North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River...

Preview:

Citation preview

North Palm Beach County – Part 1

Comprehensive Everglades Restoration Plan

North Palm Beach County – Part 1

Comprehensive Everglades Restoration Plan

Loxahatchee River Management Coordinating CouncilSeptember 24, 2007Loxahatchee River Management Coordinating CouncilSeptember 24, 2007

Agenda

•Project Status and Summary

•Operations Report

•Questions?

Flow-way #1

Flow-way #2

Flow-way #3

L-8 Reservoir

CERP Proposed Storage and Flow-way Improvements

L-8 Reservoir – August 2007

L-8 Reservoir – Temporary Pumps

M Canal Widening

Control #2 Pump Station

G-161

Northlake Bridge

G-160

Flow-way #1

Grassy Waters Preserve – M Canal

Control #2 Pump Station

M-Canal Widening

Improved Section

Unimproved Section

Grassy Waters Preserve – M Canal

M Canal

Open Cut to Interior

G-161 Northlake Boulevard Structure

Northlake Bridge Structure

Northlake Bridge Structure

G-160 Loxahatchee Slough Structure

Flow-way #2

CGCDD Flow-way

ITID Flow-way Mecca Farms Flow-way

C-18W Improvements

Coordination with Local Government AgenciesCoordination with Local Government Agencies

Conceptual Sector PlanMecca Farms

Indian Trail Improvement District – Outfall Canal

Indian Trail Improvement District – MO Canal

Indian Trail Improvement District – MO and L Canal

J.W. Corbett WMA – Southeast Area

Canal C-18 West - Improvements

Flow-way #3

NineGems Restoration

Culpepper Ranch Improvements

Storage or Wetland Restoration

Cypress Creek Improvements

Flow-way #3

Flow-way #3

Control #2 Pump Station

G-161

G-160

Periodic Operations Report for Flow-way #1 Structures

L-8 Reservoir

S-46G-92

Lainhart Dam

G-160

Periodic Operations Report for Flow-way #1 Structures

S-46G-92

Lainhart Dam

Lainhart Dam

G-92

S-46

G-160

Flow-way #1

Flow-way #2

Flow-way #3

L-8 Reservoir

Summary

Questions?Questions?

Recommended