NuMI Horns and Targets MINOS-era operational challenges and NOVA-era expectations Labor day weekend:...
View
214
Download
0
Category
Documents
Report
Preview:
Click to see full reader
Recommended
NuMI Radiation and Environmental Protection
Documents
NuMI NBI2006 September 6, 2006 NuMI Horns Experience Jim Hylen / FNAL Page 1 NuMI Horns Experience Horns were put in target hall June 2004 1 st run with
Documents
NUMI NuMI Magnet Power Supply System WBS 1.1.3 Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001
Documents
Design of NuMI Magnetic Focusing Horns Presented by: Kris Anderson Fermi National Accelerator Lab
Documents
COUPP-60 NuMI Commissioning
Documents
Accelerator and NuMI Upgrades Shutdown Update
Documents
NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation
Documents
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview
Documents
Experience with the NuMI Target
Documents
NuMI Near Hall Detectors: MINOS and Beyond
Documents
Prospects for NUMI Off-axis Initiative
Documents
The NuMI neutrino beam - Harvard University
Documents
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated
Documents
NuMI Horn & Target Alignment
Documents
NuMI Target Pile Fan Repair
Documents
NuMI Run II meeting Nov. 4, 2004 NuMI Target Hall Jim Hylen Page 1 NuMI Target Hall Status / Plan 8 slide introduction to target hall 9 slide list of status
Documents
NUMI NuMI Horn Jim Hylen (FNAL) NBI03 November 7-11, 2003 Page 1 NuMI Horn Construction and Testing At NBI’02 Just finishing testing of prototype horn
Documents
First MINOS Results from the NuMI Beam
Documents
National Utilization Management Integration (NUMI) · June 2018 NUMI Systems Management Guide, Release 1.1.15.5 2 2 Introduction NUMI is a web-based application that supports field
Documents
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On
Documents