  • INTRODUCTION Toran commenced working with Gosling Electrical in 2009 as a tradesman’s assistant. Shortly a

  • PROJECT EXPERIENCE Roads and MariLme Services Pacific Highway Works • OHL-York Joint Venture: Team lead for the Woolgoolga to Halfway Creek highway realignment inclusive of high and low

    voltage reloca?on and addi?ons, transformer installa?ons, liaising and problem solving for vegeta?on and environmental concerns and community access and liaising.

    • Civil Mining & Construc?on Pty Ltd (CMC Group): Team lead for the Halfway Creek to Glenugie Pacific Highway realignment inclusive of high and low voltage reloca?on and addi?ons, transformer installa?ons, liaising and problem solving for vegeta?on and environmental concerns and community access and liaising.

    • Acciona Ferrovial Joint Venture (Pacifico): Responsible for preparing and submijng all tender documents for asset reloca?on and upgrade on the Pacific Highway bypass from Nambucca Heads to Macksville achieving the successful Award of the contract; project manage network design and modifica?ons including installa?on and reloca?on of underground and overhead electrical services and coordina?on of construc?on in conjunc?on with Pacifico’s earthworks construc?on team.

    • Acciona Ferrovial Joint Venture (Pacifico Harwood): Project manage 11 kV supply to contractor’s compound and bridge abutments on the new bridge at Harwood

    • Project managed the installa?on of mul?ple fauna crossings and infrastructure (rope bridges and glider poles) on the new Pacific Highway via a mul?tude of Tier One companies.

    Pacific Complete • Responsible for preparing and submijng all tender documents achieving the successful Award of the contract.

    • End to end project management of the underground and overhead electricity network reloca?on and upgrade including mul?ple design layout changes, across five separate loca?ons.

    • Successful liaison with other subcontractors, suppliers and trades during early works to facilitate smooth transi?on from early works to bulk earth moving contract works.

    • Management and submission of extension project documenta?on throughout construc?on including commissioning, markups and as construc?on drawings.

    Fulton Hogan addiLonal crossing over the Clarence River at GraUon • Project manage the reloca?on of overhead infrastructure including working through power outage logis?cs with Essen?al

    Energy during construc?on works, coordina?ng work par?es and managing subcontractors and trades such as traffic management on both public and RMS roads.

    Coffs Harbour City Council • Responsible for preparing and submijng all tender documents for the upgraded intersec?on of Cook Drive and the Pacific

    Highway in Coffs Harbour achieving successful Award of the contract.

    • End to end project management including new and upgraded substa?ons, high voltage underground cables, overhead powerlines, street ligh?ng and coordina?ng work par?es and managing subcontractors and trades such as traffic management on both public and RMS roads.

    Subdivisions • Administered end-to-end comple?on of overhead and underground subdivisions across a wide range of loca?ons between

    Port Macquarie in the south, Tweed Heads in the north and Gunnedah in the west. A large por?on of these were mul?-stage developments.

    Gosling Electrical ABN 56491602668 62 Industrial Drive, North Boambee Valley NSW 2450 | PO Box 8040 Coffs Harbour NSW 2450

    02 6652 3283 | admin@goslingelectrical.com.au | www.goslingelectrical.com.au

    mailto:admin@goslingelectrical.com.aumailto:admin@goslingelectrical.com.au

Recommended