08 09 10 11 12 13 14 15 16 17 18 19 20Fiscal Year

RDT&ENSSL, MIT/LL, others

NWRT

Demo 1Wx

Demo 2Wx/Acft

Algorithm Dev Algorithm & Software Dev

Tradeoff Analyses

Testing

Upgrade to Active Sub-array

Scan Strategies

FAA IOC for Wx &

ASR

RFI

Concept Def3 Contractors, FP

Solicit

Industry Day

AwardRFP

2 Contractors, CPFF

Fly-Off Full

RFP Dev

Solicit

RFP

RFP Dev

Award

Cost-Benefit Study

Pre-Prod Model

RFP Dev

Dev

Limited Prod1 Contractor, CPFF

Solicit

Award

OT&EDT&E

Concept Definition /

System Development

Analysis of Alternatives

Siting/SpectrumSite Surveys

Site Acq & Prep

Spectrum Approvals

Spectrum & Siting Requirements Analysis

Management Approach

Agency InternalTest & Eval Org

Ops Support Org

Program Council Oversight

Joint System Program Office

Ops Concept Development

Reqts Analysis

Reqts Def Definition & Refinement

Employment ConceptRefinement

P3I DevTradeoffs – Design to Budget

Refinement

DOD CPDDOD CDDDOD ICD

DOD FSA DOD POM Bld

DOD DP

DOD DPDOD DP

KDP1 (Def need, priority, and $)

KDP2 (Select design & move to demo/test)

KDP3 (Full Scale Dev)

KDP4(Full Prod)

DOD DP

DOD DP

Mission & Service Needs Analysis andRequirements BASC

Study

Svc Analysis

FAA DPFAA DP

FAA DP

Init Acq Review Wx & Air

Replace ASR-8/9?

Replace 88D?

Ops Concept Development

Reqts Analysis

Reqts Def Definition & Refinement

Employment ConceptRefinement

P3I DevTradeoffs – Design to Budget

Refinement

DOD CPDDOD CDDDOD ICD

DOD FSA DOD POM Bld

DOD DP

DOD DPDOD DP

KDP1 (Def need, priority, and $)

KDP2 (Select design & move to demo/test)

KDP3 (Full Scale Dev)

KDP4(Full Prod)

DOD DP

DOD DP

Mission & Service Needs Analysis andRequirements BASC

Study

Svc Analysis

MPAR Symposium / Implementation StrategyMPAR Risk-Reduction Implementation Strategy

08 09 10 11 12 13 14 15 16 17 18 19 20Fiscal Year

RDT&ENSSL, MIT/LL, others

NWRT

Demo 1Wx

Demo 2Wx/Acft

Algorithm Dev Algorithm & Software Dev

Tradeoff Analyses

Testing

Upgrade to Active Sub-array

Scan Strategies

FAA IOC for Wx &

ASR

FAA DPFAA DP

FAA DP

Init Acq Review Wx & Air

Replace ASR-8/9?

Replace 88D?

MPAR Symposium / Implementation StrategyMPAR Risk-Reduction Implementation Strategy

08 09 10 11 12 13 14 15 16 17 18 19 20Fiscal Year

RDT&ENSSL, MIT/LL, others

NWRT

Demo 1Wx

Demo 2Wx/Acft

Algorithm Dev Algorithm & Software Dev

Tradeoff Analyses

Testing

Upgrade to Active Sub-array

Scan Strategies

RFI

Concept Def3 Contractors, FP

Solicit

Industry Day

AwardRFP

2 Contractors, CPFF

Fly-Off Full

RFP Dev

Solicit

RFP

RFP Dev

Award

Cost-Benefit Study

Pre-Prod Model

RFP Dev

Dev

Limited Prod1 Contractor, CPFF

Solicit

Award

OT&EDT&E

Concept Definition /

System Development

Analysis of Alternatives

Siting/SpectrumSite Surveys

Site Acq & Prep

Spectrum Approvals

Spectrum & Siting Requirements Analysis

Management Approach

Agency InternalTest & Eval Org

Ops Support Org

Program Council Oversight

Joint System Program Office

FAA DPFAA DP

FAA DP

Init Acq Review Wx & Air

Replace ASR-8/9?

Replace 88D?FAA IOC for Wx &

ASR

Ops Concept Development

Reqts Analysis

Reqts Def Definition & Refinement

Employment ConceptRefinement

P3I DevTradeoffs – Design to Budget

Refinement

DOD CPDDOD CDDDOD ICD

DOD FSA DOD POM Bld

DOD DP

DOD DPDOD DP

KDP1 (Def need, priority, and $)

KDP2 (Select design & move to demo/test)

KDP3 (Full Scale Dev)

KDP4(Full Prod)

DOD DP

DOD DP

Mission & Service Needs Analysis andRequirements BASC

Study

Svc Analysis

As of 29 Jan 08

4

MPAR Symposium / Implementation Strategy

• FAA is committed to R&D funds to assess MPAR as a:

– Cost-effective backup to next-generation cooperative surveillance system

– Possible replacement for legacy weather radars

• NOAA has been funding the National Weather Radar Testbed at annual baseline rate

– NOAA in final stages of identifying additional funding beginning in FY10 for MPAR risk-reduction program

• From Under Secretary mtg on North American Air Defense

– DoD and DHS must take active role in assessing emerging approaches to improving the Nation’s surveillance capabilities, including MPAR

MPAR Program Status

5

Summary

• MPAR planning process has included federal agencies, academia, military laboratories, and radar industry

• Initial analysis indicates MPAR is technically feasible to meet multiple user needs

• Affordability issue can only be addressed through a managed risk-reduction R&D program

• Large cost of R&D effort for MPAR beyond scope of any one agency

– Requires interagency cooperation to succeed

• Now is the time to begin evaluation of MPAR

Recommended