Center
Point
490. Afforestation 2008-09
U 9 Suin Kandhar Darlaghat Kunihar 15 Ha. N31028.470’ E076
054.627’ 3375 Ft. Center
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
491. Afforestation 2008-09
D3 Bajrail Kandhar Darlaghat Kunihar 25 Ha. N31021.583’ E076
054.962’ 2420 Ft. Center
Point
492. Afforestation 2008-09
D 4 Suin Marora Kandhar Darlaghat Kunihar 20 Ha. N31021’328’ E076
055.912’ 2709 Ft. Center
Point
493. Afforestation 2009-10
U F- Manru Mangoo Darlaghat Kunihar 5 Ha. N31013.987’ E077
059.984’ 4313 Ft. Center
Point
494. Afforestation 2009-10
Sergharakru Danoghat Darlaghat Kunihar 5 Ha. N310 20.460’ E076
054.738’ 4227 Ft. Center
Point
495. Afforestation 2009-10
U 17 Matreach Labrath Darlaghat Kunihar 5 Ha. N31018.475’ E076
055.625’ 4816 Ft. Center
Point
496. Afforestation 2009-10
U 13 Kandhar Kandhar Darlaghat Kunihar 20 Ha. N31021.017’ E076
055.540’ 3075 Ft. Center
Point
497. Afforestation 2009-10
D -10 Banola Labrath Darlaghat Kunihar 10 Ha. N31021.133’ E076
057.664’ 5962 Ft. Center
Point
498. Afforestation 2009-10
D 52 bajrial Mangoo Darlaghat Kunihar 5 Ha. N31013.473’ E076
059.834’ 3858 Ft. Center
Point
499. Afforestation 2009-10
U 43 Pakati Chandi Darlaghat Kunihar 5 Ha. N31015.107’ E076
000.173’ 5625 Ft. Center
Point
500. Afforestation 2009-10
D 51 Sergharakru Danoghat Darlaghat Kunihar 10 Ha. N 31012.705’ E076
0 58.471’ 4948 Ft. Center
Point
501. Afforestation 2009-10
U 19 Skor Labrath Darlaghat Kunihar 5 Ha. N31018.847’ E076
055.554’ 4468 Ft. Center
Point
502. Rim Plantation 2009-10
D -3 Bajrail Kandhar Darlaghat Kunihar 10 Ha. N31021.520’ E076
054.547’ 2025 Ft. Center
Point
503. Rim Plantation 2009-10
U-8 Boi Kandhar Darlaghat Kunihar 10 Ha. N31021.559’ E076
055.350’ 1980 Ft. Center
Point
504. Rim Plantation 2009-10
D-3 Bajrail Kandhar Darlaghat Kunihar 10 Ha. N31021.520’ E076
054.547’ 6480 Ft. Center
Point
505. Afforestation 2010-11
D 51 Sergharakru Danoghat Darlaghat Kunihar 7 Ha. N31012.554’ E076
059.199’ 4395 Ft. Center
Point
506. Afforestation 2010-11
D 49 Gharakru Danoghat Darlaghat Kunihar 7 Ha. N31011.785’ E076
059.096’ 4510 Ft. Center
Point
507. Afforestation 2010-11
D 50 C2 Daran Danoghat Darlaghat Kunihar 5 Ha. N31012.389’ E076
059.877’ 3861 Ft. Center
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxvi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
508. Afforestation 2010-11
U- 7 Kauli Kandhar Darlaghat Kunihar 7 Ha. N31021.214’ E076
054.467’ 2430 Ft. Center
Point
509. Afforestation 2010-11
U-F Sehnali Kandhar Darlaghat Kunihar 7 Ha. N31021.025’ E076
054.370’ 3250 Ft. Center
Point
510. Afforestation 2010-11
D -3 Bajrail Kandhar Darlaghat Kunihar 5 Ha. N31021.567’ E076
054.765’ 2018 Ft. Center
Point
511. Afforestation 2010-11
U 19 Skor Labrath Darlaghat Kunihar 5 Ha. N31019.001’ E076
056.903’ 3635 Ft. Center
Point
512. Afforestation 2010-11
D 5 Kathpol Labrath Darlaghat Kunihar 15 Ha. N31019.488’ E076
055.187’ 5455 Ft. Center
Point
513. Afforestation 2010-11
D-5 - Kathpol Labrath Darlaghat Kunihar 15 Ha. N31019.310’ E076
0 55.318’ 5344 Ft. Center
Point
514. Afforestation 2010-11
DPF- Baryal Mangoo Darlaghat Kunihar 10 Ha. N31013.326’ E077
0 59.545’ 3373 Ft. Center
Point
515. Rim Plantation 2010-11
U 19 Skor Labrath Darlaghat Kunihar 10 Ha. N31018.991’ E076
056.781’ 3898 Ft. Center
Point
516. Rim Plantation 2010-11
U 9 Suin Kandhar Darlaghat Kunihar 10 Ha. N31021.598’ E076
056.562’ 3255 Ft. Center
Point
517. Rim Plantation 2010-11
UF Parlakyar Labrath Darlaghat Kunihar 3 Ha. N31019.723’ E076
057.047’ 2479 Ft. Center
Point
518. Rim Pltn. 2009-10 UF Padyar Kandhar Darlaghat Kunihar 10 Ha. N31021.423’ E076
053.909’ 4225 Ft. Center
Point
519. Rim Plantation 2010-11
J -21 Jandoi Labrath Darlaghat Kunihar 5 Ha. N31018.661’ E076
057.275’ 3403 Ft. Center
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxvii
Division – Nachan
1. Afforestation 2004-05
Salotli Baila Seraj Nachan 5 Ha. N310 30.258’ E077
0 14.746’ 8220 Ft. Entry Point
2. Afforestation 2004-05
Salotli Liuri Baila Seraj Nachan 10 Ha. N310 30.002’ E077
0 14.551’ 7638 Ft. Center Point
3. Afforestation 2005-06
Magrugalla Baila Seraj Nachan 10 Ha. N310 28.929’ E077
0 15.571’ 7860 Ft. Center Point
4. Afforestation 2005-06
Chainidhar Baila Seraj Nachan 12 Ha. N310 29.511’ E077
0 15.332’ 8236 Ft. Entry Point
5. Afforestation 2005-06
Lambidhar Baila Seraj Nachan 10 Ha. N310 29.273’ E077
0 15.458’ 8358 Ft. Entry Point
6. Afforestation 2005-06
Grijnoo -1 Baila Seraj Nachan 10 Ha. N310 29.246’ E077
0 15.664’ 8550 Ft. Entry Point
7. Afforestation 2005-06
Grijnoo -2 Baila Seraj Nachan 10 Ha. N310 29.183’ E077
0 15.697’ 8608 Ft. Entry Point
8. Afforestation 2005-06
Magrugalla Baila Seraj Nachan 10 Ha. N310 28.928’ E077
0 15.567’ 8726 Ft. Entry Point
9. Afforestation 2005-06
Lambidhar Baila Seraj Nachan 10 Ha. N310 28.978’ E077
0 14.796’ 9004 Ft. Center Point
10. Afforestation 2005-06
Lambidhar Baila Seraj Nachan 10 Ha. N310 28.909’ E077
0 14.817’ 8953 Ft. Center Point
11. Afforestation 2005-06
Deoridhar Baila Seraj Nachan 10 Ha. N310 28.712’ E077
0 14.815’ 8886 Ft. Entry Point
12. Afforestation 2005-06
Chaitridhar Baila Seraj Nachan 8 Ha. N310 28.598’ E077
0 14.138’ 8668 Ft. Entry Point
13. Afforestation 2005-06
GariJhoo Baila Seraj Nachan 10 Ha. N310 30.253’ E077
0 14.749’ 8204 Ft. Entry Point
14. Afforestation 2005-06
Manshanidhar Baila Seraj Nachan 12 Ha N310 30.401’ E077
0 14.716’ 8089 Ft. Center Point
15. Afforestationv 2005-06
Labni Nalla Baila Seraj Nachan 5 Ha. N31029.807’ E077
018.290’ 9310 Ft. Center Point
16. Afforestation 2005-06
Pokhridhar Baila Seraj Nachan 9 Ha. N310 28.901’ E077
0 15.190’ 9230 Ft. Center Point
17. Afforestation 2005-06
Bijnadhar Baila Seraj Nachan 10 Ha. N310 29.512’ E077
0 15.432’ 8531 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxviii
18. Pasture Development 2006-07
Garijnoo Baila Seraj Nachan 14 Ha. N310 29.445’ E077
0 14.144’ 7436 Ft. Entry Point
19. Afforestation 2007-08
Jhalru Baila Seraj Nachan 5 Ha. N310 29.575’ E 77
0 14.958’ 7294 Ft. Center Point
20. Pasture Development 2007-08
Malsigarh Baila Seraj Nachan 10 Ha. N310 29.512’ E077
0 15.432’ 8531 Ft. Centr Point
21. Afforestation 2008-09
Garijnoo Bail Seraj Nachan 15 Ha. N310 29.575’ E077
0 14.958’ 7924 Ft. Center Point
22. Afforestation 2007-08
Snohalidhar Baila Seraj Nachan 5 Ha. N310 30.167’ E077
0 14.135’ 8057 Ft. Centr Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xxxix
Division – Shimla
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
520. Afforestation 2004-05
DPF Kheel Sanog Dhami Shimla 5 Ha. N31008.467’ E077
006.259’ 5491 Ft. Entry
Point
521. Afforestation 2004-05
Tallgiri Tall Tara Devi Shimla 4 Ha. N31006.891' E077
008.019' 6552 Ft. Entry Point
522. Afforestation 2004-05
GCL Nalhayal Tutu Tara Devi Shimla 4 Ha. N31007.588' E077
007.844' 6221 Ft. Entry Point
523. Afforestation 2004-05
GCL Nalhayal Tall Tara Devi Shimla 3 Ha. N31007.391’ E077
007.862’ 6600 Ft. Entry Point
524. Afforestation 2004-05
GLC - Marhon Kamyana Tara Devi Shimla 7 Ha. N31008.461' E077
0 10.045' 6416 Ft. Entry Point
525. Afforestation 2004-05
DPF Badfaranlog
Bharari Mashobra Shimla 15 Ha. N31007.139’ E077
012.033’ 6639 Ft. Entry Point
526. Afforestation 2004-05
UF Janlog Bharari Mashobra Shimla 5 Ha. N31008.506’ E077
010.743’ 5661 Ft. Entry Point
527. Afforestation 2004-05
DPF Janlog Bharari Mashobra Shimla 5 Ha. N31008.541‘ E077
010.977 ‘ 5399 Ft. Entry Point
528. Afforestation 2004-05
Kanda/ Dhar Dharti Mashobra Shimla 10 Ha. N31007.701‘ E077
016.202’ 6395 Ft. Entry Point
529. Afforestation 2004-05
Himala/Kanda Mashobra Mashobra Shimla 10 Ha. N31008.916‘ E077
014.156’ 5825 Ft. Entry Point
530. Afforestation 2004-05
D 73 Mashobra Seepur Mashobra Shimla 10 Ha. N31008.919‘ E077
012.977’ 2497 Ft. Entry Point
531. Afforestation 2004-05
D 67 Paniyali C 2
Paniyali Mashobra Shimla 5 Ha. N31009.713‘ E077
013.107’ 6357 Ft. Entry Point
532. Afforestation 2004-05
UF Jug Paniyali Mashobra Shimla 5 Ha. N31010.443’ E077
012.579’ 6290 Ft. Entry Point
533. Afforestation 2004-05
DF Seon Naldehra Mashobra Shimla 15 Ha. N31010.914‘ E077
010.273’ 5940 Ft. Entry Point
534. Pasture Development 2004-05
UF Ghatti Naldehra Mashobra Shimla 5 Ha. N31009.651‘ E077
012.053’ 4990 Ft. Entry Point
535. Afforestation D 73 Mashobra Seepur Mashobra Shimla 5 Ha. N31009.443‘ E077
012.799’ 7174 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xl
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2004-05 C1
536. Afforestation 2004-05
UF Charain Naldehra Mashobra Shimla 5 Ha. N31011.414’ E077
012.169’ 4313 Ft. Entry Point
537. Afforestation 2004-05
D 73 Mashobra C III
Dhalli Mashobra Shimla 5 Ha. N31007.296' E077
013.539' 6950 Ft. Entry Point
538. Afforestation 2004-05
D 26 Biru Khatnol Bhajji Shimla 18 Ha. N 31016.527’ E077
012.239' 6720 Ft. Entry Point
539. Pasture Dev. 2004-05
UF Deothi Seepur Mashobra Shimla 3 Ha. N31008.071' E077
014.730' 7279 Ft. Entry Point
540. Afforestation 2004-05
Tallgiri Tall Tara Devi Shimla 4 Ha. N31007.297' E077
007.865' 6400 Ft. Entry Point
541. Pasture Development 2004-05
DPF Janlog Bharari Mashobra Shimla 10 Ha. N31008.463’ E077
010’678’ 5375 Ft. Entry Point
542. Afforestation 2005-06
GLC Marhon Kamyana Tara Devi Shimla 7 Ha. N 31008.502' E077
010.195’ 6382 Ft. Entry Point
543. Afforestation 2005-06
Bohli Halog Dhami Shimla 4 Ha. N31010.688' E077
013.344' 4932 Ft. Entry Point
544. Afforestation 2005-06
UF Sharog Ganeog Dhami Shimla 5 Ha. N 31009.116' E077
005.514' 4862 Ft. Entry Point
545. Afforestation 2005-06
Mahapuna Halog Dhami Shimla 4 Ha. N31011.154’ E077
003.094’ 5449Ft. Entry Point
546. Afforestation 2005-06
Hir Ki Beshak Halog Dhami Shimla 6 Ha. N31010.159' E077
002.232' 5142 Ft. Entry Point
547. Afforestation 2005-06
Bohli Dhalaya Dhami Shimla 4 Ha. N31010.688' E077
003.753' 4932 Ft. Entry Point
548. Afforestation 2005-06
DPF Baddu Badoo Dhami Shimla 8 Ha. N310
09.207' E077004.456' 5457 Ft. Entry Point
549. Afforestation 2005-06
UF Pahal Bathol Bhajji Shimla 10 Ha. N31010.220’ E077
010.200' 4000 Ft. Entry Point
550. Afforestation 2005-06
D 70 Naldehra C III
Naldehra Mashobra Shimla 10 Ha. N31011.218' E077
011.089' 6507 Ft. Entry Point
551. Afforestation 2005-06
DF 208 Gadoug Gadaug Tara Devi Shimla 2 Ha. N31006.437' E77
007.711' 5979 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xli
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
552. Afforestation 2005-06
GLC Dhart Kamyana Tara Devi Shimla 10 Ha. N310 08.908' E077
008.946' 5379 Ft. Entry Point
553. Afforestation 2005-06
D 214 Jhajia Banoti Tara Devi Shimla 6 Ha. N310 07.894' E077
0 06.478' 5676 Ft. Entry Point
554. Afforestation 2005-06
GCL Kalawat Tall Tara Devi Shimla 3 Ha. N310 07.776' E077
0 07.772' 5750 Ft. Entry Point
555. Afforestation 2005-06
GCL Karound Tall Tara Devi Shimla 10 Ha. N310 08.065' E077
0 08.732' 5375 Ft. Entry Point
556. Afforestation 2005-06
D 208 Gadaug Gadaug Tara Devi Shimla 10 Ha. N310 06.579’ E077
0 07.547' 6339 Ft. Entry Point
557. Afforestation 2005-06
GCL Nalhayal Tall Tara Devi Shimla 4 Ha. N31007.294’ E077
007.715’ 6040 Ft. Entry Point
558. Afforestation 2005-06
UPF Bathmana Dhalaya Dhami Shimla 3 Ha. N31010.903’ E077
003.101’ 5152 Ft. Entry Point
Afforestation 2005-06
U-6 Dhagogra Sandoa Bhajji Shimla 5 Ha. N31015.160’ E077
019.596’ 6102 Ft. Entry Point
559. Afforestation 2005-06
U-48 Beru Khatnol Bhajji Shimla 5 Ha. N31011’02.1” E077
015’07.8” 5635 Ft. Entry Point
560. Afforestation 2005-06
UPF Bohli Dhalaya Dhami Shimla 4 Ha. N310 10.705’ E077
0 03.571’ 5103 Ft. Entry Point
561. Afforestation 2005-06
Bainsh Bakhrail Okharoo Dhami Shimla 4 Ha. N 310 12.712’ E077
0 01.407’ 3668 Ft. Entry Point
562. Afforestation 2005-06
Panjaily Nerty Okharoo Dhami Shimla 5-Ha. N310 12.731’ E077
0 01.330’ 3612 Ft. Entry Point
563. Afforestation 2005-06
U P F Okhroo Madeya
Okharoo Dhami Shimla 3 Ha. N310 12.349’ E077
0 00.589’ 3508 Ft. Entry Point
564. Afforestation 2005-06
U P F Dargot Salaun Dhami Shimla 7 Ha. N310 10.995’ E077
0 04.825’ 5245 Ft. Center
Point
565. Afforestation 2005-06
U F Sharog Bhajol Bhajji Shimla 10 Ha. N31012.586’ E077
006.959’ 3616 Ft. Entry point
566. Afforestation 2005-06
UPF Ganeog Ganeog Dhami Shimla 5 Ha. N31010.367' E77
0 05.284' 5813 Ft. Entry Point
567. Afforestation 2005-06
U-25 Kadharghat
Kandharghat Bhajji Shimla 15 Ha. N31013’07.1” E077
011’44.5” 4866 Ft. Entry point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xlii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
568. Afforestation 2005-06
DPF Hiri Ki Beshak
Halog Dhami Shimla 6 Ha. N310 10.157’ E077
0 02.238’ 5043 Ft. Entry Point
569. Afforestation 2005-06
DPF Bara Pandish
Sanog Dhami Shimla 4 Ha. N310 09.585’ E077
0 06.416’ 5435 Ft. Center
Point
570. Afforestation 2005-06
UPF Deola Sanog Dhami Shimla 4 Ha. N310 09.636’ E077
0 06.203’ 4962 Ft. Entry
Point
571. Afforestation 2005-06
UPF Saden Badoo Dhami Shimla 4 Ha. N310 09.464’ E077
0 02.564’ 5305 Ft. Entry
Point
572. Afforestation 2005-06
UPF Badoo Badoo Dhami Shimla 5 Ha. N310 08.918’ E077
0 04.125’ 6319 Ft. Entry Point
573. Afforestation 2005-06
DPF Bledi Ganeog Dhami Shimla 3 Ha. N310 10.569’ E077
0 05.279’ 5539 Ft. Entry Point
574. Afforestation 2005-06
GCL Neri Tall Tara Devi Shimla 5 Ha. N310 08.447’ E077
0 08.496’ 5063 Ft. Entry Point
575. Afforestation 2005-06
U-19 Grovnjaishi
Karyali Bhajji Shimla 10 Ha. N31014.485’ E077
013.344’ 4318 Ft. Entry Point
576. Afforestation 2005-06
DPF Bag Ka Nal Ghanahatti Dhami Shimla 8 Ha. N310 08.408’ E077
0 05.457’ 5672 Ft. Entry Point
577. Afforestation 2005-06
DPF Brelli Ghanahatti Dhami Shimla 8 Ha. N310 09.088’ E077
0 05.759’ 5696 Ft. Center
Point
578. Afforestation 2005-06
GCL Janol Banoti Tara Devi Shimla 5 Ha. N310 08.511’ E 077
0 07290 5854 Ft. Entry Point
579. Afforestation 2005-06
U 42 Nin Badmain Bhajji Shimla 5 Ha. N310 08.738' E077
0 15.791 5472 Ft. Entry Point
580. Pasture development(2005-06)
DPF Kaulpur Sunni Bhajji Shimla 5 Ha. N31014’47.8” E077
006’89.3” 2636 Ft. Entry point
581. Pasture Development 2005-06
R 27 Gadaug Gadaug Tara Devi Shimla 2 Ha. N310 06.327' E077
0 07.605’ 6318 Ft. Entry Point
582. Pasture Dev. 2005-06
UPF Cherain Naldehra Mashobra Shimla 5 Ha. N310 11.198 ‘ E077
0 12.016’ 5115 Ft. Entry Point
583. Pasture Development
R-27 Gadaug Gadaug Tara Devi Shimla 5 Ha. N310 06.357’ E077
0 07.725' 6217 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xliii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2005-06
584. Afforestation 2006-07
DPF Sangech Ganeog Dhami Shimla 7 Ha. N310 09.295’ E077
0 05.098’ 5721 Ft. Entry Point
585. Afforestation 2006-07
GCL - Jhollo Kamyana Tara Devi Shimla 10 Ha. N310 09.259' E077
0 09.561' 5882 Ft. Entry Point
586. Afforestation 2006-07
UF Janlog Bharari Mashobra Shimla 10 Ha. N31003.553 ‘ E077
010.810’ 5525 Ft. Entry Point
587. Afforestation 2006-07
UF 155 Jagyalroo
Mashobra Mashobra Shimla 10 Ha. N31011.365’ E077
012.840 ‘ 4345 Ft. Entry Point
588. Afforestation 2006-07
UF Anu Bharari Mashobra Shimla 5 Ha. N31008.124 ‘ E077
010.893 ‘ 5906 Ft. Entry Point
589. Afforestation 2006-07
U-17 Himri Himri Bhajji Shimla 20 Ha. N31013.388’ E077
016.802’ 6563 Ft. Entry Point
590. Afforestation 2006-7
D-9 Drabla Karyali Bhajji Shimla 10 Ha. N31014.783’ E077
015.032’ 3808 Ft. Entry Point
591. Afforestation 2006-07
U- 15 Drabla Karyali Bhajji Shimla 10 Ha. N31014.699’ E077
014.039’ 4044 Ft. Entry Point
592. Afforestation 2006-07
Kainth Ki Ghati Dhalaya Dhami Shimla 3 Ha. N 310 10.891' E77
0 03.918' 4785 Ft. Entry Point
593. Afforestation 2006-07
U-12 Gadhau Himri Bhajji Shimla 10 Ha. N31011.508’ E077
016.137’ 4859 Ft. Entry Point
594. Afforestation 2006-07
U-32 Bhargan Madhorghat Bhajji Shimla 10 Ha. N31014.182’ E077
004.386’ 3873 Ft. Entry point
595. Afforestation 2006-07
U-1 Anukayalu Pandoa Bhajji Shimla 15 Ha. N31015.307’ E077
020.475’ 4744 Ft. Entry Point
596. Afforestation 2006-07
D-15 Malawan Pandoa Bhajji Shimla 15 Ha. N31014.951’ E077
020.165’ 5283 Ft. Entry Point
597. Afforestation(2006-07
U-53 Ramahan Khatnol Bhajji Shimla 10 Ha. N31010’95.2” E077
014’43.5” 4736 Ft. Entry point
598. Afforestation(2006-07
D-26 Berk Khatnol Bhajji Shimla 20 Ha. N31011’35.5” E077
015’02.0” 5858 Ft. Entry point
599. Afforestation 2006-07
U-59 Dandibag Khatnol Bhajji Shimla 15 Ha. N31010’26.3” E077
017’03.9” 6452 Ft. Entry point
600. Afforestation U-47Jajehar Kadharghat Bhajji Shimla 25 Ha. N31011.78.7” E077
013.034” 3927 Ft. Center
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xliv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2006-07 Point
601. Afforestation 2006-07
U 22 Palag Kadharghat Bhajji Shimla 10 Ha. N31013’33.9” E077
012.49.0” 4437 Ft. Entry point
602. Afforestation 2006-07
D28 Bag Sunni Bhajji Shimla 10 Ha. N31012’59.0” E077
007’02.2” 4600 Ft. Entry point
603. Afforestation 2006-07
U-36 Mandhorghat
Basantpur Bhajji Shimla 10 Ha. N31011’49.8” E077
011’20.3” 3505 Ft. Entry point
604. Afforestation(2006-07)
U-26 Basantpur Basantpur Bhajji Shimla 10 Ha. N31013’02.6” E077
009’43.5” 3680 Ft. Entry point
605. Afforestation 2006-07
DPF 210 Girb III Gadaug Tara Devi Shimla 5 Ha. N310 07.244’ E077
0 07.047’ 6337 Ft. Entry Point
606. Afforestation 2006-07
GCL Chewla Banoti Tara Devi Shimla 6 Ha. N310 09.615’ E077
0 07.527’ 6465 Ft. Entry Point
607. Afforestation 2006-07
DPF Bhukhoo Ganeog Dhami Shimla 5 Ha. N 310 10.399’ E077
0 05.963’ 4552 Ft. Center
Point
608. Afforestation 2006-07
DPF Bara Pandish
Sanog Dhami Shimla 5 Ha. N310 09.827’ E077
0 06.606’ 5546 Ft. Center
Point
609. Afforestation 2006-07
UPF Nerog Sanog Dhami Shimla 5 Ha. N310 08.870’ E077
0 06.139’ 5199 Ft. Entry Point
610. Afforestation 2006-07
DPF Lahog Ki Ghar
Halog Dhami Shimla 3 Ha. N310 10.035’ E077
0 02.370’ 4911 Ft. Center
Point
611. Afforestation 2006-07
D-25 Kandharghat
Kandharghat Bhajji Shimla 15 Ha. N31013.309’ E077
012.006’ 4737 Ft. Entry point
612. Afforestation 2006-07
D-23 Chowki Kandharghat Bhajji Shimla 20 Ha. N31013.463’ E077
011.978’ 4806 Ft. Entry point
613. Afforestation 2006-07
Kushah Ganeog Dhami Shimla 2 Ha. N31010.409' E077
0 05.518' 5499 Ft. Entry Point
614. Afforestation 2006-07
Baledi Ganeog Dhami Shimla 3 Ha. N31010.212' E077
0 05.201' 4321 Ft. Entry Point
615. Afforestation 2006-07
Kainth Ki Ghatti Dhalaya Dhami Shimla 3 Ha. N310 10.878’ E077
0 03.913’ 4756 Ft. Entry
Point
616. Afforestation 2006-07
DPF Jhalpari Dhalaya Dhami Shimla 3 Ha. N310 11.002’ E077
0 03.865’ 4942 Ft. Center
Point
617. Afforestation UPF Kangti Dhalaya Dhami Shimla 8 Ha. N310 11.020’ E077
0 03.608’ 5394 Ft. Entry
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xlv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2006-07 Bhima Rngi Point
618. Afforestation 2006-07
D P F Shahal Salaun Dhami Shimla 6 Ha. N310 10.925’ E077
0 04.827’ 5294 Ft. Entry
Point
619. Afforestation 2006-07
U P F Narihana Salaun Dhami Shimla 4 Ha. N310 10.154’ E077
0 03.214’ 4640 Ft. Center
Point
620. Afforestation 2006-07
U P F Ghulan Halog Dhami Shimla 2 Ha. N310 11.531’ E077
0 03.126’ 5423 Ft. Entry
Point
621. Afforestation 2006-07
U P F Baikiar Okharoo Dhami Shimla 4 Ha. N310 11.541’ E077
0 00.491’ 3769 Ft. Entry
Point
622. Afforestation 2006-07
Bag Ka Nalla Ghanahatti Dhami Shimla 1 Ha. N31008.500' E077
0 05.443' 5708 Ft. Entry Point
623. Afforestation 2006-07
Okharoo Madhya
Okharoo Dhami Shimla 11 Ha. N310 12.261' E077
0 02.019’
3933Ft. Entry Point
624. Afforestation 2006-07
U 143 Kayar Thiala Bhajji Shimla 10 Ha. N310 08.725' E077
0 15.946' 5129 Ft. Entry Point
625. Afforestation 2006-07
U 15 Drawal Karyali Bhajji Shimla 10 Ha. N310 14.698’ E077
0 14.041’ 4041 Ft. Entry Point
626. Afforestation 2006-07
D 260 Malag Bajhol Bhajji Shimla 5 Ha. N310 12.062’ E077
0 06.868’ 4843 Ft. Entry Point
627. Afforestation 2006-07
D -9 Drabla Karyali Bhajji Shimla 10 Ha. N31014.619' E077
015.145' 4036 Ft. Entry Point
628. Pasture Development 2006-07
UPF Narihana Salaun Dhami Shimla 4 Ha. N310 10.147' E077
0 3.208' 4575 Ft. Entry Point
629. Pasture Dev. 2006-07
U 594 Kotla Bajhol Bhajji Shimla 10 Ha. N310 12.104' E077
0 05.458' 3350 Ft. Entry Point
630. Pasture Development 2006-07
D-9 Drabla Karyali Bhajji Shimla 10 Ha. N31014.625’ E077
015.139’ 3940 Ft. Entry Point
631. Pasture Dev. 2006-07
U 20 Domehar Kariyali Bhajji Shimla 20 Ha. N310 13.598' E077
0 13.217' 4353 Ft. Entry Point
632.
Afforestation 2007-08
U 22 Palag Kadharghat Bhajji Shimla 12 Ha. N 31013’32.9” E077
012’476” 4430 Ft. Entry point
633. Afforestation200 U 23 Chowki Thiala Bhajji Shimla 25 Ha. N31013’38.7” E077
012’51.5” 4262 Ft. Entry point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xlvi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
7-08
634. Afforestation 2007-08
U 29 Reog Sunni Bhajji Shimla 10 Ha. N31013’57.0” E077
005’40.2” 3452 Ft. Entry point
635. Afforestation 2007-08
U-26 Basantpur Basantpur Bhajji Shimla 10 Ha. N31012’30.9” E077
010’45.0” 3256 Ft. Entry point
636. Afforestation 2007-08
U-50 Shalli Khatnol Bhajji Shimla 20 Ha. N31011’21.2” E077
016’47.4” 7540 Ft. Entry
point
637. Afforestation 2007-08
U-10 Malgi Sandoa Bhajji Shimla 10 Ha. N31015.456’ E077
017.280’ 3734 Ft. Entry Point
638. Afforestation 2007-08
U-6 Dharogra Sandoa Bhajji Shimla 5 Ha. N31014.284’ E077
019.570’ 5384 Ft. Entry Point
639. Afforestation 2007-08
U-8 Glah Sandoa Bhajji Shimla 10 Ha. N31013.757’ E077
018.039’ 5850 Ft. Entry Point
640. Afforestation 2007-08
U-35 Golan Madhorghat Bhajji Shimla 10 Ha. N31015.379’ E077
002.506’ 4203 Ft. Entry point
641. Afforestation 2007-08
DPF Bashadi Chalawag Bhajji Shimla 10 Ha. N31014.070’ E077
002.972’ 2800 Ft. Entry point
642. Afforestation 2007-08
U-13 Oglisuma Himri Bhajji Shimla 20 Ha. N31015.924’ E077
016.063’ 2625 Ft. Entry Point
643. Afforestation 2007-08
U-11 Bari-Bamuna
Himri Bhajji Shimla 10 Ha. N31014.660’ E077
016.528’ 3927 Ft. Entry Point
644. Afforestation 2007-08
U-14 Bharara-Drabla
Karyali Bhajji Shimla 15 Ha. N31014.713’ E077
014.039’ 4002 Ft. Entry Point
645. Afforestation 2007-08
DPF Brelli Ghanahatti Dhami Shimla 2 Ha. N310 08.397' E077
0 05.441' 5636 Ft. Entry Point
646. Afforestation 2007-08
U - 20 Domehal Karyali Bhajji Shimla 7 Ha. N31013.782' E077
0 14.113' 5913 Ft. Entry Point
647. Afforestation 2007-08
U - 27 Sunni Shakrodi
Sunni Bhajji Shimla 5 Ha. N31013.733' E077
0 07.794' 2647 Ft. Entry Point
648. Afforestation 2007-08
U - 40 Dadhoeg Sunni Bhajji Shimla 5 Ha. N31013.527' E077
0 05.299' 3945 Ft. Entry Point
649. Afforestation 2007-08
U 143 Kayar Thaiala Bhajji Shimla 10 Ha. N310 08.726' E077
0 15.956' 5100 Ft. Entry Point
650. Afforestation UF Taloh Khatnol Bhajji Shimla 10 Ha. N310 10.221' E077
0 16.546' 6800 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xlvii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2007-08
651. Afforestation 2007-08
D 70 Anu Bharari Mashobra Shimla 5 Ha. N310 08.138' E077
0 10.926' 5771 Ft. Entry Point
652. Afforestation 2007-08
U 167 Jayali Dhalli Mashobra Shimla 5 Ha. E310 08.516’ E077
0 12.206’ 6169 Ft. Entry Point
653. Afforestation 2007-08
D 62 Kufri Dharti Mashobra Shimla 10 Ha. N31007.036‘ E077
014.853’ 7626 Ft. Entry Point
654. Afforestation 2007-08
D 69 Sawakar Naldehra Mashobra Shimla 5 Ha. N31011.619‘ E077
012.317’ 4353 Ft. Entry Point
655. Afforestation 2007-08
U 180 Anu Bharari Mashobra Shimla 5 Ha. N310 07.989' E077
0 10.658’ 6503 Ft. Entry Point
656. Afforestation 2007-08
R-17 Marhon Kamyana Tara Devi Shimla 10 Ha. N310 08.217’ E077
0 10.263' 6676 Ft. Entry Point
657. Afforestation 2006-07
D 214 Jhajia Banoti Tara Devi Shimla 6 Ha. N310 07.765' E077
0 05.860' 6219 Ft. Entry Point
658. Afforestation 2007-08
GCL Kajail Banoti Tara Devi Shimla 5 Ha. N310 09.107’ E077
0 07.606 4902 Ft. Entry Point
659. Afforestation 2007-08
DPF Bag Ka Nal Ghanahatti Dhami Shimla 3 Ha. N310 08.909’ E077
0 05.606’ 5107 Ft. Center
Point
660. Afforestation 2007-08
DPF Bledi Ganeog Dhami Shimla 10 Ha. N310 10.538’ E077
0 05.371’ 5489 Ft. Center
Point
661. Afforestation 2007-08
UPF Kiuroo Ganeog Dhami Shimla 2 Ha. N310 09.773’ E077
0 05.950’ 4748 Ft. Entry
Point
662. Afforestation 2007-08
DPF Sanog Sanog Dhami Shimla 5 Ha. N310 08.702’ E077
0 06.073’ 5329 Ft. Entry
Point
663. Afforestation 2007-08
DPF Brelli Ghanahatti Dhami Shimla 2 Ha. N310 08.435’ E077
0 05.426’ 5628 Ft. Center
Point
664. Afforestation 2007-08
DPF Lahog Ki Ghar
Halog Dhami Shimla 3 Ha. N310 10.042’ E077
0 02.426’ 4897 Ft. Entry
Point
665. Afforestation 2007-08
UPF Bohli Dhalaya Dhami Shimla 3 Ha. N310 10.625’ E077
0 03.697’ 4954 Ft. Entry
Point
666. Afforestation 2007-08
D P F Salaun Salaun Dhami Shimla 8 Ha. N310 10.028’ E077
0 03.673’ 5094 Ft. Entry
Point
667. Afforestation(200 R-1 Mohranal Basantpur Bhajji Shimla 10 Ha. N31013’10.5” E077
009’51.6” 3669 Ft. Entry point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xlviii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
7-08)
668. Afforestation 2007-08
U 14 Bhara-Drabla
Karyali Bhajji Shimla 10 Ha. N31014.572’ E077
0 14.598’ 3963 Ft. Entry Point
669. Afforestation 2007-08
D P F Halog Halog Dhami Shimla 2 Ha. N310 11.249’ E077
0 02.656’ 5177 Ft. Entry
Point
670. Pasture Development 2007-08
DPF Brelli Ghanahatti Dhami Shimla 2 Ha. N310 08.749’ E077
0 05.001’ 5139 Ft. Center
Point
671. Pasture Dev. 2007-08
U 51 Dalana Khatnol Bhajji Shimla 10 Ha. N310 10.625' E077
016.139' 6527 Ft. Entry Point
672. Pasture Development 2007-08
Bharwar Ka Dhank
Ghanahatti Dhami Shimla 5 Ha. N310 08.691' E077
0 05.160' 5027 Ft. Entry Point
673. Pasture Development 2007-08
U-14 Bhara-Drabla
Karyali Bhajji Shimla 20 Ha. N31014.705’ E077
014.023’ 4043 Ft. Entry Point
674. Pasture Development 2007-08
U-47 Jajehar Kandharghat Bhajji Shimla 15 Ha. N31012.113’ E077
012.742’ 4232 Ft. Entry point
675. Pasture Development 2007-08
U-25 Kandharghat
Kandharghat Bhajji Shimla 15 Ha. N31013.460’ E077
011.946’ 4756 Ft. Entry point
676. Pasture development 2007-08
D-7 Jander Badmain Bhajji Shimla 5 Ha. N31011’56.5” E077
009’41.9” 5693 Ft. Centre
Point
677. Pasture development(2007-08)
U-51 Dalana Khatnol Bhajji Shimla 10 Ha. N31011’00.3” E077
016’24.5” 7117 Ft. Center
Point
678. Afforestation2008-09
D-25 Kadharghat
Khatnol Bhajji Shimla 10 Ha. N31°13’15.5” E077
012’33.1
” 4504 Ft. Center
Point
679. Afforestation(2008-09)
U 29 Reog Sunni Bhajji Shimla 6 Ha. N31013’47.8” E077
005’31.1” 3513 Ft. Entry point
680. Afforestation(2008-09)
U-26 Basantpur
Basantpur Bhajji Shimla 10 Ha. N31013’13.7” E077
010’20.2” 2963 Ft. Entry point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. xlix
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
681. Afforestation(2008-09
R-1 Mohranal
Basantpur Bhajji Shimla 5 Ha. N31013’02-8” E077
009.43.0” 3170 Ft. Entry point
682. Afforestation 2008-09
D-26 Beru Khatnol Bhajji Shimla 25 Ha. N31011’37.8” E077
015’01.9” 5760 Ft. Entry point
683. Afforestation 2008-09
U-48 Berti Khatnol Bhajji Shimla 10 Ha. N31010.46.5” E077
013’35.8” 3500 Ft. Entry point
684. Afforestation 2008-09
U-10 Malgi Sandoa Bhajji Shimla 5 Ha. N31015.500’ E077
017.493’ 3605 Ft. Entry Point
685. Afforestation 2008-09
D-11 Mandal Pandoa Bhajji Shimla 5 Ha. N31015.563’ E077
017.992’ 3635 Ft. Entry Point
686. Afforestation 2008-09
U-25 Kadharghat
Kandharghat Bhajji Shimla 20 Ha. N31012.586’ E077
011.955’ 4347 Ft. Entry point
687. Afforestation 2008-09
U-34 Ratia Madhorghat Bhajji Shimla 10 Ha. N31015.690’ E077
002.802’ 3270 Ft. Entry point
688. Afforestation 2008-09
U-47 Jagehar Kandharghat Bhajji Shimla 20 Ha. N31012.312’ E077
012.385’ 4258 Ft. Entry point
689. Afforestation 2008-09
U F Bashat Bajhol Bhajji Shimla 2 Ha. N31011.456’ E077
006.447’ 4292 Ft. Entry point
690. Afforestation 2008-09
U F Pahal Bajhol Bhajji Shimla 5 Ha. N31012.225’ E077
006.867’ 5086 Ft. Entry point
691. Afforestation 2008-09
D- 577 Jaini Nalla
Chalawag Bhajji Shimla 5 Ha. N31014.943’ E077
001.949’ 3440 Ft. Entry point
692. Afforestation 2008-09
U-21 Khaira Pandain
Karyali Bhajji Shimla 10 Ha. N31014.650’ E077
013.155’ 4460 Ft. Entry Point
693. Afforestation 2008-09
UPF Kheel Sanog Dhami Shimla 5 Ha. N31009.765’ E77
002.899’ 5426 Ft. Entry Point
694. Afforestation 2008-09
Bag Ka Nalla Ghanahatti Dhami Shimla 3 Ha. N310
08.886' E770 05.622' 5163 Ft. Entry Point
695. Afforestation 2008-08
Dadeheog Okharoo Dhami Shimla 5 Ha. N310 12.231' E77
0 01.965' 3853 Ft. Entry Point
696. Afforestation 2008-09
D-20 Lambidhar Sandoa Bhajji Shimla 5 Ha. N 310 15.200’ E077
0 16.457’ 4640 Ft. Entry Point
697. Afforestation 2008-09
U - 41 Chatyar Badmain Bhajji Shimla 7 Ha. N310 11.797' E077
0 08.5.8' 4640 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. l
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
698. Afforestation 2008-09
D 25 Kandhar ghat
Kandharghat Bhajji Shimla 10 Ha. N310 13.413’ E077
0 17.063’ 4564 Ft. Entry Point
699. Afforestation 2008-09
U 57 Bag Khatnol Bhajji Shimla 5 Ha. N3310 10.327’ E077
0 16.555’ 7000 Ft. Entry Point
700. Afforestation 2008-09
UPF 180 Anu Dharti Mashobra Shimla 3 Ha. N31°07.781' E077010.587' 6673 Ft. Entry Point
701. Afforestation 2008-09
U 31 Gharyana Sunni Bhajji Shimla 3 Ha. N31014.688' E077
0 05.959' 2165 Ft. Entry Point
702. Afforestation 2008-09
U 15 Malawan Pandoa Bhajji Shimla 10 Ha. N31015.297’ E077
0 10.457' 4781 Ft. Entry Point
703. Afforestation 2008-09
D 66 Seepur C 2 Seepur Mashobra Shimla 5 Ha. N31007.286’ E077
014.500’ 7683 Ft. Entry Point
704. Afforestation 2008-09
U 141 Koni Dharti Mashobra Shimla 10 Ha. N31006.903‘ E077
016.293’ 7298 Ft. Entry Point
705. Afforestation 2008-09
R 18 Poabo Kamyana Tara Devi Shimla 5 Ha. N310 08.589’ E077
0 09.700' 6586 Ft. Entry Point
706. Afforestation 2008-09
UPF Dadeheog Okharoo Dhami Shimla 3 Ha. N310 12.325’ E077
0 02.113’ 3621 Ft. Entry
Point
707. Afforestation 2008-09
Bainsh Okharoo Dhami Shimla 5 Ha. N310 12.601’ E077
0 01.886’ 3537 Ft. Entry
Point
708. Afforestation 2008-09
U P F Dhalla Okharoo Dhami Shimla 4 Ha. N310 12.159’ E077
0 03.570’ 4104 Ft. Entry Point
709. Afforestation 2008-09
U P F Khan ki Dhank
Halog Dhami Shimla 2 Ha. N310 11.463’ E077
0 03.387’ 5410 Ft. Entry
Point
710. Afforestation 2008-09
UPF Kiari Okharoo Dhami Shimla 3 Ha. N310 12.374’ E077
0 02.575’ 3847 Ft. Entry
Point
711. Afforestation 2008-09
U-13 Oglisuma Himri Bhajji Shimla 10 Ha. N31015.688’ E077
016.278’ 3163 Ft. Entry Point
712. Afforestation 2008-09
U-11 Bari-Bamuna
Himri Bhajji Shimla 10 Ha. N31014.856’ E077
016.612’ 3664 Ft. Entry Point
713. Pasture development 2008-09
U-45 Jandor Basantpur
Badmain Bhajji Shimla 5 Ha. N31011’52.1” E077
010’09.1” 5401 Ft. Centre
Point
714. Pasture U-24 Lunsung Kandharghat Bhajji Shimla 15 Ha. N31013.517’ E077
011.898’ 4817 Ft. Entry point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. li
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
Development 2008-09
715. Pasture Dev. 2008-09
U 145 Mool Bhajji
Thiala Bhajji Shimla 3 Ha. N310 08.721' E70
0 15.947' 5343 Ft. Entry Point
716. Afforestation 2009-10
U-41 Chatyar
Badmain Bhajji Shimla 5 Ha. N31011’45.3” E077
008’45.0” 4530 Ft. Entry point
717. Afforestation 2009-10
U-45 Jandar Badmain Bhajji Shimla 5 Ha. N31011’56.6” E077
009’39.1” 5665 Ft. Entry Point
718. Afforestation 2009-10
U-59 Dandibag Khatnol Bhajji Shimla 5 Ha. N31°10’22.8” E077017’07.9” 6357 Ft. Entry point
719. Afforestation 2009-10
U-49 Saroh Khatnol Bhajji Shimla 5 Ha. N31011’00.4” E077
015’15.8” 5650 Ft. Entry Point
720. Afforestation 2009-10
D-26 Beru Khatnol Bhajji Shimla 5 Ha. N31011’24.6” E077
014’51.7” 5668 Ft. Entry point
721. Afforestation 2009-10
U-53 Ramahan Sarar
Khatnol Bhajji Shimla 5 Ha. N31010’36.9” E077
013’50.8” 3612 Ft. Entry point
722. Afforestation 2009-10
D-11 Mandal Pandoa Bhajji Shimla 5 Ha. N31015.635’ E77
018.353’ 3627 Ft. Entry Point
723. Afforestation 2009-10
U-2 Aisha Pandoa Bhajji Shimla 5 Ha. N31015.134’ E077
019.605’ 6166 Ft. Entry Point
724. Afforestation 2009-10
D-21 Fulagalni Sandoa Bhajji Shimla 5 Ha. N31013.904’ E077
018.808’ 5648 Ft. Entry Point
725. Afforestation 2009-10
U-8 Glah Sandoa Bhajji Shimla 5 Ha. N31013.772’ E077
018.832’ 5802 Ft. Entry Point
726. Afforestation 2009-10
U-47 Jajehar Kandharghat Bhajji Shimla 5 Ha. N31012.511’ E077
012.129’ 4355 Ft. Entry point
727. Afforestation 2009-10
U-36 Madhorghat
Madhorghat Bhajji Shimla 5 Ha. N31014.770’ E077
003.407’ 3773 Ft. Entry point
728. Afforestation 2009-10
U 577 Jaini Nalla
Chalawag Bhajji Shimla 5 Ha. N31014.641’ E077
001.949’ 3000 Ft. Entry point
729. Afforestation 2009-10
U-583 Sohal Chalawag Bhajji Shimla 5 Ha. N31013.809’ E077
002.425’ 2997 Ft. Entry point
730. Afforestation 2009-10
U-17 Himri Himri Bhajji Shimla 5 Ha. N31013.882’ E077
016.587’ 5502 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
731. Afforestation 2009-10
U-11 Bagri Banuna
Himri Bhajji Shimla 5 Ha. N31013.682’ E077
016.489’ 5462 Ft. Entry Point
732. Afforestation 2009-10
U-14 Bhara-Drabla
Karyali Bhajji Shimla 5 Ha. N31014.956’ E077
099.035’ 3835 Ft. Entry Point
733. Afforestation 2009-10
U-21 Kaira Pandain
Karyali Bhajji Shimla 5 Ha. N31014.561’ E077
013.161’ 4475 Ft. Entry Point
734. Afforestation2009-10
DPF Bijo Ka Dhalla
Ganeog Dhami Shimla 3 Ha. N310
09.791'
E770 05.234' 5716 Ft. Entry Point
735. Afforestation 2009-10
Bathmana Dhalaya Dhami Shimla 3 Ha. N310 10.485' E077
0 03.587' 5382 Ft. Entry Point
736. Afforestation 2009-10
DPF Salaun Salaun Dhami Shimla 5 Ha. N310 09.877' E077
0 03.276' 5556 Ft. Entry Point
737. Afforestation 2009-10
Pani Rana Okharoo Dhami Shimla 10 Ha. N310 12.531’ E077
002.600’ 3545 Ft. Entry Point
738. Afforestation 2009-10
U - 20 Domehal Karyali Bhajji Shimla 5 Ha. N31013.382' E077
0 13.915' 6656Ft. Entry Point
739. Afforestation 2009-10
U - 27 Sunni Shakrodi
Sunni Bhajji Shimla 4 Ha. N31013.624' E077
0 08.067' 2350 Ft. Entry Point
740. Afforestation 2009-10
U 144 Deothi Thiala Bhajji Shimla 5 Ha. N310 085.685' E077
0 15.909' 4279 Ft. Entry Point
741. Afforestation 2009-10
U 10 Malgi Pandoa Bhajji Shimla 5 Ha. N310 15.114' E077
0 17.998’ 3514 Ft. Entry Point
742. Afforestation 2009-10
O 14 Anukyalu Pandoa Bhajji Shimla 5 Ha. N310 15.297' E077
0 20.457' 4781 Ft. Entry Point
743. Afforestation 2009-10
R 17 Marhon Kamyana Tara Devi Shimla 10 Ha. N310 08.335' E077
0 09.975' 6597 Ft. Entry Point
744. Afforestation 2009-10
UPF Gharog Ghanahatti Dhami Shimla 3 Ha. N310 09.387’ E077
0 04.855’ 6177 Ft. Entry Point
745. Afforestation 2009-10
UPF Bledi Ganeog Dhami Shimla 3 Ha. N310 10.595’ E077
0 05.475’ 5516 Ft. Entry
Point
746. Afforestation 2009-10
DPF Sanog Sanog Dhami Shimla 4 Ha. N310 08.714’ E077
0 05.989’ 5047 Ft. Entry
Point
747. Afforestation 2009-10
UPF Raukichauri
Sanog Dhami Shimla 5 Ha. N310 08.553’ E077
0 06.257’ 5543 Ft. Entry
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. liii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
(Prot)
748. Afforestation 2009-10
DPF Lahog Ki Ghar
Halog Dhami Shimla 3 Ha. N310 10.226’ E077
0 02.578’ 4849 Ft. Entry
Point
749. Afforestation 2009-10
UPF Bathmana Dhalaya Dhami Shimla 3 Ha. N310 10.993’ E077
0 03.277’ 5143 Ft. Entry
Point
750. Afforestation 2009-10
UPF Toon Okharoo Dhami Shimla 5 Ha. N310 12.021’ E077
0 02.451’ 3871 Ft. Entry
Point
751. Afforestation 2009-10
UPF Binu Okharoo Dhami Shimla 3 Ha. N310 12.006’ E077
0 01.826’ 4103 Ft. Entry
Point
752. Afforestation 2009-10
DPF Salaun Salaun Dhami Shimla 5 Ha. N310 09.831’ E077
0 03.393’ 5684 Ft. Entry
Point
753. Pasture Development 2009-10
Binu Okharoo Dhami Shimla 3 Ha. N310 12.007' E77
0 01.826' 4092 Ft. Entry Point
754. Afforestation 2010-11
U-28 Bag Sunni Bhajji Shimla 4 Ha. N31012’55.1” E077
006’55.1” 4205 Ft. Entry point
755. Afforestation(2010-11
U 29 Reog Sunni Bhajji Shimla 4 Ha. N31013’54.3” E077
005’18.8” 3580 Ft. Entry point
756. Afforestation 2010-11
D-7 Jander Badmain Bhajji Shimla 5 Ha. N31011’56.6” E077
009’41.9” 5696 Ft. Entry Point
757. Afforestation 2010-11
U 47- Jajehar Badmain Bhajji Shimla 10 Ha. N31011’068” E077
013’966” 4211 Ft. Entry point
758. Afforestation 2010-11
U-52 Banijalag Khatnol Bhajji Shimla 5 Ha. N31010’29.9” E077
015’52.3” 6325 Ft. Entry Point
759. Afforestation 2010-11
U-10 Malgi Himri Bhajji Shimla 3 Ha. N31015.583’ E077
016.677’ 4920 Ft. Entry Point
760. Afforestation 2010-11
U-10 Malgi Sandoa Bhajji Shimla 5 Ha. N31015.120’ E077
017.971’ 3491 Ft. Entry Point
761. Afforestation 2010-11
U-6 Dhagogra Sandoa Bhajji Shimla 4 Ha. N31015.382’ E077
018.069’ 3595 Ft. Entry Point
762. Afforestation 2010-11
U-3 Bag-Sainj Pandoa Bhajji Shimla 5 Ha. N31016.320’ E077
019.980’ 3369 Ft. Entry Point
763. Afforestation 2010-11
U-3 Bag-Sainj Pandoa Bhajji Shimla 15 Ha. N31016.309’ E077
020.092’ 3506 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. liv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
764. Afforestation 2010-11
U-35 Golan Madhorghat Bhajji Shimla 5 Ha. N31015.086’ E077
003.171’ 4093 Ft. Entry point
765. Afforestation 2010-11
U-35 Madhorghat
Madhorghat Bhajji Shimla 5 Ha. N31014.794’ E077
003.171’ 3698 Ft. Entry point
766. Afforestation 2010-11
U F Bajhal Bajhol Bhajji Shimla 4 Ha. N31011.631’ E077
006.141’ 3927 Ft. Entry point
767. Afforestation 2010-11
U-258 Basharu Chalawag Bhajji Shimla 5 Ha. N31014.195’ E077
002.541’ 3901 Ft. Entry point
768. Afforestation 2010-11
U-11 Bari Bamuna
Himri Bhajji Shimla 10 Ha. N31011.411’ E077
016.437’ 4754 Ft. Entry Point
769. Afforestation 2010-11
U-14 Bharara Drabla
Karyali Bhajji Shimla 10 Ha. N31014.641’ E077
014.446’ 3955Ft. Entry Point
770. Afforestation 2010-11
Makri Okhru Dhami Shimla 2 Ha. N310 11.748' E077
001.472' 4446 Ft. Entry Point
771. Afforestation 2010-11
U – 3 Bag Sainj Pandoa Bhajji Shimla 15 Ha. N31016.365' E077
0 20.116' 3318 Ft. Entry Point
772. Afforestation 2010-11
U - 14 Bhara Drabla
Karyali Bhajji Shimla 10 Ha. N31014.655' E077
0 014.985’ 3959 Ft. Entry Point
773. Afforestation 2010-11
D P F Daban Salaun Dhami Shimla 5 Ha. N310 10.468’ E077
0 04.753’ 4647 Ft. Entry
Point
774. Afforestation (2010-11)
D-4Bag
Sunni Bhajji Shimla 4 Ha. N31013’02.9” E077
007’01.3” 4595 Ft. Entry point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lv
Division – Suket Range - Kangoo
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
775. Afforestation 2004-05
Patta Batwara Kangoo Suket 5 Ha. N 31022.908’ E076
055.327’ 3261 Ft Bottom
Entry Point
776. Afforestation 2004-05
OD 272 Kanagol Behli Kangoo Suket 6-Ha. N 310 16.790’ E077
002.699’ 4571 Ft Top Entry
Point
777. Afforestation 2004-05
O D 300 Chouri Badoo Kangoo Suket 6 Ha. N 310 22.194’ E076
058.231’ 6616 Ft Top Entry
Point
778. Afforestation 2004-05
N D 276 Bragta Hara Boi Kangoo Suket 6 Ha. N 310 17.855’ E077
001.245’ 3646 Ft Top Entry
Point
779. Afforestation 2005-06
Patta Batwara Kangoo Suket 15 Ha. N 31022.937’ E076
055.565’ 4205 Ft Top Entry
Point
780. Afforestation 2005-06
Pajrana Harpoi Kangoo Suket 10 -Ha. N 310 21.535’ E076
0 59.365’ 5786 Ft Top Entry
Point
781. Afforestation 2005-06
N D 275 Behli Behli Kangoo Suket 10-Ha. N 310 17.533’ E077
0 02.345’ 4692 Ft Top Entry
Point
782. Afforestation 2005-06
Chouri Badhu Kangoo Suket 10- Ha. N 310 22.166’ E076
0 58.210’ 6610 Ft Top Entry
Point
783. Afforestation 2005-06
N D 276 Bragta Har Boi Kangoo Suket 10 Ha. N 310 17.721’ E077
001.854’ 4511 Ft Center Point
784. Afforestation 2005-06
N D 280 Tahli Har Boi Kangoo Suket 10 Ha. N 31018.084’ E077
000.423’ 3609 Ft Top Entry
Point
785. Afforestation 2005-06
N D 287 Hara Har Boi Kangoo Suket 15 Ha. N 31018.544’ E077
022.862’ 3875 Ft Center Point
786. Afforestation (2005-06)
Manjheli Gehru Kangoo Suket 10 Ha. N31022.758’ E076°56.931’ 4219 Ft Side entry
point
787. Afforestation (2005-06)
Jarandhar Gehru Kangoo Suket 25 Ha. N31022.744’ E076°57.145’ 4444 Ft Side entry
point
788. Afforestation (2005-06)
Prali Gehru Kangoo Suket 10 Ha. N31023.476’ E076°57.186’ 6799 Ft Middle side
entry point
789. Afforestation 2005-06
Kayan Dhawal Kangoo Suket 10 Ha. N 31022.668’ E076
052.402’ 2715 Ft Top entry
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lvi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
790. Afforestation 2005-06
Ahen Sunali II Dhawal Kangoo Suket 10 Ha. N 31022.059’ E076
052.751’ 2986 Ft Top Entry
Point
791. Afforestation 2005-06
Dhawal Dhawal Kangoo Suket 15 Ha. N 310 24.679’ E 76
0 52.788’ 1847 Ft Center Point
792. Pasture Development 2005-06
Ahen Sunali Dhawal Kangoo Suket 5 Ha. N 31022.272’ E076
052.639’ 3008 Ft Top Entry
Point
793. Pasture Development 2005-06
N D 278 Sojha Behli Kangoo Suket 12-Ha. N 310 17.620’ E077
002.543’ 4318 Ft Top Entry
Point
794. Pasture Development 2005-06
Ratta-II Batwara Kangoo Suket 10 Ha. N 31023.047’ E076
055.132’ 4228 Ft Bottom
Entry Point
795. Afforestation 2006-07
ND 274 Kator Behli Kangoo Suket 8-Ha. N 31017.087’ E077
002.769’ 4831 Ft Center Point
796. Afforestation 2006-07
N D 298 Neri Ropra
Badoo Kangoo Suket 10 Ha. N 31020.990’ E076
057.108’ 4216 Ft Top Entry
Point
797. Afforestation 2006-07
Panjolth Batwara Kangoo Suket 8 Ha. N 31023.041’ E076
054.630’ 3540 Ft Top Entry
Point
798. Afforestation (2006-07)
Kathla Gehru Kangoo Suket 16 Ha. N31022.77.2’ E076°57.13.3’ 4452 Ft Side entry
point
799. Afforestation (2006-07)
Devidhar Gehru Kangoo Suket 10 Ha. N31023.573’ E076°56.483’ 7125 Ft Side entry
point
800. Afforestation 2006-07
O D 300 Chouri Badoo Kangoo Suket 6 Ha. N 310 22.141’ E076
058.224’ 6569 Ft Top Entry
Point
801. Afforestation 2006-07
Ahen Sunali II Dhawal Kangoo Suket 10 Ha. N 31021.863’ E076
052.832’ 3121 Ft Below entry
Point
802. Afforestation 2006-07
273 Bhallam Behli Kangoo Suket 8-Ha. N 310 17.060’ E077
0 03.738’ 2907 Ft Entry Point
803. Afforestation 2006-07
N D 286 Hara (P) Har Boi Kangoo Suket 5 Ha. N 310 18.769’ E077
0 55.518’ 4074 Ft Entry Point
804. Afforestation (2007-08)
Gohloo Gehru Kangoo Suket 10 Ha. N31022.642’ E076’52.782’ 3870 Ft Bottom side
Entry point
805. Afforestation Gehroodhar Gehru Kangoo Suket 8 Ha. N31023.534’ E076’56.877’ 6790 Ft Bottom
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lvii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
(2007-08) entry point
806. Afforestation 200708
Ahen Sunali Dhawal Kangoo Suket 15 Ha. N 31021.602’ E076
032.840’ 2969 Ft Top Entry
Point
807. Afforestation 2007-08
Ghawol Dhawal Kangoo Suket 10 Ha. N 31021.775’ E076
052.793’ 366 Ft Top Entry
Point
808. Afforestation 2007-08
N D 273 Bhallan Behli Kangoo Suket 2-Ha. N 31017.501’ E077
0 03.496’ 2945 Ft Entry Point
809. Afforestation 2007-08
O D 272 Karagal Behli Kangoo Suket 18-Ha. N 31016.348’ E077
0 03.023’ 2726 Ft Entry Point
810. Afforestation 2007-08
N D 285 Jallah Hara Boi Kangoo Suket 5- Ha. N 31019.083’ E076
0 58.327’ 2321 Ft Top Entry
Point
811. Afforestation 2007-08
N D 283 Bartha Hara Boi Kangoo Suket 5 Ha. N 31019.780’ E076
0 57.786’ 2666 Ft B. Entry
Point
812. Afforestation 2007-08
N D Chouri Hara Boi Kangoo Suket 5- Ha. N 310 18.856’ E077
0 14.237’ 4649 Ft Top Entry
Point
813. Afforestation 2007-08
N D 288 Chouri Har Boi Kangoo Suket 3 -Ha. N 310 18.728’ E077
0 13.418’ 4510 Ft Top Entry
Point
814. Afforestation 2007-08
N D 280 Tahli Har Boi Kangoo Suket 5 Ha. N 310 18.227’ E077
0 00.683’ 3737 Ft Center Point
815. Afforestation 2007-08
N D 296 Cholun Badoo Kangoo Suket 10 Ha. N 310 20.936’ E076
0 57.108’ 4185 Ft Entry Point
816. Afforestation 2007-08
N D 298 Neri Ropra
Badoo Kangoo Suket 10 Ha. N 310 20.819’ E076
0 57.033’ 3734 Ft Center Point
817. Afforestation 2007-08
N D 290 Deauli Badoo Kangoo Suket 8 Ha. N 310 21.828’ E076
0 59.630’ 5557 Ft Entry Point
818. Afforestation 2007-08
N D 291 Deauli Badoo Kangoo Suket 10 Ha. N 310 21.662’ E076
0 59.546’ 6111 Ft Top Entry
Point
819. Afforestation 2007-08
O D 300 Chouri Badoo Kangoo Suket 8 Ha. N 310 21.899’ E076
0 59.527’ 5321 Ft Entry Point
820. Afforestation 2007-08
O D 300 Chouri Badoo Kangoo Suket 10 Ha. N 310 22.168’ E076
0 58.128’ 6569 Ft Center point
821. Afforestation 2007-08
O D 300 Chouri Badoo Kangoo Suket 10 Ha. N 310 22.168’ E076
0 58.128’ 6586 Ft Center point
822. Afforestation Dorhnadhar Batwara Kangoo Suket 10 Ha. N 31023.183’ E076
054.981’ 4276 Ft Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lviii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2007-08
823. Afforestation 2007-08
Rakiunraa Gehra Batwara Kangoo Suket 12 Ha. N 31023.209’ E076
055.165’ 4805 Ft Center Point
824. Afforestation 2007-08
Salog Batwara Kangoo Suket 10 Ha. N 31022.807’ E076
054.062’ 4002 Ft Top Entry
Point
825. Afforestation 2007-08
Jartu Batwara Kangoo Suket 10 Ha. N 31022.696’ E076
053.872’ 4669 Ft Top Entry
Point
826. Afforestation 2007-08
Kehloo Batwara Kangoo Suket 5 Ha. N 31023.061’ E076
055.583’ 4575 Ft Center Point
827. Afforestation 2007-08
Devidhar Gairu Kangoo Suket 10 Ha. N 310 23.511’ E 76
0 56.809’ 6872 Ft Center Point
828. Pasture Development (2007-08)
Kathla Gehru Kangoo Suket 10 Ha. N31022.886’ E076’57.048’ 4571 Ft Bottom
entry point
829. Pasture Development(2007-08)
Salogdhar Gehru Kangoo Suket 5 Ha. N31023.180’ E076’57.668’ 6617 Ft Top entry
point
830. Pasture Development 2007-08
N D 274 Kator Dalol
Behli Kangoo Suket 7.5-Ha. N 310 17.139’ E077
0 02.775’ 4764 Ft Top Entry
Point
831. Pasture Development 2007-08
Sufri Ka tat Dhawal Kangoo Suket 15 Ha. N 31022.108’ E076
053.031’ 3462 Ft Below Entry
Point
832. Down Steam Teatment 2007-08
Padhana Dhawal Kangoo Suket 7 Ha. N 31023.759’ E076
053.022’ 1948 Ft Top Entry
Point
833. Down Steam Teatment 2007-08
Padhana Dhawal Kangoo Suket 13 Ha. N 31024.517’ E076
052.895’ 2200 Ft Center point
834. Afforestation 2008-09
N D 281 Khalind Har Boi Kangoo Suket 20 Ha. N 310 18.867’ E077
0 00.353’ 4724 Ft Top Entry
Point
835. Afforestation 2008-09
Jartu Batwara Kangoo Suket 9 Ha. N 31022.464’ E076
054.341’ 2976 Ft Top Entry
Point
836. Afforestation N D 282 Thung Hara Boi Kangoo Suket 20 Ha. N 310 19.356’ E076
0 59.256’ 3013 Ft B. Entry
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lix
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2008-09 Dhar Point
837. Afforestation 2008-09
N D 277 Morid Har Boi Kangoo Suket 25 Ha. N 310 17.160’ E077
001.713’ 3623 Ft Top Entry
Point
838. Afforestation 2008-09
O D 272 Karagal Behli Kangoo Suket 16-Ha. N 310 16.121’ E077
003.401’ 2553 Ft Entry Point
839. Afforestation 2008-09
O D 300 Chouri Badoo Kangoo Suket 10 Ha. N 310 22.295’ E076
057.849’ 6265 Ft Entry point
840. Afforestation 2008-09
N D 291 Deauli Badoo Kangoo Suket 10 Ha. N 310 21.194’ E076
059.654’ 6652 Ft Top Entry
Point
841. Afforestation 2008-09
N D 296 Cholun Badoo Kangoo Suket 15 Ha. N 310 21.117’ E076
057.904’ 4677 Ft Entry Point
842. Afforestation 2008-09
N D 280 Tahli Har Boi Kangoo Suket 10 Ha. N 310 18.437’ E077
000.013’ 3808 Ft Entry Point
843. Afforestation 2008-09`
Patta Batwara Kangoo Suket 25 Ha. N 31022.818’ E076
055.558’ 3918 Ft Center Point
844. Afforestation 2008-09
Ahen Sunali Dhawal Kangoo Suket 22 Ha. N 31021.697’ E076
052.873’ 3076 Ft Center Point
845. Afforestation 2008-09
Ahen Sunali Dhawal Kangoo Suket 10 Ha. N 31022.343’ E076
052.554’ 2975 Ft Center Point
846. Afforestation (2008-09)
Prali - II* Gehru Kangoo Suket 5 Ha. N31
033.19.3’ E076’57.42.6’ 6094 Ft Side entry
point
847. Afforestation 2008-09
Ahen Sunali Dhwal Kangoo Suket 15 Ha. N 310 22.341’ E 76
0 53.214’ 3575 Ft Center Point
848. Afforestation 2008-09
Jartu (16) Batwara Kangoo Suket 16 Ha. N 310 22.309’ E 76
0 54.429’ 3163 Ft Center Point
849. Pasture Development 2008-09
Pralidhar Gelrou Kangoo Suket 5 Ha. N 31023.402’ E076
057.289’ 6518 Ft Bottom
Entry Point
850. Pasture Development 2008-09
O D 300 Chouri Badoo Kangoo Suket 15 Ha. N 31021.999’ E076
0 58.559’ 5887 Ft Entry point
851. Pasture Cront Batwara Kangoo Suket 5 Ha. N 31023.014’ E076
055.100’ 4000 Ft Top Entry
* Prali-II not in list but is in CAT Plan
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lx
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
Development 2008-09
Point
852. Afforestation 2009-10
N D 298 Neri Ropra
Badoo Kangoo Suket 10 Ha. N 31020.521’ E076
057.102’ 3113 Ft Center Point
853. Afforestation 2009-10
N D 275 Bindllo Behli Kangoo Suket 9-Ha. N 31016.879’ E077
001.905’ 3159 Ft Top Entry
Point
854. Afforestation 2009-10
Jartu Batwara Kangoo Suket 9 Ha. N 31022.464’ E076
054.341’ 2976 Ft Top Entry
Point
855. Afforestation 2009-10
Ahon Sunali Dhal Dhawal Kangoo Suket 15 Ha. N 31022.108’ E076
053.031’ 3462 Ft Below Entry
Point
856. Afforestation 2009-10
Jartu 25 Batwara Kangoo Suket 25 Ha. N 31022.797’ E 76
054 167’ 3331 Ft Center Point
857. Pasture Development 2009-10
Chouri Badhu Kangu Suket 17.5 Ha. N 310 26’26.4” E 77
0 04’26.3” 6849 Ft Center Point
858. Pasture Development 2009-10
Jartu Batwara Kangoo Suket 10 Ha. N 310 23.023’ E 76
0 53.969’ 3998 Ft Center Point
859. Afforestation 2010-11
Jartu Batwara Kangoo Suket 12 Ha. N 31022.144’ E 76
054.592’ 2897 Ft Center Point
860. Afforestation 2010-11
N D 294 Chauri Badoo Kangoo Suket 17.5 Ha.
N 31021.569’ E076
059.581’ 4068 Ft Entry Point
861. Afforestation 2004-05
Kathiuni Kathiuni Jhungi Suket 10- Ha. N 31026’01.5” E077
03’47.7” 6745 Ft Center Point
862. Afforestation 2004-05
Manjhaki Jaral Jhungi Suket 5- Ha. N 31026’59.0” E077
004’01.7” 8591 Ft Top Entry
point
863. Afforestation 2004-05
Trechdi Kinder Jhungi Suket 10 Ha. N 310 18’10.5” E 077
0 07’57.3” 4534 Ft Center Point
864. Pasture Development 2004-05
Heg Dhawar Jhungi Suket 7 Ha. N 31026’38.9” E077
006’47.1” 8795 Ft Center Point
865. Pasture Development 2004-05
Heg Dhawar Jhungi Suket 10- Ha. N 31026’35.2” E077
006’42.3” 8570 Ft Botom Entry
Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
866. Pasture Development(2004-05)
Galtoo Barmig Jhungi Suket 10 Ha. N31027.459’ E077’05.536’ 9003 Ft Center point
867. Afforestation(2005-06)
Kharyana Nehri Jhungi Suket 7 Ha. N31023.339’ E077’02.595’ 5270 Ft Top entry
point
868. Afforestation 2005-06
Chehar Plantation Site
Nihri Jhungi Suket 5 Ha. N 310 23.498” E 077
0 02.047’ 6217 Ft Center Point
869. Afforestation 2005-06
Ranghol –II Dhawar Jhungi Suket 5 Ha. N 31026’90.2” E077
006’30.4” 7693 Ft Top entry
point
870. Afforestation(2005-06)
Haluoo Marhara Jhungi Suket 5 Ha. N31022.386’ E077’02.408’ 5960 Ft Center point
871. Afforestation(2005-06)
Marhara Marhara Jhungi Suket 5 Ha. N31022.507’ E077’01.318’ 6482 Ft Center point
872. Afforestation 2005-06
N.D. 264. Chand
Jaral Jhungi Suket 5- Ha. N 31022’24.3” E077
002’34.7” 4860 Ft Botom Entry
point
873. Afforestation(2005-06)
OD–251 Shivshankar
Jhungi Jhungi Suket 10 Ha. N31025.277’ E077’05.425’ 6262 Ft Center point
874. Afforestation(2005-06)
Khoba Jhungi Jhungi Suket 5 Ha. N31024.582’ E077’06.096’ 6379 Ft Center point
875. Afforestation 2005-06
Kathiuni Kathiuni Jhungi Suket 7- Ha. N 31025’20.4” E077
03’40.4” 6428 Ft Center Point
876. Afforestation(2005-06)
Kathala Balag Jhungi Suket 8 Ha. N31022.24.6’ E076°59.20.3’ 6595 Ft Entry point
877. Afforestation 2005-06
Daint–C-2-b Galankhar Jhungi Suket 5- Ha. N 31025’47.3” E077
005’03.2” 7302 Ft Center Point
878. Afforestation 2005-06
Daint–C-1-b Galankhar Jhungi Suket 5- Ha. N 31025’49.9” E077
005’00.5” 7251 Ft Top Entry
Point
879. Afforestation 2005-06
Manjhaki –C-1-B Jaral Jhungi Suket 5- Ha. N 31027’00.7” E077
004’01.5” 8647 Ft Botom Entry
point
880. Afforestation(2005-06)
Kamrah Nehri Jhungi Suket 3 Ha. N31024.30.3’ E077°02.043’ 7400 Ft Center point
881. Afforestation(2005-06)
Kanon Kanon Jhungi Suket 10 Ha. N31024.35.0’ E077°01.403’ 7780 Ft Top entry
point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
882. Afforestation(2005-06)
Dogri Bandli Jhungi Suket 5 Ha. N31021.036’ E077°01.263’ 6503 Ft Top entry
point
883. Afforestation(2005-06)
Dogri Bandli Jhungi Suket 7 Ha. N31020.592’ E077°01.245’ 6336 Ft Center point
884. Afforestation(2005-06)
Dogri* Bandli Jhungi Suket 6 Ha. N31
020.588’ E077°01.232’ 6240 Ft Entry point
885. Afforestation(2005-06)
Narehli Kinder Jhungi Suket 10 Ha. N31018.386’ E077°02.497’ 3448 Ft Center Point
886. Afforestation(2005-06)
Narehli Kinder Jhungi Suket 5 Ha. N31018.415’ E077°02.564’ 3562 Ft Center Point
887. Afforestation(2005-06)
Supadhar Trechh Jhungi Suket 10 Ha. N31021.484’ E077°02.544’ 4305 Ft Top entry
point
888. Afforestation(2005-06)
Kathala Balag Jhungi Suket 5 Ha. N31022.309’ E076°59.237’ 7015 Ft Top entry
point
889. Pasture Development(2005-06)
Plundli Trechh Jhungi Suket 5 Ha. N31022.387’ E077°00.138’ 7734 Ft Center Point
890. Pasture Development 2005-06
Heg Dhawar Jhungi Suket 10- Ha. N 31026’43.1” E077
006’51.4” 8970 Ft Center Point
891. Afforestation 2006-07
Kathla Balag Jungi Suket 10 Ha. N 31022’40.7’’ E 076
0 59’42.7” 7430 Ft Center Point
892. Afforestation 2006-07
Trechdi Kinder Jhungi Suket 10 Ha. N 310 18’52.5” E 77
0 01’41.5” 5146 Ft Center Point
893. Afforestation 2006-07
Chanadbahan Chanadbahan
Jhungi Suket 5- Ha. N 31023’53.2” E077
005’08.6” 6728 Ft Top Entry
Point
894. Afforestation(2006-07)
Dogri Bandli Jhungi Suket 20 Ha. N31020.596’ E077’01.081’ 6041 Ft Entry point
895. Afforestation 2006-07
Ranghol Dhawar Jhungi Suket 5 Ha. N 31026’13.0” E077
006’24.4” 7255 Ft From Center
896. Afforestation 2006-07
Ranghol Dhawar Jhungi Suket 5 Ha. N 31026’26.7” E077
006’39.4” 8337 Ft Top entry
point
* Dogri (2005-06) 6 ha. was not in list but is in CAT Plan.
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxiii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
897. Afforestation 2006-07
Kathiuni Kathiuni Jhungi Suket 5- Ha. N 31025’35.7” E077
003’39.0” 6642. Ft Top Entry
Point
898. Afforestation(2006-07)
Kamrah Nehri Jhungi Suket 10 Ha. N31024’49.4” E077°02’57.3” 7380 Ft Center point
899. Afforestation(2006-07)
Narehli Kinder Jhungi Suket 10 Ha. N31018’46.7” E077°02’57.5” 3325 Ft Center Point
900. Afforestation(2006-07)
Narehli Kinder Jhungi Suket 10 Ha. N31018.512’ E077°03.030’ 3102 Ft Center Point
901. Afforestation(2006-07)
Narehli Kinder Jhungi Suket 10 Ha. N31019.016’ E077°02.545’ 3150 Ft Bottom
entry point
902. Afforestation 2006-07
Manjhaki Jaral Jhungi Suket 10- Ha. N 31026’343” E077
004’088” 7575 Ft Top Entry
point
903. Afforestation(2006-07)
Trechh Trechh Jhungi Suket 5 Ha. N31021.484’ E077’01.207’ 7001 Ft Top entry
point
904. Afforestation 2006-07
Shi Vshankar Junghi Jungi Suket 5 Ha. N 31024’35.4’’ E 076°52’32.4” 1820 Ft Center Point
905. Afforestation(2007-08)
Balag Balag Jhungi Suket 5 Ha. N31022.261’ E076°59.203’ 6763 Ft Top entry
point
906. Afforestation(2007-08)
Tandidhar Trechh Jhungi Suket 5 Ha. N31021.132’ E077°02.389’ 4831 Ft Top entry
point
907. Afforestation(2007-08)
Marhara Marhara Jhungi Suket 10 Ha. N31023.173’ E077°01.587’ 6690 Ft Top entry
point
908. Afforestation(2007-08)
Kinder Kinder Jhungi Suket 10 Ha. N31019.052’ E077°02.316’ 4301 Ft Center Point
909. Afforestation(2007-08)
Kinder Kinder Jhungi Suket 7 Ha. N31019.074’ E077°02.307’ 4739 Ft Center Point
910. Afforestation 2007-08
Kathiuni Kathiuni Jhungi Suket 5- Ha. N 31025’29.5” E077
003’33.4” 6619 Ft Center Point
911. Afforestation(2007-08)
Bah Nehri Jhungi Suket 10 Ha. N31024.186’ E077°02.573’ 6920 Ft Center point
912. Afforestation 2007-08
Galankhar Galankhar Jhungi Suket 10- Ha. N 31024’49.7” E077
004’23.0” 6320 Ft Center Point
913. Afforestation 2007-08
Manjhaki Jaral Jhungi Suket 10- Ha. N 31026’34.8” E077
004’09.2” 7589 Ft Top Entry
point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxiv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
914. Pasture Development 2007-08
Manjhaki Jaral Jhungi Suket 15- Ha. N 31026’55.5” E077
004’02.7” 8421 Ft Top Entry
point
915. Pasture Development 2007-08
Heg Dhawar Jhungi Suket 10- Ha. N 31026’45.4” E077
006’48.6” 9140 Ft Center Point
916. Pasture Development 2007-08
Manjhaki Jaral Jhungi Suket 5- Ha. N 31027’01.6” E077
004’02.1” 8691 Ft Top Entry
point
917. Afforestation(2008-09)
Kamrah Nehri Jhungi Suket 10 Ha. N31024.588’ E077°02.458’ 7848 Ft Top entry
point
918. Afforestation(2008-09)
Gadachh Bandli Jhungi Suket 15 Ha. N31021.176’ E077°01.148’ 6462 Ft Bottom
entry point
919. Afforestation 2008-09
Ranghol Dhawar Jhungi Suket 5 Ha. N 31026’30.3” E077
006’34.0” 8321 Ft Top entry
point
920. Afforestation 2008-09
Ranghol -II Dhawar Jhungi Suket 5 Ha. N 31026’28.9” E077
006’39.9” 8401Ft Top entry
point
921. Afforestation 2008-09
Ranghol -I Dhawar Jhungi Suket 5 Ha. N 31026’12.2” E077
006’39.0” 8000 Ft Top entry
point
922. Afforestation 2008-09
Gahghka Chhol Dhawar Jhungi Suket 5 Ha. N 31025’42.6” E077
006’21.2” 7120.Ft Center
Point
923. Afforestation 2008-09
Khundhar Salani Jhungi Suket 10- Ha. N 31022’04.8” E077
004’12.4” 6236 Ft Center point
924. Afforestation 2008-09
Simoo-1 Salani Jhungi Suket 10- Ha. N 31021’49.1” E077
003’21.0” 5033 Ft Top Entry
Point
925. Afforestation 2008-09
Simoo-2 Salani Jhungi Suket 5- Ha. N 31022’03.5” E077
003’05.5” 5037 Ft Top Entry
Point
926. Afforestation 2008-09
Simoo-3 Salani Jhungi Suket 5- Ha. N 31022’02.3” E077
003’04.2” 4983 Ft Top Entry
Point
927. Afforestation 2008-09
Khunedher Salani Jhungi Suket 5- Ha. N 31022’40.5” E077
004’00.5” 5745 Ft Top Entry
Point
928. Afforestation 2008-09
Simoo Salani Jhungi Suket 5- Ha. N 31022’16.6” E077
003’33.7” 5005 Ft Top Entry
Point
929. Afforestation Simoo Salani Jhungi Suket 5- Ha. N 31022’25.4” E077
003’35.9” 4961 Ft Top Entry
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2008-09 Point
930. Afforestation 2008-09
Salani-1 Salani Jhungi Suket 5- Ha. N 31022’27.5” E077
003’40.8” 5279 Ft Top Entry
Point
931. Afforestation(2008-09)
Bart Marhara Jhungi Suket 10 Ha. N31022.55.3’ E077°02.46.6’ 5690 Ft Bottom
entry point
932. Afforestation(2008-09)
Haluoo Marhara Jhungi Suket 10 Ha. N31028.032’ E077°03.012’ 5123 Ft Center point
933. Afforestation(2008-09)
Marhara Marhara Jhungi Suket 10 Ha. N31023.080’ E077°01.206’ 7313 Ft Center point
934. Afforestation(2008-09)
Kumarhoo Bandli Jhungi Suket 15 Ha. N31020.12.4’ E077°00.422’ 6716 Ft Top entry
point
935. Afforestation(2008-09)
Charog Kinder Jhungi Suket 10 Ha. N31019.31.0’ E077°01.215’ 6451 Ft From center
936. Afforestation(2008-09)
Trehli Kinder Jhungi Suket 20 Ha. N31018.292’ E077°02.321’ 4888 Ft Top entry
point
937. Afforestation(2008-09)
Narehli Kinder Jhungi Suket 10 Ha. N31019.011’ E077°02.521’ 3284 Ft Bottom
entry point
938. Afforestation(2008-09)
Tandidhar Trechh Jhungi Suket 10 Ha. N31021.115’ E077°02.385’ 4820 Ft Entry point
939. Afforestation(2008-09)
Kathala Balag Jhungi Suket 15 Ha. N31022.335’ E076°59.475’ 7532 Ft Top entry
point
940. Afforestation 2008-09
Kumaru Bandli Jhungi Suket 35 Ha. N 310 20.242’ E 76
059.518’ 6784 Ft Center Point
941. Pasture Development (2008-09)
Kathala Balag Jhungi Suket 10 Ha. N31022.292’ E076°59.593’ 7740 Ft Top entry
point
942. Pasture Development 2008-09
Heg Dhawar Jhungi Suket 6- Ha. N 31026’48.0” E077
006’49.5” 9130 Ft Center
point
943. Pasture Development 2008-09
Daint Galankhar Jhungi Suket 10- Ha. N 31025’31.0” E077
004’51.0” 6766 Ft Center Point
944. Pasture Development
Kathla Kathla Jhungi Suket 10 Ha. N 310 22’29.2” E 76
0 59.59.3” 7740 Ft Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxvi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2008-09
945. Afforestation(2009-10
Maj Pragan) Bandli Jhungi Suket 10 Ha. N31020.293’ E077°02.223’ 4759 Ft Center Point
946. Afforestation(2009-10)
Trehli–1 Kinder Jhungi Suket 6 Ha. N31092.208’ E077°02.392’ 4229 Ft Top entry
point
947. Afforestation(2009-10)
Trehli–II Kinder Jhungi Suket 6 Ha. N31018.161’ E077°02.391’ 3999 Ft From top
entry point
948. Afforestation 2009-10
Fegal Salani Jhungi Suket 5 Ha. N 31021’34.6” E077
004’19.2” 5358 Ft Center Point
949. Afforestation 2009-10
Fegal –II Salani Jhungi Suket 5- Ha. N 31021’23.5” E077
004’15.2” 5035 Ft Top Entry
Point
950. Afforestation 2009-10
Ukri –1 Salani Jhungi Suket 5- Ha. N 31021’20.5” E077
003’56.5” 5182. Ft Top Entry
Point
951. Afforestation 2009-10
Ukri -2 Salani Jhungi Suket 6- Ha. N 31021’28.1” E077
003’45.1” 5257. Ft Top Entry
Point
952. Afforestation 2009-10
O.D. Manjhaki –I Jhungi Jhungi Suket 5- Ha. N 31026’19.3” E077
004’31.9” 7549 Ft Top Entry
Point
953. Afforestation 2009-10
O.D. Manjhaki II Jhungi Jhungi Suket 5- Ha. N 31026’10.1” E077
004’31.1” 7125 Ft Center Point
954. Afforestation(2009-10)
Salani Salani Jhungi Suket 5 Ha. N31023.46.6’ E077°04.20.7’ 6032 Ft Center point
955. Afforestation(2009-10)
Chebaz Nehri Jhungi Suket 3 Ha. N31023.436’ E077°02.065’ 6105 Ft Bottom
entry point
956. Afforestation(2009-10)
Kathala Balag Jhungi Suket 4 Ha. N31
022.229’ E076°59.095’ 6261 Ft Center Point
957. Afforestation 2009-10
Trechdi Trechh Jungi Suket 5 Ha. N 31021.481’ E 77
0 01.212’ 6860 Ft Center Point
958. Pasture Development 2009-10
Manjhaki Jaral Jhungi Suket 13- Ha. N 31026’26.4” E077
004’26.3” 6849 Ft Botom Entry
point
959. Afforestation(2010-11)
Mallraher* Marhara Jhungi Suket 5 Ha. N31
023.041’ E077°03.041’ 5035 Ft Center point
* Mallraher is a afforestation site which us out given in list but is in CAT Plan
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxvii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
960. Afforestation(2010-11)
Salani Salani Jhungi Suket 6 Ha. N31023.496’ E077°04.324’ 6458 Ft Bottom
entry point
961. Afforestation 2010-11
Trechdi Kinder Jhungi Suket 10 Ha. N 31018.252’ E 77
0 20.389’ 4110 Ft Center Point
962. Afforestation 2010-11
Narehli Kinder Jhungi Suket 10 Ha. N 310 19.345’ E 77
0 02.066’ 5480 Ft Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxviii
Division – Theog Range –Theog
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
963. Afforestation 2004-05
Khalashi –I Khalashi Theog Theog 10 Ha. N31006’37.6” E077
018’09.2” 7024 Ft. Center Point
964. Afforestation 2004-05
Khalashi –II Khalashi Theog Theog 10 Ha. N31006’36.2” E077
018’38.0” 7680 Ft. Center Point
965. Afforestation 2004-05
Narainty-I Matiana Theog Theog 10 Ha. N31013’13.4” E077
022’47.4” 8252 Ft. Center point
966. Afforestation 2004-05
Narainty-II Matiana Theog Theog 10 Ha. N31013’02.7” E077
022’38.2” 8186 Ft. Entry Point
967. Afforestation 2004-05
Rohru Shalli Theog Theog 10 Ha. N31007’03.7” E077
022’21.1” 7603 Ft. Entry Point
968. Afforestation 2004-05
Makhrol Kufri Theog Theog 5 Ha. N31005’43,1” E077
017’10.6” 7952 Ft. Center Point
969. Afforestation 2004-05
Gawai- Kufta Chadara Theog Theog 10 Ha. N31010’59.9” E077
020’05.2” 6894 Ft. Center Point
970. Afforestation 2004-05
Rohru Shali Theog Theog 10 Ha. N310 07.155’ E077
022.517’ 7687 Ft. Entry Point
971. Afforestation 2004-05
Makhrol Kufri Theog Theog 5 Ha. N310 05.503’ E077
0 17.263’ 7951 Ft. Entry Point
972. Afforestation 2004-05
Bagna Kufri Theog Theog 5 Ha. N310 05.275’ E077
0 17.813’ 7876 Ft. Entry Point
973. Afforestation 2004-05
Sholvi Chadara Theog Theog 5 Ha. N310 13.364’ E077
0 20.145’ 8888 Ft. Entry Point
974. Afforestation 2004-05
Shalli-I Dharam pur
Theog Theog 10 Ha. N31012.119’ E077
019.123’ 7835 Ft. Center Point
975. Afforestation 2004-05
Shalli-II Dharam pur
Theog Theog 10 Ha. N31012.149’ E077
019.190’ 7724 Ft. Center Point
976. Afforestation 2004-05
Balech Gowai Theog Theog 5 Ha. N31007.640’ E077
023.420’ 7430 Ft. Center Point
977. Afforestation 2005-06
Lanoo 2 Dearati Theog Theog 5 Ha. N310 10.058’ E077
0 20.560’ 6561 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxix
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
978. Afforestation 2005-06
Majhar Dearati Theog Theog 5 Ha. N310 07.131’ E077
0 18.215’ 6260 Ft. Entry Point
979. Afforestation 2005-06
Khanoor Nalla Kufri Theog Theog 20 Ha. N310 06.280’ E077
0 16.685’ 7594 Ft. Entry Point
980. Afforestation 2005-06
Kuinal Chadara Theog Theog 4 Ha. N310 13.018’ E077
0 21.995’ 8101 Ft. Entry Point
981. Afforestation 200506
Kandharghat Sarog Theog Theog 10 Ha. N310 08.777’ E077
0 19.967’ 6576 Ft. Entry Point
982. Afforestation 2005-06
Chalawag -1 Shalli Theog Theog 10 Ha. N310 08.466’ E077
0 20.944’ 6875 Ft. Entry Point
983. Afforestation 2005-06
Pralighashi Dharampur
Theog Theog 6 Ha. N310 11.508’ E077
0 18.685’ 6635 Ft. Entry Point
984. Afforestation 2005-06
Rainall Chadara Theog Theog 10 Ha. N31010’26.6” E077
020’04.1” 5561 Ft. Entry point
985. Afforestation 2005-06
Bagana Cheog Theog Theog 10 Ha. N31005’19.2” E077
017’44.0” 7910 Ft. Entry point
986. Afforestation 2005-06
Gatlu Matiana Theog Theog 10 Ha. N31013’03.9” E077
022’49.6” 8354 Ft. Center Point
987. Afforestation 2005-06
Matiana Matiana Theog Theog 10 Ha. N31012’12.4” E077
022’46.4” 8353 Ft. Entry Point
988. Afforestation 2005-06
Majhrana Dharam pur
Theog Theog 20 Ha. N31011.989’ E077
019.148’ 7895 Ft. Center Point
989. Afforestation 2005-06
Chikhar-1 Gowai Theog Theog 10 Ha. N31009.123’ E077
021.836’ 6625 Ft. Center Point
990. Afforestation 2005-06
Chikhar-3 Gowai Theog Theog 10 Ha. N31009.122’ E077
021.947’ 6840 Ft. Center Point
991. Afforestation 2005-06
Nal Dharam pur
Theog Theog 10 Ha. N31009.923’ E077
017.899’ 5808 Ft. Center Point
992. Afforestation 2005-06
Charaghat Dharmpur Theog Theog 5 Ha. N31009.639’ E077
018.573’ 7215 Ft. Center Point
993. Afforestation 2005-06
Shalli Tir Dharam pur
Theog Theog 15 Ha. N31009.832’ E077
017.793’ 5840 Ft. Center Point
994. Afforestation 2005-06
Karyal Kiari Theog Theog 10 Ha. N31009’14.7” E077
017’22.2” 5315 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxx
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
995. Afforestation 2005-06
Bagoti -2 Kiari Theog Theog 10 Ha. N31008’31.6” E077
017’45.0” 6307 Ft. Center Point
996. Afforestation 2005-06
U-127 Sarog Kiari Theog Theog 10 Ha. N31007’52.3” E077
018’39.7” 6864 Ft. Center Point
997. Afforestation 2005-06
Majhar Khalashi Theog Theog 10 Ha. N31007’05.0” E077
018’15.8” 6201 Ft. Center Point
998. Afforestation 2005-06
Kufta Jugo Theog Theog 10 Ha. N31009’01.3” E077
019’32.9” 5417 Ft. Center Point
999. Afforestation 2005-06
Cheeng Jugo Theog Theog 10 Ha. N31008’50.2” E077
020’09.2” 5961 Ft. Center Point
1000. Afforestation 2005-06
Kheel – II Jugo Theog Theog 10 Ha. N31008’44.1” E077
020’24.4” 6172 Ft. Center Point
1001. Pasture Dev. 2005-06
Siholvi Pasture Matiana Theog Theog 20 Ha. N310 12.948’ 077
0 22.870’ 8101 Ft. Entry Point
1002. Afforestation 2006-07
Sainj Khufta 2 Jugo Theog Theog 10 Ha. N310 08.688’ E077
0 20.301’ 6217 Ft. Entry Point
1003. Afforestation 2006-07
Gagan Ghatir Dharam pur
Theog Theog 15 Ha. N310 12.202’ E077
0 19.346’ 7751 Ft. Entry Point
1004. Afforestation 2006-07
Sainj Kufta 1 Jugo Theog Theog 10 Ha. N310 08.857’ E077
0 20.151’ 6061 Ft. Entry Point
1005. Afforestation 2006-07
Kandharghat Sarog Theog Theog 10 Ha. N310 08.555’ E077
0 17.767’ 6176 Ft. Entry Point
1006. Afforestation 2006-07
U-63- Tikkar Dharati Theog Theog 10 Ha. N31011’45.5” E077
021’28.9” 6140 Ft. Center Point
1007. Afforestation 2006-07
Kandharghat Sarog Theog Theog 10 Ha N310 08.555’ E077
0 17.767’ 6176 Ft. Entry Point
1008. Afforestation 2006-07
Ghorajubbar Sandhu Theog Theog 5 Ha. N310 09.053’ E077
0 23.034’ 6176 Ft. Entry Point
1009. Afforestation 2006-07
Mahog Jugo Theog Theog 10 Ha. N31008’52.0” E077
019’59.4” 5955 Ft. Center Point
1010. Afforestation 2006-07
Talal Jugo Theog Theog 10Ha. N31008’48.4” E077
019’55.2” 5843 Ft. Center Point
1011. Afforestation 2006-07
Chichar – I Khalashi Theog Theog 10 Ha. N31006’25.5” E077
018’22.6” 6396 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxxi
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
1012. Afforestation 2006-07
Chichar – II Khalashi Theog Theog 10 Ha. N31006’33.7” E077
018’14.5” 6291 Ft. Center Point
1013. Afforestation 2006-07
Budhil – I Khalashi Theog Theog 10 Ha. N31006’35.8” E077
018’14.6” 6329 Ft. Center Point
1014. Afforestation 2006-07
Goltimbi – I Khalashi Theog Theog 10 Ha. N31007’30.4” E077
019’23.8” 7619 Ft. Center Point
1015. Afforestation 2006-07
Goltimbi – II Khalashi Theog Theog 5 Ha. N31007’18.9” E077
019’28.9” 7526 Ft. Center Point
1016. Afforestation 2006-07
Manal Kiari Theog Theog 10 Ha. N31008’39.6” E077
018’08.4” 7180 Ft. Center Point
1017. Afforestation 2006-07
U-129 Ghaini Kiari Theog Theog 5 Ha. N31008’10.0” E077
017’48.6” 6364 Ft. Center Point
1018. Afforestation 2006-07
Manal Gasog Kiari Theog Theog 5 Ha. N31008’36.6” E077
018’02.4” 7068 Ft. Center Point
1019. Afforestation 2006-07
Kandharghat Kairi Theog Theog 10 Ha. N31008’33.1” E077
017’46.3” 6176 Ft. Center Point
1020. Afforestation 2006-07
Shikari Kiari Theog Theog 5 Ha. N31008’32.2” E077
017’47.0” 6345 Ft. Center Point
1021. Afforestation 2006-07
Balech Gowai Theog Theog 10 Ha. N31007.557’ E077
023.386’ 7680 Ft. Center Point
1022. Afforestation 2006-07
Kathal Gowai Theog Theog 10 Ha. N31009.607’ E077
022.617’ 8182 Ft. Center Point
1023. Afforestation 2006-07
Ramkali Gowai Theog Theog 10 Ha. N31009.275’ E077
022.160’ 7123 Ft. Center Point
1024. Afforestation 2006-07
D-49 Pap-1 Gowai Theog Theog 10 Ha. N31008.293’ E077
023.061’ 7675 Ft. Center Point
1025. Afforestation 2006-07
Kotdhar Gowai Theog Theog 5 Ha. N31008.493’ E077
023.230’ 7520 Ft. Center Point
1026. Afforestation 2006-07
Deothinal Dharam pur
Theog Theog 20 Ha. N31011.972’ E077
019.127’ 7505 Ft. Center Point
1027. Afforestation 2006-07
Kufta Dharam pur
Theog Theog 10 Ha. N31012.162’ E077
019.400’ 7415 Ft. Center Point
1028. Afforestation 2006-07
Shali ki tir Dharam pur
Theog Theog 20 Ha. N31009.531’ E077
017.313’ 7235 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxxii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
1029. Afforestation 2006-07
Karyal Matiana Theog Theog 18 Ha. N31013’03.4” E077
025’04.5” 8250 Ft. Entry Point
1030. Afforestation 2006-07
Rohru Shalli Theog Theog 20 Ha. N31007’04.9” E077
021’56.6” 7574 Ft. Entry Point
1031. Afforestation 2006-07
Bharyana Shalli Theog Theog 10 Ha. N31007’50.2” E077
021’05.8” 7274 Ft. Entry Point
1032. Afforestation 2006-07
Chalawag Shalli Theog Theog 10 Ha. N31007’41.0” E077
021’11.2” 7182 Ft. Entry Point
1033. Afforestation 2006-07
Chalawag Shalli Theog Theog 10 Ha. N31007’48.4” E077
021’28.1” 6988 Ft. Entry Point
1034. Afforestation 2006-07
Chalawag Shalli Theog Theog 10 Ha. N31007’50.1” E077
022’24.1” 7735 Ft. Entry Point
1035. Afforestation 2006-07
Naur Shalli Theog Theog 4 Ha. N31007’02.6” E077
022’24.1” 7735 Ft. Entry Point
1036. Afforestation 2006-07
Khanoor Kufri Theog Theog 20 Ha. N31006’16.8” E077
016’41.2” 7718 Ft. Entry Point
1037. Afforestation 2006-07
Jahoo Kufri Theog Theog 20 Ha. N31007’48.2” E077
018’11.7” 8253 Ft. Center Point
1038. Afforestation 2006-07
Sholvi Chadara Theog Theog 15 Ha. N31013’13.3” E077
020’15.8” 8515 Ft. Entry Point
1039. Afforestation 2006-07
Kufta Chadara Theog Theog 10 Ha. N31011’31.9” E077
020’59.5” 7444 Ft. Entry point
1040. Afforestation 2006-07
Solvi Chadara Theog Theog 5 Ha. N31011’03.0” E077
020’19.4” 6775 Ft. Entry Point
1041. Afforestation 2006-07
Fargula Dearati Theog Theog 10 Ha. N31009’28.4” E077
019’13.5” 5295 Ft. Entry point
1042. Afforestation 2006-07
Lanoo Dharati Theog Theog 5 Ha. N31010’24.4” E077
019’40.6” 5707 Ft. Center Point
1043. Afforestation 2006-07
U-100- Khanu Dearati Theog Theog 5 Ha. N31010’25.1” E077
020’09.0” 6140 Ft. Center Point
1044. Afforestation 2006-07
U-Koti Dearati Theog Theog 10 Ha. N31009’41.5” E077
020’26.4” 6870 Ft. Center Point
1045. Afforestation 2006-07
Khanro Dearati Theog Theog 7 Ha. N31011’26.9” E077
021’10.1” 6260 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxxiii
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
1046. Afforestation 2006-07
Badima Dharampur
Theog Theog 10 Ha. N310 10.981’ E077
0 18.817’ 6814 Ft. Entry Point
1047. Afforestation 2006-07
Majhoan Dharati Theog Theog 7 Ha. N310 10.058’ E 077
0 20.860’ 6564 Ft. Entry Point
1048. Afforestation 2006-07
Shali ki Tir Dharam pur
Theog Theog 10 Ha. N310 11.951’ E077
0 19.139’ 7570 Ft. Entry Point
1049. Afforestation 2007-08
Kheel –I Jugo Theog Theog 10 a. N31008’45.3” E077
020’17.6” 5856 Ft. Center Point
1050. Afforestation 2007-08
Kufta Matiana Theog Theog 10 Ha. N31011’32.7” E077
022’45.9” 7888 Ft. Entry Point
1051. Afforestation 2007-08
Sholvi Chadara Theog Theog 5 Ha. N31013’15.6” E077
020’16.8” 8553 Ft. Entry point
1052. Afforestation 2007-08
Kamalthi Chadara Theog Theog 10 Ha. N31010’50.0” E077
019’39.0” 5581 Ft. Center Point
1053. Afforestation 2007-08
Kathal 2 Gowai Theog Theog 10 Ha. N310 10.437’ E077
0 21.913’ 7410 Ft. Entry Point
1054. Afforestation 2007-08
Kathal 1 Gowai Theog Theog 10 Ha. N310 09.607’ E077
0 22.613’ 8013 Ft. Entry Point
1055. Afforestation 2007-08
Bhalech Gowai Theog Theog 5 Ha. N310 07.521’ E077
0 22.927’ 7621 Ft. Entry Point
1056. Afforestation 2007-08
Narainty Matiana Theog Theog 10 Ha. N310 11.956’ E077
0 19.137’ 7768 Ft. Entry Point
1057. Afforestation 2007-08
Budlhi 2 Dharam pur
Theog Theog 10 Ha. N310 06.680’ E077
0 18.161’ 6120 Ft. Entry Point
1058. Pasture Development 2007-08
U-40 Narainty Matiana Theog Theog 5 Ha. N31011’37.7” E077
023’04.3” 7929 Ft. Entry Point
1059. Afforestation 2007-08
Karyal Matiana Theog Theog 20 Ha. N31013’03.1” E077
023’03.3” 8147 Ft. Entry Point
1060. Pasture Development 2007-08
Sherti Matiana Theog Theog 15 Ha. N31013’01.2” E077
022’04.9” 8718 Ft. Center Point
1061. Pasture Development
D 52 Rohru Shalli Theog Theog 10 Ha N31007’03.6” E077
021’58.8” 7565 Ft. Center Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
NH Consulting Pvt. Ltd. lxxiv
Sl. No.
Components Name of Site Beat Range Division Are of Pltn. (Ha.)
Latitude
Longitude Altitude (Ft.)
Point of Location Reading
2007-08
1062. Pastucher Development 2006-07
Rohru Shalli Theog Theog 10 Ha. N31007’02.6” E077
022’21.1” 7608 Ft. Center Point
1063. Pasture Development 2007-08
U-138- Jahoo Kufri Theog Theog 10 Ha. N31009’47.3” E077
019’12.9” 8362 Ft. Entry Point
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxv
Annexure - II
Data Sheet for Enumeration of Plantation
1.0 Location Data 1.1 Division: ……………………………………………………….. 1.2 Range: …………………………………………………………… 1.3 Block: ……………………………………………………………. 1.4 Beat: ………………………………………………………………. 1.5 Name of the area: ……………………………………………. 1.6 Year of plantation: …………………………………………… 1.7. Total area planted (Hac): ………………………………… 1.8. Aspect: ……………………………………………………………
Longitude Latitude Altitude
1.9. Distance of site from Road ……………………………………………………………………… 1.10. Distance of site from Habitation ………………………………………………………….. 1.11 eological Formations of the Site
……………………………………………………………………………….....................................
……………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………
1.12. No. of Plants Planted & Species
S.No Name of species Number
1
2
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxvi
3
4
5
6
1.13. Source of Saplings: …………………………………………………………………………………………………. 1.14. Distance of the nursery from the plantation site (Km.): …………………………………………… 1.15 Size of sapling (nursery):
S No. Species Size of sapling
1.
2.
3.
4.
2.0 Land Use Pattern
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………
3.0 Slope of Land (%) …………………………………………………………………………………………………………
- Other Intervention Components ………………………………………………………………………………….
- Terrain Description (write about soil, rock, water source, surroundings etc.)
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………..……………………………………………………………………………
…………………………………………………………………………………………………………………………………………………
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxvii
………………………………………………………………………………………………………………………………………..………
…………………………………………………………………………………………………………………………………………………
- Scheme of Plantation (a) Afforestation
(b) Rim Plantation
(c) Pasture Development
- Downstream Treatment (d) Fringe plantation (e) Grass slip planting (f) Others
- Type of Participation by Villagers
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………..……………………………………………………………………………
- Fencing status & type
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………
4.0 Cost of fencing
…………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………
5.0 Biotic Pressure Status
5.1 Incidence of Grazing ………………………………………………………………………
5.2 Incidence of fodder collection ……………………………………………………………
5.3 Incidence of fire ………………………………………………………………………………..
5.4 Other biotic pressure …………………………………………………………….……………
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxviii
6.0 Enumeration Sheet
Sl
No.
Sample
Plot No
Size of plot
(30mx33m)
Species No. of
Surviving
Plants
Mortality
No.
Sl
No.
Sample
Plot No
Size of plot
(30mx33m)
Species No. of
Surviving
Plants
Mortality
No.
I. 26
II. 27
III. 28
IV. 29
V. 30
VI. 31
VII. 32
VIII. 33
IX. 34
X. 35
XI. 36
XII. 37
XIII. 38
XIV. 39
XV. 40
XVI. 41
XVII. 42
XVIII. 43
XIX. 44
XX. 45
XXI. 46
XXII. 47
XXIII. 48
XXIV. 49
XXV. 50
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxix
7.0 Growth parameters
Growth Parameters
Sl. No. Species Plants
No.
Height Girth
(B/C)
B C Crown
condition
(E/UE)
1.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxx
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
Name of Investigator ……………………………………..
Name& designation of Officer interacted…………………………………………………………………………….
Signature of Investigator ………………………..…... Signature of Officer Interacted …………………..….
Date of Enumeration ………………………………………..
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxxi
Annexure - III
Check Dam Monitoring Data Sheet
1.0 Location Data 1.1 Division: …………………………………………………… 1.2 Range: …………………………………………………………. 1.3 Block: ……………………………………………………………… 1.4 Beat: …………………………………………………………………. 1.5 Name of drainage line (Nalla): ………………………………. 1.6 Year of construction: …………………………………………….. 1.7 Catchment area of the nalla: ………………………………… 2.0 Total length of drainage line ………………………………………………………………………………………. 3.0 Slope of drainage line (%)……………………………………………………………………………………………. 4.0 No. of check dams constructed on this drainage line…………………………….………………………
5.0 Siltation data
S No. Check dam Percentage of Siltation Year (1st, 2nd etc)
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. lxxxii
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. 83
6.0 Monitoring data recording of individual check dam Division………………………………………………..Range…………………………..……………Block………………………….………….
Beat………………………….Name of Nalla……………………………………………….. Total Catchment (Ha.)……………………………………………………
Check
dam
no.
Location Cross section of nalla (Mtr) Foundation
material soil/
Geological
formation
Type of
check
dam
Dimension of check dam Quantity of
silt
( volume)
U M L Bottom
width
Top
width
Dept
h
Botto
m
width
Top
width
Length Height
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
Note: Sample weight of silt deposited will be determined on a sample basis (in Kg)
Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consuling Pvt. Ltd. 84
7.0 Cost of construction………………………………………………………………………………………………………….
8.0 Present condition of check dams……………………………………………………………………………………………… Name of Investigator ……………………………Name and designation of official Interviewed………….…………… Signature of Investigator ……………………..………………... Signature of Officer Interacted …………………..…. Date of Enumeration ………………………………………..
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
lxxxv
Annexure - IV
Component wise Tasks Completed
Bilaspur Circle
Range : Sadar Division : Bilaspur Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. DPF Chamyon Chamyon 2005-06 13
2. DPF Chamyon Chamyon 2006-07 21
3. DPF Chamyon Chamyon 2007-08 13
Range : Sadar Division : Bilaspur Component : Downstream Treatment
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. DPF Jamthal Jamthal 2006-07 15
2. DPF Jamthal Jamthal 2007-08 15
Range : Sadar Division : Bilaspur Component : Rim Plantation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. DPF Sangan Chamyon 2005-06 11
2. UPF Kasol Chamyon 2005-06 4
Range : Sadar Division : Bilaspur Component : Check Dams
Sl No. Site Name Year No. of dams
1. UPF Kasol 2006-07 8
2. UPF Kasol 2005-06 12
3. UPF Kasol 2005-06 2
4. Sooth ka paani nalla 2006-07 2
5. Tol nalla 2006-07 39
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
lxxxvi
Range : Dalraghat Division : Kunihar Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. D 8 Trot Labrath 2005-06 10
2. U 17 Matnech Labrath 2006-07 10
3. UF C -6 Lanogha 2009-10 5
4. D 8 Trot Labrath 2004-05 7.5
5. D 52 Barial Mangroo 2010-11 10
6. D 5 Kattpol Labrath 2010-11 15
7. D 3 Bajrial Kandhar 2006-07 5
8. D 9 Skor Labrath 2008-09 25
9. D 51 Sergharakur Danogha 2009-10 10
10. D 9 Skor Labrath 2007-08 7
11. UF Manru Mangroo 2009-10 5
12. U17 Matrechl Labrath 2009-10 5
Range : Dalraghat Division : Kunihar Component : Rim Plantation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. J 21 Jandoi Labrath 2010-11 5
2. U 2 Padyar U2 Kandhar 2009-10 10
Range : Dalraghat Division : Kunihar Component : Check Dams Sl No. Site Name Type Year No. of Dams
1. Skor DPF nalla B – 0 M – 0 S – 25
2004-05 25
2. Siharli nalla S – 20 2005-06 20
3. Matrech nalla M – 10 2006-07 10
4. Jandoi UF nalla S – 50 2006-07 50
5. Matrech nalla M – 25 2007-08 28
6. Siharli nalla S – 100 2007-08 100
7. Kun nalla M – 5 S - 10
2008-09 15
8. Dangoil nalla M - 20 2010-11 20
Range : Arki Division : Kunihar Component : Check Dams
Sl No. Site Name Type Year No. of Dams
1 Palaniya Nalla M – 20 S – 20
2010 - 11 40
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
lxxxvii
Mandi Circle Range : Karsog Division : Karsog Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. OD 170 Tikan Karsog Samarli 2004-05 5
2. MD 201 Aglidhar Machaudi 2005-06 5
3. OD 187 Bajhu C III (a) Samarli 2006-07 7
4. OD 124 Kolontha Mahunmag 2007-08 5
5. D-170 tikri Karsog Samarli 2008-09 10
6. OD 193 Katach bhanhera Kashoul 2004-05 7
7. ND 183 Maha Dey ki Banouri Munal 2004-05 7
8. ND 131 Parnaj Parlog 2004-05 10
9. ND 199 Dhamyara Kashoul 2005-06 5
10. OD 124 Koloultha Mahumnag 2009-10 05
11. MD 203 Thach C-II Mehandi 2007-08 15
12. D-188 Kandi Kaushol 2008-09 5
13. OD 173 Dopha Dopha 2007-08 11
14. ND 207 Gandhoi Mehandi 2005-06 10
15. D 170 Tikar Karsog (II ) Samarli 2006-07 7
16. MD 131 Parhot Parlog 2007-08 15
17. D 161 Kath domail Kamand 2008-09 10
18. OD 137 Nagalth Mahunmag 2004-05 5
19. OD 167 Bajnu Sanosli 2005-06 10
20. OD 198 Dhamiyana Kashoul 2007-08 17
21. D 176 Galyach Galyach 2008-09 10
22. D 135 Bagbokali Mohunmag 2009-10 10
23. D 207 ghandhoi Mehandi 20010-11 9
Range : Karsog Division : Karsog Component : Pasture Development Sl No. Site Name Beat Year of
Plantation Size of Plantation
(Ha.)
1. OD 124 Kolratha Bagshon 2005-06 10
2. D 175 Pehram Gholyach 2010-11 10
3. OD 138 Bag Bokhali Mahunmag 2005-06 10
4. MD 135 fofam Parlog 2007-08 15
5. ND 133 Hiru Parlog 2007-08 9
6. D 133 Hiru Parlog 2010-11 5
7. D 134 Mangum Parlog 2008-09 5
8. ND 183 Maha Dey ki Banouri Mamail 2010-11 6
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
lxxxviii
Range : Karsog Division : Karsog Component : Check Dam
Sl No. Site Name Type Year No. Dams
1. Harmola nalla L -1 M - 2 S - 3
2005-06 6
2. Nagatiha nalla M - 4 S – 2
2005-06 6
3. Bhanera nalla L -2 M - 3 S - 7
2006-07 12
4. Mehram nalla L -2 M - 4 S – 6
2007-08 12
5. Dumehal nalla L -5 M - 4 S – 2
2009-10 11
6. Tharmi nalla L -1 M - 1 S - 12
2008-09 14
7. Khadoma nalla S – 12 M – 1 L – 1
2008-09 14
8. Judli nalla S – 12 M – 1 L – 1
2008-09 14
9. Puni nalla S – 13 M – 1 L – 2
2008-09 16
10. Tatmu nalla S – 13 M – 2 L – 2
2008-09 17
11. Jingal nalla S – 13 M – 1 L – 2
2008-09 16
12. Shayongi nalla S – 13 M – 1 L – 2
2008-09 16
13. Sursi nalla S – 10 M – 1 L – 1
2009-10 12
14. Ghalyach nalla S – 10 M – 2 L – 1
2009-10 13
15. Bahj nalla S 2009-10 25
16. Sarkol nalla S 2009-10 20
17. Bhanera nalla S – 2 M – 3 L - 1
2005-06 6
18. Mehram nalla - 2009-10 20
19. Ghalsa nalla - 2009-10 17
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
lxxxix
Range : Magroo Division : Karsog Component : Afforestation
Sl No.
Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. ND 289 Ghanidhar Mangarh 2004-05 4
2. ND 278 Nadaan Cassi 2005-06 10
3. OD 255 sapach Mahog 2004-05 3
4. D 279 Nadaam Cassi 2006-07 10
5. ND 283 Raidhar Serimangarh 2005-06 3
6. D 259 Latta Katanda 2006-07 10
7. DD 259 Latta (IV) Katanda 2005-06 13
8. ND 283 Raidhar Chora 2004-05 4
9. ND 264 Khatu Sagagi 2006-07 5
Range : Magroo Division : Karsog Component : Pasture Development
Sl No.
Site Name Beat Year of Plantation Size of Plantation (Ha.)
1 N D – 283 Raidhar Chora 2007 – 08 5
2 N D 283 Raidhar ll Chora 2005 – 06 5
3 N D 278 Nadaan Cassi 2005 – 06 10
Range : Magroo Division : Karsog Component : Check Dams
Sl No. Site Name Type Year of Plantation
No. of Dams
1 Jangla Nalla Mid – 2 Small - 2
2004 – 05 4
2 Bashala Dam S – 10 M – 8 L – 2
2008 – 09 20
3 Nagan nalla S – 10 M – 8 L – 2
2008 – 09 20
4 Khanak Nalla S – 10 M – 10
L – 4
2008 – 09 24
5 Kathan shor S – 15 M – 10
L – 0
2009 – 10 25
6 Katachl S – 3 M – 0 L – 3
2007 – 08 6
7 Katandhar S – 10 M – 0 L – 8
2007 – 08 18
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xc
8 Keshri Nalla S – 15
M – 12 L – 4
2008 – 09 31
9 Haridhar Nalla S – 6 M – 8 L – 2
2008 – 09 16
Range : Seri Division : Karsog Component : Afforestation
Sl No. Site Name Beat Year of Plantation
No. of Dams
1 OD237 katanda Pathreui 2005-06 13
2 OD228 Bhonda Shill Chohridhar 2005-06 5
3 N&242 Boona Tebhan 2007-08 5
4 D-249 Makri Rolohi 2008-09 4
5 OD219 Ganoo c II Dhamun 2004-05 6
6 OD236 Pathravi Pathravi 2004-05 8
7 N-D 245 Firnoo Taban 2005-06 5
8 D-233 Richhani Richani 2006-07 10
9 OD247 saran Saeakni 2009-10 5
10 D-222 pog Nanj 2009-10 5
11 OD-233 Richami CI (b) Richami 2004-05 7
12 M.D 222 pog Nanj 2005-06 2
13 OD228 Bhondashill Chauisha 2006-07 10
14 OD234 surdru Katkash 2007-08 5
15 D 247 Saran Saeackni 2007-08 5
16 D245 Firnoo Louoastru 2008-09 9
17 D-241 kandloo Tebban 2008-09 3
18 D-247 saran Susahan 2005-06 5
19 D-213 Nehain Nal Nachai 2007-08 15
20 D213 Nachain Nal Nachai alol 2008-09 11
21 D222 pog Nanj 2010-11 1
22 D-236 pathreavi Pathreavi 2010-11 5
23 ND247 saran Sasahan 2009-10 5
Range : Seri Division : Karsog Component : Pasture Development
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. D 247 Saran Goradpur 2007-08 5
2. D 214 Jhunjhan Niharinal 2009-10 20
3. D 213 Niharinal Niharinal 2005-06 7
4. D 249 Makra Sorahan 2007 – 08 2
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xci
Range : Seri Division : Karsog Component : Check Dams
Sl No. Site Name Type Year No. of Dams
1 Naresh Nalla L=1 M=4 S=4
2005-06 9
2 Bogh Nalla L=0 M=1 S=1
2005-06 2
3 Pathrevi Nalla L=1 M=4 S=4
2005-06 9
4 Kandal Nalla L=2 M=2 S=10
2007-08 14
5 Jai Nala L=2 M=4 S=10
2007-08 16
6 Kandlu Nalla L=2 M=0 S=18
2007-08 20
7 Tharmi Nalla L=1 M=2 S=5
2007-08 8
8 Niharinal nalla L=0 M=2 S=6
2007-08 8
9 Pandoo Nalla L=2 S=4 M=4
2008-09 10
10 Makri Kot Nalla L=3 S=5 M=5
2008-09 13
11 Badoham Nalla L=3 M=4 S=5
2008-09 12
12 Trimbli Nalla L=1 M=4 S=10
2009-10 15
13 Godam Nalla L=1 M=5 S=10
2009-10 16
14 Jai Nalla L=1 M=2 S=2
2009-10 15
15 Sayanj Nalla L=0 M=3 S=0
2004-05 3
16 Mambli Nalla L=0 M=3 S=0
2004-05 3
17 Kathanda Nalla L=0 M=4 S=0
2004-05 4
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xcii
Range : Pangana Division : Karsog Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. D101 Naudoo Pattapavi 2005-06 7
2. D74 Parvain Balnidi 2005-06 8
3. D105 khadain Talehan 2006-07 10
4. D96 shoj Tattapui 2007-08 10
5. D87 saran Alsuidi 2008-09 5
6. D 39 shill Lurhal 2008-09 6
7. D76 Gharlal cII c/k 2010-11 12
8. D90 Mahota T/A 2010-11 5
9. D104 Bestu Talchan 2004-05 10
10. D100 Ghangar Talta pani 2005-06 7
11. D74 parvain Balnidi 2006-07 30
12. D95 Jeouri Tattapavi 2006-07 10
13. D101 Nandoo Tattapani 2008-09 20
14. D109 Ghawala Talechan 2008-09 20
15. D72 Reshtedharar cIV c/k 2010-11 5
16. D86 lochar Tattapavi 2004-05 8
17. D62 Kunash Chindi 2010-11 5
18. D63 panyonoo Chindi 2005-06 4
19. D-16 chittri suket Sioishi 2007-08 10
20. D20 Huimgi nalla Pangna 2008-09 6
21. D76 kapdyas Alsuidi 2004-05 10
22. D101 Nandoo Tattapani 2005-06 10
23. D72 Ristadhave Kanda 2005-06 4
24. D106 Bhoura Talechan 2006-07 10
25. D 100 Ghargan Tattapani 2007-08 5
26. D72 Restadher C II Kanda 2008-09 10
27. D 99 Brakar Tahenam 2008-09 15
28. D 19 shalog Kanda 2008-09 4
29. D24 Barnug Katwachi 2009-10 6
30. D80 kanda Balindi 2007-08 20
31. D76 kapdyal Alsuidi 2007-08 15
32. D84 Alyash T/A 2010-11 10
33. D19 Shalog Shalog 2009-10 5
34. D1 Mahog P/surhi 2010-11 5
35. D8 panyanoo Shorshan 2009-10 5
36. D105 khadain Talchan 2009-10 30
37. D80 kanda Balnidi 2009-10 5
38. D 40 Ghoshal Ghoshal 2008-09 5
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xciii
Range : Pangana Division : Karsog Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1 D 94 Tattapani Tattapani 2007 – 2008 10
Range : Pangana Division : Karsog Component : Check Dams
Sl No. Site Name Type Year No. of Dams
1. Panyroo khablage Nalla S=4 M=7 L=0
2004-05 11
2. Bithori Bourl Nalla S=10 M=4 L=0
2004-05 14
3. Chitchad durkanoo majhoat nalla S=0 M=0 L=4
2005-06 14
4. Patti, jhorandi nalla S=15 M=0 L=3
2005-06 18
5. Talehan Nalla S=5 M=5 L=2
2005-06 17
6. Bithori, Bouri Nalla S=10 M=5 S=1
2005-06 13
7. Salong, Dagsh panyora nalla S=10 M=5 S=1
2005-06 16
8. Udhun k hady belar nalla S=0 M=8 L=4
2005-06 12
9. Baryon kuudi maloonala S=0 M=7 S=4
2005-06 12
10. Shakrainidi nalla L=1 M=1 S=12
2008-09 14
11. Chutkor nalla L=2 M=1 S=13
2008-09 16
12. Kunash nalla L=1 M=1 S=12
2008-09 14
13. Sandrehal nalla L=1 M=1 S=12
2008-09 14
14. Chukhu nalla L=1 2009-10 17
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xciv
M=1 S=15
15. Gujnodhar nalla L=1 M=4 S=12
2009-10 12
16. Chatkar, Durkunoo S=16 M=0 L=0
2009-10 16
Range : Seraj Division : Nachan Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. Saloti/ Liuri Baila 2004-05 10
2. Labni Nala Baila 2005-06 8
3. Magrugala Baila 2005-06 10
4. Jhalru Baila 2007-08 5
5. Bijnadhar Baila 2005-06 10
6. Pokhridhar Baila 2005-06 9
7. Grijnoo / Halsigad Baila 2008-09 15
Range : Seraj Division : Nachan Component : Silvi-Pasture
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. Halsigad Baila 2007-08 10
Range : Seraj Division : Nachan Component : Check Dams
Sl No. Site Name Type Year No. Dams
1. Grijnu nalla Big 2007-08 2
2. Shradhinal nalla Medium 2007-08 2
3. Srijnoo nalla Small 2007-08 30
4. Jogni nalla Small 2008-09 9
Range : Jhungi Division : Suket Component : Afforestation
Sl No. Site Name Beat Year of Plantation Size of Plantation (Ha.)
1. Trehadi Kindar 2004-05 10
2. Salani Salani 2005-06 5
3. Kathiuni kathauni 2005-06 7
4. Manjjhki Jaral 2005-06 5
5. Chehar Nihri 2005-06 5
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xcv
6. Trechh Trech 2009-10 5
7. Shivshankar Jhungi 2006-07 5
8. Salani Salni 2006-07 5
9. Trehli Trehli 2006-07 10
10. Kathla Balag 2006-07 10
11. Kumahru Bandli 2008-09 35
12. Narehi Kindar 2009-10 6
13. Kathla Balag 2009-10 4
14. Manghel Marhara 2009-10 2
15. Supadhar Trechh 2010-11 11
16. Malohi – I Trechh 2010-11 5
17. Khoondar Salani 2010-11 10
18. Salani Salani 2010-11 10
19. Narehi Kinder 2010-11 10
20. Tarehi Kinder 2010-11 10
Range : Jhungi Division : Suket Component : Pasture Development
Sl No. Site Name Beat Year of Plantation Size of Plantation (Ha.)
1. Kathla Balag 2009-10 9
Range : Jhungi Division : Suket Component : Check Dams
Sl No. Site Name Type Year No. of Check Dams
1. Timbroo nalla S 2000-05 2
2. Marogra nalla S 20005-06 2
3. Mehra nalla S 20005-06 3
4. Chanad nalla L 2005-06 2
5. Kandi nalla M 2005-06 3
6. Brokhri nalla L 2005-06 6
7. Timbroo nalla S – 2 M – 3
2005-06 5
8. Nihri nalla S – 5 M – 3
2005-06 8
9. Kkriya nalla L 2005-06 3
10. Trechh nalla S – 8 M – 4
2005-06 12
11. Chakki nalla S – 4 M – 2
2005-06 6
12. Roproo nalla L 2005-06 7
13. Chiral nalla M 2006-07 1
14. Chhotagadon Not available 2009-10 10
15. Shivshankar Not available 2009-10 10
16. Brough nalla Not available 2009-10 13
17. Jadhnu nalla Not available 2009-10 9
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xcvi
18. Trechh nalla Not available 2009-10 2
19. Kamrah nalla Not available 2009-10 13
20. Kathna nalla Not available 2009-10 30
21. Balag nalla Not available 2009-10 20
22. Bah Not available 2010-11 18
23. Nirhi – I Not available 2010-11 2
24. Trechh Not available 2010-11 18
25. Kathuini nalla Not available 2004-05 9
Range : Kangoo Division : Suket Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. Galma Geiru 2004-05 5
2. Ahen sunali Dhawal 2005-06 20
3. Dhawal Dhawal 2005-06 15
4. Sojha Behli 2005-06 10
5. Krangal Behli 2005-06 10
6. Devidhar Batwara 2007-08 10
7. Karla Arawai 2007-08 3
8. Hara Arawai 2007-08 5
9. Neri Ropru Badhu 2005-06 5
10. Bindlu Behli 2008-09 9
11. Ahen Sunali Dhawal 2008-09 15
12. Jartu Barwara 2008-09 16
13. Jartu Barwara 2009-10 25
14. Behli Behli 2010-11 10
15. Baragta Maraboi 2009-10 4
16. Chaloun Badhu 2009-10 14
17. Jartu Batwara 2010-11 12
18. Mared Behli 2010-11 10
19. OD 300 Chouri Badhu 2010-11 20
20. Neri Ropru Badhu 2009-10 10
Range : Kangoo Division : Suket Component : Pasture Development
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. Ahen Sunali Dhawal 2005-06 5
2. Thungdhar Harabol 2005-06 10
3. Thungdhar Harabol 2008-09 7
4. Jartu Batwara 2009-10 10
Range : Kangoo Division : Suket
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xcvii
Component : Rim Plantation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1 DPF Karangal Not Available 2010 – 2011 80
2 Karla DPF Not Available 2010 – 2011 10
3 Tahli Not Available 2010 - 2011 80
Range : Kangoo Division : Suket Component : Check Dams
Sl No. Site Name Type Year No. of Dams
1. Fafna Nalla S 2004 – 05 16
2. Garla Bragata S 2004 – 05 11
3. Sunali Nalla S – 25 M – 4 L – 2
2005 – 2006 31
4. Manjheli Nalla S – 11 M – 5 L – 2
2005 – 2006 18
5. Narla Nalla M – 2 L – 2
2005 – 2006 14
6. Smoul Nalla M 2005 – 2006 5
7. Garla Nalla S 2005 – 2006 10
8. Jadium Nalla L 2005 – 2006 1
9. Dohru Nalla M 2006 – 2007 2
10. Gehroo Nalla S 2006 – 2007 2
11. Snoha M 2009 – 2010 6
12. Jindri S 2010 – 2011 20
13. Chehru L 2010 – 2011 12
14. Doghri L – 4 M – 5 S - 3
2010 – 2011 12
15. sojha L – 5 M – 6 S - 4
2010 – 2011 15
16. Gadehra Nalla Not Available 2009 – 2010 20
17. Kayan nalla Not Available 2009 – 2010 12
18. Salog Nalla Not Available 2009 – 2010 20
19. Mandyana Nalla Not Available 2009 – 2010 10
20. Baballa Nalla Not Available 2009 – 2010 18
21. Smoul Nalla Not Available 2009 – 2010 15
22. Kathla Nalla Not Available 2009 – 2010 20
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xcviii
Shimla Circle Range : Mashobra Division : Shimla Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. U 167 Jayali Dhalli 2007-08 5
2. U 180Aun Bharari 2007 - 08 5
3. D 73 Mashobra C III Dhalli 2004-05 5
4. D 70 Aun Bharari 2007-08 5
5. D 70 Naldhera C III Naldehra 2005-06 10
6. Annu Bharari 2008-09 3
7. UF Taloh Khotnol 2007-08 10
Range : Mashobra Division : Shimla Component : Pasture Development
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. U.F. Deothi Seepur 2004-05 3
2. UF Charain Naldehra 2005-06 5
Range : Mashobra Division : Shimla Component : Check Dams
Sl No. Site Name Type Year No. Dams
1. Seepur Nalla Not Available 2005 – 06 21
2. Kumhali nalla Not Available 2005 – 06 10
3. Surila / Burila Not Available 2006 – 07 20
4. Manjhari Nalla Not Available 2006 – 07 4
5. Seepur phase ll Not Available 2006 – 07 18
6. Ajidhar Nalla Not Available 2007 – 08 14
7. Kuni Nalla Branch Not Available 2007 – 08 13
8. Paniartu Not Available 2008 – 09 16
9. Janlog Not Available 2008-09 20
10. Chanawat nalla Not Available 2008-09 21
Range : Tara Devi Division : Shimla Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. GCL Neri Tall 2005-06 5
2. GCL Dhart Kamyana 2005-06 10
3. D 214 Jhajia Banoti 2006-07 6
4. R 17 Marhon Kamyana 2007-08 10
5. R 18 Poabo Kamyana 2008-09 5
6. D 207 Tallgiri Tall 2004-05 4
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
xcix
7. GCL Marhon Kamyana 2005-06 7
8. D 207 Tallgiri Tall 2004-05 4
9. D 210 Girab Gadaug 2006-07 5
10. GCL Chiwla Banoti 2006-07 46
11. GCL Jhollo Kamyana 2006-07 10
12. GCL Marhon Kamyana 2004-05 7
13. D 208 Gadoug Gadoug 2005-06 2
14. D 214 Jhajia Banoti 2006-07 6
15. GCL Nalhayal Tall 2004-05 4
16. GCL Nalhayal Tall 2005-06 4
17. GCL Karound Tall 2005-06 10
18. GCL Nalhayal Tall 2004-05 3
19. GCL Kalawat Tall 2005-06 3
20. GCL Janol Banoti 2005-06 5
21. D 208 Gadoug Gadoug 2005-06 10
22. GCL Kajail Banoti 2007-08 5
23. R 17 Marhon Kamyana 2009-10 10
Range : Tara Devi Division : Shimla Component : Pasture Development
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. R 27 Gadoug Gadoug 2005-06 2
2. R 27 Gadoug Gadoug 2005-06 5
Range : Tara Devi Division : Shimla Component : Check Dams
Sl No. Site Name Type Year No. Dams
1. Dhander nalla Not available 2004-05 4
2. Bharoi nalla Not available 2005-06 25
3. Kiar nalla Not available 2006-07 24
4. Manla nalla Not available 2007-08 15
5. Bhong nalla Not available 2008-09 26
6. Haron nalla Not available 2009-10 18
7. Sanog nalla Not available 2008-09 7
8. Klar nalla Not available 2010-11 6
Range : Dhami Division : Shimla Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. DPF Badoo Badoo 2005-06 8
2. DFP Brelli G/Hatti 2007-08 2
3. UPF Kushah G/Hatti 2008-09 2
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
c
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
4. UPF Bathmana Dhalaya 2009-10 3
5. UPF Makri Okhroo 2010-11 2
6. UPF Okhroo Madeya Okhroo 2006-07 11
7. DPF Kheel Sanog 2008-09 5
8. DPF Salaun Salaun 2009-10 5
9. UPF Mahapuna Halog 2005-06 3
10. UPF Kainth Ki ghati Dhalaya 2006-07 3
11. UPF Ganeog Ganeog 2005-06 5
12. DPF Bag ka nall G/Hatti 2006-07 1
13. DPF Panihana Okhroo 2009-10 10
14. UPF Bohli Dhalaya 2005-06 4
15. UPF Sharog Ganeog 2005-06 5
16. UPF Dhaheog Okhroo 2007-08 5
17. UPF Bag ka nalla Ganeog 2008-09 3
18. DPF Biza Ka Dhalla Ganeog 2009-10 3
19. DPF Bledi Ganeog 2006-07 3
Range : Dhami Division : Shimla Component : Pasture Development
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. DPF Bhawar ki dhak G/Hatti 2007-08 5
2. UPF Narihana Salaun 2006-07 4
3. DPF Binu Pkhroo 2009-10 3
Range : Dhami Division : Shimla Component : Check Dams
Sl No. Site Name Type Year No. of Dams
1. Hiri Ki Beshak Nalla Not Available 2004-05 15
2. Jabri Nalla Not Available 2004-05 16
3. Ghaneog nalla Not Available 2004-05 17
4. Panti nalla Not Available 2005-06 20
5. Barika nalla Not Available 2004-05 17
6. Chand Ki nallai Not Available 2005-06 7
7. Rattanpur Main Khad Not Available 2005-06 8
8. Banaun nalla Not Available 2005-06 7
9. Kushah nalla Not Available 2006-07 17
10. Moolbari nalla Not Available 2006-07 10
11. Dhalya nalla Not Available 2006-07 6
12. Sari nalla Not Available 2007-08 60
13. Dhagech Not Available 2008-09 11
14. Dhogoh/Gainchari nalla Not Available 2008-09 7
15. Mataini nalla and branches Not Available 2008-09 7
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
ci
16. Dido Ghatti nalla Not Available 2008-09 51
17. Dhadeyog nalla Not Available 2008-09 13
18. Bledi nalla and branches Not Available 2009-10 10
19. Madeyana nalla Not Available 2009-10 7
Range : Bhajji Division : Shimla Component : Afforestation
Sl No.
Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1 U-42 Nin Chalabag 2005-06 5
2 U-18 chapprani karyali 2005-06 5
3 D-26 Biru khatnaol 2005-06 18
4 U-60 Farinda khatnol 2005-06 10
5 U.F Pahal bajhol 2005-06 10
6 U.F.chanawag Chalabag 2006-07 10
7 DPF Nalag bhajhol 2006-07 5
8 U-15 Drawal karyali 2006-07 10
9 U-9 Drabla karyali 2006-07 10
10 U-13 Ogli Suma himri 2006-07 20
11 U-53 Ramahan khatnaol 2006-07 10
12 U-143 Kayar Thaeila 2006-07 10
13 U-27 Suni,Shakrodi Sunni 2007-08 5
14 U-40 Dadhoeg Sunni 2007-08 5
15 UF Dishti Madhorghat 2007-08 5
16 U-14 Bharara Drabla karyali 2007-08 10
17 U-19 Groan Jasshi karyali 2007-08 25
18 U-20 Dommehar karyali 2007-08 7
19 U-143 Kayar Thaeila 2007-08 10
20 U-56 Taloti khatnaol 2007-08 10
21 U.F. Jaini Nalla I Chalabag 2008-09 5
22 U.F 41. Chatyarh Chalabag 2008-09 7
23 U.31 Gharayana Sunni 2008-09 3
24 D-15 Malaawan Pandoa 2008-09 15
25 D-23 Chapprani Karyali 2008-09 15
26 D-20 Lambidhar Sandoa 2008-09 5
27 D.25 Kadharghat Kandarghat 2008-09 10
28 U-57 Bag Khatnol 2008-09 5
29 U-20 Domehar Karyali 2009-10 5
30 D-10 Malgi Sandoa 2009-10 5
31 D-14 Anu kailu Pandoa 2009-10 5
32 U-144 Deothi Thaeila 2009-10 5
33 U-27 Suni Shakrodi Sunni 2009-10 4
34 U-14 Bharara Drabla Karyali 2010-11 10
35 U-3 Bag-Saini Pandoai 2010-11 15
36 U F Jaminal Chalawa 2009-10 5
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cii
Range : Bhajji Division : Shimla Component : Pasture Development
Sl No. Site Name Beat Year of Plantation
Size of plantation (Ha.)
1 U-35 Golan Mandhor ghat 2005-06 5
2 U-12 Gadhau Himri 2005-06 8
3 U.F 594.Kotla Bajhol 2006-07 10
5 U-60 Farinda Thaeila 2005-06 10
6 U-51 Dalana Katnol 2007-08 10
7 U-145 Mool Bhajji Thaeila 2008-09 3
Range : Bhajji Division : Shimla Component : Check Dams
Sl No. Site Name Type Year No. of Dams
1 Sandoa Nalla S 2005-06 2
2 Malthi S=20 M=7
2005-06 27
3 Katli Nalla S=8 M=4
2005-06 12
4 Kangti Nalla S=22 M=25
2005-06 47
5 Hudu Nalla S=3 M=7
2005-06 10
6 Chamba Nalla S=10 M=10
2006-07 20
8 Dyangal S=11 M=12
2006-07 13
9 Chamba Nalla S=2 M=8 L=2
2007-08 12
10 Drabla Nalla S=2 M=11
L=5
2007-08 18
11 Broom Nalla S=10 M=8 L=2
2008-09 20
12 Khanawag S=4 M=11
L=3
2008-09 18
13 Sohal S=5 M=6 L=2
2008-09 13
14 Mandari S=1 M=2
2009-10 3
15 Shamloh S 2009-10 1
16 Khirpidi S=3 2009-10 5
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
ciii
M=2
17 Judloo / Mucharna S=5 M=3 L=2
2009-10 10
18 Chakyana S=3 M=9 L=3
2009-10 15
Range : Theog Division : Theog Component : Afforestation
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1. Bagana Cheog 2004-05 5
2. Rohro Theog 2004-05 10
3. Majhar Khanashi 2005-06 5
4. Sainjkhuta I Jugo 2006-07 10
5. Kathaal 1 Gowai 200708 10
6. Bardima D/pur 2006-07 10
7. Shovil Chandara 2009-10 5
8. Khanor Nala Kufri 2005-06 20
9. Kuinial Chandara 2005-06 4
10. Kandaghat Kiari 2005-06 10
11. Sainj Kufta 2 Sugo 2006-07 10
12. Budhil 2nd D/pur 2007-08 10
13. Kathaal 2 Gowai 2007-08 10
14. Bhalech Gowai 2007-08 5
15. Chalawag 1 Shilli 2005-06 10
16. Lanoo 2nd Dharti 2005-06 5
17. Gihorajubbar Sandhu 2006-07 5
18. Gagan Ghari D/pur 2006-07 15
19. Narainty Matinana 2007-08 10
20. Makhrol Kufri 2004-05 5
21. Pralighasni Matiana 2005-06 6
22. Kandaghat Sarog 2006-07 10
23. Shalli Ki Teer D/pur 2006-07 10
Range : Theog Division : Theog Component : Pasture Development
Sl No. Site Name Beat Year of Plantation
Size of Plantation (Ha.)
1) Sholvi Chandara 2005-06 20
2) Chichar Matiana 2006-07 11
3) U 93 Kathog Matiana 2007-08 5
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
civ
Range : Theog Division : Theog Component : Check Dams
Sl No. Site Name Type Year No. of Dams
1) D 144 Kundly nalla Big 2004-05 5
2) Narainty nalla Medium 2004-05 15
3) Rohru nalla Small 2004-05 20
4) Rahighat nalla Big 2005-06 15
5) Jugoo nalla Medium 2005-06 20
6) Rahighat nalla Small 2005-06 19
7) Rohroo nalla Big 2006-07 5
8) Sholvi nalla Medium 2006-07 10
9) Narainty nalla Small 2006-07 10
10) Chechar nalla Small 2006-07 10
11) Khanor nalla 2007-08 2008-09
50
12) Jhamu 2006-07 10
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cv
Annexure - V
Attendance Sheet of Himachal Pradesh Forest Officials
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cvi
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cvii
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cviii
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cix
Annexure - VI
Survival Percentage Based on Distance from Habitation and Road – Afforestation (%)
Bilaspur Division (%)
Sl
No.
Species Distance from Road Distance From Habitation
≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km
1. Khair 58 - - 59 57 -
2. Tuna 61 - - 61 79 -
3. Teak 58 46 - 59 57 -
4. Drek 61 - - 61 46 -
5. Chil - 80 - - 80 -
6. Bamboo 59 - - 62 57 -
7. Shisham 57 68 - 59 60 -
Karsog Division
Sl
No.
Species Distance from Road Distance From Habitation
≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km
1. Chil 64 58 60 60 58 -
2. Deodar 59 60 55 68 61 -
3. Daroo 60 58 63 61 59 -
4. Leucaena 58 69 62 59 59 -
5. Robinia 48 60 65 49 60 -
6. Shisham 66 60 60 64 60 -
7. Ban 59 52 57 52 56 -
Kunihar Division
Sl
No.
Species Distance from Road Distance From Habitation
≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km
1. Chil - 57 44 51 - -
2. Deodar - 54 - 54 - -
3. Kachnar 72 51 64 58 - -
4. Leucaena - 63 57 59 - -
5. Khair 52 63 61 61 - -
6. Chirindi 72 59 59 60 - -
7. Daroo 76 56 - 60 - -
Nachan Division
Sl
No.
Species Distance from Road Distance From Habitation
≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km
1. Deodar 73 58 70 63 - 60
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cx
2. Khanor 71 65 - 66 - 58
3. Robinia 66 59 - 61 - 60
4. Khair - 63 - 63 - -
5. Chuli - 62 - - 63 62
Shimla Division
Sl
No.
Species Distance from Road Distance From Habitation
≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km
1. Deodar 56 62 68 58 59 -
2. Ban 46 57 58 55 46 35
3. Daroo 63 64 82 59 66 37
4. Karal 53 68 - 52 61 -
5. Khair 64 40 - 56 45 -
6. Leucaena 66 57 72 57 65 -
7. Ritha 59 44 - 38 46 -
Suket Division
Sl
No.
Species Distance from Road Distance From Habitation
≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km
1. Amla 64 58 60 - 60 -
2. Ban 65 57 58 68 59 56
3. Deodar 57 59 57 60 58 55
4. Shisham 60 58 53 57 58 -
5. Amaltas 64 66 56 73 60 -
6. Khair 59 61 59 68 58 -
7. Leucaena 62 62 53 68 59 -
Theog Division
Sl
No.
Species Distance from Road Distance From Habitation
≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km
1. Ban 59 59 - 59 - -
2. Chil 56 58 - - 58 -
3. Daroo 57 57 - - 57 -
4. Deodar 55 56 - 59 54 -
5. Robinia 56 64 - - 57 -
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxi
Annexure - VII
Survival of plantations made under different components
Sl.no Division Range Beat Name of Site Year of Plantation
Area of Plantation (Ha.)
Components Average Survival (%)
1 Bilaspur Sadar Panjgain Chamyoun 2005-06 10 Afforestation 57
2 Bilaspur Sadar Jamthal DPF Jamthal Part 1 2007-08 15 Afforestation 59
3 Bilaspur Sadar Chamyoun DPF 2006-07 11 Afforestation 67
4 Bilaspur Sadar Chamyoun DPF 2006-07 21 Afforestation 62
5 Bilaspur Sadar Chamyoun Chanyon 2007-08 13 Afforestation 74
6 Bilaspur Sadar Chamyan UPF Kasol 2005-06 4 Rimplantation 60
7 Karsog Seri Richhni OD 233 RichChni 2006-07 10 Afforestation 67
8 Karsog Seri Katash D 234 sundro 2007-08 5 Afforestation 66
9 Karsog Seri Pathraivi OD 236 Pathraivi 2004-05 8 Afforestation 61
10 Karsog Seri Pathrairi D 236 Pattraivi 2010-11 5 Afforestation 67
11 Karsog Seri Pathrairi Pathrivi OD 237 Kathanda 2005-06 13 Afforestation 65
12 Karsog Seri Tabber ND 245 Firno 2005-06 5 Afforestation 58
13 Karsog Magroo Chora ND 283 Raidhar 2004-05 4 Afforestation 73
14 Karsog Magroo Lassi D 278 Nadoon 2005-06 10 Afforestation 61
15 Karsog Pangana Bilindi D 80 Kanda 2009-10 5 Afforestation 55
16 Karsog Karsog Galaych D - 175 Pehran 2010-11 10 Pasture Development 65
17 Karsog Karsog Snorli D 170 Tikkar Karsog
2004-05 5 Afforestation 55
18 Karsog Karsog Dopha D 173 Dopha 2007-08 11 Afforestation 55
19 Karsog Karsog Mahaunag D 124 Kolontha 2007-08 5 Afforestation 55
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxii
20 Karsog Karsog Mahaunag D 124 Kolontha 2009-10 5 Afforestation 60
21 Karsog Karsog Mahaunag 138 Bag bhokhari 2009-10 10 Afforestation 71
22 Karsog Karsog Mahunag OD 124 Kalontha 2005-06 10 Afforestation 62
23 Karsog Karsog Snarli D 170 Tikar Karsog 2006-07 7 Rimplantation 55
24 Karsog Karsog Snarli Baju (OD 167) 2005-06 10 Afforestation 45
25 Karsog Karsog Mahunaag OD 137 Nagaltha 2004-05 5 Pasture Development 63
26 Karsog Karsog Kashol D-199 Dhanyara 2005-06 5 Afforestation 30
27 Karsog Karsog Manail ND 183 Maha Dev ki Banouri
2004-05 7 Afforestation 71
28 Karsog Magroo Serimangarh ND 289 Ghanidhar 2004-05 4 Afforestation 62
29 Karsog Magroo Lassi D 279 Nadoon 2006-07 10 Afforestation 59
30 Karsog Magroo Katande D 259 Latta 2006-07 10 Afforestation 77
31 Karsog Magroo Katande D 259 Latta C IV 2005-06 13 Afforestation 61
32 Karsog Magroo Lassi D 278 Nadoon 2005-06 10 Afforestation 59
33 Karsog Magroo Chora ND 283 Raidhar 2005-06 3 Afforestation 67
34 Karsog Magroo Malrog OD 255 Sagarh 2004-05 3 Afforestation 58
35 Karsog Pangana Tattapani D 95 Jeori 2006-07 10 Afforestation 58
36 Karsog Pangana Shalog D 19 Shlog 2008-09 4 Afforestation 51
37 Karsog Pangana Tattapani D 101 Nandoo 2008-09 20 Afforestation 56
38 Karsog Pangana Talehan D 105 Khadix 2006-07 10 Afforestation 70
39 Karsog Karsog Kashol D 198 Dhanyara 2007-08 17 Afforestation 79
40 Karsog Pangana surhii D 1 Mahog 2010-11 5 Afforestation 64
41 Karsog Pangana Surri D 8 Panyanoo 2009-10 5 Afforestation 62
42 Karsog Pangana Kanda D72 Reshtedheer 2010-11 5 Afforestation 62
43 Karsog Pangana Kutach D 24 Barnug 2009-10 6 Afforestation 58
44 Karsog Pangana Shalog D 19 Shlog 2009-10 5 Afforestation 59
45 Karsog Pangana Talehan D 109 Ghawla 2008-09 10 Afforestation 61
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxiii
46 Karsog Pangana Balar D 62 Kunash 2010-11 5 Afforestation 59
47 Karsog Pangana Alsindi Alyash 2010-11 10 Afforestation 59
48 Karsog Pangana Takhan D 106 Bhoura 2006-07 10 Afforestation 58
49 Karsog Pangana Ghushal D 40 Bajhu 2008-09 5 Afforestation 58
50 Karsog Pangana Pangana D 17 Chittri Suket 2007-08 10 Afforestation 55
51 Karsog Pangana Gushal D 39 Shill 2008-09 6 Afforestation 57
52 Karsog Pangana Bilindi D 74 Pavain 2005-06 8 Afforestation 59
53 Karsog Pangana Bilindi D 80 Kanda 2007-08 20 Afforestation 53
54 Karsog Karsog Snarli D 167 Baju (111) 2006-07 7 Afforestation 53
55 Karsog Karsog Mahu Naag 138 Bag bhokhari 2005-06 10 Pasture Development 59
56 Karsog Karsog Manohi OD 193 Katach 2004-05 7 Afforestation 66
57 Karsog Karsog Kashoul D 188 Kandi 2008-09 5 Afforestation 40
58 Karsog Karsog sonarli D 170 Tikar Karsog 2008-09 10 Afforestation 59
59 Karsog Karsog Mamail D 18Maha Dev ki Banouri
2010-11 6 Pasture Development 68
60 Karsog Pangana Bilinali D 74 Parvavr 2006-07 30 Afforestation 57
61 Karsog Pangana Alsindi D 87 Saran 2008-09 5 Afforestation 61
62 Karsog Seri Saran D 249 Hakra 2008-09 4 Afforestation 55
63 Karsog Karsog Parlog D 133 Hiru 2010-11 5 Pasture Development 67
64 Karsog Karsog Parlog D 133 Parnot 2007-08 12 Afforestation 69
65 Karsog Karsog Mehndi ND 201 Aglidhar 2005-06 5 Afforestation 55
66 Karsog Karsog Perlig ND 131 Parnol 2004-05 10 Afforestation 61
67 Karsog Karsog Mendi B 207 Ghandoi 2010-11 9 Afforestation 71
68 Karsog Karsog Mendi D 207 Gandhoi 2005-06 10 Afforestation 75
69 Karsog Pangana Tattapani D 101 Nabdoo 2005-06 7 Afforestation 63
70 Karsog Pangana Talehan D 105 Khandain 2009-10 30 Afforestation 68
71 Karsog Seri Nehri Naal D 213 Nehari Naal 2007-08 15 Afforestation 62
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxiv
72 Karsog Seri Nehri Naal D 213 Nehari Naal 2008-09 11 Afforestation 63
73 Karsog Seri Chauridhar D 208 Bhondshill 2006-07 10 Afforestation 43
74 Karsog Seri Chauridhar D 208 Bhondshill 2005-06 5 Afforestation 54
75 Karsog Seri Nanj D222 Pog 2005-06 2 Afforestation 52
76 Karsog Seri Saran NB 247 Saran 2007-08 5 Pasture Development 59
77 Karsog Seri Tabben D 245 Firrio 2008-09 9 Afforestation 58
78 Karsog Seri Tabben ND 242 Boona 2007-08 5 Afforestation 46
79 Karsog Seri Richhni D 233 Richni 2004-05 7 Afforestation 57
80 Karsog Seri Dhamoon D 219 Ganoo C ii 2004-05 6 Afforestation 54
81 Karsog Seri Nahj D 222 Pog 2010-11 1 Afforestation 47
82 Karsog Magroo Chawra ND 283 Raidhor 2007-08 5 Pasture Development 67
83 Karsog Magroo Chawra ND 283 Raidhor 2005-06 5 Pasture Development 69
84 Karsog Karsog Parlog D 133 Hiru 2007-08 9 Pasture Development 65
85 Karsog Karsog Mehndi D 203 Thach 2007-08 15 Afforestation 54
86 Karsog Karsog Parlog 135 fagog 2007-08 5 Afforestation 59
87 Karsog Pangana Balar D 61 Sorsan Plantation Site
2005-06 5 Afforestation 57
88 Karsog Pangana Balar D 64 Salana Degoh 2009-10 5 Afforestation 68
89 Karsog Pangana Kanda D 72 Rishtedhar 2008-09 10 Afforestation 67
90 Karsog Pangana Balar D 63 Panyroo 2005-06 4 Afforestation 60
91 Karsog Pangana Kanda D 72, RestaDhar 2005-06 4 Afforestation 62
92 Karsog Pangana Kanda D 72, RestaDhar 2 2008-09 6 Afforestation 71
93 Karsog Pangana Kanda D 73 Gharlal 2010-11 12 Afforestation 72
94 Karsog Seri Nahi D 222 Pog 2009-10 5 Afforestation 60
95 Karsog Seri Saran D 249 Makra 2007-08 2 Afforestation 58
96 Karsog Seri Saran D 247 saran 2009-10 5 Afforestation 61
97 Karsog Seri Drehari Nal D 214 Jhunjhun 2009-10 20 Pasture Development 76
98 Karsog Seri Tabben 241 Kandloo 2008-09 3 Afforestation 60
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxv
99 Karsog Seri Nehri Nal Nehri Nal 2005-06 7 Pasture Development 69
100 Karsog Seri Sarhan OD 247 Saran 2009-10 5 Afforestation 54
101 Karsog Seri Sarhan OD 247 Saran 2004-05 5 Afforestation 46
102 Karsog Seri Sarhan OD 247 Saran 2005-06 5 Afforestation 68
103 Karsog Pangana Tattapani D99 Brahar 2008-09 15 Afforestation 56
104 Karsog Pangana Tattapani D 100 Ghangar 2004-05 10 Afforestation 61
105 Karsog Pangana Tattapani D 76 Kapdyal 2007-08 15 Afforestation 59
106 Karsog Pangana Alsnidi D 90 Mahita 2 2010-11 5 Afforestation 68
107 Karsog Pangana Tattapani D 100 ghanger 2007-08 5 Afforestation 57
108 Karsog Pangana Tattapani D 96 Shoj 2007-08 10 Afforestation 54
109 Karsog Pangana Talehan D 104 Besta 2004-05 10 Afforestation 58
110 Karsog Magroo Segagi ND 264 Khatu 2006-07 5 Afforestation 73
111 Karsog Karsog Porlog D 134 magan 2008-09 5 Pasture Development 61
112 Karsog Karsog Kakashan D 161 Damail 2008-09 10 Afforestation 59
113 Karsog Karsog Galaych D 176 Galyech 2008-09 10 Afforestation 51
114 Karsog Seri Saran D 249 Makra 2008-09 4 Afforestation 37
115 Karsog Pangana Pangana D 20 Humginalla 2008-09 6 Afforestation 55
116 Karsog Karsog Porlog 135 Fafan 2007-08 5 Pasture Development 78
117 Karsog Pangana Alsindi D 86 lochar 2004-05 8 Afforestation 78
118 Karsog Pangana tatta Pani D 101 Nandoo 2005-06 10 Afforestation 64
119 Karsog Pangana tatta Pani D 100 Ghangar 2005-06 7 Afforestation 64
120 Karsog Pangana Alsuidi D-76, Kapadyas 2004-05 10 Afforestation 78
121 Kunihar Darlaghat Labrath DS - Katpol 2010-11 15 Afforestation 57
122 Kunihar Darlaghat Mangoo Manru - UF 2009-10 5 Afforestation 57
123 Kunihar Darlaghat Kandhar UF Padyar 2009-10 10 Rimplantation 63
124 Kunihar Darlaghat Labrath D 8 Trat 2004-05 7.5 Afforestation 58
125 Kunihar Darlaghat Danoghat Serghara Kau UFC 6 C 6
2010-11 5 Afforestation 59
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxvi
126 Kunihar Darlaghat Labrath U 17 Matreach 2009-10 5 Afforestation 62
127 Kunihar Darlaghat Mangoo Baryal DPF 2010-11 10 Afforestation 60
128 Kunihar Darlaghat Kandhar 23 Bajrail 2006-07 5 Afforestation 57
129 Kunihar Darlaghat Labrath U 17 Matreach 2006-07 10 Afforestation 58
130 Kunihar Darlaghat Kandhar Labrath 2005-06 10 Afforestation 55
131 Kunihar Darlaghat Ladhar J 21 2010-11 5 Rimplantation 54
132 Kunihar Darlaghat Danoghat D 51 sergharakur E 2
2009-10 10 Afforestation 63
133 Kunihar Darlaghat Labrath 09-Skor 2007-08 7 Afforestation 40
134 Kunihar Darlaghat Labrath D 9 Skor 2008-09 25 Afforestation 65
135 Nachan Seraj Bail Grytroof 2008-09 15 Afforestation 72
136 Nachan Seraj Bail Bijnadhar 2005-06 10 Afforestation 65
137 Nachan Seraj Bail Jhalrue 2007-08 5 Afforestation 69
138 Nachan Seraj Bail Santotili 2004-05 10 Afforestation 59
139 Nachan Seraj Bail Magarugala 2005-06 10 Afforestation 52
140 Nachan Seraj Bail Pohhridhar 2005-06 9 Afforestation 53
141 Nachan Seraj Baila Kasigad 2007-08 10 Afforestation 67
142 Nachan Seraj Bail Labni Nalla 2005-06 5 Afforestation 65
143 Shimla Dhami Shngo UPF Kheel 2008-09 5 Afforestation 60
144 Shimla Dhami Ganeog Kushah 2008-09 2 Afforestation 56
145 Shimla Dhami Ganeog Baledi 2006-07 3 Afforestation 53
146 Shimla Dhami Ganeog UPF Ganeog 2005-06 5 Afforestation 59
147 Shimla Dhami Ganeog DPF Bijo Ka Dhalle 2009-10 3 Afforestation 61
148 Shimla Dhami Ganeog UF Sharog 2005-06 5 Afforestation 41
149 Shimla Dhami halog Mahapuna 2005-06 4 Afforestation 55
150 Shimla Dhami Dhalaya Kainth ki Ghati 2006-07 3 Afforestation 75
151 Shimla Dhami Dhalaya Bathmana 2009-10 3 Afforestation 75
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxvii
152 Shimla Dhami Salaun DPF Salaun 2009-10 5 Afforestation 68
153 Shimla Dhami Salaun UPF Narihana 2005-06 4 Pasture Development 54
154 Shimla Dhami Ghanhatti Bag Ka Nalla 2008-09 3 Afforestation 53
155 Shimla Dhami Ghanhatti Bharwar Ka Dhank 2007-08 5 Pasture Development 67
156 Shimla Dhami Okhru Binu 2009-10 3 Afforestation 59
157 Shimla Dhami Okhru Makri 2010-11 2 Afforestation 56
158 Shimla Dhami Okhru Pani Lane 2009-10 10 Afforestation 57
159 Shimla Dhami Ghanhatti Bag Ka 2006-07 1 Afforestation 55
160 Shimla Dhami Ghanhatti BDF Brelli 2007-08 2 Afforestation 61
161 Shimla Dhami Okhru Dhaheog 2007-08 5 Afforestation 78
162 Shimla Dhami Okhru Dokhru Madhya 2006-07 11 Afforestation 69
163 Shimla Dhami Holog Hin Ki Beshak 2005-06 6 Afforestation 63
164 Shimla Dhami Dhalaya Bohli 2005-06 4 Afforestation 52
165 Shimla Bhajji Himri U - 13 Oglisuma 2006-07 20 Afforestation 76
166 Shimla Bhajji Karyali U - 20 Domehal 2009-10 5 Afforestation 59
167 Shimla Bhajji Karyali U - 20 Domehal 2007-08 7 Afforestation 60
168 Shimla Bhajji Sunni U - 27 Sunni Shakrodi
2007-08 5 Afforestation 44
169 Shimla Bhajji Sunni U - 27 Sunni Shakrodi
2009-10 4 Afforestation 55
170 Shimla Bhajji Sunni U - 40 Dadhoeg 2007-08 5 Afforestation 61
171 Shimla Bhajji Madhorghat UF Dishti 2007-08 5 Afforestation 61
172 Shimla Bhajji Madhorghat U - 35 Golan 2005-06 5 Pasture Development 59
173 Shimla Bhajji Chalnwag Chalnwag 2006-07 10 Afforestation 27
174 Shimla Bhajji Chalnwag UF Jaminala 2009-10 5 Afforestation 44
175 Shimla Bhajji Khotnol D 26 Biru 2004-05 18 Afforestation 50
176 Shimla Bhajji Khotnol U 51 Dalana 2007-08 10 Pasture Development 63
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxviii
177 Shimla Bhajji Khotnol U 53 Ramhar 2006-07 10 Afforestation 61
178 Shimla Bhajji Thaila U 143 kayar 2006-07 10 Afforestation 67
179 Shimla Bhajji Thaila U 143 kayar 2006-07 10 Afforestation 47
180 Shimla Bhajji Sandoa D-20 Lambi Dhar 2008-09 5 Afforestation 65
181 Shimla Bhajji Badhain U - 41 Chatyar 2008-09 7 Afforestation 59
182 Shimla Bhajji Pandoa U - 3 Bag - Sainj 2010-11 15 Afforestation 69
183 Shimla Bhajji Karyali U - 14 Bhara Drabla
2010-11 10 Afforestation 57
184 Shimla Bhajji Thaila U - 60 Farinda 2005-06 10 Afforestation 69
185 Shimla Bhajji Karyali D- 23 Chaprni 2008-09 15 Afforestation 75
186 Shimla Bhajji Thaila U - 60 Forinda 2006-07 10 Pasture Development 56
187 Shimla Bhajji Himri U 12 Gadhau 2005-06 8 Pasture Development 58
188 Shimla Bhajji Kariyali U 18 ChaPrani 2005-06 5 Afforestation 62
189 Shimla Bhajji Thaila U 145 Mool Bhajji 2008-09 3 Pasture Development 54
190 Shimla Bhajji Thaila U 144 Deothi 2009-10 5 Afforestation 43
191 Shimla Bhajji Kariyali U 20 Domehar 2006-07 20 Pasture Development 65
192 Shimla Bhajji Khatnol U 57 Bag 2008-09 5 Afforestation 67
193 Shimla Bhajji Panooa U 10 Malgi 2009-10 5 Afforestation 55
194 Shimla Bhajji Karyali U 15 Drawal 2006-07 10 Afforestation 43
195 Shimla Bhajji Bathol UF Pahal 2005-06 10 Afforestation 37
196 Shimla Bhajji KadharGhat D 25 Kdhar Ghat 2008-09 10 Afforestation 65
197 Shimla Bhajji Karyali U 14 Bhara-Drable 2007-08 10 Afforestation 57
198 Shimla Bhajji Khatnol U 57 Bag 2008-09 5 Afforestation 71
199 Shimla Bhajji Bajhol D 260 Malalag 2006-07 5 Afforestation 66
200 Shimla Bhajji Pandoha O 14 anuKajhr 2009-10 5 Afforestation 71
201 Shimla Bhajji Bajhol U 594 kotla 2006-07 10 Pasture Development 53
202 Shimla Bhajji Badmain U 42 Neen 2005-06 5 Afforestation 51
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxix
203 Shimla Dhami Badoo DPF Badoo 2005-06 8 Afforestation 65
204 Shimla Bhajji Sunjni U 31 Gharyana 2008-09 3 Afforestation 65
205 Shimla Bhajji Karyali D -9 Drabla 2006-07 10 Afforestation 59
206 Shimla Bhajji Pandoa U 15 Malawan 2008-09 10 Afforestation 60
207 Shimla Mashobra Dhalli D 73 Mashobra Cttt
2004-05 5 Afforestation 53
208 Shimla Taradevi Gadeug RF 27 Gadaug (PD) 2005-06 5 Pasture Development 61
209 Shimla Taradevi Ghamyana GLC Marhon 2005-06 7 Afforestation 56
210 Shimla Mashobra Bharari U 180 anu 2007-08 5 Afforestation 68
211 Shimla Mashobra Bharari D 70 Anu 2007-08 5 Afforestation 69
212 Shimla Mashobra Nalderhra D 70 Naldehra C III 2005-06 10 Afforestation 63
213 Shimla Taradevi Khamyana GLC - Marhon 2004-05 7 Afforestation 70
214 Shimla Taradevi Kamyana R 17 Marhav 2009-10 10 Afforestation 53
215 Shimla Taradevi Kamyana GCL - Jhollo 2006-07 10 Afforestation 54
216 Shimla Taradevi Ghamyana R- 17 Morhon 2007-08 10 Afforestation 67
217 Shimla Taradevi Taal Taalgiri 2004-05 4 Afforestation 55
218 Shimla Taradevi Gamyana R 18 Poabo 2008-09 5 Afforestation 55
219 Shimla Taradevi Khamyana GLC Dhart 2005-06 10 Afforestation 60
220 Shimla Taradevi Bauoti D 214 Jhagio 2005-06 6 Afforestation 70
221 Shimla Taradevi Tall GCL Kalawat 2005-06 3 Afforestation 43
222 Shimla Taradevi Tall GCL Nalayal 2004-05 3 Afforestation 76
223 Shimla Taradevi Tall GCL Karomed 2005-06 10 Afforestation 56
224 Shimla Mashobra Bharti UPF 180 Anu 2008-09 3 Afforestation 52
225 Shimla Mashobra Seepur UF Deothi (Pastune)
2004-05 3 Pasture Development 53
226 Shimla Taradevi Gadaug R 27 Gadaug 2005-06 2 Pasture Development 52
227 Shimla Taradevi Gadaug D 208 Gadang 2005-06 10 Afforestation 60
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxx
228 Shimla Taradevi Tutu GCL Nalhayal 2004-05 4 Afforestation 55
229 Shimla Taradevi Boondi D 214 Jhajra 2006-07 6 Afforestation 60
230 Shimla Taradevi Taal Taalgiri 2004-05 4 Afforestation 48
231 Shimla Mashobra Naldera UPF Cherain 2005-06 5 Pasture Development 71
232 Shimla Taradevi Gadaug DPF 210 Garib III 2006-07 5 Afforestation 59
233 Shimla Bhajji Karyali U 19 Graon Jassi 2007-08 25 Afforestation 74
234 Shimla Taradevi Tall GCL Nalhayal 2005-06 4 Afforestation 61
235 Shimla Taradevi Banooti GCL Kajail 2007-08 5 Afforestation 63
236 Shimla Taradevi Banooti GCL Janol 2005-06 5 Afforestation 57
237 Shimla Mashobra Dhalli U 167 Sayali 2007-08 5 Afforestation 56
238 Shimla Taradevi Boonati GCL Chewla 2006-07 6 Afforestation 55
239 Shimla Taradevi Taal GCL Neri 2005-06 5 Afforestation 57
240 Shimla Bhajji Bathol UF Pahal 2005-06 10 Afforestation 37
241 Shimla Taradevi Guduya DF 208 badoug 2005-06 2 Afforestation 77
242 Suket Kangu Badhoo UD 300 Chauri 2010-11 70 Afforestation 63
243 Suket Kangu Behli mared 2010-11 10 Afforestation 60
244 Suket Kangu Behli Behli 2010-11 10 Afforestation 59
245 Suket Kangu Batwara Ahemsunali 2005-06 20 Afforestation 58
246 Suket Kangu Batwara Jartu 2009-10 10 Pasture Development 57
247 Suket Kangu Dhawal Dhawal 2005-06 15 Afforestation 60
248 Suket Kangu Batwara Jartu (16) 2009-10 16 Afforestation 52
249 Suket Kangu Gairu Devidhar 2007-08 10 Afforestation 52
250 Suket Kangu Haraboi Bargata 2009-10 4 Afforestation 59
251 Suket Kangu Haraboi Tahli 2010-11 80 Afforestation 52
252 Suket Jhungi Junghi Shi Vshankar 2006-07 5 Afforestation 63
253 Suket Jhungi Trechh Supadhar 2010-11 11 Afforestation 67
254 Suket Jhungi Balag Trechh 2009-10 4 Afforestation 59
255 Suket Jhungi Trechh Trechh 2009-10 5 Afforestation 53
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxi
256 Suket Jhungi Balag Kathla 2006-07 10 Afforestation 59
257 Suket Jhungi Kinder Trechh 2004-05 10 Afforestation 60
258 Suket Jhungi Kathuni Kathuni 2005-06 7 Afforestation 60
259 Suket Kangu Batwara Jartu 2010-11 12 Afforestation 63
260 Suket Kangu Haraboi Karla 2007-08 3 Afforestation 56
261 Suket Kangu Badhoo DPF Chaloun 2010-11 14 Afforestation 53
262 Suket Kangu Haraboi Karla 2010-11 10 Rimplantation 56
263 Suket Kangu Badhu New ropree 2005-06 5 Afforestation 53
264 Suket Jhungi Trechh Ropa 2010-11 5 Afforestation 77
265 Suket Kangu Haraboi Thungdar III 2009-10 20 Pasture Development 58
266 Suket Kangu Behli Karangal 2009-10 80 Rimplantation 82
267 Suket Jhungi Salani Salani 2005-06 5 Afforestation 63
268 Suket Jhungi Jarel Hanjki 2005-06 5 Afforestation 51
269 Suket Kangu Harboi Thungfar 2 2008-09 7 Pasture Development 59
270 Suket Kangu Dhwal Ahen sunali 2008-09 15 Afforestation 56
271 Suket Kangu Gairu Galma 2004-05 5 Afforestation 61
272 Suket Kangu Haraboi Thungdar 1 2005-06 10 Pasture Development 60
273 Suket Kangu Behli Bindloo 2008-09 9 Afforestation 53
274 Suket Kangu Behli Karngal 2005-06 10 Afforestation 58
275 Suket Kangu Harabai Hara 2007-08 5 Afforestation 62
276 Suket Jhungi Kinder Narehli 2009-10 6 Afforestation 63
277 Suket Jhungi Kinder Kinder 2010-11 10 Afforestation 73
278 Suket Jhungi Bandli Malohi 2010-11 5 Afforestation 63
279 Suket Jhungi Kinder Narehli 2010-11 10 Afforestation 73
280 Suket Jhungi Nihri Chehar Plantation site
2005-06 5 Afforestation 63
281 Suket Kangu Behali Sojha 2005-06 10 Afforestation 54
282 Suket Kangu Dhwal Ahen Sunali 2005-06 5 Pasture Development 57
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxii
283 Suket Jhungi Salani Khoondar 2010- 11 10 Afforestation 83
284 Suket Jhungi Kinder Trechdi 2006-07 10 Afforestation 56
285 Suket Kangu Badoo Near Ropru 2009-10 10 Afforestation 71
286 Suket Jhungi Bandli Kumaru 2008-09 35 Afforestation 54
287 Suket Jhungi Marhara manghel 2009-10 15 Afforestation 61
288 Suket Jhungi Saloni Saloni 2010-11 5 Afforestation 55
289 Suket Jhungi Saloni Saloni 2006-07 5 Afforestation 52
290 Suket Kangu Batwara Jartu 2009-10 25 Afforestation 58
291 Theog Theog Matiana Sholui Pasture 2005-06 20 Pasture Development 60
292 Theog Theog Shali Rohroo 2004-05 10 Afforestation 59
293 Theog Theog Shali Chalawog -1 2005-06 10 Afforestation 55
294 Theog Theog Dharampur Prlighashi 2005-06 6 Afforestation 56
295 Theog Theog Ghowai Kathal 2 2007-08 10 Afforestation 57
296 Theog Theog Ghowai Kathal 1 2007-08 10 Afforestation 55
297 Theog Theog Dharampur Basdima 2006-07 10 Afforestation 61
298 Theog Theog Ghowai Bhalech 2007-08 5 Afforestation 54
299 Theog Theog Koofri Makrol 2004-05 5 Afforestation 59
300 Theog Theog Koofri Bagna 2004-05 5 Afforestation 59
301 Theog Theog Koofri Kanor Nalla 2005-06 20 Afforestation 58
302 Theog Theog Chidara Kuinal 2005-06 4 Afforestation 59
303 Theog Theog Sarog Khadhaghat 2005-06 10 Afforestation 55
304 Theog Theog Matyana Narainty 2007-08 10 Afforestation 55
305 Theog Theog Deoth Magaen Gaen 2006-07 7 Afforestation 60
306 Theog Theog Dharti Maghar 2005-06 5 Afforestation 67
307 Theog Theog Dharmpur Shalu hi tear 2006-07 10 Afforestation 45
308 Theog Theog Dharmpur Budlhi 2 2007-08 10 Afforestation 63
309 Theog Theog Sandu Ghorajubbar 2006-07 5 Afforestation 41
310 Theog Theog Chadara Sholvi 2004-05 5 Afforestation 67
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxiii
311 Theog Theog Jugo Sainj Khafta 2 2006-07 10 Afforestation 23
312 Theog Theog Dharmpur Gagan Ghatir 2006-07 15 Afforestation 64
313 Theog Theog Jugo Sainj Kupla 1 2006-07 10 Afforestation 56
314 Theog Theog Sarog Kandaghat 2006-07 10 Afforestation 61
315 Theog Theog Deoth Lanoo 2 2005-06 5 Afforestation 56
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxiv
Results of Chek Dam Monitoring Sl.No Division Name of the Drainage Line Year of
Treatment Range Beat Average Depth
of silt / Ha. (m) Average Weight of Silt(ton/Ha)
1 Bilaspur D 80 Kanda 2009-10 2005-06 Sadar UPF Kasol Nala 0.6 1.7
2 new Kayari 2006-07 Sadar Chamyaun 1.1 3.1
3 Suit ka Pani Nalla 2006-07 Sadar Jmthal 0.8 2.4
4 Tal nalla 2006-07 Sadar Chamyan 1.3 3.7
5 UPF Nalla 2005-06 Sadar Chamyan 0.7 2.0
6 Karsog Badoham 2008-09 Seri Dhamoesh 1.5 4.3
7 Bahj 2009-10 Karsog Kashol 0.9 2.5
8 Bahj nalla 2009-10 Karsog Kashol 0.8 2.5
9 Banera 2005-06 Karsog Banera 1.6 4.7
10 Banera 2006-07 Karsog Banera 1.5 4.5
11 Baryon Kuudi 2005-06 Pangana Kanda 1.4 4.1
12 Bashala Nalla 2008-09 Magroo Serinangarh 0.1 0.2
13 Bhogu 2005-06 Seri Chauridhar 2.0 5.9
14 Bithari bouri nalla 2004-05 Pangana Katach 1.7 5.0
15 Bithouri Bouri nalla 2005-06 Pangana Pangna 1.6 4.8
16 Boghu 2005-06 Seri Chauridhar 2.5 7.3
17 Chatkar 2009-10 Pangana Kanda 0.7 2.0
18 Chitchad nall 2005-06 Pangana Katamda 0.6 1.6
19 Chukku nalla 2009-10 Pangana Karadal 2.4 6.9
20 Danoil 2009-10 Karsog Kakahen 0.4 1.0
21 Domail 2009-10 Karsog Kakahon 0.4 1.3
22 Galyach 2009-10 Karsog Galyach 1.6 4.8
23 Ghalash Nalla 2009-10 Pangana Alsindi 2.3 6.7
24 Godarn Nalla 2009-10 Seri Puchi 1.4 4.2
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxv
25 Gujroodhar nalla 2009-10 Pangana Alsuindi 2.0 5.8
26 Haridhar Nalla 2008-09 Magroo SreMangrih 1.4 4.2
27 Harmolla 2005-06 Karsog Galyach 1.7 4.9
28 hatkar nallas 2008-09 Pangana Alsuindi 2.0 6.0
29 Jai Nalla 2007-08 Seri Saran 1.0 3.0
30 Jai Nalla 2009-10 Seri Saran 0.7 2.0
31 Jhingal 2009-10 Karsog Darmour 1.9 5.6
32 Kandlu 2007-08 Seri Tabben 1.6 4.7
33 Kandlu 2007-08 NA Tabber 1.7 4.9
34 Karashi nalla 2008-09 Magroo Chora 1.1 3.3
35 Kataclu Nalla 2007-08 Magroo Katamda 1.7 5.0
36 Kathende 2004-05 Seri Pathrari 1.5 4.4
37 Khanek Nalla 2008-09 Magroo Sereangish 1.3 3.9
38 Khodona 2008-09 Karsog Banero 1.5 4.5
39 Kondal 2007-08 Seri Richhni 1.2 3.6
40 Kus Nalla 2008-09 Pangana Belar 0.7 1.9
41 Makrikat nalla 2008-09 Seri Pathaivi 1.4 4.1
42 Makrikot Nalla 2008-09 Seri Patnrairi 1.3 3.9
43 Mehram Nall 2009-10 Karsog Darmour 1.8 5.3
44 Mehran 2007-08 Karsog Dharmour 1.8 5.4
45 Nagaltha 2005-06 Karsog Mahunaag 2.0 5.8
46 Naguam nalla 2008-09 Magroo mahog 0.2 0.5
47 Naresh 2005-06 Seri Chavridhar 1.6 4.8
48 Narosh 2005-06 Seri Churidhar 2.0 5.9
49 Nehari Nal 2007-08 Seri Nehari Nal 1.4 4.2
50 Nehaxi nalla 2007-08 Seri Nehari Nalla 1.6 4.8
51 Padoo 2008-09 Seri Seri 1.5 4.3
52 Palhrairi Nalla 2005-06 Seri Palhrairi 2.1 6.0
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxvi
53 Pandao 2008-09 Seri Seri 1.5 4.4
54 Panyroo khablaye 2005-06 Pangana Belar 1.6 4.7
55 Path Jhurandi nalla 2005-06 Pangana Karadal 1.8 5.3
56 Path Jhurandi nalla 2005-06 NA Karadal 1.6 4.7
57 pathreivi nalla 2005-06 Seri Pathreivi 2.1 6.0
58 Puni 2008-09 Karsog Dopha 0.7 2.0
59 Puni nalla 2008-09 Karsog Dopha 0.6 1.7
60 Saganj 2004-05 Seri Nahi 1.5 4.4
61 Sakrahan nalla 2008-09 Pangana Blindi 1.9 5.7
62 Salaundagah 2005-06 Pangana Belar 0.8 2.5
63 Sarkol 2009-10 Karsog Snarli 0.9 2.5
64 Sayani 2004-05 Seri Nahi 1.5 4.4
65 Shandrelal nalla 2008-09 Pangana Pangna 0.8 2.4
66 Shayongi 2008-09 Karsog Bakshae 2.1 6.3
67 Shayongi 2008-09 NA Bhakshaal 2.1 6.3
68 Sursi 2009-10 Karsog Manail 1.5 4.5
69 Tatapani Nalla 2005-06 Pangana Tatapani 1.9 5.5
70 Tatmu 2008-09 Karsog Mahunaag 1.8 5.2
71 Thambli 2004-05 Seri Nahi 1.6 4.6
72 Thangi nall 2009-10 Magroo Chara 0.1 0.4
73 Thermi 2008-09 Karsog Mamail 0.7 2.1
74 Thermi nalla 2007-08 Seri Gowalpur 0.0 0.0
75 Thermlli 2009-10 Seri Nahi 1.5 4.3
76 Tudli 2008-09 Karsog Dopha 1.5 4.5
77 Udhun k nalla 2005-06 Pangana Belar 0.2 0.5
78 Kunihar Dangaril 2010-11 Darlaghat Bagga 0.3 1.0
79 Jandhoi U F nalla 2006-07 Darlaghat LABRATH 0.9 2.7
80 Kun nalla 2008-09 Darlaghat mangoo 0.5 1.5
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxvii
81 matraich nalla 2006-07 Darlaghat LABRATH 0.9 2.5
82 matraich nalla 2007-08 Darlaghat LABRATH 1.0 2.9
83 Pladnia nalla 2010-11 Arki Sanalaghat 1.2 3.4
84 Shiharli nalla 2007-08 Darlaghat LABRATH 1.1 3.1
85 SHIRIJ 2005-06 Darlaghat LABRATH 1.0 2.9
86 Skor DPF 2004-05 Darlaghat Karrath 1.3 3.8
87 Nachan Jogni Girjinoo nalla (running)
2009-10 Seraj Baila 1.6 4.7
88 Lrojnce 2008-09 Seraj Baila 1.3 3.8
89 Shimla Ajdhar nalla (working nalla) 2007-08 Mashobra Dhalli 1.2 3.4
90 Banaun Nalla 2005-06 Dhami Salaun 1.1 3.2
91 Bharoia nalla 2005-06 Taradevi Banauti 1.1 3.1
92 Bhong batal nalla 2008-09 Taradevi taal 0.0 0.0
93 Bledi nalla 2009-10 Dhami Ganeog 1.8 5.2
94 Bron 2008-09 Bhajji Himri 1.7 5.1
95 Chakvana 2009-10 Bhajji Thila 1.1 3.4
96 Chamba nalla 2006-07 Bhajji Karyali 1.5 4.5
97 Chand ki Nalla 2005-06 Dhami Dhalaya 1.6 4.7
98 Chand ki Wall 2005-06 Dhami Dhalaya 1.6 4.7
99 Chanmba 2007-08 Bhajji Karyali 1.9 5.5
100 Chhanawat 2008-09 Mashobra Dhalli 0.7 2.1
101 Dayangal 2006-07 Bhajji Thail 1.4 4.0
102 Dhadyag nala 2009-10 Dhami okru 0.6 1.9
103 Dhagech Nalla 2008-09 Dhami Dhalaya 1.6 4.6
104 Dhagech Nalla 2008-09 NA Dhalaye 1.6 4.6
105 Dhagoh yainchari 2008-09 Dhami Holog 1.3 3.8
106 Dhalaya nalla 2006-07 Dhami Dhalaya 1.5 4.4
107 Dhandar nalla 2004-05 Taradevi Banauti 2.0 5.8
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxviii
108 Dholaya Nalla 2006-07 Dhami Dhalaya 1.5 4.4
109 Didighatti nalla 2008-09 Dhami Sarog 1.6 4.7
110 Drabla nalla 2007-08 Bhajji Karjali 1.2 3.7
111 Ghanog nalla 2005-06 Dhami Ganeog 1.3 3.9
112 Haroon nallah 2009-10 Taradevi Banauti 0.0 0.0
113 Hiri ki beshak 2005-06 Dhami halog 1.2 3.5
114 Hudu Nalla 2005-06 Bhajji Chanaurag 1.4 4.0
115 Jabri Nalla 2004-05 Dhami Dhalaya 1.4 4.2
116 Janglog 2008-09 Mashobra Bharari 1.3 3.7
117 Judlu Nalla 2009-10 Bhajji Chanaway 1.3 3.7
118 Kair nalla 2010-11 Taradevi Tall 0.0 0.0
119 Kangti nalla 2005-06 Bhajji Bajhol 1.6 4.8
120 Katali Nalla 2005-06 Bhajji Maldhor 1.1 3.2
121 Khanawag 2008-09 Bhajji Khotnul 1.0 2.9
122 Khirpadi 2009-10 Bhajji Himri 0.4 1.1
123 Kiar nalla 2006-07 Taradevi Gadaug 1.6 4.7
124 Kumalli nalla 2005-06 Mashobra Dhalli 0.0 0.0
125 Kunni nalla and branches 2007-08 Mashobra Dharti 1.5 4.4
126 Kushaha nalla 2006-07 Dhami Ganeog 1.6 4.7
127 Madyana nalla 2009-10 Dhami Okhroo 0.6 1.9
128 Majheri nalla 2006-07 Mashobra Dharti 1.6 4.6
129 Malthi nalla 2005-06 Bhajji Thaila 1.5 4.3
130 Mandri Nalla 2009-10 Bhajji Maldhorghat 1.8 5.4
131 Manla nalla & branches 2007-08 Taradevi Tutu 0.6 1.6
132 mataini nalla 2008-09 Dhami Ghanhatti 0.3 0.8
133 Moolbari Nalla 2006-07 Dhami Shanog 1.5 4.3
134 Moolbari Nalla 2006-07 NA Shawog 1.6 4.8
135 Paniartu nalla 2008-09 Mashobra Paniyali 0.6 1.7
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxix
136 Panti nala 2005-06 Dhami Shanog 1.0 2.9
137 Panti nala 2005-06 NA Shanog 0.6 1.8
138 Rari ka nalla 2004-05 Dhami Ganeog 1.5 4.5
139 Rattan pur nala 2005-06 Dhami Salaun 0.7 2.1
140 Sandua 2005-06 Bhajji Sandua 1.3 3.7
141 Sanog nalla 2009-10 Taradevi Tall 2.1 6.2
142 Sari nall 2007-08 Dhami Dhalay 0.4 1.3
143 Seepur nalla 2005-06 Mashobra Seepur 1.9 5.7
144 Seepur nalla Phase II 2006-07 Mashobra Seepur 0.0 0.0
145 Shimaoh Nalla 2009-10 Bhajji Sunni 1.1 3.2
146 Sohal 2008-09 Bhajji Chananrag 0.9 2.6
147 Surilla/burrilla nalla (running)
2006-07 Mashobra Dhalli 1.0 2.9
148 Suket Babailla nalla 2009-10 Kangoo Haraboi 0.4 1.1
149 Bah Nalla 2010-11 Jhungi Nihri 1.4 4.2
150 Balagh nalla 2008-09 Jhungi Balagh 1.5 4.5
151 Baragta nalla 2004-05 Kangoo Haraboi 1.5 4.4
152 Brdkhari nalla 2005-06 Jhungi Jarek 1.0 2.9
153 Brough Ball 2009-10 Jhungi Salani 0.8 2.3
154 Chakki nalla 2005-06 Jhungi Bandli 1.3 3.7
155 Chanad nall 2009-10 Jhungi Kinder 1.0 3.0
156 Chehru nalla 2010-11 Kangoo Batwara 0.2 0.5
157 Chhutagadam 2009-10 Jhungi Chahagadan 1.1 3.3
158 Chiral Nalla 2006-07 Jhungi Nirihi 2.2 6.4
159 Dagri nalla 2010-11 Kangoo Haraboi 0.3 1.0
160 fafna nalla 2004-05 Kangoo Badhu 2.3 6.7
161 Gadhyana nalla 2009-10 Kangoo Batwara 0.6 1.7
162 garla nallaGarla nalla 2005-06 Kangoo Haraboi 1.4 4.2
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxx
163 Gehroo Nalla 2006-07 Kangoo Gairu 1.7 4.9
164 Jariun nalla 2005-06 Kangoo Behali 1.6 4.7
165 Jindri nalla 2010-11 Kangoo Gairu 0.5 1.4
166 Jodhnoo nalla 2009-10 Jhungi Kinder 1.3 3.9
167 Kamrah Nalla 2009-10 Jhungi Nihri 1.5 4.3
168 Kathla Nalla 2008-09 Jhungi Balag 1.1 3.1
169 Kathla Nalla 2009-10 Jhungi Balag 1.2 3.6
170 Kathla Nalla 2009-10 Kangoo Gairu 0.5 1.6
171 Kathuri nalla 2004-05 Jhungi Kathuri 0.7 2.1
172 Khyan nalla 2009-10 Kangoo Dhawal 0.6 1.9
173 Kriya nalla 2005-06 Jhungi Bandli 1.9 5.7
174 Madaiyana 2009-10 Kangoo Haraboi 0.2 0.7
175 Manjheli Nalla 2005-06 Kangoo Gairu 1.8 5.1
176 Marogra nalla 2005-06 Jhungi Bandli 1.1 3.2
177 Mehron nalla 2005-06 Jhungi Badli 0.0 0.0
178 Naraity nalla 2005-06 Kangoo Badhu 1.6 4.7
179 Narehli check 2009-10 Jhungi Kinder 0.4 1.2
180 Narella Nalla 2005-06 Jhungi Kinhu 1.3 3.8
181 Nhri-1 2010-11 Jhungi Nihri 3.1 9.1
182 Nihri nalla 2005-06 Jhungi Nihri 1.5 4.4
183 Roproo Nalla 2005-06 Jhungi Kinder 1.0 3.0
184 salog nalla 2009-10 Kangoo Gairu 0.6 1.7
185 Sanoha nalla 2009-10 Kangoo Dhawal 1.4 4.1
186 Shibhanpar 2009-10 Jhungi jungi 1.1 3.2
187 Smoul nalla 2005-06 Kangoo Badhu 1.5 4.3
188 Smoul nalla 2009-10 Kangoo Badhu 0.4 1.3
189 Sojha nalla 2010-11 Kangoo Behali 0.5 1.5
190 Sunali nalla 2005-06 Kangoo Dhawal 0.9 2.6
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxi
191 Timbroo Nalla 2005-06 Jhungi Nihri 1.6 4.6
192 Timbroo Nalla 2005-06 NA Nirihi 1.1 3.3
193 Trechh nalla 2005-06 Jhungi Trechh 0.8 2.5
194 Trechh nalla 2009-10 Jhungi Trechh 0.8 2.4
195 Trechh nalla 2010-11 Jhungi Trech 1.4 4.1
196 Theog Jhamu nalla 2006-07 Theog Chadara 1.1 3.1
197 Jugoo Nalla 2005-06 Theog Jugo 0.9 2.8
198 Kundley nalla 2004-05 Theog Shalli 1.2 3.5
199 Narainty nalla 2004-05 Theog Pathreivi 1.1 3.3
200 Narainty nalla 2006-07 Theog Pathreivi 1.1 3.1
201 Rahighat 2005-06 Theog Shalli 0.0 0.0
202 Rahi-Ghat 2005-06 Theog Shali 0.0 0.0
203 Rohroo nalla 2004-05 Theog Shalli 1.3 3.7
204 Rohru nalla 2006-07 Theog Shalli 1.8 5.4
205 Solvi nalla 2006-07 Theog Chandara 1.0 2.8
Average 1.1 3.3
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxii
Annexure - VIII
Overall Survival % - Afforestation
Bilaspur Karsog Kunihar Nachan Shimla Suket Theog
Species Survival %
Species Survival %
Species Survival %
Species Survival %
Species Survival %
Species Survival %
Species Survival %
Amla 61 Kharor 60 Amla 60 Ban 60 Ailanthus 62 Amaltas 66 Ban 59
Amaltas 63 Siris 65 Ban 55 Willow 47 Amaltash 36 Amla 60 Chil 58
Arjun 56 Amaltas 59 Chil 51 Chil 54 Amla 38 Ban 58 Daroo 57
Bamboo 59 Amla 62 Daroo 59 Chuli 63 Bhida 48 Bahera 75 Deodar 55
Bheda 56 Ban 55 Deodar 54 Daroo 53 Ban 54 Chil 60 Robinia 62
Chil 80 Bahera 61 Karaunda 60 Deodar 66 Bahera 58 Chuli 53
Drek 57 Bihul 67 Kachnar 63 Khanor 62 Beul 63 Daroo 68
Jatropha 66 Binya 65 Khair 61 Robinia 63 Chill 60 Deodar 58
Kachnar 56 Beuns 69 Leucaina 57 Chuli 54 Drek 60
Khair 58 Chil 58 Ritha 64 Daroo 66 Jatropha 62
Leucaina 58 Chuli 58 Slock 62 Deodar 66 Kachnar 58
Pangomia 60 Daru 62 Toon 60 Darek 59 Khair 60
Shisham 60 Darle 60 Jamun 83 Leucaina 62
Ticktonia 62 Deodar 60 Jatropha 53 Ritha 60
Teak 58 Dharke 59 Jhadinu 61 Saghwan 61
Tuna 70 Drek 61 Kachnar 60 Shisham 58
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxiii
Jamun 52 Karal 62 Tuna 59
Jatropha 59 Khair 49
Kachnar 54 Kinnu 52
Khair 63 Leuciana 62
Leucaina 58 Mahru 39
Ritha 55 Mulberry 47
Robinia 63 Poplar 49
Shisham 62 Ritha 52
Walnut 61 Robinia 54
Saroo 65
Shisham 65
Siris 59
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxiv
Annexure - IX
Drainage Line Wise Sedimentation Data in Tonnage
Name of Nalla Avg weight of Silt (Tonnes / Ha)
Bilaspur
D 80 Kanda 2009-10 1.7
new Kayari 3.1
Suit ka Pani Nalla 2.4
Tal nalla 3.7
UPF Nalla 2.0
Karsog
Badoham 4.2
Bahj 2.5
Bahj nalla 2.5
Banera 4.6
Baryon Kuudi 4.1
Bashala Nalla 0.2
Bhogu 5.9
Bithari bouri nalla 5.0
Bithouri Bouri nalla 4.8
Boghu 7.3
Chatkar 2.0
Chitchad nall 1.6
Chukku nalla 6.9
Danoil 1.0
Domail 1.3
Galyach 4.8
Ghalash Nalla 6.7
Godarn Nalla 4.2
Gujroodhar nalla 5.8
Haridhar Nalla 4.2
Harmolla 4.9
hatkar nallas 6.0
Jai Nalla 2.5
Jhingal 5.6
Kandlu 4.8
Karashi nalla 3.3
Kataclu Nalla 5.0
Kathende 4.4
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxv
Khanek Nalla 3.9
Khodona 4.5
Kondal 3.6
Kus Nalla 1.9
Makrikat nalla 4.1
Makrikot Nalla 3.9
Mehram Nall 5.3
Mehran 5.4
Nagaltha 5.8
Naguam nalla 0.5
Naresh 4.8
Narosh 5.9
Nehari Nal 4.2
Nehaxi nalla 4.8
Padoo 4.3
Palhrairi Nalla 6.0
Pandao 4.4
Panyroo khablaye 4.7
Path Jhurandi nalla 4.7
pathreivi nalla 6.0
Puni 2.0
Puni nalla 1.7
Saganj 4.4
Sakrahan nalla 5.7
Salaundagah 2.5
Sarkol 2.5
Sayani 4.4
Shandrelal nalla 2.4
Shayongi 6.3
Sursi 4.5
Tatapani Nalla 5.5
Tatmu 5.2
Thambli 4.6
Thangi nall 0.4
Thermi 2.1
Thermi nalla 0.0
Thermlli 4.3
Tudli 4.5
Udhun k nalla 0.5
Kunihar
Dangaril 1.0
Jandhoi U F nalla 2.7
Kun nalla 1.5
matraich nalla 2.8
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxvi
Pladnia nalla 3.4
Shiharli nalla 3.1
SHIRIJ 2.9
Skor DPF 3.8
Nachan
Jogni Girjinoo nalla (running) 4.7
Lrojnce 3.8
Shimla
Ajdhar nalla (working nalla) 3.4
Banaun Nalla 3.2
Bharoia nalla 3.1
Bhong batal nalla 0.0
Bledi nalla 5.2
Bron 5.1
Chakvana 3.4
Chamba nalla 4.5
Chand ki Nalla 4.7
Chand ki Wall 4.7
Chanmba 5.5
Chhanawat 2.1
Dayangal 4.0
Dhadyag nala 1.9
Dhagech Nalla 4.6
Dhagoh yainchari 3.8
Dhalaya nalla 4.4
Dhandar nalla 5.8
Dholaya Nalla 4.4
Didighatti nalla 4.7
Drabla nalla 3.7
Ghanog nalla 3.9
Haroon nallah 0.0
Hiri ki beshak 3.5
Hudu Nalla 4.0
Jabri Nalla 4.2
Janglog 3.7
Judlu Nalla 3.7
Kair nalla 0.0
Kangti nalla 4.8
Katali Nalla 3.2
Khanawag 2.9
Khirpadi 1.1
Kiar nalla 4.7
Kumalli nalla 0.0
Kunni nalla and branches 4.4
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxvii
Kushaha nalla 4.7
Madyana nalla 1.9
Majheri nalla 4.6
Malthi nalla 4.3
Mandri Nalla 5.4
Manla nalla & branches 1.6
mataini nalla 0.8
Moolbari Nalla 4.6
Paniartu nalla 1.7
Panti nala 2.6
Rari ka nalla 4.5
Rattan pur nala 2.1
Sandua 3.7
Sanog nalla 6.2
Sari nall 1.3
Seepur nalla 5.7
Seepur nalla Phase II 0.0
Shimaoh Nalla 3.2
Sohal 2.6
Surilla/burrilla nalla (running) 2.9
Suket
Babailla nalla 1.1
Bah Nalla 4.2
Balagh nalla 4.5
Baragta nalla 4.4
Brdkhari nalla 2.9
Brough Ball 2.3
Chakki nalla 3.7
Chanad nall 3.0
Chehru nalla 0.5
Chhutagadam 3.3
Chiral Nalla 6.4
Dagri nalla 1.0
fafna nalla 6.7
Gadhyana nalla 1.7
garla nallaGarla nalla 4.2
Gehroo Nalla 4.9
Jariun nalla 4.7
Jindri nalla 1.4
Jodhnoo nalla 3.9
Kamrah Nalla 4.3
Kathla Nalla 2.9
Kathuri nalla 2.1
Khyan nalla 1.9
Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme
N H Consulting Pvt. Ltd.
cxxxviii
Kriya nalla 5.7
Madaiyana 0.7
Manjheli Nalla 5.1
Marogra nalla 3.2
Mehron nalla 0.0
Naraity nalla 4.7
Narehli check 1.2
Narella Nalla 3.8
Nhri-1 9.1
Nihri nalla 4.4
Roproo Nalla 3.0
salog nalla 1.7
Sanoha nalla 4.1
Shibhanpar 3.2
Smoul nalla 2.1
Sojha nalla 1.5
Sunali nalla 2.6
Timbroo Nalla 4.2
Trechh nalla 3.4
Theog
Jhamu nalla 3.1
Jugoo Nalla 2.8
Kundley nalla 3.5
Narainty nalla 3.2
Rahighat 0.0
Rahi-Ghat 0.0
Rohroo nalla 3.7
Rohru nalla 5.4
Solvi nalla 2.8
Average 3.3
Recommended