1 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
2/124
1954 .1977 1979 ROTC (15) 1979 1979 ( TPC Facade : Precast Concrete)1981 : 25,000M2(Stone Facade w/ Metal Truss Unit)1984 (Stone Facade) (Stone Facade w/ Metal Truss Unit)1983 () G300 (Stone Facade w/ PC Unit)1985 (Stone Facade : Pre assembled Unit system)1986 () KFIA :
32,000M2 Stone Facade (US Bechtel CM)1991 ( ) : 1992 ()1993 1993 () BAU Engineering :
Stone Facade , Engineering,
2 STONETECHNICS
, , , ,, , , , , , , , 3, , , Stone Facade , , Consulting .
1996 () BAU Engineering , 1996 (SES stonetechnics) : Stone Facade , Engineering, : 2010
, , , CM, , Seoul Finance Center, , , Rodamco, , Traum Hause,, Messa , , , , 1, 2, , , , 100 CM, , , , , , , , , R4DM(Open Joint PER) (Open Joint PER), (Open Joint), , , 120 CM(Open Joint PER), KOCCA, , UEC(), SK S-Trenue, IFC(), GS Square , , , , SCEA( ) , ASTM C18(Dimension Stone Committee) International Membership
8/14/2019 Modern Stone Technology 2010
3/124
C. 1. (NEW STONE CLADDING
SYSTEM FOR OPEN JOINT W/ RAINSCREEN PER)D.. STONE ENGINEERINGTONE ENGINEERING
1.. FACADEACADE 2.. WORKING PROCEDUREORKING PROCEDURE3.. /CONCEPT CALDDING SYSTEM DESIGN EXAMPLE
CONTENTS
A. 1. 2.
B. 1. 2. Epoxy Resin Mechanism 3. Shop Drawing : SK Leaders
3 STONETECHNICS
CONCEPT CALDDING SYSTEM DESIGN EXAMPLE4. STONE. STONE5. STONE ENGINEERING CLADDING PRACTICE
3. Shop Drawing : SK LeadersView Stone Facade Detail
4. Shop Drawing : SamsungTra Palace Stone Facade Detail5. 6. : 7. : 8.
8/14/2019 Modern Stone Technology 2010
4/124
A.A.
1. a. Curtain wall
1970 , , LG Twin Building,
b.
FACADE ENGINEER
4 STONETECHNICS
FACADE ENGINEER
c. (Facade Engineering) ,
d.
8/14/2019 Modern Stone Technology 2010
5/124
30
2.
5 STONETECHNICS
: Design , : (FacadeSurface) Concrete (Stone FasteningInterface)
Star # City
Tra Palace
8/14/2019 Modern Stone Technology 2010
6/124
(Perimeter Wall) FRAME
Epoxy Mortar() Dowel Pin 200kgf/M2 , Tra Palace
6 STONETECHNICS
Undercut Insert () Anchor (Pre-drilling, Pre-forming) Undercut (Public Zone), (Porch) System Epoxy Mortar
Tra Palace
Concrete
8/14/2019 Modern Stone Technology 2010
7/124
1..
(Natural Materials) : . (Brittle) . (Applicable Use) .
Concrete 6mm 5mm Stainless Plate Epoxy Mortar
B.B.
7 STONETECHNICS
. . , , : ASTM, MIA, BSI, UNI
: :
Epoxy Mortar Dowel Pin , ,.
8/14/2019 Modern Stone Technology 2010
8/124
: 50M Cornice Molding Stone
Cornice Epoxy
8 STONETECHNICS
Epoxy . . .
Epoxy Mortar .
8/14/2019 Modern Stone Technology 2010
9/124
(Expanded) Anchor Concrete (Rift) Hiddenstress (Expansion)Anchor . ,
Stainless Dowel Pin Anchor
9 STONETECHNICS
Pin EpoxyMortar .
Epoxy Mortar () . Epoxy Mortar .
8/14/2019 Modern Stone Technology 2010
10/124
a. #1
Porch Roof : Arcade (Cube stone) Molding Epoxy Mortar
10 STONETECHNICS
Porch Public Zone .
Plate EpoxyMortar . .
Epoxy Mortar , Epoxy . .
8/14/2019 Modern Stone Technology 2010
11/124
b. #2
11 STONETECHNICS
Plate Epoxy Mortar Epoxy Mortar . Epoxy Mortar .
5 : Epoxy Mortar .
8/14/2019 Modern Stone Technology 2010
12/124
2. Epoxy Resin Mechanism
: 1989 Texas Huston
12 STONETECHNICS
: Sugared Loss : Thermal HysteresisEpoxy Mortar Liner Block
Epoxy Dowel Block Pin Insert Epoxy Mortar
8/14/2019 Modern Stone Technology 2010
13/124
: Epoxy Adhesive ( ) A Study of Preference Survey on Use for Epoxy Resin Adhesive of Stone Anchoring Method : 2009 Editor : Dr. / ,
: 1.
a. Epoxy
b. (Brittleness)
2. a.
.b.
13 STONETECHNICS
b. .
3. . .
8/14/2019 Modern Stone Technology 2010
14/124
EPOXY : EPOXY ADHESIVE (Ref data : Epoxy Adhesive Formulations)OUTDOOR WEATHERING ( )
EPOXY ADHESIVE : Solar Radiation (usually UV) : Moisture (Dew, Humidity, Rain) : Heat (Surface Temperature of the Material) ( ): Pollutants (Ozone, Acid rain) : Microbiological Attack : Salt water and Salt spray
EPOXY ADHESIVE : Permeation of the Adhesive : Hydrolysis of Chemical BondsBreaking of Bonds within the Adhesive Molecule andat the Substrate-Adhesive Interface : Hydration of Substrate SurfacesCausing Bond Rupture : Swelling and Increasing Internal StressesLeading to Deboning
14 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
15/124
3. Shop Drawing : SK Leaders View Stone Facade Detail
15 STONETECHNICS
Epoxy Mortar
8/14/2019 Modern Stone Technology 2010
16/124
4. Shop Drawing : Samsung Tra Palace Stone Facade Detail
16 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
17/124
Tra Palace Stone Facade : Visual Mock Up Drawing
17 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
18/124
Tra Palace Stone Faade : Mock Up Demonstration
18 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
19/124
Tra Palace Stone Facade : Practice InstallationEngineering :
19 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
20/124
5. a. Dowel Pin Fastener (Pin Dowel Stainless Bent Anchor)
20 STONETECHNICS
: Pin (Friction Fatigue) . . Pin Cantilever Edge .
8/14/2019 Modern Stone Technology 2010
21/124
b. Dowel Pin
Concrete Stainless Bent Pin dowel
21 STONETECHNICS
Concrete Stainless Bent Pin dowel KT 2008 4 (Replacement) . KT Anchor (Friction) (Buckling)
: Fastener .Fastening System .
8/14/2019 Modern Stone Technology 2010
22/124
c.
22 STONETECHNICS
Dowel pin Kerfs
8/14/2019 Modern Stone Technology 2010
23/124
d. : Pin Dowel Anchor
23 STONETECHNICS
( )
6mm Nut Dowel Pin owel pin Dowel pin
8/14/2019 Modern Stone Technology 2010
24/124
8/14/2019 Modern Stone Technology 2010
25/124
6. : a. : 2, , FCP
25 STONETECHNICS
(Component Materials) . (, , , ) (Stability) . , Canada (Specification) Upgrade .
1989 France Paris "La Grand Arch de laDefense" . Italy Cararra Marble OpenJoint System 15 (Bowing) , .
2007 5 15 Toronto First Canadian Place Building 1mx1.2mx30T ( 140kg) Tower 60 King Street 1979Chicago Amoco Building .
8/14/2019 Modern Stone Technology 2010
26/124
1972 80 ChicagoAmoco Building . , 12000USD 9000USD .
b.
26 STONETECHNICS
2007 5 15 Toronto First Canadian Place Building 1mx1.2mx30T ( 140kg) Tower 60 King Street 1979 Chicago Amoco Building .
Chicago Amoco Building(346m/80stories) 44,000 (Bianco Carrara Marble) 30mm Mt.Airy 50mm . ASTM C18 10 1993 ASTM C1242 ( ) .
8/14/2019 Modern Stone Technology 2010
27/124
1989 2 La Grande Arch de la Defense Stone Cladding Materials : Bianco Carrara Marble (1989 Completed) 15 Bowing
c. (La Grande Arch de la Defense )
27 STONETECHNICS
Kerfs damaged on no filled grout
Thinner Veneer that is NOT exceed minimum structural thickness
La Grande Arch de la Defence Bowed Carrara Marble
1989 France Paris "La Grand Arch de laDefence" Italy Cararra Marble Open Joint System 15 (Bowing) , .
8/14/2019 Modern Stone Technology 2010
28/124
7. : a.
28 STONETECHNICS
: ,
Expansion Anchor .
: ( 100% )
1999 8 4 (25m/sec)
2007 515 CanadaToronto CFP
8/14/2019 Modern Stone Technology 2010
29/124
b. Suspending() Soffit Undercut Anchor ( Parapet)
1999 () . 2009,10 Soffits (Thaw Freezing Cycle) under cutanchor
29 STONETECHNICS
Undercut Anchor Drill Hole Pre-form Hole Anchor .
Parapet Soffit : anchor
8/14/2019 Modern Stone Technology 2010
30/124
c. (Epoxy Adhesive) Panel 2004 420 LG
30 STONETECHNICS
: , , , Weather seal , , Frame , .
8/14/2019 Modern Stone Technology 2010
31/124
d.
(Expansion Joint and Deformation)
. . (Fatigue)dl .
: . . . Paving . .
31 STONETECHNICS
Engineering Design LG TwinBuilding . 20mm Expansion Joint() .
Expansion Joint . : : , (, ) : , , : jointer Filler, Caulking Grout, Admixture, Mortar, Slider Recommendation Technology : ASTM UBC AIA Paving 6M 20mm Flooring 12M 10mm
LG Twin : 25 .
8/14/2019 Modern Stone Technology 2010
32/124
d. (Ref CWCT)
32 STONETECHNICS
: Workmanship 35%, Design 22%, Supervision 16%, Fabrication 9%, Specification 9%Materials 5%, Low maintenance 4% : Weather tightness 31%, Tolerance 16%, Durability 10%, Buildability 10%, Condensation 7%,Compatibility 7%, Structure 5%
8/14/2019 Modern Stone Technology 2010
33/124
e. (Defects of Condensation Control, Waterproofing, Flashing) : , , , , ,
33 STONETECHNICS
2004 420 LG SK Telecom
Vapor Retarder( )
8/14/2019 Modern Stone Technology 2010
34/124
Permeability vs Relative HumidityCondensation Diffusion Vapor Retarder 4x8 ftSheet Gypsum Board 1in2 (70 RH40%) Gallon(1.14L) 30
34 STONETECHNICS
Vapor Retarder( )
8/14/2019 Modern Stone Technology 2010
35/124
8. a.
35 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
36/124
b.
(Country) : , , : - - ( : ) : ( ) : () : : , Cutting Loss , : ( ) : ( )
: , , ,
36 STONETECHNICS
: , , , : ( Module) : 15%-20% ( )
Quarrying
8/14/2019 Modern Stone Technology 2010
37/124
c.
FINAL APPROVED RANGE RANDOM SLAB RANGE APPROVAL RANGE
37 STONETECHNICS
LINE INSPECTION FULL INSPECTION() RANDOM INSPECTION
FINAL APPROVED RANGE RAW BLOCK INITIAL TEST ()
8/14/2019 Modern Stone Technology 2010
38/124
d.
1)
38 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
39/124
2)
(Calcite) (limestone)
39 STONETECHNICS
(Calcite) (limestone)
8/14/2019 Modern Stone Technology 2010
40/124
3) ( : 1 )
40 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
41/124
d. ()
1)
1) ( TYP Detail)
41 STONETECHNICS
( TYP Detail)
2)
8/14/2019 Modern Stone Technology 2010
42/124
2) ENGINEERED STONE ADHESION LAYING ( TYP Detail)
42 STONETECHNICS
Engineered Stone (Laminated 2 Ply) 7mm Mortar Screed -10mm Adhesion System Laminated Membrane , : 10mm (Attached System) : ( ) , , ( 60%)
8/14/2019 Modern Stone Technology 2010
43/124
2)
43 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
44/124
2)
44 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
45/124
2)
45 STONETECHNICS
(Hook Lacing w/ Spot Plaster)
8/14/2019 Modern Stone Technology 2010
46/124
2)
46 STONETECHNICS
(Al. Fastener)
8/14/2019 Modern Stone Technology 2010
47/124
2)
47 STONETECHNICS
System
() : C Stud insert Clip 12mm-20mm(Thin Veneer)
() : Hook Lacing 20mm-30mm
() : Al. Fastener 25mm
8/14/2019 Modern Stone Technology 2010
48/124
8/14/2019 Modern Stone Technology 2010
49/124
1. (NEW STONE CLADDING SYSTEM FOR OPEN JOINT W/ RAINSCREEN PER)a. Open Wall Type (Back Framing System)
2. Concrete Wall Type
C.
49 STONETECHNICS
2. Concrete Wall Type , , , ,, , , Thermal Break, DrainageAir Ventilation, (Corrosion Resistance) Open Joint PER1997 : Open Joint 4mm Seal Joint 6mm
8/14/2019 Modern Stone Technology 2010
50/124
Kerfs Fastening W/Sealant Grout Components for Concrete wall
b. Open Joint Stone Cladding w/ PER System : / Tower Palace
50 STONETECHNICS
Open Joint Primary rain screen Pressure cavity,Secondary rain screen , Inner vapor barrier Assembly .
Cavity Flashing Open Joint Fastener Rain Screen Galv. Sheet Joint Flashing .
8/14/2019 Modern Stone Technology 2010
51/124
c. Corner and Soffit Wall Cladding System d. Open Joint Type Stone Cladding System
51 STONETECHNICS
, , , , ,, , ,Thermal Break, Drainage Air Ventilation,(Corrosion Resistance)Plug & Rod Anchor (SST)
8/14/2019 Modern Stone Technology 2010
52/124
e. (20mm 10mm) Open Joint Type (Thin Stone Veneer Hybrid Cladding System Design with Mechanical and Adhered Method)
52 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
53/124
e. Rare side Insert Clip Fastener (Thin Stone Veneer Hybrid Cladding System Design Analysis with Mechanical and Adhered Method)1) CLADDING SYSTEM
Tile Module (Mortar Adhesion System) Tile (Interface) . .
2) Structural Principle of Hybrid System( )
Hybrid Cladding Silicone
53 STONETECHNICS
Hybrid Cladding SiliconeSealant 25 6mm Al. Clip 1 Epoxy Grout 2 Sealant Groove Al. Extrusion Clip Tile Vibration Sealant System.
Hybrid Cladding System Design
8/14/2019 Modern Stone Technology 2010
54/124
3) Structural Analysis of Hybrid System Design ( )
54 STONETECHNICS
Suction Load 1/4 600mm x 600mm Tile 100kgf/M2 Pw 980Pa x 0.36M2 = 352N Fastener Clip 1 1/4 88.2N . Clip Tile (A = 2 x 0.04m x 0.004m x 2EA =452.5 x 10-6m2) (ASTM C615) 10.34MPa 4.67kN (SF=4670/88.2 = 53) (Safety Factor) Tile 5.0(MIA, BSI ) 10.6 . Tile Moveable Capacity 25%
Silicone Sealant Epoxy Mortar . Silicone Sealant Clip 9mm x 40mm x 2EA Bite Sealant 1.4kgf/cm2 (20psi) Ft =1.4kgf/cm2 x 7.2cm2 = 10.2kgf(98.8N) . Structural Silicone Sealant 10.0 .
Loading Condition on Hybrid Cladding System Design
8/14/2019 Modern Stone Technology 2010
55/124
4)
ASTM C1354-96(The Standard Method for Strength ofIndividual Stone Anchorages in Dimension Stone) Facade Anchorage(Fastening system) (LateralLoad) (Safety Factor) (Ultimate Friction Strength) ASTM C18 ( ) 1996 Cladding Anchor
55 STONETECHNICS
(Rupture Modulus) Fastener (Lateral wind load), FastenerType (Safety Factor)
For the specimens loaded using the test frame shown in Fig. 1, report the loadin the anchorage system as (see Fig. 1)
For specimens loaded using the test frames shown in Fig. 2,c Fig. 3, or Fig. 4,report the load in the anchorage system as: anchorage system load = testmachine load
ASTM C1354 (The Standard Method for Strength of Individual Stone Anchorages)
8/14/2019 Modern Stone Technology 2010
56/124
5) (Tolerance of Thickness)
56 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
57/124
INSERT KERF LAYOUT TYPICAL KERF EPOXY GROUT INSERT CLIP
6) VISUAL MOCK UP : 14MM Ceramic Tile
57 STONETECHNICS
INSERT KERF LAYOUT TYPICALCLADDING TILE INSERT CLIP GROUT KERF EPOXY GROUT INSERT CLIPFASTENER
FASTENING CLIP SAMPLE FIXING INSERT CLIP EPOXY GROUT CLIP GROOVE SEALANT .
8/14/2019 Modern Stone Technology 2010
58/124
PRACTICE SITE MOCK UP
CORNICE DECORATIVE MOLDING PREFAB BACK FRAMING FASTENING BRACKET CAVITY HOLLOBOLT (BOX BOLT)
58 STONETECHNICS
PREFAB BACK FRAMING BOLT (BOX BOLT)
AUTO TORQUE MACHINE HOLLO BOLT AUTO TORQUE WRENCH HOLLO BOLT
PRACTICE SITE MOCK UP
8/14/2019 Modern Stone Technology 2010
59/124
TILE (800X800X12T)SFC12 INSERT FIXING CLIP 12MM THIN SFC12(SES PAT) INSERT FIXING CLIP 12MM THIN VENEER MECHANICAL CONNECTION
59 STONETECHNICS
SFC12 INSERT FIXING CLIP 12MM THINVENEER MECHANICAL CONNECTION SYSTEM 12MM THIN VENEER MECHANICAL CONNECTIONSYSTEM FOR THIN VENEER
CORNICE PART PREFAB BACKFRAMING SYSTEM CORNICE PART PREFAB BACKFRAMING TILE
PRACTICE SITE MOCK UP : Ceramic Tile 14mm (700 x 700) 3mm Open Joint Cladding Sysyem
8/14/2019 Modern Stone Technology 2010
60/124
CORNICE MOLDING DECORATION
60 STONETECHNICS
CORNICE MOLDING (FIXING BOLT) VISUAL MOCK UP : EXTERIOR TILE WALLHYBRID SYSTEM CLADDING
D.D. STONE ENGINEERINGSTONE ENGINEERING
8/14/2019 Modern Stone Technology 2010
61/124
61 STONETECHNICS
1.. FACADEACADE
8/14/2019 Modern Stone Technology 2010
62/124
62 STONETECHNICS
2.. WORKING PROCEDUREORKING PROCEDURE
8/14/2019 Modern Stone Technology 2010
63/124
63 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
64/124
64 STONETECHNICS
3.. / CONCEPT CALDDING SYSTEM DESIGN EXAMPLE
8/14/2019 Modern Stone Technology 2010
65/124
65 STONETECHNICS
4. STONE. STONE
8/14/2019 Modern Stone Technology 2010
66/124
a. The original names were in Italian.Usually the name consists of two parts.The first part describes the color and second part describesthe name from where the stone was quarried.( )
ITALIAN NAME ENGLISH COLORAzzuro Bluezzuro BlueDorato / D'oro Goldorato / D'oro GoldFiore Floweriore FlowerGiallo Yellowiallo YellowNegro/Nero Blackegro/Nero BlackPerla / Perlato Pearlerla / Perlato Pearl
AZUL BAHIA PIETRA DORATA
66 STONETECHNICS
Perla / Perlato Pearlerla / Perlato PearlRosa Pinkosa PinkRosso Redosso RedVerde Greenerde GreenBianco Whiteianco WhiteExampleNegro Marquina is a black limestone from Marquina, Spain.Bianco Carrara is a white marble from Carrara, Italy. PERLATO ROYAL GIALLO SIENA
BOTTICINO FIORITO ROSA PORTOGALLO ROSSO VERONA VERDE ACCEGLIO
8/14/2019 Modern Stone Technology 2010
67/124
67 STONETECHNICS
b. /
8/14/2019 Modern Stone Technology 2010
68/124
Pietra Dorata Venata Travertine Noce Giallo Tafoukeperino Grigio
68 STONETECHNICS
Bianco Carrara D Vermont Green Brown Onyx Ardesia Nero (Cleft)
Basaltina Absolute Black Armenian Gold Felsites Carmen Red
c. : Classification of Igneous Rocks
8/14/2019 Modern Stone Technology 2010
69/124
Andesite Basalt
69 STONETECHNICS
Diolite Rhyolite
Gabbro Granite
Syenite Peridotite Scoria Obidian Tuff
d. : Sedimentary Rocks
8/14/2019 Modern Stone Technology 2010
70/124
1. Clastic Sedimentary Rocks ( )
Clastic sedimentary rocks are composed of fragments ofweathered rocks, called clasts, that have been transported,deposited, and cemented together.Clastic rocks make up more than 85 percent of allsedimentary rocks.This category includes sandstone, siltstone, and shale.
2. Organic Sedimentary Rocks ( )Organic sedimentary rocks consist of the remains of
Breccia Chert
Conglomerate Coquina
70 STONETECHNICS
Organic sedimentary rocks consist of the remains ofplants or animals. Coal is an organic sedimentary rockmade up of decomposed and compacted plant remains.
3. Chemical sedimentary rocks ( )Chemical sedimentary rocks form by direct precipitationof minerals from solution.Rock salt, for example, forms when salt precipitates fromevaporating seawater or saline lake water.
4. Bioclastic Sedimentary Rocks ( )Most limestone is composed of broken shell fragments.The fragments are clastic, but they form from organicmaterial. As a result, limestone formed in this way is calleda bioclastic rock.
Dolomite Limestone Oolitic Limestone
Gypsum Rock Sandstone
Shale Travertine
e. : Metamorphic Rocks
8/14/2019 Modern Stone Technology 2010
71/124
Anthracite Anthracite Augen Gneiss Gneiss
71 STONETECHNICS
Hornblende Schist Hornblende Schist Calcite Calcite
Mica Schist Mica Schist Phylite Quartzite
Quartzite Slate Slate Slate
8/14/2019 Modern Stone Technology 2010
72/124
b. Parapet : Rain Screen, Flashing, Waterproofing, Drainage Open Joint Cladding
8/14/2019 Modern Stone Technology 2010
73/124
73 STONETECHNICS
c. Pre Assembled Stone Unit Panel on Jig : Self Climbing Erection System : Central City High Rise Part
8/14/2019 Modern Stone Technology 2010
74/124
74 STONETECHNICS
Self Climbing Erection on Guide Rail Pre Assembling Unit Panel on Jig System
8/14/2019 Modern Stone Technology 2010
75/124
75 STONETECHNICS
Self Climbing Erection on Guide Rail : 13 Guide Rail Staging
d. Story Stone Masonry : Tram Hause
8/14/2019 Modern Stone Technology 2010
76/124
76 STONETECHNICS
: Shield Support Angle, WWF Galv. Mat,Grout Waterproofing Mortar, Insert Hook WireDrainage Tube, Flashing, Restrain Anchor
8/14/2019 Modern Stone Technology 2010
77/124
77 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
78/124
78 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
79/124
79 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
80/124
80 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
81/124
81 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
82/124
82 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
83/124
83 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
84/124
84 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
85/124
85 STONETECHNICS
Seoul Stone Cladding Facade
8/14/2019 Modern Stone Technology 2010
86/124
86 STONETECHNICS
Stone Cladding FaadePreassembled Unit Joist SystemColumn Cover and Spandrel Joist
Main Connection Swing Arm System
8/14/2019 Modern Stone Technology 2010
87/124
87 STONETECHNICS
JIN MAO TOWER AT SHANGHAI POODUNGIN MAO TOWER AT SHANGHAI POODUNGOPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
88/124
88 STONETECHNICS
JIN MAO TOWER AT SHANGHAI POODUNGIN MAO TOWER AT SHANGHAI POODUNGOPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
89/124
89 STONETECHNICS
JIN MAO TOWER AT SHANGHAI POODUNGIN MAO TOWER AT SHANGHAI POODUNGOPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
90/124
90 STONETECHNICS
JIN MAO TOWER AT SHANGHAI POODUNGIN MAO TOWER AT SHANGHAI POODUNGOPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
91/124
91 STONETECHNICS
AUROLA BUILDING AT SHANGHAI POODUNGUROLA BUILDING AT SHANGHAI POODUNG
8/14/2019 Modern Stone Technology 2010
92/124
OPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
92 STONETECHNICS
AUROLA BUILDING AT SHANGHAI POODUNGUROLA BUILDING AT SHANGHAI POODUNGOPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
93/124
93 STONETECHNICS
AUROLA BUILDING AT SHANGHAI POODUNGUROLA BUILDING AT SHANGHAI POODUNGOPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
94/124
94 STONETECHNICS
AUROLA BUILDING AT SHANGHAI POODUNGUROLA BUILDING AT SHANGHAI POODUNGOPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
95/124
95 STONETECHNICS
OPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
96/124
96 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
97/124
OPEN JOINT W/ PER SYSTEM ON LOWRISEPEN JOINT W/ PER SYSTEM ON LOWRISE
8/14/2019 Modern Stone Technology 2010
98/124
98 STONETECHNICS
7. CENTRAL CITY COMMERCIAL COMPLEX :
8/14/2019 Modern Stone Technology 2010
99/124
99 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
100/124
100 STONETECHNICS
WORKING PROCEDURE FOR STONE WORKORKING PROCEDURE FOR STONE WORK
8/14/2019 Modern Stone Technology 2010
101/124
101 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
102/124
102 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
103/124
1) : (Country of Origin) : , , ) (Monsoon), ,
2) (Location of Quarry) 3) : ( ) / 4) : Mining Open Quarry Zone5) Quality Variation (ACCEPETED RANGE FOR QUALITY)6) Raw block Waste Part Longer Delivery (LOSS RATIO MAX50%)
103 STONETECHNICS
7) Quarry 8) Alternative Stone ( RISK )9) Cut To Slab Size Quarried Block (Weight Size/Container Capacity)
10,000m3 30Thk 450m3 Raw Block(150%)Cut to Size 1.5m 1.5m 700 - 1,000m3
10) Raw Block Stock , 10 - 20%
11) :
8/14/2019 Modern Stone Technology 2010
104/124
a. : Waste Part b. : 30mm Thickness / c. : 5,000m2d.
104 STONETECHNICS
a. (Color, Darkness, Vein Grain )b. Cut to Slab (1.5m 1.5m)
(GANG SAW BLOCK: AVG. 6m3)1.5m x 1.5m x 2.6m c. d. (Cut to Size) : e. Survey Construction Management
6,000m2 (50% 3,000 M2 )
8/14/2019 Modern Stone Technology 2010
105/124
105 STONETECHNICS
(GANG SAW) CAPACITY 3,000m2 Raw Block Gang Saw Raw Block 3,000M20.04M(Sawing Thick)130%(Cut Waste)=156M31.5M1.5M2.6M=5.85M3/block Required Block Quantity : 27BlocksGang-Saw Capacity : 5days/`2blocks : 12blocks/113M2/block =Net Area 1,360M2 GANG SAW: 1,360M2 5 = 6,800M2 : Gang Saw 5
8/14/2019 Modern Stone Technology 2010
106/124
106 STONETECHNICS
QUALITY VARIATION FOR ACCEPTED RANGEUALITY VARIATION FOR ACCEPTED RANGE
8/14/2019 Modern Stone Technology 2010
107/124
107 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
108/124
108 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
109/124
109 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
110/124
110 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
111/124
111 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
112/124
112 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
113/124
113 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
114/124
114 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
115/124
115 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
116/124
8/14/2019 Modern Stone Technology 2010
117/124
117 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
118/124
118 STONETECHNICS
C0NCEPT DESIGN DETAIL FOR DEVELOPMENT0NCEPT DESIGN DETAIL FOR DEVELOPMENT
8/14/2019 Modern Stone Technology 2010
119/124
119 STONETECHNICS
C0NCEPT DESIGN DETAIL FOR DEVELOPMENT0NCEPT DESIGN DETAIL FOR DEVELOPMENT
8/14/2019 Modern Stone Technology 2010
120/124
120 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
121/124
121 STONETECHNICS
COST BREAK DOWN / SPECIAL WORKING ITEMSOST BREAK DOWN / SPECIAL WORKING ITEMS
8/14/2019 Modern Stone Technology 2010
122/124
122 STONETECHNICS
8/14/2019 Modern Stone Technology 2010
123/124
INITIAL TEST ()
8/14/2019 Modern Stone Technology 2010
124/124
124 STONETECHNICS