New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software...

Preview:

Citation preview

New and In-Process New and In-Process Software Capabilities Software Capabilities

Status Update to AIM FRBStatus Update to AIM FRB

Danette Likens and Jamie Stewart, AIM ISD Support

23-25 Aug 11

OverviewOverview• Summary of AIM I and AIM II 5.0 Functionality

‒ Demo of selected Functionality• Summary of CPM 5.0

‒ Demo of selected Functionality• Summary of LO Module 5.0 Functionality

‒ Demo of selected Functionality• Summary of in-process software capabilities

‒ CPM‒ LO Module‒ AIM I‒ AIM II

• Discussion of potential future capabilities

Summary of AIM I/II in Rel 5.0Summary of AIM I/II in Rel 5.0• FRB Prioritized ACRs

‒ Supporting AIM I and AIM II• Include:

‒ AIM II Content Comparison Report/Chg Pkg‒ AIM I Exercise Controller Guide support‒ AIM II Associated Curriculum Documents

• Numerous Smaller Items:‒ Ease of Use

• NETC specific items (mostly related to TPP)

Note: Details of functionality in backup slides (time permitting).

Summary of AIM I/II in Rel 5.0Summary of AIM I/II in Rel 5.0(contd)(contd)

• Some other items include:‒ Standardized Introduction DP’s (Establish contact, etc.)‒ Enhanced COI Split/Join Unit Topic functionality

Select EO, click “Join EO”, select another EO (even from another TO)

‒ Spell check – Course, Module, Lesson, Section

Note: Details of functionality in backup slides (time permitting).

Summary of CPM Rel 5.0Summary of CPM Rel 5.0• NLOS search capability• More ISD Considerations items support IMDP

report• TPP Modification/Cancelation • Warn to Save before Exit• Select All for checkbox functionality• JDTA Enhancements

‒ Copy and link/paste (in Project tab, too)‒ Search – Condition, Standard, Source

Note: Details of functionality in backup slides (time permitting).

OCCSTDS Support in CPMOCCSTDS Support in CPM• How did we get here?:

– Started with NETC N74/NAVMAC discussions– AIM Team Provided a CPM “sandbox” for NAVMAC

familiarization– NAVMAC developed an OCCSTDS Storybook PPT to describe

high-level functionality– Initial OCCSTDS tab implementation in Rel 5.0 for

creation/management of OCCSTDS data by NAVMAC – crawl functionality

• Working toward business rule definition of:– How OCCSTDS data pulls forward into JDTA tab– Life-cycle impacts of OCCSTDS revisions on JDTA-based learning

content

Summary of LO Module Rel 5.0Summary of LO Module Rel 5.0• Spell check – Course, Module, Lesson,

Section• Sub-DPs for ILT (with RIAs)• Before and after text for RRL links• Update from EDE (no data loss)• Copy and paste elements and resources

Note: Details of functionality in backup slides (time permitting).

Summary of In-ProcessSummary of In-ProcessFunctionalityFunctionality

• FEA support in CPM• NETC tasked and funded priorities• NAVSPECWARCEN funded AIM II

enhancements• MT Continuum lessons learned – ACRs in

process

Note: Details of functionality in backup slides (time permitting).

NAVEDTRA 139 Driving Changes NAVEDTRA 139 Driving Changes to CPM - Post 5.0to CPM - Post 5.0

Note: BCA support in CPM to follow.

Upcoming Tasked/Funded ChangesUpcoming Tasked/Funded Changes• Course Master Schedule (CMS) re-engineering per

NETC N7/AIM FRB working group AIM Change Request

• Improved semi-automated functionality for repurposing traditional AIM LP/TG content curricula into LO Module *

• CTTL Report Capability in CPM• Selection of traditional CTTL (and other tiered data)

for semi-automated pre-conference population of JDTA data

• LP/TG portion marking to support classified curricula and supporting documents

* Multiple DP, RIA, RRL tiered items at the same time.

Upcoming Tasked/Funded ChangesUpcoming Tasked/Funded Changes(contd)(contd)

• Center-based filtering of selections in CPM• CPM ‘gatekeeper’ functionality to reduce duplication

and promote standardization• Interfaces with BAH Atlas Pro toolset (LMS / ROCCE /

Assessment Engine / Survey Engine)• AIM II Modification TPP• Migration from SQL Server to Oracle as backend

database to leverage Navy enterprise license

Discussion of Potential FunctionalityDiscussion of Potential Functionality• Test Plan

– Needs updating in AIM I and AIM II to support NAVEDTRA 132 requirement – Have input from CPPD which is a good start on potential ACR

– Not covered in CPM/LO Module*

• Sub-elements in LO Module for self-paced rather than just ILT‒ How many levels?‒ LO Module ILT supports 4 total

* Test Plan was not part of CPM/LO Module design, the thought at that time was that all test work would be done in QM Perception.

Questions?

Backup Slides

Summary of AIM I/II ACRs in Rel 5.0Summary of AIM I/II ACRs in Rel 5.0

Summary of AIM I/II ACRs in Rel 5.0Summary of AIM I/II ACRs in Rel 5.0(contd)(contd)

Summary of AIM I/II ACRs in Rel 5.0Summary of AIM I/II ACRs in Rel 5.0(contd)(contd)

Summary of CPM/LO Module Enhancements in Rel 4.1Summary of CPM/LO Module Enhancements in Rel 4.1

Summary of CPM/LO Module Enhancements in Rel 4.1Summary of CPM/LO Module Enhancements in Rel 4.1(contd)(contd)

Summary of CPM/LO Module Enhancements in Rel 4.1Summary of CPM/LO Module Enhancements in Rel 4.1(contd)(contd)

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)

Summary of CPM/LO Module Enhancements in Rel 5.0Summary of CPM/LO Module Enhancements in Rel 5.0(contd)(contd)