Agendamedia.metro.net/docs/rcclc_1CentralMarch132013.pdf · Nisei Week 3. Linkages Program Update...

Preview:

Citation preview

Wednesday, March 13, 2013; 4 p.m. to 5 p.m.

AgendaRegional Connector Transit Corridor ProjectCommunity Leadership Council

1st Street/Central Avenue CommitteeJACCC, 244 S San Pedro St

1. Introductions

a. Sign-in Sheet

2. Utility Relocation Activities Update

a. Nisei Week

3. Linkages Program Update

4. Station Area and Station Design Update

5. Review Action Items

6. Schedule Next Meeting

RCCLC: 1st Street/Central Avenue March 13, 2013

1

Wednesday, March 13, 13

Agenda

> Introduction> Utility Relocation Update

• Upcoming• Nisei Week

> Linkages Program Update> Station Area Design> Action Items

2

Wednesday, March 13, 13

Construction Update

3

Wednesday, March 13, 13

2

 AT&T–  3rd  Party  U.lity  Reloca.on  AT&T–  3rd  Party  U.lity  Reloca.onAc.vity Trenching,  vault  installa4on  and  conduit  placement

Loca.on   1st  St  from  Central  Av  to  Rose  StAlameda  St  from  Temple  Av  to  2nd  St

An.cipated  Start  Date 1st  Quarter  of  2013

An.cipated  Hours

Monday  –  Friday:  9am  –  3:30pmSaturday:  8am  –  8pmSunday:  11am  –  6pmNo  night  4me  work  

An.cipated  Dura.on   5  months

What  to  Expect

Maintain  through  traffic  Maintain  access  to  drivewaysLane  reduc4ons  an4cipatedSpecific  traffic  impacts  TBD  

4

Wednesday, March 13, 13

1st St/Central Av Station – 3rd Party Utility Relocations

Hill  St  

1st St

Alam

eda

St5

Wednesday, March 13, 13

2nd St/Broadway – 3rd Party Utility Relocations

> Removal of roadway and trenching operations along 2nd St.

6

Wednesday, March 13, 13

2nd St/Broadway – 3rd Party Utility Relocations

> Telecommunication lines relocation work will continue along 2nd St near Hill St

> Relocation work will continue through May 2013

> Relocation work by So Cal Gas will follow

7

Wednesday, March 13, 13

Flower St - 3rd Party Utility Relocation

> Utility relocation started Saturday, March 9, 2013 with saw cutting of roadway.

8

Wednesday, March 13, 13

Flower St - 3rd Party Utility Relocation (Contd.)

> Grinding of street surface and metal plate installation

9

Wednesday, March 13, 13

Flower St - 3rd Party Utility Relocation (Contd.)

> Relocation work will occur in phases between 4th St and 5th St through April 2013

> Relocation activities by So Cal Gas will follow

10

Wednesday, March 13, 13

Nisei Week

> August 10, 11, 17 and 18, 2013

> Closure of First St from San Pedro St to Alameda St for Festival

> Rolling closures for Parade

> Metro will coordinate with community and Planning Committee to ensure it’s a successful event

11

Wednesday, March 13, 13

Linkages Update

> Separate effort from Regional Connector activities

> Study will begin Fall 2013

> Outcome of the study will include concrete activities for implementation

> Funding available for implementation through Metro Gold Line Eastside Extension - Access Program

12

Wednesday, March 13, 13

Contact Information

Construction Relations> Olga Arroyo> arroyoo@metro.net> 213.922.7277

13

Project Wide> regionalconnector@metro.net> www.metro.net/regionalconnector> Facebook: MetroRegionalConnector> Twitter: @metroconnector

Wednesday, March 13, 13

Station Area Design

14

Wednesday, March 13, 13

Topics for Discussion

> Review of Basic Station Entrance Plaza Site Plan

> Incorporation of Metro’s “Kit of Parts” Design for all Station Pavilion Elements

> Architectural Design Images

15

Wednesday, March 13, 13

Station Vicinity

16

Wednesday, March 13, 13

Station Entrance Plaza Site Plan

17

Wednesday, March 13, 13

Station Entrance Plaza and Pavilion

18

Wednesday, March 13, 13

Station Entrance Pavilion Looking Southwest

19

Wednesday, March 13, 13

Station Entrance Looking Southeast from 1st Street

20

Wednesday, March 13, 13

Station Entrance Looking Northwest from Alameda St

21

Wednesday, March 13, 13

Station Entrance Looking Northeast from Central Ave

22

Wednesday, March 13, 13

Station Entrance Pavilion with Canopy Removed

23

Wednesday, March 13, 13

Action Items

24

Wednesday, March 13, 13

Contact Information

Community Relations> Ann Kerman> kermana@metro.net> 213.922.7671

Construction Relations> Olga Arroyo> arroyoo@metro.net> 213.922.7277

25

Project Wide> regionalconnector@metro.net> www.metro.net/regionalconnector> Facebook: MetroRegionalConnector> Twitter: @metroconnector

Wednesday, March 13, 13

Recommended