Navajo Reservoir Operations CRFS Technical Committee November 8 , 2011 Fall Technical Meeting

Preview:

DESCRIPTION

Navajo Reservoir Operations CRFS Technical Committee November 8 , 2011 Fall Technical Meeting. Review of Water Year 2011 Operations. AVAILABLE WATER (April) PATH Min Prob : 376,960 af #2 Most Prob : 500,429 af #2 - PowerPoint PPT Presentation

Citation preview

Navajo Reservoir OperationsCRFS Technical CommitteeNovember 8, 2011Fall Technical Meeting

598559905995600060056010601560206025603060356040604560506055606060656070607560806085

-8,000

-6,000

-4,000

-2,000

0

2,000

4,000

6,000

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Daily

WS

Elev

atio

n (f

t)

Daily

Inflo

w, R

elea

se &

Cha

nge-

in-S

tora

ge (c

fs)

WY 2011

NAVAJO RESERVOIR OPERATIONS

Change-in-Storage (cfs) Total Release (cfs) Inflow (cfs) River Release (cfs) WS Elevation

1

5

14

4

1312

109

11

8

3

27

6

AVAILABLE WATER (April) PATHMin Prob: 376,960 af #2Most Prob: 500,429 af #2Max Prob: 643,061 af #2

0

1000

2000

3000

4000

5000

6000

5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun

End

of D

ay N

avaj

o Da

m R

elea

sein

Cub

ic F

eet p

er S

econ

d (C

FS)

5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun

Release (CFS) 500 2000 3200 5000 5000 5000 5000 5000 5000 5000 3400 2200 500

Navajo Reservoir 2011 Spring Peak Release Schedule(Final)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

100005/

1

5/15

5/29

6/12

6/26

7/10

Mea

n Dai

ly F

low

s (C

FS)

USGS Mean Daily Streamflows - San Juan and Animas River Stations

San Juan at Farmington San Juan at Shiprock San Juan at Four Corners San Juan at BluffAnimas@Farmington San Juan at Archuleta (Navajo) 7-Day Moving Mean

Chasing the Target Baseflow• Temporary increases to 650 cfs were required in mid

April and early May due to late runoff and dry conditions • Base releases remained at 500 cfs until August 9th

• Late runoff kept the river within Target Base Flow range without additional releases later than usual

• Increased release to 800 cfs on August 9th, up to 900 cfs on August 17th

• Returned to 500 cfs base release on October 6th.• Reduced release to 350 cfs for trout habitat

improvements (should be complete by December)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

4/1/2011 5/1/2011 6/1/2011 7/1/2011 8/1/2011 9/1/2011

Mea

n Da

ily P

rovi

siona

l Str

eam

flow

s (C

FS)

USGS Mean Daily Streamflow San Juan River Stations

SJ Farmington SJ Shiprock SJ Four Corners SJ Bluff Animas @ Farmington SJ Archuleta 7-Day Moving Mean

Navajo Current Conditions(as of 11/7/2011)

Elevation = 6058.4 (97% of Average)Storage = 1,327,727 af (78% Full)Inflow = 485 cfsRelease = 350 cfsNIIP = 6 cfs (Not Diverting)San Juan-Chama Diversion = 16 cfs

Western Colorado Area Office Contact:

Ryan Christianson970-385-6590, rchristianson@usbr.gov

Forecasting Challenges

• Over forecasting in the winter/early spring• Animas @ Farmington forecast point

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

1,100,000

1,200,000

1,300,000

1,400,000

MidD

ec

Jan

MidJan

Feb

MidFeb

Mar

MidM

ar

Apr

MidA

pr

May

MidM

ay

Jun

MidJun

Jul

MidJul

Apr

-Jul

Out

look

Forecast Date

WY2011 CBRFC - Navajo Reservoir Most, Max and Min Inflow Forecasts (acre-feet)

Max Most Min 30 Yr Avg Inf low 2011 Observed Linear (Most)

Actual Inflow – 576,275 af (78% of Average)

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

1,100,000

1,200,000

1,300,000

1,400,000

MidD

ec

Jan

MidJan

Feb

MidFeb

Mar

MidM

ar

Apr

MidA

pr

May

MidM

ay

Jun

MidJun

Jul

MidJul

Apr

-Jul

Out

look

Forecast Date

WY2010 CBRFC - Navajo Reservoir Most, Max and Min Inflow Forecasts (acre-feet)

Max Most Min

0100,000200,000300,000400,000500,000600,000700,000800,000900,000

1,000,0001,100,0001,200,0001,300,0001,400,0001,500,0001,600,000

MidD

ec

Jan

MidJan

Feb

MidFeb

Mar

MidM

ar

Apr

MidA

pr

May

MidM

ay

Jun

MidJun

Jul

MidJul

Apr

-Jul

Out

look

Forecast Date

WY2009 CBRFC - Navajo Reservoir Most, Max and Min Inflow Forecasts (acre-feet)

Max Most Min 30 Yr Avg Inflow Observed Linear (Most)

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Jan MidJan Feb MidFeb Mar MidMar Apr MidApr May MidMay Jun MidJun Jul MidJul

Apr-J

ul O

utlo

ok

Forecast Date

2007 CBRFC - Navajo Reservoir Most, Maximum and Minimum Modified Unregulated Inflow Forecasts (ac-ft)

Max MostMin 30-Yr Avg

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

1,800,000

2,000,000

MidDec Jan MidJan Feb MidFeb Mar MidMar Apr MidApr May MidMay Jun MidJun Jul MidJul

Apr

-Jul

Out

look

Forecast Date

2008 CBRFC - Navajo Reservoir Most, Maximum and Minimum Modified Unregulated Inflow Forecasts (ac-ft)

Max Most Min 30-Yr Avg Observed Linear (Most)

Recommended