NABUUR GAMAULI
CONSTRUCTION OF TWO ROOMS’ BUILDING
Partners
Local Level: Krishna Primary School/Management
committee/local community
International level: Nabuur
2
Partner school of Nabuur
3
Development so far
• Student number increased from 145 to 209• Mr. Garry Miller has supported salary for two
teacher now the number of teacher is 5 (government supported -2, Nabuur suppored- 2 & community supported-2)
• Sufficient teaching materials- provided by Stacy Helmus
• Parents visit school and work together• Teachers are punctual work trying child centered
education
4
Community combination
• Total house holds: 200– Dalits: 104– Thakuri: 39– Chhetries: 57
• Occupation– Farming: All families– Employ:
• 11 people in private companies • 7 people in government offices
5
Recent needs and priority
1. Building with two rooms2. Training for teachers (Child centered) and
materials3. Compound wall (125 Meter)4. Drinking water5. Toilet
6
Community participation
• Community can participate in following areas– Labor contribution (un skilled)– Wood– transportation
7
Support Required
• Following support is required with partner– Cash for Cement– Cash for Rods– Cash for skilled labor– Bricks/stone– Grill – Other things that need to import from outside
8
Map of building
• Map ( 23Š20 Feet/room)
9
Total length: 46 Feet
East elevation
Measurement Details Windows;
– Length= 6 feet– Height= 5 feetDoors;– Breath=3feet– Height= 7feetWall; Thick= 14 InchHeight=11 feet
10
Questions asked by Tatjana• Floor plan, elevation, sections, dimensions, position of entrance, north
orientation, photos of the building, Ans: Pls. go to building sketch, it is decided by local contractor and me. • Marked place for the future extensionAns: Marked in map• Roof is concrete slap• Measures are in feet • Foundation depth is 5 feet• Materials are stone, sand, cement, wood, concrete, rods etc
11
Estimated CostREQUESTED WITH DONOR
Unit Rate (Rs.) Total (Rs.) USD
Cement
Piller 40 950 38000 558.8
DPC 30 950 28500 419.1
Wall 50 950 47500 698.5
Slap 200 950 190000 2794.1
Plaster 60 950 57000 838.2
Rod (Piller, Beam and Slap) 15 10000 150000 2205.9
Nails, banding wire (Kg) 30 100 3000 44.1
Equipments 20 500 10000 147.1
Skilled labor 200 350 70000 1029.4
Total: - 594000 8735.3
12
Estimated cost
SHARED BY COMMUNITY
Unit Rate (Rs.) Total (Rs.) USD
Land cutting (Person) 30 200 6000 88.2
Wood (Cubic feet) 60 1500 90000 1323.5
Transportation (Person) 100 200 20000 294.1
Un skilled labor (Person) 100 200 20000 294.1
Stone (Cubic Feet) 400 50 20000 294.1
Total:- 156000 2294.1