NTS Exit Capacity Map DRAFT FOR COMMENT

Preview:

DESCRIPTION

NTS Exit Capacity Map DRAFT FOR COMMENT. Introduction. NTS Exit Capacity Map Where can capacity be made available without investment including substitution? Lead-time

Citation preview

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

NTS Exit Capacity MapDRAFT FOR COMMENT

Introduction

NTS Exit Capacity Map

Where can capacity be made available without investment including substitution?

Lead-time <36 months

Where can capacity be made available with simple medium term works?

Lead-time 36 months

Where does capacity need long lead times?

Lead time >>36 months

7. Norfolk

5. Central & East

Midlands

3. Yorkshire & The North-

East

NTS Exit Capacity Map

1. Scotland & The North

6. Peterborough to Aylesbury

2. The North-West

9. London, Suffolk & The

South East

4. South-Wales & West

Midlands

8. The South-West

2.1 North-West towards North Wales

10. Southern

Click on a box to find region information including for network sensitive areas marked by the dotted red lines

Recommended