C9FP-DI-DI1-K011:
MAINTENANENCE & OPERATIONSBUILDING(MOB#3, MOB#6, MOB#7)
Kick off Meeting
7/25/2019 MOB Building CFP KNPC MAB
2/28
SAFETY MOMENT
7/25/2019 MOB Building CFP KNPC MAB
3/28
Index
Index:
1. Project Execution Plan
2.1 Detailed Scope of Works
2.2 Construction Key Quantities
2.3 Construction Schedule
2.4 Project Organization Chart
2.5 Resource Requirements
2.5.1 Direct Manpower Histogram
2.5.2 Indirect Manpower Histogram
2.5.3 Equipment Histogram
7/25/2019 MOB Building CFP KNPC MAB
4/28
PROJECT EXECUTION PLAN
Index:
1. Project Execution Plan1. Detailed Scope of Works
2. Construction Key Quantities
3. Construction Schedule
4. Project Organization Chart
5. Resource Requirements
1. Direct Manpower Histogram
2. Indirect Manpower Histogram
3. Equipment Histogram6. Temporary Construction Facilities
7. Subcontracting Plan
7/25/2019 MOB Building CFP KNPC MAB
5/28
SUBCONTRACT WALK THROUGH:Detailed Scope of Works
The main building work activities are including, but not limited to, as follows;
Civil work and Temporary work to complete the scope of work such as site clearance,
earthworks, excavation, shoring, dewatering, backfilling, compaction, and disposal,
and all other necessary activities.
All Building works such as, but not limited to:
Concrete works including for foundation, structure, etc.
Masonry work / Plaster work
All steel structure work / miscellaneous steel works
Cladding
Water proofing
Finishing Works
Sanitary & Furniture Works
7/25/2019 MOB Building CFP KNPC MAB
6/28
SUBCONTRACT WALK THROUGH:Detailed Scope of Works
The main building work activities are including, but not limited to, as follows;
Mechanical works including HVAC, Fire Fighting, plumbing, sewage works for buildings
HVAC Equipment
Fire Fighting Equipment
7/25/2019 MOB Building CFP KNPC MAB
7/28
PROJECT EXECUTION PLAN:Construction Key Quantities
Sl. No: Description UoM Quantity
A CIVIL & BUILDING WORKSA.1 Earth Works cu m 9,617
A.1.1 Excavation cu m 4,640
A.1.2 Backfilling / Structural Fill cu m 2,901
A.1.3 Disposal cu m 2,076
A.1.4 Crushed Stone Filling sq m 238
A.1.5 Compacted Sand Filling sq m 5,670A.1.6 Polyethylene Sheet sq m 6,057
A.2 Reinforced Concrete Works cu m 3,833
A.2.1 Lean Concrete cu m 468
A.2.2 Structural Concrete cu m 3,833
A.2.3 Reinforcement Ton 486
A.2.4 Steel Wire Mesh sq m 1,708
A.2.5 Formwork sq m 16,723
A.3 Masonry Works sq m 6,080
A.3.1 Concrete Block Works sq m 6,080
A.4 Plastering Works sq m 11,699
A.4.1 Cement Plastering & Floor Finishing Works sq m 11,699
A.5 Painting Works sq m 12,321
A.5.1 Epoxy Paint sq m 627
A.5.2 Non slip chemical resistant epoxy coating sq m 1,502
A.5.3 Acid alkaline resistance paint sq m 150
A.5.4 Acrylic paint for wall sq m 6,824
A.5.5 Polyurethane paint sq m 3,218A.5.6 Wheel lane marking m 845
7/25/2019 MOB Building CFP KNPC MAB
8/28
PROJECT EXECUTION PLAN:Construction Key Quantities
Sl. No: Description UoM Quantity
A CIVIL & BUILDING WORKS
A.6 Water Proofing works
A.6.1 Roof water proofing works sq m 3,937
A.6.2 Liquid water proofing works sq m 1,433
A.6.2 Underground water proofing : Bituminous coating sq m 10,201
A.7 Tile & Floor Works
A.7.1 Ceramic mosaic tiles (Unglazed) sq m 2,654
A.7.2 Ceramic mosaic tiles (Glazed) sq m 1,766
A.7.3 Glazed ceramic tile for glazing m 2,519
A.8 Interior Work
A.8.1 Suspended acoustic tile sq m 2,145
A.8.2 Gypsum board on metal stud For wall / with insulation sq m 1,582
A.8.3 Water resistant gypsum board / wall & ceiling sq m 1,529
A.9 Door & Window WorkA.9.1 Blast & fire resistant doors EA 21
A.9.2 Fire resistant doors EA 126
A.9.3 Aluminum windows EA 114
A.9.4 Metal windows EA 12
A.10 Steel Structure Works
A.10.1 Steel fabrication & erection Ton 28
A.11 Metal Cladding Works
A.11.1 Cladding Works sq m 1,670
7/25/2019 MOB Building CFP KNPC MAB
9/28
PROJECT EXECUTION PLAN:Construction Key Quantities
Sl. No: Description UoM Quantity
B HVAC & PLUMBING WORKS
B.1 Plumbing Equipment & Fixture
B.1.1 Plumbing equipment & fixture set 201
B.2 HVAC duct works
B.2.1 Galvanized steel duct sq m 4,733
B.2.2 Volume damper EA 171
B.2.4 Motor damper EA 15B.2.5 Fire damper EA 21
B.2.6 Back draft damper EA 30
B.2.7 Motorized gas damper EA 3
B.2.8 Register EA 93
B.2.9 Square diffuser EA 225
B.2.10 Flexible duct hose EA 339
B.2.11 Stainless band EA 450
B.2.12 Sand trap louver EA 6B.2.13 Louver EA 18
B.2.14 Turning vane Set 12
B.2.15 Sound attenuator Set 6
B.3 HVAC Piping Works (Refrigerant)
B.3.1 Pipe m 480
B.3.2 90 elbow Nos 288
B.3.3 Pipe insulation (internal) m 336
B.3.4 Pipe insulation (external) m 144
7/25/2019 MOB Building CFP KNPC MAB
10/28
PROJECT EXECUTION PLAN:Construction Key Quantities
Sl. No: Description UoM Quantity
B HVAC & PLUMBING WORKSB.4 HVAC Piping Works (Condensate Drain)
B.4.1 Pipe m 48
B.4.2 90 elbow Nos 24
B.4.3 U Trap EA 6
B.4.4 Pipe insulation m 48
B.5 Potable & Hot Water Piping Works
B.5.1 Pipe m 2,625
B.5.2 Pipe insulation (internal) m 1,482
B.5.3 Pipe insulation (external) m 1,140
B.5.4 Hot water pipe insulation (internal) m 1,140
B.5.5 Pipe Fittings Nos 1,851
B.6 Sanitary (Drainage & Soil) Piping Works
B.6.1 Pipe m 639
B.6.2 Fittings Nos 921
B.7 Sanitary (Vent) Piping Works
B.7.1 Pipe m 459
B.7.2 Fittings Nos 192
C FIRE FIGHTING WORKS
C.1 Fire fighting equipment Nos 279
C.2 Sprinkler System & Indoor Hydrant System
C.2.1 Pipe m 1,164
C.2.2 Fittings Nos 1,011
7/25/2019 MOB Building CFP KNPC MAB
11/28
PROJECT EXECUTION PLAN:Construction Key Quantities
Sl. No: Description UoM Quantity
D HVAC CONTROL SYSTEMS
D.1 HVAC Control Panels Set 3
D.2 HVAC Control Instrumentations EA 120
D.3 HVAC Control Bulk materials
D.3.1 Instrument Cable m 12,390
D.3.2 Conduit m 1,590
D.3.3 Accessories EA 4,311
7/25/2019 MOB Building CFP KNPC MAB
12/28
PROJECT EXECUTION PLAN:Construction Schedule
7/25/2019 MOB Building CFP KNPC MAB
13/28
PROJECT EXECUTION PLAN:Construction Schedule
7/25/2019 MOB Building CFP KNPC MAB
14/28
PROJECT EXECUTION PLAN:Contract Milestone Dates
Building Name Start Date Finish Date
Maintenance & Operations Building (MOB#3) 14-Jan-16 26-Apr-17
Maintenance & Operations Building (MOB#6) 27-Oct-15 11-Jan-17
Maintenance & Operations Building (MOB#7) 10-Dec-15 04-Mar-17
Restroom (MOB#3,6,7) 1-Feb-17 17-May-17
Smoking Shelter (MOB#3, 6, 7) 1-Jan-17 17-May-17
Ablution Area (MOB#3, 6, 7) 1-Feb-17 16-Jun-17
Covered Parking shed (MOB# 3, 6, 7) 1-Oct-16 17-Jul-17
7/25/2019 MOB Building CFP KNPC MAB
15/28
PROJECT EXECUTION PLAN:Project Organization Chart
Home OfficeSite Office
E-mail:
bhaskara.prakash@nbtc-
kuwait.com
E-mail:
reji.k@nbtc-kuwait.com
QA/QC Supervisors
Lead QA/QC Engineer
Kumar Elumalai
Mob: 98009504
E-mail:
kumar.ellumalai@gmail.co
m
HSE Manager
HSE Supervisors
Site Administrator Planning Engineer
Construction Manager
(MOI 3 & 6)
Construction Manager
(MOB 7)
Rakesh Kumar Singh Mahammad Ghouse
Mob: 98769983 Mob:
E-mail:
rakesh.singh@nbtc-
kuwait.com
E-mail:
mohd.ghouse@nbtc-
kuwait.com
HSE Engineer
Anand Anandassery
Mob:
E-mail:
Brian Kerr Jaffrey Shafeer Ali G.B.S. Sharma
Mob: 98761970 Mob: 97620525 Mob: 97297094
E-mail:
gbs.sharma@nbtc-
kuwait.com
Operations Manager
Prince John
E-mail:
prince.john@nbtc-
kuwait.com
NBTC
Corporate Management
Mob: 99679295
Project Controls Manager QA/QC Manager
E-mail:
brian.jeffrey@nbtc-
kuwait.com
E-mail:
shafeer.ali@nbtc-
kuwait.com
Project Manager
Bhaskara Prakash
Mob: 98009531
Project Manager
Reji Kunjukutty
Mob:
7/25/2019 MOB Building CFP KNPC MAB
16/28
PROJECT EXECUTION PLAN:HSE Organization Chart
Home Off ice
Field
HSE ENGINEER
Anand Anandassery
SAFETY SUPERVISOR
1 Nos
SAFETY SUPERVISOR
1 Nos
MALE NURSE
MOB # 7
CORPORATE HSE MANAGER
Brian Kerr Jeffrey
MOB # 3
SAFETY SUPERVISOR
1 Nos
MOB # 6
7/25/2019 MOB Building CFP KNPC MAB
17/28
PROJECT EXECUTION PLAN:QA/QC Organization Chart
HOME OFFICE
FIELD
ENGINEER QA/QCCivil
Kumar Elumalai
Corp QA/QC Manager
Mr. G.B.S Sharma
QC SUPERVISOR
(Civil) : MOB # 7
1 Nos
QC SUPERVISOR
(Civil) : MOB # 3
1 Nos
ENGINEER QA/QCMechanical
QC SUPERVISOR
Mechanical
1 Nos
QC SUPERVISOR
(Civil) : MOB # 6
1 Nos
7/25/2019 MOB Building CFP KNPC MAB
18/28
PROJECT EXECUTION PLAN:Civil Construction Organization Chart
7/25/2019 MOB Building CFP KNPC MAB
19/28
PROJECT EXECUTION PLAN:Mechanical Construction Organization Chart
7/25/2019 MOB Building CFP KNPC MAB
20/28
PROJECT EXECUTION PLAN:Resource Requirements
Designation
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Construction Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Civil Superintendent 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Secretary 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Male Nurse 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Planning Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Scheduler 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Cost Estimator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Administrator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Document Controller 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Data Assistants 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CAD Draft man 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Gate Pass Co-ordinator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Office Boy 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1
Janitor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sub-Total 13 14 15 15 15 15 15 15 15 15 15 15 15 15 15 14 14 14 14 14 13 12 8
Indirect Manpower: Project Management Team
7/25/2019 MOB Building CFP KNPC MAB
21/28
PROJECT EXECUTION PLAN:Resource Requirements
Designation
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Safety Engineer1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Safety Supervisor1 1 1 2 2 3 3 3 3 3 3 3 3 3 3 3 3 2 2 1 1 1 1
HSE Helpers1 1 1 2 2 4 4 4 4 4 4 4 4 4 4 4 4 2 2 1 1 1 1
Civil Engineer 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 0
QA/QC Engineer-Civil 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0
QA/QC
Supervisors/inspectors-Civil 1 1 1 2 2 3 3 3 3 3 3 2 2 2 2 1 1 1 1 1 1 1 0
Civil Supervisors(Sitework) 1 1 1 2 2 3 3 3 3 3 3 3 3 3 3 2 2 2 2 1 1 1 0
Civil Supervisors(Rebar &Formwork)
1 1 1 1 2 2 2 2 2 2 1 1
Surveyor 1 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1
Store Keepers 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Time Keeper1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Equipment Co-ordinator1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sub-Total 10 13 13 17 17 24 24 24 24 24 24 22 21 20 20 17 17 14 14 10 10 10 4
Indirect Manpower: Civil Construction Team
7/25/2019 MOB Building CFP KNPC MAB
22/28
PROJECT EXECUTION PLAN:Resource Requirements
Designation
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Project Engineer - MEP 1 1 1 1 1 1 1 1 1 1 1 1 1
Site Engineer - MEP 1 1 1 1 1 1 1 1 1 1 1 1 1
Supervisor - HVAC 1 1 1 1 1 1 1 1 1 1 1 1
Supervisor - Plumbing & FF 1 1 1 1 1 1 1 1 1 1 1 1 1
QA/QC Engineer-Mechanical 1 1 1 1 1 1 1 1 1 1 1
QA/QC Supervisors/inspectors-
Mechanical 1 1 1 1 1 1 1 1 1 1 1 1 1
Safety Supervisor1 1 1 1 1 1 1 1 1 1 1
Sub-Total 5 7 7 7 7 7 7 7 7 7 7 7 4
Indirect Manpower: HVAC, Plumbing and Fire fighting
7/25/2019 MOB Building CFP KNPC MAB
23/28
PROJECT EXECUTION PLAN:Resource Requirements
Designation
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Foremen 1 2 3 3 4 4 5 5 5 5 5 5 5 5 5 5 4 3 3 3 3 2 1
Chargehand 2 3 4 5 6 6 7 7 8 8 8 8 8 8 7 7 6 5 5 4 4 3 2
Carpenter 2 4 4 6 8 8 8 8 8 8 8 8 8 8 8 6 6 4 4 4 2 2 2
Steel Fitter 2 4 6 6 6 6 6 5 5 5 4 4 3 2 2 1 1 1
Mason 2 3 4 6 8 10 12 14 16 16 16 16 16 16 15 14 12 12 12 10 10 8 6
Helper 4 6 8 12 16 20 24 28 32 32 32 32 32 32 30 28 24 24 24 20 20 16 12
Labour 22 29 39 42 45 45 45 45 45 45 45 45 45 45 42 38 35 28 26 22 20 16 12
Painter 2 3 4 4 5 5 5 5 4 4 4 3 2
Scaffolder 2 2 3 3 3 4 4 4 4 4 4 4 4 4 3 3 3 2 2 2 2
Fabricator 2 3 3 4 4 4 3 3 3 2 2
Rigger 4 4 4 4 4 4 4 2 2 2 2 4 4 4 4 4 2 2 2 2 2
Driver/Operator 9 10 11 11 13 13 12 12 11 9 9 9 8 8 5 5 5 5 4 4 5 3 3
Sub-Total 46 63 86 98 113 120 127 134 141 137 139 140 139 139 129 119 107 95 86 75 72 55 42
Direct Manpower: Civil Construction Team
7/25/2019 MOB Building CFP KNPC MAB
24/28
PROJECT EXECUTION PLAN:Resource Requirements
DesignationSep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
HVAC foreman 1 1 1 1 1 1 1 1 1 1 1 1 1
Plumbing foreman 1 1 1 1 1 1 1 1 1 1 1 1 1
Firefighting forman 1 1 1 1 1 1 1 1 1 1 1 1 1
BMS forman 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical forman 1 1 1 1 1 1 1 1 1 1 1 1 1
Duct Fitters 4 4 4 4 4 4 4 4 4 4 4
Duct Insulators 2 2 4 6 6 6 6 6 6 4 2 2 2
Pipe welders 2 2 2 4 4 4 4 4 4 3 2 1 1
Riggers 8 8 8 8 8
Pipe insulators 2 2 2 2 2 2 2 2 2 2 2 1 1
A/c technicians 3 3 3 3 3 3 3
BMS technicians 1 1 1 1 1 1 1 1 1 1 1 1 1
Electricians 1 1 1 1 1 1 1 1 1 1 1 1 1
Helpers 5 5 10 10 10 12 12 12 12 10 10 4 4
Plumbers 2 2 2 4 4 5 5 5 5 5 4 2 2
Assit Plumbers 2 2 2 4 4 5 5 5 5 5 4 2 2
Firefighting technicians 2 2 2 2 2 2 3 4 4 2 2 2 2
Assit Firefighting technicians 2 2 2 2 2 2 3 4 4 2 2 2 2
Operators/Drivers 2 2 2 2 2 2 2 2 2 2 2 1 1
Sub-Total 32 32 50 58 55 62 61 58 55 49 41 27 27
Direct Manpower: HVAC, Plumbing and Fire fighting
7/25/2019 MOB Building CFP KNPC MAB
25/28
PROJECT EXECUTION PLAN:Resource Requirements
Category
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
INDIRECT MANPOWER
Project Management 13 14 15 15 15 15 15 15 15 15 15 15 15 15 15 14 14 14 14 14 13 12 8
Civil 10 13 13 17 17 24 24 24 24 24 24 22 21 20 20 17 17 14 14 10 10 10 4
HVAC. Plumbing, Fire fighting 5 7 7 7 7 7 7 7 7 7 7 7 4
Total Indirect Manpower 23 27 28 32 32 39 39 39 44 46 46 44 43 42 42 38 38 35 35 31 27 22 12
DIRECT MANPOWER
Civil 46 63 86 98 113 120 127 134 141 137 139 140 139 139 129 119 107 95 86 75 72 55 42
HVAC. Plumbing, Fire fighting 32 32 50 58 55 62 61 58 55 49 41 27 27
Total Direct Manpower 46 63 86 98 113 120 127 134 173 169 189 198 194 201 190 177 162 144 127 102 99 55 42
Overall Manpower 69
90
114
130
145
159
166
173
217
215
235
242
237
243
232
215
200
179
162
133
126
77
54
Overall Manpower
7/25/2019 MOB Building CFP KNPC MAB
26/28
PROJECT EXECUTION PLAN:Resource Requirements
46
201
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0
50
100
150
200
250
Sept-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sept-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Overall Manpower Histogram
Indirects Directs Cumulative
Peak Indirect Manpower: 46Peak Direct Manpower: 201
Peak Total Manpower: 243
7/25/2019 MOB Building CFP KNPC MAB
27/28
PROJECT EXECUTION PLAN:Resource Requirements
Category
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Excavator 1 1
Loader 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Combination Loader (JCB) 1 1 1
Dozer 1Low bed Trailor 1 1 1 1 1 1 1
Dump Truck (18Cum) 1 2 2 3 3 3 2 2 2 2 2 2 1 1
Boom Truck 1 1 1 1 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1
water tanker 1 1 1 1 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1
Compactor 1 2 2 2 3 3 3 3 2 2 2 2 1 1 1 1 1 1 1
Jumping Jack 1 2 2 3 4 4 4 4 4 4 3 3 3 2 2 1 1 1 1 1 1
Bobcat 1 2 2 2 2 2 2 2 1 1 1 1 1 1
Crane-20Ton 1 1 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Crane-50Ton 1 1 1 1 1 1 1Man lift 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welding Machine 1 1 1 2 2 2 2 2 2 2 2 2 2 1 1 1 1
Steel Cutting Machine 1 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1
Air Compressor 1 1 1 1 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1
Generator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Pick up 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 1 1
Bus 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1
Sub-Total 17 21 22 25 31 31 30 31 29 27 26 25 23 22 18 17 16 15 13 11 12 7 7
Equipment Histogram: Civil Construction Works
7/25/2019 MOB Building CFP KNPC MAB
28/28
PROJECT EXECUTION PLAN:Resource Requirements
Category
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Crane 150T ( When Required) 1 1 1 1 1 1
Crane 50T ( When Required) 1 1 1 1 1 1 1
Crane-20Ton 1 1 1 1 1 1 1 1 1 1 1
Forklift - 5Ton 1 1 1 1 1 1 1 1 1 1
Welding Machine 1 2 2 2 2 2 2 2 2 2 1 1
Man lift 1 2 2 2 2 2 2 2 2 1
Threading Machine 2 2 2 2 2 2 2 2 2 2 2
Fusion Welding machine` 1 1 1 1 1 1 1 1 1 1 1
HDPE Hot plate 1 1 1 1 1 1 1 1 1 1 1
Generator 1 1 1 1 1 1 1 1 1 1 1 1
Trailors (When required) 1 1 1 1 1 1 1 1 1 1
Pick-Up/Jeep 1 1 1 1 1 1 1 1 1 1 1 1 1
Buses 1 1 1 1 1 1 1 1 1 1 1 1 1
Sub-Total 3 13 16 16 16 16 16 16 15 14 12 9 3
Equipment Histogram: HVAC, Plumbing & Fire Fighting