MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 1
Detector DAQ IssuesDetector DAQ Issues
o Achievements Since CM24
o Trigger
o Event Building
o Online Software
o Front End Electronics
o CAM-DAQ Interface
o Schedule Milestones
o Summary
Jean-Sebastien Graulich, Geneva
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 2
Achievements since Achievements since CM24CM24
DAQ and Controls ReviewDAQ and Controls Review Factor of 5 increase in # of particle Factor of 5 increase in # of particle
triggers per spilltriggers per spill FADC Firmware upgradedFADC Firmware upgraded
Factor of 4 reduction in data size
Trigger DebuggedTrigger Debugged Problem with Event building under Problem with Event building under
controlcontrol
-------------------------------------------------------------------------------- Target DAQ des-integratedTarget DAQ des-integrated
DAQ ReviewDAQ Review
Details presented at VC 121Details presented at VC 121
The DAQ Review is Done ! The DAQ Review is Done ! Very useful comments have been receivedVery useful comments have been received Detector DAQ appears to be in shape and Detector DAQ appears to be in shape and
should allow data taking for Step III and should allow data taking for Step III and beyondbeyond
Unified Controls, Data Flow and Online Unified Controls, Data Flow and Online Database are more recent projects and the Database are more recent projects and the committee has noticed it’s not yet maturecommittee has noticed it’s not yet mature
Need better integration DAQ/Controls More thinking on Online Data Buffer Disk Access
Serious concern about the man power Serious concern about the man power available for Controlsavailable for Controls
MICE VC June 2009 Jean-Sébastien Graulich Slide 3
ReminderReminder
The DAQ Spill Gate has to be checked The DAQ Spill Gate has to be checked before data takingbefore data taking
Documentation available Adjust Width And log !!!
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 4
TOF1
Accepted Particle Trigger
GVA1 = Part. Trg Request
Spill Gate
Trigger debuggingTrigger debugging
Trigger signal generation was in “update” Trigger signal generation was in “update” modemode
Went unnoticed at low rate Introduced variable dead time difficult to control Caused saturation
SolvedSolved
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 5
Particle Trigger request
Accepted Particle Trigger
Event BuildingEvent Building
Synchronization can be lost because ofSynchronization can be lost because of Unstable electronics in DAQ trigger distribution Unstable behavior of the VME/Pci Interface
The DAQ software release the busy The DAQ software release the busy and enables the DAQ trigger receiver and enables the DAQ trigger receiver channel after readoutchannel after readout
Must go through the VME/Pci Interface It happens that one of the two commands is not
executed properly… Unpredictable Cured only by a power cycle
Has to be monitoredHas to be monitored
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 6
DAQ Trigger MonitorDAQ Trigger Monitor
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 7
Number of LDC receiving a DAQ Trigger per DAQ event
LDC Number
cou
nts
# o
f D
AQ
Tri
gg
ers
Particle Trigger Particle Trigger monitormonitor
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 8
Equipment number
LDC Number
Co
un
ts#
of
Pa
rt T
rig
ger
s
V1724FADCsScalar ch0
TDCs
V1731FADC
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 9
Front End ElectronicsFront End Electronics
TOF2TOF2 1 TDC and 5 FADC to be
installed Will require upgrade of the
rack layout in Control Room
EMR: Electron Muon EMR: Electron Muon Ranger (aka SW)Ranger (aka SW)
Prototype of Front End Board exists BUT :
We consider going for another ASIC (Amplifier-Shaper-Discriminator)
Buffer Card will be developed in Geneva
More details in Daniela Lietti’s talk
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 10
CAM/DAQ Interface
Double link EPICS should know the DATE status A summary of EPICS data should be inserted
in the online data stream Date Status Monitoring
James Leaver has provided EPICS Server EPICS Client Test Software Status Display
Next step: A small piece of code reading real status from DATE
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 11
CAM/DAQ Special Case:
Target DAQ Target data is really both CAM and
DAQ Double flow is implemented Based on a single I/O software -> No issue
with format change
Waiting for the target to be online for final tests
But in the meanwhile the code vanished…
Will require dedicated testing runs
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 12
Schedule Schedule MilestonesMilestones
From CM23From CM23 TOF2 Shaper/Splitter ProductionTOF2 Shaper/Splitter Production mid Marchmid March need need
testingtesting DAQ reviewDAQ review June 09June 09 Upgrade of fADC firmwareUpgrade of fADC firmware July 09July 09 CAM data in Online Data StreamCAM data in Online Data Stream June 09 June 09 -> Nov -> Nov
0909 Tracker integrated in DAQ and OLMTracker integrated in DAQ and OLM July 09 July 09 ->-> Jan 10Jan 10 TOF TDC Clock SynchronizationTOF TDC Clock Synchronization July 09 July 09 -> March 10-> March 10
More complicated than first thought. Need a dedicated board Burst Gate Signal in the Trigger SystemBurst Gate Signal in the Trigger SystemNeed aupport hereNeed aupport here
Approval of SW/EMR Front End ElectronicsApproval of SW/EMR Front End Electronics In Proto phaseIn Proto phase Production of SW/EMR Front End ElectronicsProduction of SW/EMR Front End Electronics Sept 2009 Sept 2009 -> Jan -> Jan
1010--------------------------------------------------------------------------
TOF2 DAQ InstallationTOF2 DAQ Installation Dec 09Dec 09
SummarySummary
DAQ review passedDAQ review passed Data rate increased by a factor of Data rate increased by a factor of
Mainly due to FADC upgrade
Trigger system upgraded to handle Trigger system upgraded to handle this ratethis rate
Event building problem understood Event building problem understood and under monitoringand under monitoring
Next stepsNext steps Interface with CAM Integration of TOF2
MICE CM25 Nov 2009 Jean-Sebastien Graulich Slide 13
Recommended