Unconventional/Tight Gas DevelopmentChallenges and Pricing Issues 

PIP - Pakistan Energy Conference 2011

 April 10  – 12, 2011

Serena Hotel, Islamabad

Moin Raza Khan General Manager Exploration

Dr. Fareed Siddiqui Senior Manager Reservoir Engineering

Saqib Ahmed Chief Accountant

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 2/39

TALK OUTLINE

Global Energy Overview

Energy Resources Overview - Pakistan

Unconventional Reservoirs? - Resource Potential

Unconventional Reservoirs - Development Challenges

Pricing Issues vis-à-vis Risk, Uncertainty and Cost of Exploration and Development

Conclusions and Recommendations

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 3/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 4/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 5/39

Future prediction By year 2030…… 

By year 2030 totaldemand to be about 100million barrels oil per day

The global energy mixwill look very similar 

Resources are adequateto support global demandgrowth. Access alongwith Technology areimportant in all aspects

of our energy challenges

Still considered thesafest resource, vizrecent nuclear disaster inJapan

Source: Exxon Mobil Corporation – 2009 Summary Annual Report

MMboed

350

300

250

200

150

100

50

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 6/39

Energy Resources Overview - Pakistan

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 7/39

Country’s Exploration & Production 

Hydrocarbon Potential vs. Exploration Total Sedimentary Area = 827,268 Sq. km.

  Area under Exploration = 279,618 Sq. km. (34%)

Reserves Prognosticated Discovered

Oil (Billion barrels) 40 1

Gas (Trillion Cu. ft.) 200 54

Wells Drilled:Exploratory (Success Ratio: 1:3.3) 776Discoveries 238

Development and Appraisal 1,048

 Average 22 wells per 10,000 Sq. Km. against world average of 100 wells

Oil and Gas Reserves / Production:Product Reserves Production R/P RatioGas 27.59 Tcf 4,208 mmcfd 18.9Oil 306 MMBBL 68,298 bpd 12.9

PPL’s share in Country’s Production: Gas 24%

Oil /NGL/Condensate 09% 

2

10

30%

10%

0%

10%

20%

30%

40%

0

2

4

6

8

10

12

Pakistan World

Drilling Density and Success Rate

Drilling Density Success Rate

659 mmbbl

306 mmbbl

Crude Oil Reserves January 2011

Cumulative Production Balance Recoverable

26.40 Tcf

27.60 Tcf

Natural Gas Reserves January2011

Cumulative Production Balance Recoverable

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 8/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 9/39

Pakistan - Future Energy Demand Supply Deficit

Coal lmports

137.6

(demand)

33.5

(local)

88.5(supply)

Nuclear

Local Coal

Projected indigenous gas supply

(Source: Ministry of Petroleum)

Projected naturalgas demand at

4.5% GDPgrowth

(2.5 bcfd)(8 bcfd)

Source: PIP – Energy Outlook April 2011

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 10/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 11/39

Unconventional Reservoirs (UCR)?Resource Potential

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 12/39

"Future energy resources of the World, particularly gas, will be found in

what we consider today to be unconventional reservoirs. These are not, in

 fact, undiscovered resources, since their occurrences are fairly well-known.

  However, we do not have adequate geologic data to evaluate the

 contribution such reservoirs will make to the World’s energy endowment in

 the future.”  

(USGS)

Why go for unconventional reservoirs......

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 13/39

Resource Triangle

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 14/39

Unconventional Hydrocarbon Resources

Unconventional resources are

o Difficult to develop with available technologyo Expensive to produce

Unconventional hydrocarbon resources include

o Tight Gas (TG) Sand Reservoirs (in situ permeability of less than 0.1 mD and porosity about 10%)

o Shale gas

o Coal bed Methane

o Deep gas

o Methane hydrates

o Tar sands and Oil

shales

Basin-centered Gas

Permeable Ssreservoir

Tight gasplay

Pervasiveprolific source

rock

Region Coalbed Methane(Tcf)

Shale Gas(Tcf)

Tight Sand Gas(Tcf)

Total(Tcf)

World 9,051 16,112 7,406 32,560

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 15/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 16/39

Total Unconventional Gas in Pakistan

Total Known Tight Gas:~34 Tcf 

Prognosticated ShaleGas in-place Reserves :65 Tcf 

Preliminary Analysis

  A Shale Gasassessment study isunderway

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 17/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 18/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 19/39

Reservoir Management Challenges

In-place and Reserves Estimation - Difficult to Estimate

Specialized Logging, Reservoir Engineering ConceptsModification required for low rate production, lowpermeability reservoirs

Sharp Decline in Well Productivity

~70% decline in the first year  Long Production Tail

Reserves highly sensitive to price because of highCapex/Opex

Limited per well Drainage Area

Per well recovery limited to well drainage area

10-20 acre well spacing as compared to 160 acre for Conventional reservoirs

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 20/39

How to Initiate UCR Projects

Operator  Identify and analyze TGR development project

Define pilot project

Submit development concept to authorities

E&P Service Contractor 

Offer latest technologies and equipment,

Experienced people,

Discount for TGR campaign

Government authorities

Provide incentives to the industry for TGR developments

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 21/39

Specialized Development Strategies –  

From Technical Success to Commercial Success

Evaluate and Plan  Develop Resource Maps 

Core and Core analysis 

Logging and Testing

Exploration/Exploitation Plan

Pilot

Select Pilot Area

Pilot well – Confirm Drilling and Completion Strategy

Optimize

More than one Pilot may be required for differentsections of the same Resource

Develop

Modular Development Approach

Similar to Mining Approach

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 22/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 23/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 24/39

 

TG Policy The tight gas policy announced by GoP in 2010 provides the

stepping stone for Pakistan’s unconventional gas industry. The

policy provides 40% - 50% premium over the 2009 Policy Price.

Tight Gas Price on the Card!

Compared to price of imported petroleum products of aroundUS$ 13 /mmtbu *

* Source: Pakistan Energy Yearbook 2010 

40% premium(USD / mmbtu)

50% premium(USD / mmbtu)

PP '09 (Z III) 6.13 6.57

PP '09 (Z II) 6.59 7.06

PP '09 (Z I) 7.04 7.55

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 25/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 26/39

Economic Scenario

Input Assumptions Normal BTU Case Medium BTU Case

Gas Initially In Place 750 BCF 750 BCF

Recovery / Shrinkage 59% / 85% 59% / 85%

BTU Factor 920 850

TG Price for Zone II II

Well productivity 5 MMscfd 5 MMscfd

No. of wells 25 25

Production cycle 20 year 20 year 

Opex / boe $3.5 $3.5

Capex $421m $511m

Escalation 3.5% 3.5%

Discount Factor 14% 14%

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 27/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 28/39

IRR Sensitivities at Different Crude Prices

Results of Economics (2of 3)

18.4920.1

20.5

22.43 22.43

11.98

13.29

13.62

15.2 15.2

0

5

10

15

20

25

0 20 40 60 80 100 120 140

Inen ReoRun

Oil Price (US $/Barrel)

Base Case - Medium BTU Value (920) Low BTU Case (850)Normal BTU (920) Medium BTU (850)

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 29/39

NPV Sensitivities with variation in CAPEX & OPEX (@ CrudePrice 75 $/bbl)

Results of Economics (3 of 3)

62.84

41.4930.39

-4.59

-24.7-35.02

-70.00

-20.00

30.00

80.00

130.00

180.00

Base 10% 15%

Na1% D(UMio

CAPEX + OPEX Sensitivities

Base Case - Medium BTU (920) Low BTU Case (850)ormal BTU (920) Medium BTU (850)

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 30/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 31/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 32/39

Thanks

& Questions?

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 33/39

Conventional sandstone reservoir 

Tight gas sandstone

Tight Gas Reservoir 

Gas bearing sandstones and carbonateshaving in-situ permeability to gas of lessthan 1 mD

Many ‘ultra tight’ gas reservoirs may havein-situ permeability down to 0.001 mD

Typically, un-stimulated gas flow rates ina well less than 1 mmscfd

USA: ~ 300 Tcf (Recoverable reserves)

Pakistan: ~ 34 Tcf  (Estimated recoverable resource)

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 34/39

  The term “Shale  Gas” refers to

unconventional, continuous-type, self-sourced resources contained in finegrained organic-rich, low permeabilityclay rich rocks

Shale permeability restricted utilization of a rich resource in the past

Horizontal drilling and Hydraulic fracturingresulted shale gas boom in recent years

Shale gas accounts for major gas supplyin North America – Expected to rise more

USA: ~ 742 Tcf (Recoverable reserves)

Pakistan: Not estimated, could be up to ~65Tcf 

What are shale gas?

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 35/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 36/39

Basinwise Prognosticated Reserves

of Shale Gas in Pakistan

Prognosticated ShaleGas in-place Reserves :65 Tcf 

Preliminary Analysis

PPL-Eni undertakinga joint Shale Gasassessment study for Pakistan

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 37/39

Hydraulic multi-fracture simulationUnder balance Drilling

Coil Tubing

Enhance Perforation

Acid Stimulation

Tight Gas Development Technologies

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 38/39

8/2/2019 Moin_raza_khan Unconventional or Tight Gas Development Challenges and Pricing Issues

http://slidepdf.com/reader/full/moinrazakhan-unconventional-or-tight-gas-development-challenges-and-pricing 39/39

Drilling for Unconventional Resources requires to leverage on

Fit-for-purpose Rigs, portable, fast moving, multiple workstrings with minimal footprint

Managed pressure-drilling with adaptive fluids

Requires industrialized drilling environment in the country

Development of Unconventional Resources:

Drilling & Production Technology

Production

Sand jet perforation followed by annular coiled tubing (CT) fracture stimulation => excellent

production results in targeted thin-sands

Completion: Fraccing with Microseismic Monitoring technology. Directional frac. Dewatering.