1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.

2. BUS STOPS AND ASSOCIATED CROSSING LOCATIONS ARE INDICATIVEAND SUBJECT TO FURTHER DESIGN DEVELOPMENT. BUS STOPINFRASTRUCTURE TO BE PROVIDED BY OTHERS.

3. THIS IS A 2D LAYOUT AND AS SUCH EARTHWORKS EXTENTS AREINDICATIVE AND YET TO BE CONFIRMED.

4. REQUIRED TEMPORARY ACCESS RAMPS AT PRIORITY JUNCTIONS TOBE PROVIDED BY OTHERS.

5. DISTRIBUTOR ROAD AND LINK ROADS TO BE FULLY LIT.

ACCESS GATE FOR TEMPORARY ACCESS IF REQUIRED

PEDESTRIAN GATE

HIGHWAY BOUNDARY FENCING SHOWN INDICATIVELYWITH FENCING TYPE TO BE CONFIRMED

LEGEND:

INDICATIVE EXTENT OF ROAD RESTRAINT SYSTEMREQUIRED SUBJECT TO FURTHER DESIGNDEVELOPMENT. SITES ASSESSED TO BE OF 'MEDIUM'PRIORITY ACCORDING TO THE PROVISION OF ROADRESTRAINT SYSTEMS ON LOCAL AUTHORITY ROADS

RED LINE BOUNDARY (SWDR)

TRAFFIC SIGNAL

TACTILE PAVING

STAINLESS STEEL BOLLARD OR APPROVEDEQUIVALENT, SIZE TO BE CONFIRMED

BLOCK PAVING

Tony Gee and Partners LLPHardy House

140 High StreetEsher, Surrey

KT10 9QJTel: 01372 461600

DO NOT SCALE

APPROVED:

DRAWING No:

SCALE @ A1:

TITLE:

PROJECT:

DESIGNED:

CHECKED:

DATE:

REV:

DRAWING STATUS:

DRAWN:PROJECT NO:

Tel: (0118) 974 6000 Web: www.wokingham.gov.ukShute End, Wokingham, Berkshire RG40 1BN

CLIENT:

CONTRACTOR:

DESIGNER:

WOKINGHAM MAJOR HIGHWAYS PROGRAMME

KEYPLAN:

www.tonygee.comConsulting Civil, Structural and Geotechnical Engineers

File n

ame S

:\PRO

JECT

S\20

18\C

1180

47\B

IM\01

-WIP

\DRA

WIN

GS\W

MHP-

TG-S

RWG1

-DR-

HI-91

01.D

WG,

print

ed on

01 M

arch 2

021 1

5:05:1

2, by

Ben

Haw

kins

REV DATE BY DESCRIPTION CHK APP

SWDR - SPINE ROAD ANDWESTERN GATEWAY PHASE 1

WMHP-TG-SRWG1-DR-HI-9101 P04

SUITABLE FOR REVIEW & COMMENT S3

SPINE ROAD AND WESTERN GATEWAY PHASE 1

HIGHWAYSPLANNING

GENERAL ARRANGEMENT SHEET 1 OF 6

TCHBH

BH JC1:500

C118047 December 20

P02 02/12/2020 BH UPDATED FOLLOWING SCO COMMENTS

JC INDICATIVE FORMAL CROSSINGS AND PED ROUTES SHOWN01/03/2021P03

BH CROSSINGS AND PED ROUTES ANNOTATIONS AMENDED01/03/2021P04

JCBH

JCBH

JCJBM

SWDR - WESTERNGATEWAY PHASE 2

PLANSCALE 1:500

0 50m10m 20m 30m 40mSCALE 1:500

10m

RED LINE BOUNDARY

PROPOSED VARIED WIDTHCARRIAGEWAY

PROPOSED 3.0m VERGE

PROPOSED 3.0m FOOTWAY /CYCLEWAY

PROPOSED 1.0m VERGEPROPOSED EARTHWORK

SOUTH WOKINGHAMDISTRIBUTOR ROAD (SWDR)

PROPOSED TESCO ACCESS

CULVERT O

PROPOSED 3.0m VERGE

PROPOSED 3.0m FOOTWAY /CYCLEWAY

PROPOSED 1.5m VERGE

PROPOSED EARTHWORK

PROPOSED ACCESS TO TESCOCAR PARK AND STORE

FUTURE ARM TO SERVICEPERSIMMON HOMESDEVELOPMENT

MATCH LINE

MATCH LINE

FOR CONTINUATION REFER TO DRG No. WMHP-TG-SRWG1-DR-HI-9102

PROPOSED 9mCARRIAGEWAY

PROPOSED 5m CARRIAGEWAY

CULVERT N

DETENTION BASIN

DETENTION BASIN

ROAD MARKINGS TOTIE INTO EXISTING

ROAD MARKINGS TOTIE INTO EXISTING

ROAD MARKINGS TOTIE INTO EXISTING

ã Crown copyright and database rights 2018 OS 100005035. You are granted a non-exclusive,royalty free, revocable licence solely to view the Licensed Data for non-commercial purposes forthe period during which Tony Gee and Partners LLP makes it available. You are not permitted tocopy, sub-license, distribute, sell or otherwise make available the Licensed Data to third parties inany form. Third party rights to enforce the terms of this licence shall be reserved to OS.

REALIGNED LUCKLEY BROOK

PROPOSED TESCO ACCESS FORPEDESTRIANS AND CYCLISTS

TESCO SUPERSTORE

CULVERT P

INDICATIVE LOCATION OFFORMAL PEDESTRIANCROSSING SUBJECT TOFURTHER INVESTIGATION

INDICATIVE LOCATION OFFORMAL PEDESTRIANCROSSING SUBJECT TOFURTHER INVESTIGATION

INDICATIVE POTENTIALPEDESTRIAN ROUTE SUBJECT TO

FURTHER INVESTIGATION ANDAGREEMENT WITH 3rd PARTIES

INDICATIVE POTENTIALPEDESTRIAN ROUTE SUBJECT TOFURTHER INVESTIGATION ANDAGREEMENT WITH 3rd PARTIES