MINING PLAN
WITH PROGRESSIVE MINES CLOSURE PLAN
OF GUJARAT MINOR MINERAL CONCESSION
(AMENDMENT) RULES, 2015
JABUGAM ORDINARY SAND AREA
SURVEY NO. ORSANG RIVER ADJOING 284/A,
NEAR VILLAGE - JABUGAM, TALUKA – BODELI,
DISTRICT- CHHOTAUDEPUR, STATE - GUJARAT
APPLIED AREA 07.95.00 HECTARE (NON FOREST)
Period of Mining Plan – 03 year
(SUBMITTED UNDER RULE GMMCR(A), 2015)
APPLICANT ARVINDKUMAR THAKORDAS KAYASTHA
VILLAGE - UDHNAGAM, TALUKA - CHORYASI, DISTRICT - SURAT.
-: PREPARED BY :- PATEL JITUBHAI HATHIBHAI
504, ABHISHEK COMPLEX, OPP.HOTEL HAVELI, SECTOR - 11, GANDHINAGAR, GUJARAT
RQP/UPD/379/2014/A, VALID UP TO : 16/11/2024
2
C O N T E N T S
CHAPTER HEADING PAGE
NO.
INTRODUCTION 3
1 GENERAL 4
2 LOCATION & ACCESIBILITY 5
3 DETAILS OF APPROVED MINING PLAN/SCHEME 6
PART - A
1 GEOLOGY & EXPLORATION 7 to 11
2 MINING 12 to 16
3 MINES DRAINAGE 17 to 18
4 STACKING OF MINERAL REJECTS/SUB GRADE MATERIAL
AND DISPOSAL OF WATES
19
5 USE OF MINERAL AND MINERAL REJECT 20
6 PROCESSING OF ROM AND MINERAL REJECT 21
7 OTHER 22
8 PROGRESSIVE MINES CLOSURE PLAN 23 to 29
PART - B
9 CERTIFICATE/UNDERTAKING/CONSENTS 30 to 31
10 LIST OF THE PLANS AND SECTION SUBMITTED 32
11 LIST OF DOCUMENTS ANNEXED 32
12 LEASE AREA PHOTO 33 to 34
3
I N T R O D U C T I O N
The Mining Plan of Jabugam Ordinary Sand deposit (Survey No. Orsang River
Adjoing 284/A, area 07-95-00 Hect.) has been prepared on the request of Minerals Ordinary
Sand Village - Jabugam, Taluka - Bodeli, District - Chhotaudepur, State Gujarat of
Arvindkumar Thakordas Kayastha, Village - Udhnagam, Taluka - Choryasi, District - Surat,
State Gujarat.
The letter of intent is for mineral Ordinary Sand in Village - Jabugam, Taluka -
Bodeli, District - Chhotaudepur, (Gujarat) in favor of Shri Patel Jitubhai Hathibhai, 504,
Abhisek Complex, Opp.Hotel Haveli, Sector No.11, Gandhinagar by Gujarat Government.
The Environment Clarence by GPCB by vide order no.
SEIAA/GUJ/EC/1(a)/126/2015 of date-25/03/2015
4
1.0 GENERAL
a) Name of the lessee Arvindkumar Thakordas Kayastha
Address Village - Udhnagam, Taluka - Choryasi
District Surat
State Gujarat
Pin code 394210
Phone No
Fax No
Mobile No 9825666371
E-Mail Id No
b) Status of Lessee Arvindkumar Thakordas Kayastha is
aIndividualAuthorised signatory.
Private Individual Government
Public limited Company -
Public Sector Undertaking -
Other (Please specify) Government
c)Mineral (s) which are including in the
prospecting license (for fresh grant)
Ordinary Sand
d)Mineral (s) which are included in the letter
of Intent/lease deed
Ordinary Sand
e)Mineral (s) which are included in the letter
of intent/lease deed
Ordinary Sand
f)Name & address of RQP under rule 22C of
MCR, 1960 or a person employed under
clause (c) of sub rule (1) of rule 42 of
MCDR, 1988 (Application for Scheme of
mining Only) Preparing mining plan.
Patel Jitubhai Hathibhai. RQP/UPD/379/
2014/A
Valid up to 16.11.2024 RQP Certificate
attached. Following two Key persons are
authorized prepare the SOM.
Address : 504, Abhisek Complex, Opp.Hotel
Haveli, Sector No.11, Gandhinagar.
Phone No
Fax No
Mobile No. +91-9909718109/9898858183
E-Mail ID Geoinfo_gimc@yahoo.com
Registration No. RQP/UPD/379/2014/A
Date of grant / renewal Valid up to 16.11.2024
5
2.0 LOCATION AND ACCESSIBILITY. a) Lease Details (Existing Mines)
Name of Mines Jabugam Ordinary Sand Mines
Lat/long of any boundary point Corner latitude and longitudes of lease area. Sr. No. LATITUDE LONGITUDE
1 2464220.28 372641.95
2 2464262.65 372737.55
3 2464287.84 372758.97
4 2464316.03 372903.05
5 2464301.86 373041.15
6 2464092.09 373036.59
7 2464099.13 372907.70
8 2464085.18 372794.08
9 2464041.99 372675.72
Date of grant of lease The mining was executed which has been granted
was executed on 29.12.06 for a period of 03 years.
Period/Expiry Date Quarry lease will expire on Deed. (Renewal)
Name of lease holder Arvindkumar Thakordas Kayastha
Postal Address Village - Udhnagam, Taluka - Choryasi
Telephone No
Fax No
Email ID No
Mobile No. 9825666371
b) Details of applied / lease area with location
map (Fresh area / Mines)
Forest Non-forest Non forest Government land
Forest (specify) Area (ha) NA
(i) Waste land 07-95-00 Hect.
(ii) Grazing land 0
(iii) Agriculture land 0
(iv) Others (Specify) -
Area (ha) 07-95-00 Hect.
Total lease area / applied area 07-95-00 Hect.
District & State Chhotaudepur & Gujarat
Taluka Bodeli
Village Jabugam
Whether the area falls under Coastal Regulation
Zone (CRZ) ?
No, The Mines area does not fall under Coastal
regulation zone.
If yes, Details therefore -
Existence of public road/railway line, if any
nearby & approximate distance
Highway - SH 11 -04.70 km.
Railway - Bodeli -05.02 km.
Airport - Vadodara -56.30 km.
Toposheet No. with Latitude and Longitude of
all corner boundary point/pillar
Topo sheet No.45 F/3,09 Boundary Pillar,
c) Location & Key plan attached? Yes
(Attach a general location map showing area
and access routes. It is preferred that the area be
marked on a Survey of India topographical map
or a cadastral map or forest map as the case
may be. However, if none of these are available,
the area may be shown on an administrative
map.)
It is attached Plate No.1
6
3.0 DETAILS OF APPROVED MINING PLAN / SCHEME OF
MINING (IF ANY)
3.1 Date and reference of earlier approved MP/SOM :-
Not Applicable
3.2 Details of last modification if any (for the
previous approved period) of approved
MP/SOM, indicating date of approval, reason
for modification
:-
3.3 Give review of earlier approved proposal (if
any) in respect of exploration, excavation,
reclamation etc.
:-
3.4 Give status of compliance of violations pointed
out by IBM :-
3.5 Indicate and give details of any
suspension/closure/ prohibitory order issued by
any Government agency under any rule or Court
of law.
:-
3.6 In case the MP/SOM is submitted under rules 9
and 10 of the MCDR'88 or under rule 22(6) of
the MCR'1960 for approval of modification,
specify reason and justification under these
rules.
:-
7
PART - A
1.0 GEOLOGY AND EXPLORATION. (a) Brief description of the topography, general geology and local geology of the
Mineral deposit including drainage pattern.
Topography & Drainage pattern.
The Mines area falls in ToposheetNo.45 F/3. The Ordinary Sand outcrops occur as flat
terrian. The highest and lowest point of the applied area is 84.98 and 80.17 meters
respectively. The area falls on the slope of the hill, with 20 degree average inclination towards
N-S.
The Mines is fully Government land, which is flat terrain.
River bed exists within the area, Rain water flows through river slope towards North to south,
during rainy season.
Vegetation
The area is in Chhotaudepur which falls under arid climate. Consequently, it is characterized
bysandy plain, more of less barren of vegetation expect in rainy season when multitudes of
ephemeral come un and transform the bare land into a green carpet, These ephemeral
complete their life cycle before the advent of summer heat and bulk of the area is once more
transformed into open sandy and stony plane, desolate and barren.
In general the vegetation in arid region is sparse. Plants with xerophytes adaptation are able
to establish themselves. The bulk of vegetation at the study area consists of stunted, thorny or
prickly shrubs or perennial herbs capable of brought resistance, distantly scattered trees of
stunted growth are found in this part of the country. Such vegetation is known as desert scrub.
The dominant tree species are Neem, Baval, Sagvan, Pipal, Mango, Banyan tree etc.
Climate conditions
The climate is moderate and temperature ranges from 26-430C during summer to about 12
0C
during winter. The average annual rain fall is 400 to 500 mm which received during monsoon
season from June to September. Predominant wind direction is SE-NE. Generally wind blows
with a velocity of 12-12 Km/hr in all seasons. Relative humidity varies from 23% to 83%.
(b) Brief description of Regional Geology with reference to location of lease/applied
area. Regional Geology:
The Chhotaudepurs district forms the north-eastern part of the Gujarat State. It is bounded by
the Sabarkantha district of Gujarat and the Banswara district of Rajasthan in the north, and by the
Jhabua district of Madhya Pradesh to the west. The district occupies an area of 8,866 km and has a
population of 29,56,456 people, Bodeli, Sant Rampur, JhalodShehera, Godhra, Limkheda, Dahod,
KalolDevgarhBaria, Halol and Jambughoda are the 11 talukas. Excepting the western plain part, the
entire district has hills of low altitude. The only exception being the Pavagadh hill. The Mahiriver is
the most Prominent river along with its tributaries like the Karod, the Mesri, the Goma and the
Panam. The avarage annual rainfall of the district is 90 cm. The district is well connected by roads
and rails.
8
The Archaean (?) crystallines, exposed to the southeast of DevgadhBaria, Comprising granite
gneiss and biotite gneiss are presumed to e oldest rocks in the area, Major part of the hilly terrain of
the district is occupied by the intensely flowed Aravalli Super group of rocks, comprising lithounits
belonging to the udaipur, Bodeli and the Champaner Groups. The Udaipur Group of rocks is exposed
in the east of Santrampur as a narrow belt and comprisephyllite, mica schist, metasubgraywacke
chlorite schist, phyllitic quartzite, protoquartizite and minor bands of dolomite. The Champaner
Group of rocks, restricted to the southern part of the district, has been subdivided into six formatics,
mainly due to interfomational conglomerate horizons.
Loamy and clayey soils occur in the piedmont plains, hilly terrain and plains. Bouger Gravity
anomaly varies form 30 to 50 mgals. The entire district falls in the moderate risk zone of the
seismicity. hot springs are present at Tuca, Nimbod and RathMoti. The main geomorphic units in the
district are alluvial plains, metasedimentary and granitic pediplains. sedimentarypediplain and alluvial
plain are excellent acquifers.
GEOLOGY AND MINERALS : Litho logy Formation Group Supergroup Age
Flood plain and channel-fill deposits Katpur Formation Holocene
Mottied clay and sandstone PanduMewasa
Formation
Pliocene
Rhyolite
Basalt
Deccan
Volcanics
Cretaceous
to Eocene
A. Limestone, shale, sandstone and
conglomerate with mrine fossils
B. Limestone, sandstone and conglomerate
with fresh water fossils.
Bagh/Lameta
Group
Upper
Cretaceous
A. Granite B. Granodiorite Godhra
Granite
Upper
Proterzoic
Phyllite, slate and mica schist with
intercalations of limestone, subgraywacke
and quartzite
Rajgarh Formation
Champaner
Group
Phyllite and manganiferousphyllite, quartzite
and dolomitic limestone
Shivrajpur
Formation
Phyllite, Metaconglomerate, quartzite and
metaconglomerate
Jaban Formation
AravalliSupergroup Lower
Proterozoic
Quartzite, phyllite and metaconglomerate Narukot Formation
Quartzite, quart-biotite schist, dolomitic
limestone, phyllite, metasubgraywacke,
metaconglomerate
Khandia
Formation
Quarzite, mica schist, metasubgraywacke,
conglomerate and migmatite
Lambia Formation
A.Phyllite, mica schist, metasubgraywacke
and chlorite schist B.quartzite and phyllitic
quartzite C.quartzite mica schist,
protoquartziteD.dolomite
Bodeli Group
Phyllite, mica schist and quartzite BalichaForamtion Udaipur
Group
Granite gneiss, biotite gneiss Archaean (?)
(c) Detailed description of Geology of the lease area (Such as Shape and size of the
Mineral/Ore Deposit, disposition Variouslitho-units indicating structural
features if any etc.)
Brief Description of the area is as
Alluvium - Recent
Ordinary Sand - Recent
Ordinary Sand:-
- It is mainly used in the building construction, roads and walls etc.
9
(d) DETAILS OF LESSEE
(i) Name of Prospecting/exploration agency Arvindkumar Thakordas Kayastha
(ii) Address Village - Udhnagam,Taluka - Choryasi
(iii) E mail Address No
(iv) phone No. No
(v) Fax No
(vi) Mobile No. 9825666371
(e) Details of the exploration already carried out.
The area is explored by digging within the area and can find out the thickness of
Ordinary Sand, quantity and quality of the Ordinary Sand.
(f) Surface Plans.
Surface plan of the area has been prepared on a scale of 1:1000 with 2 m Contour
interval (Please see plate No.2A)
(g) Geological Plans.
Geological plan of the area has been prepared on a scale of 1:1000 with 2 m Contour
interval (Please see plate No.2B).
(h) Geological Section.
A Geological section passing through the pits has been drawn on a scale of 1:1000
(horizontal) & 1:200 (vertical) (plate No.2B)
(i) Year wise Future Program of Exploration.
No need of future program of exploration, because part of the area has been explored
up to a depth of 3m. Even though, when we will go to depth side we can find out the
quality and quantity of the Ordinary Sand position
10
(j) Reserves and Resources as per UNFC with respect to the threshold value notified
by IBM may be furnished in a tabular from as given below:
Although the Ordinary Sand bed has been exposed fully in the whole area and also seen
in the bottom of pit which has gone to 3m deep. The quality of Ordinary Sand position
is improved in the deep portion. So we calculate the reserve of Ordinary Sand depends
upon the position which may vary from level to level & lateral wise. The occurrence of
uniforms & massive reserves. As per Geological Plan with section A’-A’’, B’-B’’ & C’-
C’’.
Proved Reserves (111)
The proved reserves can be estimated taking 2m interval continuity around the pits i.e.
about 07-95-00 sqm. & the depth is considered up to the 3m i.e. 5m below the actual
depth of the because by drilling. It is proved that Ordinary Sand is continuing in depth
& quality is also improved.
Probable Reserves (121 & 122)
An additional depth of 1.5m from the horizon of proved reserves have been taken under
probable reserves. The area of influence some change i.e. 07-95-00Sqm.
Possible Reserves (222)
A further addition depth of 1.5m from the horizon of probable reserves has been taken
under possible reserves. The area of influence some change i.e07-95-00Sqm.
Classification Code Quantity in tonnes Grade
Total Mineral Resources (A+B)
-
A. Mineral Reserve
1. Proved Mineral Reserves 111 620100
2. Probable Mineral Reserves 121 & 122 310050
B. Remaining Resources
1. Feasibility Mineral Reserves 211
2. Prefeasibility Mineral Reserves 221 & 222 310050
3. Measured Mineral Reserves 331
4. Indicated Mineral Reserves 332
5. Inferred Mineral Reserves 333
6. Reconnaissance Mineral Reserves 334
(k) Furnish detailed calculation of reserves /resources section wise.
As Above.
11
(l) Mineral Reserves/Resources
Level of Exploration Resources in tons Grade
G1 Detailed Exploration - -
G2 General Exploration - -
G3 Prospecting - -
G4 Reconnaissance - -
As the mineral reserves estimated as per mining plan was based mainly on Open pit in mines
area and on geological consideration. The details of mineral reserves estimation as per UNFC
Guidelines has to be furnished with the justification of rewarding codes of Economic axis,
Feasibility axis and Geological axis under various categories. The reference to prescribed
threshold values of mineral is to be made for computation of reserves.
Classification Code Quantity in tonnes Grade
Total Mineral Resources (A+B)
-
A. Mineral Reserve
1. Proved Mineral Reserves 111 620100
2. Probable Mineral Reserves 121 & 122 310050
B. Remaining Resources
1. Feasibility Mineral Reserves 211
2. Prefeasibility Mineral Reserves 221 & 222 310050
3. Measured Mineral Reserves 331
4. Indicated Mineral Reserves 332
5. Inferred Mineral Reserves 333
6. Reconnaissance Mineral Reserves 334
Total Reserves + Resources 1240200
Life of mine
Life of mine at the planned rate of production at 57876 TPA Shall be 1 years (as per present
reserves) Life of mines 13 years.
Reserves estimated can be carried out based on exploration proposed.
12
2.0 MINING
A. OPEN CAST MINING
(a) Brief description of the existing as well as proposed method for excavation with
alldesign parameters indicating on plans / sections.
(i) Existing method for excavation: Design Parameters:
The deposit is in form of flat surface. So far of mining, Ordinary Sand exposed in
applied lease area, opencast is the only method which can be followed to work the
deposits.
The Mines plan is designed to use the existing natural parameter optimally for the
recovery of Ordinary Sand. The bench height has been kept at 8meters to make it
convenient for easy handling of primary and for safety purpose
(ii) Proposed method for excavation design parameters:
No change in method of mining is proposed.
(b) Year wise tentative Excavation in m3 indicated development, ROM, pit wise as in
table below.
Inset Tentative Excavation
Year Pit No. Total
tentative
Excavation
(sqm)
Topsoil
(cum)
OB/SB/IB
(cum)
ROM (cum) Mineral
reject Ore
Ratio
(cum)
Mineral
reject
Ratio
(cum)
2016-17 - 15900 0 0 22260 -- --
2017-18 - 15900 0 0 22260
2018-19 - 15900 0 0 22260
2019-20 - 15900 0 0 22260
2020-21 - 15900 0 0 22260
Total 111300 -- --
13
Estimated available material (cum)
Dump
Identification/No
Year wise handling
(cum)
Estimated recovery of
saleable material (cum)
Reject (cum)
No dump existing
'A' Category Mines Yes
Individual year wise development plans and
sections showing pit layouts, dumps, stacks of
Mineral reject attached?
Yes
'B' Category Mines No
Composite development plans showing pit
layouts, dumps, stacks of Mineral, reject, if any
etc. and year wise sections attached?
No
(c) Brief description giving salient features of the proposed method of working
indicating category of Mines.
It is proposed to adopt the semi-mechanized open cast method of mining by using
Excavator. As stated earlier the Ordinary Sand mining is entirely different from
conventional type of mining. The bench parameters have been Mineral, 1.5m height
& width.
The Mining suggested is semi mechanized at present and subsequently based on
market it is planned to improvement to mechanized operations.
(d) Brief description of the layout of Mines working, pit road layout, the layout of
faces and sites for disposal of O/B, waste along with ground preparation prior to
disposal of waste, reject etc. A reference to the plans and sections may be given.
UPL or ultimate size of the pit is to be shown for identification of the suitable
dumping site.
Area is devoid of over burden so no Development works will be proposed. Bench
height will be 3m and targeted production will be 289380 tones Five year (with
Mineral reject) Details of year wise bench wise production is given in the tables
below.
First Year (2016-17)
During the first year the production from this applied lease area will be 57876 tones. During
the first year entire production of Ordinary Sand.The likely positions of the benches, roads &
plantation etc. In this Mines are at the end of first year are shown in the plate no.3.
Surface area in Sq.m. Avg. Height of bench
in m
Volume in cu.m. Tonnage
15900 1.4 22260 57876
22260 57876
14
Second Year (2017-18)
During the Second year the production from this applied lease area will be 57876 tones.
During the Second year entire production of the likely positions of the benches, roads &
plantation etc. In this Mines are at the end of first year are shown in the plate no 3.
Surface area in Sq.m. Avg. Height of bench
in m
Volume in cu.m. Tonnage
15900 1.4 22260 57876
22260 57876
Third Year (2018-19)
During the third year the production from this applied lease area will be 57876 tones (with
Mineral reject).During the third year entire production of Ordinary Sand.The likely positions
of the benches, roads & plantation etc. In this Mines are at the end of first year are shown in
the plate no 3.
Surface area in Sq.m. Avg. Height of bench
in m
Volume in cu.m. Tonnage
15900 1.4 22260 57876
22260 57876
Fourth Year (2019-20)
During the fourth year the production from this applied lease area will be 57876 tones(with
Mineral reject). During the fourth year entire production of Ordinary Sand.The likely
positions of the benches, roads & plantation etc. In this Mines are at the end of first year are
shown in the plate no.3.
Surface area in Sq.m. Avg. Height of bench
in m
Volume in cu.m. Tonnage
15900 1.4 22260 57876
22260 57876
Fifth Year (2020-21)
During the fifth year the production from this applied lease area will be 57876 tones(with
Mineral reject). During the fifth year entire production of Ordinary Sand.The likely positions
of the benches, roads & plantation etc. In this Mines are at the end of first year are shown in
the plate no3.
Surface area in Sq.m. Avg. Height of bench
in m
Volume in cu.m. Tonnage
15900 1.4 22260 57876
22260 57876
(e) Conceptual Mines planning up to the end of lease period taking into consideration the
present available reserves and resources describing the excavation, recovery of ROM,
Disposal of waste, Backfilling of voids, reclamation and rehabilitation showing on a
plan with few relevant sections.
15
Exploration:
Massive deposit of Ordinary Sand occurs is in the form of a lose, having exposure of all
sides up to bottom of River bed. The huge quantity of material to sustain production more
than 13 years is visible under proved category. Therefore further exploration is not
required.
Mines development:
As such very nominal development work for proposed road making work will be required
to start production from this area. The proposed mining has been selected along strike
direction covering maximum width up to ultimate depth. Therefore, the development &
production plan have been described.
Optimum Exploitation and utilization of Mineral:
Ordinary Sand Mineral in the lease area has been excavated up to 7.5 m statutory barrier
all along the lease boundary with the restriction of mining width; under the present
scenario mining cannot proceed below 80.17mRL.
Lessee should apply to DGMS for mining in 7.5 barrier.
In the present pit design final pit slope is considered at 450. In the fifth year of mining the
present reserves are likely to exhaust, hence company can approach DGMS for steeper
final slope of the pit and recover the blocked Mineral to possible maximum limit.
Disposal of Waste
0% waste of ROM from Ordinary Sand will be generated during mining. Total 111300
cum tone & 0 swelled wastes will be generated. Initially during scheme of mining (1st to
5th
year) waste will be dumped on ground level as shown in plate no.3.
During the proposed five years period year wise barbed wire fencing will be done around
the plantation area wire fencing will prevent any inadvertent entry. Year Waste in cum
2016-17 --
2017-18 --
2018-19 --
2019-20 --
2020-21 --
Total --
Environmental Aspects:
Due to mining, envies Jabugam land degradation will be in the form of open pit and area
covered will be about 6.3706 hectares out of 7.9500 hectares. By the end of life of Mines
1.5794 ha. will be developed as green belt along the statutory barrier.
Machinery in use at the Mines will generate dust and noise and all preventive measures as
per consent to operate will be strictly implemented. Negative impact on land degradation
will be reduced by way of green belt along the lease boundary. Air pollution will be
controlled by way of providing fully automatic drilling machine from where continuous
supply of water during drilling flows down to suppress any dust generated during drilling.
Sprinkling of water over haul roads, loading and unloading points will be provided. Dusts
masks will be provided to workers engage Jabugam in drilling and working in dusty
environment. No Mineral beneficiation is proposed hence, no water treatment is required.
However any water flowing from the Mines to outside will be circulated through the
sumps and settlers, so arrest any silt. Sumps and settlers will be periodically cleaned.
16
Regular Air, water and noise quality will be monitored as per the guide lines from SPCB.
SPM level of 500 ug/m3in ambient air will be achieved. Standard of 600 ug/m
3 will be
applicable within 3-10 m of any equipment.
Day time noise level shall be kept below 75d B A (Leq) and night time at 70 dB A
(Leq)
Other conditions as per consent operate will be followed
Plantation :
Plantation will be carried out along the lease boundary over 7.5 m statutory barrier
(1.5794 hectares) by the end of SOM period.
Year wise plantation program for the SOM period is given below.
SN Site Area 15-16 16-17 17-18 18-19 19-20
1 Green
belt
along
statutory
barrier
1.5794
(25 No. of Plant)
25 28 28 28 28
Species to be planted:
Neem, Sagwan, Banyan, Pilu, Baval etc.
Expected rate of Survival : Expected rate of survival is anticipated at 80 %
Proper care maintenance will be done as proposed in the chapter on environment
management in the SOM.
Post Mining land use:
The applied lease area at the end of mining when Mineral will be fully exhausted will be
backfilled by waste from ROM generated during mining and remaining mine out will be
used for rain water storage. However at the end of lease period total plantation area will
be 1.5794 hectares. This will enhance the aesthetic beauty of the area. This work should
be taken up in consultation with Horticulturist and landscape designers.
Reclamation &Rehabilitation:
At the end of mining plan period, about 6.3706 hectares area will be cover under mining
up to depth 80.17 m RL. Ordinary Sand Mineral will continue in strike for further mining.
Thus no reclamation is proposed at this plan period. The plantation will be done along
lease boundary in next five years. At the end of mining plan period total 1.5794 hectares
area will be planted.
Backfilling has proposed in next five year plan period. Nonetone of waste will be
generated from Ordinary Sand, total waste will be generated during plan period will be
dumped on the ground level.
(f) System of Drilling & Blasting
Not Applicable
(g) Under Ground Mining
Not Applicable
17
3.0 MINES DRAINAGE
(a) Minimum and maximum depth of water table based on observation from rear by
wells and water bodies.
Minimum depth of
water table
Maximum depth of
water table
Source Remark
61.12 mRL 71.12 mRL - -
(b) Indicate maximum and minimum depth of workings.
Year Maximum depth of working Minimum depth of working
2016-17 81.12 mRL 82.52 mRL
2017-18 81.12 mRL 82.52 mRL
2018-19 81.12 mRL 82.52 mRL
2019-20 81.12 mRL 82.52 mRL
2020-21 81.12 mRL 82.52 mRL
(c) Quantity and quality likely to be encountered, the pumping arrangements and
places where the Mines water is finally proposed to be discarnate.
Year Quantity of
water likely to
be encountered
Quality of water likely
to be encountered
pumping
arrangements
Final place
of discharge
of Mines
water
Remark
Not applicable Ordinary Sand is
nontoxic and hence no
chemical treatment of
Mines water is required.
Periodical quality
monitoring will be
carried out and reports
submitted to concerned
authorities.
Any excess water
will be pumped out
after passing
through settlers and
sump.
Used for
plantation
purpose.
18
Surface water Quality:
The rainwater shall accumulate in working pit. No mining activities shall be carried
out during rainy season.
Though the pits are on ground level, there is always some accumulation of water
during rainy season in the pits. So it proposed to use 5 Hp diesel engine operated
pump rainy season to dewater the pits, as and used for plantation.
(d) Description of regional and local drainage pattern indicating annual rain fall,
catchments area, and likely quantity of rain water to flow through the lease area,
arrangement for arresting solid wash off etc.
The average annual rainfall is 400 to 500 mm which received during monsoon season
from June to September. There are no nalla exist within lease area.
Orsang river is nearer to Mines site approximate 100m.
19
4.0 STACKING OF MINERAL REJECT/SUB GRADE
MATERIAL AND DISPOSAL OF WASTE
(a) Brief description of the nature and quantity of top soil, overburden/waste and
Mineral reject to be disposed of.
No Generated waste during the mining Scheme period.
(b) Location of proposed dumping ground within the lease area weather proved for
presence or absence of Mineral and be outside the UPL unless simultaneous back
filling is proposed or purely temporary dumping for a short period is proposed
in Mineralized area with technical constrains & justification.
No Generated waste during the mining Scheme period.
(c) Note indicating the manner of disposal of waste, configuration and sequence of
year wise buildup of dumps along with the proposals for protective measured.
Total 0 tones waste will be generated.
20
5.0 USE OF MINERAL AND MINERAL REJECT
(a) Brief description of the requirement of end use industry specifically in terms of
physical & chemical composition.
Ordinary sand is mainly used in the building construction, roads and walls. Ordinary
Sand is used in water harvesting, bore well, water filtration systems, landscaping
projects, custom concrete mixes, interlocks for good compaction, drainage to all
concrete projects, building roads in making concrete etc.
(b) Brief description of requirement of intermediate industry involved in up
gradation of Mineral before its end use.
The Ordinary Sand Jabugam extracted from lease area will be directly used in next
five year.
(c) Details of requirements for other industries, captive consumption, export,
associated industrial use etc.
Ordinary Sand find extensive use for Building Construction, Buildup road and other
major industries.
(d) Precise physical and chemical specification stipulated by buyers.
100% Of ROM will be produced. Therefore, 100% ROM will be sold to buyers.
(e) Details of processes adopted to upgrade the ROM to suit the use requirements.
Ordinary Sand not further processed after mining.
21
6.0 PROCESSING OF ROM AND MINERAL
REJECT
(a) If processing / beneficiation of the ROM of Mineral Reject are planned to be
conducted briefly description of nature of processing / beneficiation, indicating
size and grade of feed material and concentrate, recovery etc.
No Generated waste during the mining Scheme period.
(b) Material balance chart with a flow sheet of schematic diagram of the processing
producer indicating feed, product, recovery, and its grade at each stage of
processing.
No Generated waste during the mining Scheme period.
(c) Disposal method for tailing or reject from the processing plant.
Not applicable
(d) Quantity and quality of tailing / rejecting proposed to be disposed, size and
capacity of tailing pond, toxic effect of such tailing , if any with process adopted
to neutralize any such effect before their disposal and dealing of excess water
from the tailing dam.
Not applicable
(e) Quantity and type of chemicals in any to be used in the processing plant.
Not applicable
(f) Specify quantity and type of chemicals to be stored on site / plant.
Not applicable
(g) Quantity (cum per day) of water required for mining and processing and sources
of supply of water, disposal of water and extent of recycling along with water
balance chart.
Not applicable
22
7.0 OTHERS
Brief description of the following:
(a) Site Services
The site Services i.e. workshop, power supply, water supply, office, store fuel storage,
first aid station, canteen etc. Have been provided outside lease area, close to the
Mines.
Other infrastructure facilities are provided at the mining site.
There is no proposal for closure of Mines in the next five years, hence no
decommissioning of infrastructure is proposed. Building will be dismantled and
reusable material sold of used elsewhere. Transmission line will be de-energized and
dismantled. No live electric supply line will be left.
(b) Employment potential:
(i) Workers:
As stated earlier will be done by semi mechanized opencast method with drilling. The
Mines will work for only one shift during day time from 8 a.m. to 5 p.m. with one
hour recess. Considering 300 working days in a year excavation shall be as follows:
Year Rom (in
tones)
ROM (In
cum)
Daily
excavation (In
cum)
*Proposed labors
First 57876 22260 26 5
Second 57876 22260 26 5
Third 57876 22260 26 5
Fourth 57876 22260 26 5
Fifth 57876 22260 26 5
Total 289380 111300 26 (Average) 5 (Average)
Out of the total 8 manpower to be engage Jabugam in the Mines, one man will be
allocated for proper care and maintenance of plantation, one for office work shall be
employed. One tractor driver with helper shall also employ. One for JCB operator &
one drives for tipper, thus total labors/workers shall be 8.
(ii) One drivers for tipper, thus total labors/workers shall be 8.
A provision is made for employment of following statutory personnel
Mines Manager under MMR’ 1970 - 1
Mining Engineer part time Under MCDR’ 1988 - 1
Mining Geologist part time under MCDR’ 1988 - 1
23
8.0 PROGRESSIVE MINES CLOSURE PLAN
UNDER RULE 23 OF MCDR’1988
8.1 Environment Base Line Information:
Topography & Drainage
The Mines area falls in ToposheetNo.45 F/3. The Ordinary Sand outcrops occur as
massive hillocks. The highest and lowest points of the applied area are 84.98 and
80.17 meters respectively. The area falls on the slope of the hill, with 20 degree
average inclination towards N-S.
The Mines is fully Government land, which is flat terrain.
River bed exists within the area, Rain water flows through river slope towards North
to south, during rainy season.
Existing Land use Pattern:
The lease area is a Government land of Orsang River Adjoing 284/A, which falls
under Jabugam Village. No agriculture land exist the lease area. (Refer plate No.2A) Activity Present In Hec At the end of plan Period In
Hec
Mining 0.0 6.3706
Pits/Activity
Mining Area
0.0 0.0
Dumps 0.0 0.0
Haul Road 0.0 0.0
Infrastructure 0.0 0.0
Mineral Stock 0.0 0.0
Plantation 0.0 1.5794
Remaining virgin
area
7.9500 0.0
7.9500 7.9500
(i) Water regime
Surface and Ground Bodies :
S.No. Name of the water Body Date of Sampling Sampling Location
1 Mining Site - -
(ii) Quality of air
The entire area is very calm and quiet and free form air pollution. The quality of air
level appears to be within permissible limits (No Survey has been conducted for the
preparation of mining plan of small area). The source of pollution as regard air area
the surrounding small Mines which contribute mainly for the pollution.
24
(iii) Ambient noise level
The entire area is very calm and quiet and free from noise pollution. The quality of
ambient noise level appears to be within permissible limit (no survey has been
conducted for the preparation of mining plan of small area) the source of pollution as
regard noise area the surrounding small Mines which contribute mainly for the
pollution.
(iv) Flora and fauna
The area lies in Chhotaudepur, which falls under arid climate. Consequently, it is
characterized by sandy plain, more of less barren of vegetation except in rainy season
when multitudes of ephemeral come up and transform the bare land into a green
carpet. These ephemeral complete their life cycle before the advent of summer heat
and bulk of the area is once more transformed into open sandy and stony plane,
desolate and barren.
In general the vegetation in arid region is sparse. Plants with xerophytes adaptation
are able to establish themselves. The bulk of vegetation at the study area consists of
stunted, Thorny of prickly shrubs of perennial herbs capable of drought resistance.
Distantly scattered trees of stunted growth are found in this part of the country. Such
vegetation is known as desert scrub. The dominant tree species are neem, Baval,
Sagvan, Pipal, Mango, Banyan tree etc.
The terrestrial fauna of the region mainly comprises of domestic animals and burrow
dwellers. During the study period no endangered of rare species was found within the
study area.
(v) Climatic conditions
The climate is moderate and temperature ranges from 26-430C during summer to
about 120C during winter. The average annual rain fall is 400 to 500 mm which
received during monsoon season from June to September. Predominant wind direction
is SE-NE. Generally wind blows with a velocity of 12-12 Km/hr in all seasons.
Relative humidity varies from 23% to 83%.
(vi) Human settlements
There is no village within the lease area. Lease area is situated in the revenue
boundary of Jabugam, Jabugam village is situated in north direction of the lease area.
(vii) Public buildings, places of worship and monuments
Area is free from any public building and monuments. The lease area is free from sink
hole having any connection to any cave system and Perennial River is far away from
the lease area as such not going to affect any way.
(viii) Weather any Sanctuary is located in the vicinity of lease hold?
No any Sanctuary is located in the vicinity of lease hold area.
8.2 Impact Assessment:
The Mining operation will have some impact on the existing environment, both
adverse and beneficial. Considering the nature and scale of operation, on the other
hand impact on socio-economic will be largely beneficial. The possible impacts are
enumerated below:
25
(i) Land Environment
At the end of five years, damage to the landscape in the form of pit & road etc., about
7.9500 hectares will be pit. The area influence of mining at the end of 5th
year & end
of the Mines life is given below:
Activity Present In Hec At the end of plan Period
In Hec
Mining 0.0 6.3706
Pits/Activity Mining
Area
0.0 0.0
Dumps 0.0 0.0
Haul Road 0.0 0.0
Infrastructure 0.0 0.0
Mineral Stock 0.0 0.0
Plantation 0.0 1.5794
Water Storage 0.0 0.0
Backfilled area 0.0 0.0
Remaining virgin
area
7.9500 0.0
7.9500 7.9500
(ii) Air Quality
Air quality gets affected due to mining, blasting and movement of earth moving
equipment etc.However, the impacts area localized and is not continuous. Overall
effect for mining of Ordinary Sand from this 7.9500 hect. Area is insignificant. To
reduce such impacts measures will be adopted from the inception by spraying water
all along the haul road. Further a forestation all along the lease boundary and haul
road will arrest a major quantity of dust. In blasting use of delay/non electric system
will result reduction of vibration as well as dust.
(iii) Water Quality
The mining excavation of which will never touch the ground water table. Hence no
question of ground water pollution arises.
(iv) Noise levels
Operation of equipment will emit noise. To have control on noise level within 80 db
adherence to strict schedule maintenance, monitoring of noise will be carried out.
Blasting-Noise & Vibration during blasting is momentary but needs proper planning
to reduce the same.
(v) Water regime
Unaffected
(vi) Acid Mines drainage
This is not applicable to the Ordinary Sand area.
26
(vii) Surface subsidence
This is not applicable to the Ordinary Sand area.
(viii) Socio-economic environment
Mining in this lease area will gave more job opportunity to the local people
thus,Ordinary Sand mining will not create any adverse effect to the local people.
Ordinary Sand mining will not generate hazardous dust, which may cause health
problem to Mines workers. The nearest human settled village is Jabugam which is
nearby from lease area. Thus mining will not have any impact on the village human
settlement.
(ix) Historical monuments etc.
No Historical monument lies within the core and 5 Km. buffer zone.
8.3 Progressive reclamation plan:
8.3.1 Mine out land
Description of the proposals to be implemented for reclamation and rehabilitation of
Mine out land including the manner in which the actual site of the pit will be restored
for future use, supported with yearly plans and section depicting yearly progress in the
activities for land restoration/reclamation/rehabilitation, a forestation etc., called
“Reclamation plan”
Land use pattern at present and at the end of plan period is given above:
Reclamation & Rehabilitation
At the end of mining plan period, about 7.9500hectares area will be cover under
mining up to depth 80.17mRL. Ordinary Sand Mineral will continue is strike for
further mining after approved applet Authority. Thus no reclamation is proposed at
this exiting mining area. The plantation will be done along lease boundary in next five
year. At the end of mining plan period total 1.5794hectares area will be planted.
Plantation:
Plantation will be carried out along the lease boundary over 7.5 m statutory barrier
(1.5794 hectares) by the end of plan period.
Year wise plantation program for the SOM period is given below:
Year No.of plants Area (in Hect.,) Survival Rate
2016-17 10 0.31588 50%
2017-18 10 0.31588 50%
2018-19 10 0.31588 50%
2019-20 10 0.31588 50%
2020-21 10 0.31588 50%
Total 1.5794
Expected rate of survival: Expected rate of survival is anticipated at 80%
Proper care maintenance will be done as proposed in the chapter on Environment
management in the SOM.
27
8.3.2 Top soil Management:
No top soil generated whatever top soil generated has been used for plantation.
8.3.3 Tailings Dam Management:
There is no tailing generation in the process of mining. Hence no tailing dam
management.
8.3.4 Acid Mines drainage, if any and its mitigative measures.
There is no acid drainage in this Mines of Ordinary Sand area, so no mitigative
measures are proposed.
8.3.5 Surface subsidence mitigation measures through backfilling of Mines voids or by
any other means and its monitoring mechanism.
The information on protective measures for reclamation and rehabilitation works year
wise may be provided as per the following table.
SUMMARY OF YEARWISE PROPOSAL FOR ITEM No.8.3
Items Details Proposed Actual Remarks
Dump management Area afforested (Ha) -- -- There is no
proposal for
dump plantation No. of saplings planted -- --
Cumulative no. of plants -- --
Cost including watch and
care during the year
-- --
Management of
worked out benches
Area available for
rehabilitation Ha
-- --
--DO--
Afforestation done Ha -- --
No. of saplings planted in
the year
-- --
Cumulative no. of plants
any other method of
rehabilitation (specify)
-- --
Cost including watch and
care during the year
-- --
Reclamation and
Rehabilitation by
backfilling
Void available for
Backfilling (LxBxD) pit
-- --
--DO--
Pit wise /Stoke wise -- --
Void filled by
waste/tailings
-- --
Afforestation on the
backfilled area
-- --
Rehabilitation by making
water reservoir
-- --
Any other means (specify) -- --
Rehabilitation of
waste land within
lease
Area Available Ha -- --
--DO-- Area rehabilitated -- --
Method of rehabilitation -- --
Others (specify) -- --DO--
28
8.4 Disaster Management and Risk Assessment:
A major emergency in Mines is one which has potential to cause serious injury or loss
of life and cause damage to activities resulting in disruption to normal activities. The
emergency may be caused due to human failure, breakdown of machinery or natural
cause.
The disaster management plan prevents accidents, by systematic planning, operation,
maintenance of machinery and training of personal. Since absolute safety is not
achievable the essential part of hazard control is to be aimed at mitigating the effects
of all accident.
The measures include recognizing the possibilities of accidents, assessing
consequence, decide on steps to be implemented in case of emergency. The
emergency plan both offsite and onsite to be consistent with each other. The
objectives of emergency plan include:
To localize emergency and eliminate hazards
To minimize the effects on people and property
Elimination of hazards by local / supervisory personnel and minimizing effects
includes rendering first aid, evacuation, hospitalization, rehabilitation.
To seek help from outside sources if required.
Notice / information to authorities.
It is a hard rock area and as such no serious disaster is foreseen. However accidents
cannot be ruled out in the Mines. Following risks are anticipated:
Failure of benches.
Fall of machinery / person from benches.
Failure of transport machinery.
Heavy rainfall.
Accidents due to blasting / explosive
Accidents due to fire
The Onsite Emergency plan is already in place and will be followed strictly in case of
any emergency. If required help will be sought from district authorities and DGMS.
8.5 Care and maintenance during temporary discontinuance:
In case of any temporary discontinuance due to court order or due to statutory
requirement or any other unforeseen circumstance following measures for care and
maintenance and monitoring of status shall be taken.
Notice of temporary discontinuance of work in Mines shall be given to the controller
General, Controller of Mines and the Regional controller of Mines, IBM and DGMS
officials under Rule 24 of MCDR 1988 and Reg.6 of MMR 1961 respectively.
All the mining machinery shall be shifted to a safe place.
Competent persons shall inspect the area regularly.
Air, water and other environment monitoring shall be carried out.
Care and upkeep of plantation shall be carried out on regular basis.
Measures of care, maintenance and monitoring of status of unplanned, discontinued
mining operations shall be followed in case of any temporary discontinuance of
Mines.
Entrance to Mines working shall be properly fenced as per the DGMS circular.
No temporary discontinuance is anticipated during the closure plan period.
29
8.6 Financial Assurance:
The lessee is required to submit the financial Assurance for the area to be put to use
for mining and allied activities at the end of scheme of mining period. Following table
shows the calculation as per the CCOM’s circular No. 4/2006.
S.
No
Item Area
put on
use at
Start of
plan
(Ha)
Additional
requirement
during plan
period (Ha) (B)
Total
(Ha) C
=
(A+B)
Area considered
as fully reclaimed
and rehabilitation
(Ha) (D)
Net area
considered
(Ha) E = (C-
D)
1 Area to be excavated 0 6.3706 6.3706 0 6.3706
2 Storage for topsoil 0 0 0 0 0
3 Overburden/dumps 0 0 0 0 0
4 Mineral storage 0 0 0 0 0
5 Infrastructure
(Workshop, Adm.
Building)
0 0 0 0 0
6 Haul Roads 0 0 0 0 0
7 Railways 0 0 0 0 0
8 Green belt 0 1.5794 1.5794 0 1.5794
9 Tailing pond 0 0 0 0 0
10 Effluent treatment
plan
0 0 0 0 0
11 Mineral separation
plan
0 0 0 0 0
12 Township area 0 0 0 0 0
13 Others (private land) 0 0 0 0 0
Total 0 7.9500 7.9500 0 7.9500
Proposed area to be put to use at the end of plan period is 7.9500 hectares. Financial
assurance for semi mechanized Mines are calculated at the rate of Rs.50,000/- per hectares
for area to be put to use. For 7.9500 hectares it works out to Rs.3,97,500/- But as per Rule
23F(1) minimum financial assurance for B category Mines is Rs.1,00,000/- FA in the form of
bank Guarantee will be submitted at the time of submission of five copies of the SOM.
Date :-
Place :- Gandhinagar.
(Patel Jitubhai Hathibhai)
RQP/UPD/379/2014/A
Valid up to 16.11.2024
30
CONSENT LETTER / UNDERTAKING / CERTIFICATE
1. The Scheme of mining in respect of Jabugam Ordinary Sand mine, over an area of 7.9500
Ha in Village - Jabugam, Taluka - Bodeli, District - Chhotaudepur, State - Gujarat under
rule GMMCR (Amendment)-2015 has been prepared by Jitubhai Hathibhai Patel, RQP.
This is to request the CGM, Gandhinagar to make further correspondence regarding any
correction of the Scheme of Mining with the said recognized person at his address below:
Mr. Jitubhai Hathibhai Patel
RQP/UPD/379/2014/A (Valid up to 16.11.2024)
Office Address : 504, Abhisek Complex, Opp.Hotel Haveli, Sector No.11, Gandhinagar.
We hereby undertake that all modifications/updating as made in the said Scheme of
Mining by the said recognized person be deemed to have been made with our knowledge
and shall be acceptable to us and binding in all respects.
2. It is certified that CCOM circular no.2/2010 will be implemented and complied with
when an authorized agency is approved by the State Government.
3. It is certified that the Progressive Mine Closure Plan of Jabugam Ordinary Sand mine,
over an area of 7.9500 Ha complies with all Statutory rules, regulations, Orders made by
the Central or State Government, Statutory organizations, Court etc., which have been
taken into consideration and wherever any specific permission is required, the lessee will
approach the concerned authorities. The information furnished in the Progressive Mine
Closure Plan is true and correct to the best of our knowledge and records.
4. The provisions of Mines Act, Rules and Regulations made there under have been
observed in the Scheme of Mining over an area of 7.9500 Ha in Village -Jabugam, Taluka
- Bodeli, District - Chhotaudepur, State - Gujarat belonging to Jabugam Ordinary Sand
mine, and where specific permissions are required, the lessee will approach the D.G.M.S
Further, standards prescribed by D.G.M.S in respect of Miner's health will be strictly
implemented.
Place :
Date :
(Arvindkumar Thakordas Kayastha)
Village - Udhnagam, Taluka - Choryasi,
District - Surat
31
CERTIFICATE FROM RQP
The Provision Of The Mineral Conservation and Development Rules 1988 Have Been
Observed In The Preparation Of Scheme Of Mining Under rule GMMCR(Amendment)-2015
for Jabugam Ordinary Sand Mine Over an area of 7.9500 Ha, Village - Jabugam, Taluka -
Bodeli, District - Chhotaudepur, Gujarat of Arvindkumar Thakordas Kayastha, Village -
Udhnagam, Taluka - Choryasi, District - Surat, Gujarat and Whenever Specific Permission
are Required, the Lessee Will approach the concerned authorities of Commissioner &
Commissioner ate of Geology and Mining, Gandhinagar, Gujarat.
The information furnished in the Scheme of Mining is true and correct to the best of our
Knowledge.
Date :-
Place :- Gandhinagar.
(Patel Jitubhai Hathibhai)
RQP/UPD/379/2014/A
Valid up to 16.11.2024
32
LIST OF PLATE
S.no. Plates Plate
No. Scale
1 Location & Key Plan 1 1 : 1000
2 Surface Plan 2A 1 : 1000
3 Geological Plan & Sections 2B 1 : 1000
4 Five Years Development Plan and Section (2016-17 to 2020-
21)
3 1 : 1000
5 Conceptual Plan & Section 4 1 : 1000
6 Mine layout plan & section 5 1 : 1000
7 Environment Plan 6 1 : 5000
L I S T O F DOCUMENTS ANNEXED
S.no. Annexure Annexure
no.
1 RQP Certificate 1
2 Photo ID with Address Proof 2
3 Letter Of Intent 3
4 Lease Deed 4
5 Environment Clearance Application Letter 5
33
Lease Area Photograph
Photo - 1