Muskeget Channel Tidal Energy Project
Stephen BarrettHarris Miller Miller & Hanson Inc.
January 25, 2012
Electricity Production
Enough power for about 1,500households
70% of Edgartown’s electricityat peak production
20% of Edgartown’s electricityover an average year
5% of the Vineyard’selectricity over an averageyear
Three times the electricityconsumed by Edgartown’stown government annually
Schedule
2008 - FERC Permit Secured
2009 - Current Flow Verified
2010 - Initiate DOE-funded Environmental Studies
2011 - Submit FERC Draft License Application
- Conduct Demonstration Project (Aug 15)
2012 - Complete Environmental Studies
2013 - Apply for License for Pilot Project
- Deploy Pilot
2014 - Study Pilot, Assess Expansion Potential