OASIS WSDM TC Face To Face Agenda

Preview:

DESCRIPTION

OASIS WSDM TC Face To Face Agenda. June, 2004 GGF, Honalulu, HI. Agenda, Thursday June 10th. Morning Session 08:00am - 09:00am GGF Joint sessions post-mortem 09:00am - 9:30:00am Liaison status: DMTF: Utility WG, State WG, Interop CIM-SOAP GGF: OGSA CMM OASIS: Security TC - PowerPoint PPT Presentation

Citation preview

OASIS WSDM TC Face To Face Agenda

June, 2004

GGF, Honalulu, HI

Agenda, Thursday June 10th

Morning Session• 08:00am - 09:00am GGF Joint sessions post-mortem• 09:00am - 9:30:00am Liaison status:• DMTF: Utility WG, State WG, Interop CIM-SOAP• GGF: OGSA CMM• OASIS: Security TC• 9:30-11:30 – Discovery –

– wrap up outstanding discovery discussions – William– correllatable names – Igor/Andrea (Disc05)– manageability capabilities – Heather (Disc06/Disc07)– Registries – William (Disc09)

AgendaThursday June 10th

11:30-12:30 LunchAfternoon Session• 12:30-2:30 Event Formats – Andrea/Heather• 2:30-3:30 Relationships kickoff –

survey/requirements – Igor• 3:30-5 Planning• Action Items• Outstanding work items• Specification Planning• Next F2F Planning

Agenda suggestions

• Minute taker?

• We’d like to adjust our agenda to be able to close a little earlier today – 3pm?

• Do planning during lunch?

• Shorten discovery?

• Shorten Laisons?

GGF Post mortem

• Was it worth spending a day of our F2F w/ GGF?

• CDDLM engagements– Overlap with WSDM/DMTF state work– Overlap with WS-RF Resource Properties

• OGSA CMM engagements– Gap analysis has a few requirements for us

• OGSA engagements– EMS work as a scenario to help drive requirements

on WSDM and understanding on OGSA

Laisons• DMTF:

– Utility WG – prioritizing use cases, not just server oriented, next week at f2f, this will drive profiles to tie together sets of cim classes for a use. These use cases should be valuable to us as well.

AI: review use cases from Utility WG when they are readyAI: relationship between CIM Profiles and WSDM Capabilities proposal;

Andrea will try to post a pointer to a overview in DMTF– State WG – state model, transition encoding; determine state based on

model, research group in France w/ concrete proposal, a language alongside cim to describe semantics behind a state, how it is transitioned/determined, based on UML state work. New use cases from server management wg.

AI: pointer to requirements document for WSDM? Andrea – Interop CIM-SOAP & WS-CIM – CIM-SOAP phase 3 + Server Mgt

structure protocol; WMX possible proposed solution from MS, Rejustifying early decision to be WSDM based. Revisiting requirements.

• GGF: – OGSA – CMM

• OASIS: Security TC

Discovery

• Discovery – – wrap up outstanding discovery discussions –

William– Status on Disc01-Disc09– Correllatable names – Igor/Andrea (Disc05)– Manageability capabilities – Heather

(Disc06/Disc07)– Registries – William (Disc09)

Event Formats

• CBE as a starting point?

• Comparing CBE with CIM

• Comparing CBE with HP’s WSMF

• Continuing this work?

Relationships

• Survey of contributions– WS-Manageability– WSMF

• WSDM Requirements

• New requirements?

• Continuing this work?

Action Items• Use cases, Profiles from Utility WG• Capabilities – HK writeup, done

– Scenario – HK– Taxonomy/portTypes - Igor

• CBE-CIM mapping – Andrea, done• Registry – Fred writeup?• Conceptual model followup with WS-Addressing in IBM –

HK• WSDM requirements for WS-RF and WS-Notification –

Warren?• WSDM discovery requirements for WS-RF – Igor• Correlatable properties write up – Igor• Relationships – concept model – Igor• Security Questions - Andreas

Outstanding Work: MUWS and MOWS

Champion, assign #calls they have to work in, scope of items (w/ some scope perhaps not in 1.0).

• Finish discovery• Meta information• Relationships• Notifications mechanism• Event Formats• Collections• Finishing capabilities:

– Identity (version/)– State– Metrics

• New Capabilities– Configuration– Correlatable Properties

• MOWS managing per operation• Security• ?Change Management

Planning

• Action Items– Pre-existing– From this meeting

• Outstanding work items– What needs to be accomplished for our spec

• Any subgroups? no• Specification Planning

– Dates?• Next F2F Planning

– When and where• Early week of Aug 16th in Silicon Valley, Calif HP?

Recommended