Learning for Life

Duxbury Co-Located Middle & High School

Town of Duxbury

SHEPHERD

ENGINEERING

3Si

THE TEAM

UEC

OPM

Souza True &Partners

Frank Locker

� 50 Years of Service

� Professional and Technical Staff including:

� Registered Architects

� Recognized Educational Facilities Planners

� Interior Designers

� Licensed Construction Supervisors

� LEED Professional / Green Team

� In-House Specifications Writer

� 130 School Building Projects in Massachusetts

� $2.6 Billion ( today's $ ) in Construction

� No Legal Judgments

Mount Vernon Group Architects

Architecture Awards and Publications

� Responsive, Contextual, Functional Designs

� Flexible, Economical, Sustainable (Green)

� Maximum High Performance and High

Technology Features

� Fulfill Community Needs and Expectations

� Enhance Educational Attainment

The Mount Vernon GroupDesign Philosophy

Design Philosophy

GREEN Initiatives

Green Initiatives

Teaching Tool :

• Computer based monitoring system

• Monitor in public space displays power generation by

Renewable Energy :

• Photovoltaic

• Geothermal

Photovoltaic system and building energy usage.

GREEN/ Sustainable Design Goals

• Improves the learning environment

• Costs less to operate and maintain

• Protects the environment

Green Initiatives

The Incremental Costs & Benefits of Green Schools in Massachusetts(Including renewable energy costs, incentives and benefits)

Table 1: Total Project Statistics

Cost Benefits of Green Schools

Chicopee High School

Chicopee High School

Chicopee High School

Roosevelt Middle School

Normandin Middle School

Amesbury High School

Ashland High School

Ashland High School

Ashland High School

Ashland High School

Ashland High School

Ashland High School

Academic

Core / Community

Core / Community

Administration /

Support / Media

Sp

ine

Ashland Model High School Organization

Minnechaug Regional High School, Wilbraham, MA

General Bid Results

General Contractor Contract Price

Bidder $45,504,000

• 60 kw photo voltaic

• IT infrastructure

• Security system (camera's insideand outside school )

• Consumer lab 4 stations and teaching stations

• Full theatrical Auditorium ( 750 )

Cost per Square Foot

$198.00

• Science casework, fume hoods, washing machines, refrigerators, cabinets

• Kitchen equipment

• Driveways, Parking, Ball Fields & Utilities

• Fixed Gymnasium Equipment

Minnechaug RHS -General Bid Results

Model High School – Study Elevation

Model High School – Study Elevation

Minnechaug Regional High School

Manchester Essex Middle High School

Manchester Essex Middle High School

Manchester-Essex High School Manchester, Massachusetts

Manchester Essex Middle High School

Existing Conditions

Existing Traffic

Existing Traffic

Option 1 TrafficOption 1

Option 2 TrafficOption 2

Option 2

Option 1 - Construction – Phase 1 (Construct Middle School)Option 1

Option 1 - Construction – Phase 2 (Demolish Old Middle School, Construct High School)

Option 1

Option 1 - Old High School Site DevelopmentOption 1

Option 1 First Floor PlanOption 1

PAC

Vision Diagram

Option 1 Second Floor PlanOption 1

PAC

Vision Diagram

Option 1 Third Floor PlanOption 1

PAC

Vision Diagram

Existing Conditions

Option 2 - Construction – Phase 1Option 2

Option 2 - Completed ProjectOption 2

Option 2 Conceptual Site Plan

Organizational Diagram

Organizational Diagram

Organizational Diagram

Organizational Diagram

Organizational Diagram

Organizational Diagram

1st Floor Plan (with Auditorium)Option 2a

Vision Diagram

H.S. Entry

M.S. Entry

Community Entry

2nd Floor Plan (with Auditorium)Option 2a

Vision Diagram

3rd Floor Plan (Auditorium Scheme)Option 2a

Vision Diagram

Conceptual Site Plan

Elevation Study

Elevation Study

Elevation Study

Elevation Study

Elevation Study

Thank You