View
3
Download
0
Category
Preview:
Citation preview
Designed:
Approved:
Drawn:
Survey Datum:
Surveyed:
Dra
win
g n
am
e: M
:\E
ngine
erin
g S
ervices\A
RD
- C
AD
- 3
D\T
raffic E
ng
ineering C
apital W
orks 2
020-2
1\P
ath D
esigns\C
AD
\B
aden
D
rive, F
irst, S
eco
nd
...A
ve\S
eco
nd A
ve
nu
e.dw
g (2
3 M
ar, 2
02
1)
Rev:
Drawing No:
Sheet No:
NAA
NA
NANA
D.BATTOCCHIO23_03_2021
D.BATTOCCHIO23_03_2021
Date:
Date:
Date:
Date:City Transport
45 Princes Highway
Werribee VIC 3030
Australia
Tel: (03) 9742 0777
Fax: (03) 9741 6237
AmendmentsRev By ApprovedDate
A ISSUED FOR ___ ____/_/ _
PRIOR TO COMMENCEMENT OF ANY WORKS.
WARNING
ALL SERVICES SHOWN ON THIS DRAWING ARE
APPROXIMATE ONLY AND EXACT LOCATION IS
TO BE CONFIRMED ON SITE BY CONTRACTOR
Continued on Sheet 2
Notes
Prelimanary Design
1 of 3
1. Construct 1.5m footpath as per WCC SD 2-1
2. Provide construction joints, expansion joins
and crack control joints as per WCC SD 2-4
3. Incorporate pits as per WCC SD 2-5
4. Construct pram crossings as per WCC SD 3-1
17
17
17
21
19
16
22
18
23
21
19
17
11
13
15
SCALE 1:500 AT A3 SIZE
1050 25m2015
17
Obj No:
14
Pedestrian Footpath
Second Avenue
BA
DE
N D
RIV
E
20
PROPOSED FOOTPATH
LEGEND
EXISTING TREE/
VEGETATION
EXISTING FOOTPATH
Design
SEPARATE PROJECT
PROPOSED FOOTPATH
REMOVE EXISTING
FOOTPATH
SE
CO
ND
AV
EN
UE
Designed:
Approved:
Drawn:
Survey Datum:
Surveyed:
Dra
win
g n
am
e: M
:\E
ngine
erin
g S
ervices\A
RD
- C
AD
- 3
D\T
raffic E
ng
ineering C
apital W
orks 2
020-2
1\P
ath D
esigns\C
AD
\B
aden
D
rive, F
irst, S
eco
nd
...A
ve\S
eco
nd A
ve
nu
e.dw
g (2
3 M
ar, 2
02
1)
Rev:
Drawing No:
Sheet No:
NAA
NA
NANA
D.BATTOCCHIO23_03_2021
D.BATTOCCHIO23_03_2021
Date:
Date:
Date:
Date:City Transport
45 Princes Highway
Werribee VIC 3030
Australia
Tel: (03) 9742 0777
Fax: (03) 9741 6237
AmendmentsRev By ApprovedDate
A ISSUED FOR ___ ____/_/ _
PRIOR TO COMMENCEMENT OF ANY WORKS.
WARNING
ALL SERVICES SHOWN ON THIS DRAWING ARE
APPROXIMATE ONLY AND EXACT LOCATION IS
TO BE CONFIRMED ON SITE BY CONTRACTOR
Notes
Prelimanary Design
2 of 3
Previous on Sheet 1
1. Construct 1.5m footpath as per WCC SD 2-1
2. Provide construction joints, expansion joins
and crack control joints as per WCC SD 2-4
3. Incorporate pits as per WCC SD 2-5
4. Tree and Vegetation removal will be required,
but avoid where possible
5. Remove existing footpath in front of properties
49 and 51 and replace with 1.5m footpath as
per WCC SD 2-1
4
10
12
2
7
Obj No:
Pedestrian Footpath
Second Avenue
P
O
W
E
L
L
D
R
I
V
E
8
6
11
9
PROPOSED FOOTPATH
LEGEND
EXISTING TREE/
VEGETATION
EXISTING FOOTPATH
Design
SEPARATE PROJECT
PROPOSED FOOTPATH
REMOVE EXISTING
FOOTPATH
5
1
16-18
12
14
SE
CO
ND
AV
EN
UE
SCALE 1:500 AT A3 SIZE
1050 25m2015
3
16-18
TYPICAL METHOD FOR PRAM CROSSINGS AND TGSI INSTALLATION
Designed:
Approved:
Drawn:
Survey Datum:
Surveyed:
Dra
win
g n
am
e: M
:\E
ngine
erin
g S
ervices\A
RD
- C
AD
- 3
D\T
raffic E
ng
ineering C
apital W
orks 2
020-2
1\P
ath D
esigns\C
AD
\B
aden
D
rive, F
irst, S
eco
nd
...A
ve\S
eco
nd A
ve
nu
e.dw
g (2
3 M
ar, 2
02
1)
Rev:
Drawing No:
Sheet No:
NAA
NA
NANA
D.BATTOCCHIO23_03_2021
D.BATTOCCHIO23_03_2021
Date:
Date:
Date:
Date:City Transport
45 Princes Highway
Werribee VIC 3030
Australia
Tel: (03) 9742 0777
Fax: (03) 9741 6237
AmendmentsRev By ApprovedDate
A ISSUED FOR ___ ____/_/ _
Prelimanary Design
3 of 3 Obj No:
Pedestrian Footpath
Second Avenue
Recommended