Meuangvang Development Co.LTD Standard Working Procedure 005 Manual Handling
M V D C S W P 0 0 5 M a n u a l H a n d l i n g M a y 2 0 0 8
Page 1
1. Application To provide a standard work practice for “Manual handing” as required in accordance with Meuangvang Development Co Ltd Safety Management Program
Manual handling of materials is the largest single cause of industrial injuries. All personnel move or lift things at times, either at work or at home, sometimes without much thought of the way they set about to manually move object But like all other tasks there is a right and wrong way, an easy and difficult way, a safe and unsafe way. Before lifting any load, the job should be sized up – a little thought can save a lot of effort Because of the way the human body is constructed, most of the joints are at a severe mechanical disadvantage during lifting, especially the spine. If this is subjected to excessive strain over a period of time, it can lead to serious back problems. The kinetic method of handling, places the strain on the muscles and joints best suited to do the job. 2. Revision Schedule
Rev # Old Section Ref New Section Ref Description of Changes 0 New document created May 2008
3. Table of Contents
1 Application 8 Definitions 2 Revision Schedule 9 Purpose & Expected outcomes3 Table Of Contents 10 Task 4 Personal Protective Equipment 11 Written Assessment 5 Accountability 12 Improvement Suggestion 6 Training Requirements 13 Approval 7 Document Storage 14
Meuangvang Development Co.LTD Standard Working Procedure 005 Manual Handling
M V D C S W P 0 0 5 M a n u a l H a n d l i n g M a y 2 0 0 8
Page 2
4. Personal Protective Equipment (PPE) / Special Equipment • Safety Glasses • Safety Boots • Kidney belt or other lifting aids • gloves
Special Equipment
Forklift, Gantry Crane, mobile/non slewing crane pallet jack or Samson trolley
5. Accountability
Project/Department Managers/or appointed delegates are responsible for ensuring this document is used within their department. The Safety Officers/trainers are responsible for ensuring all personnel are trained, and complete the assessment/sign off statement included in this document.
6. Training Requirements All employees (current and new) are to complete Manual Handling training, and the written assessment included with this document. The completed assessment document (signed off by all parties) is to be filed on the employees training file.
Additional training and information can be sourced from: Code of Practice “Manual Handling” http://www.docep.wa.gov.au/index.htm
7. Document Storage The electronic master version of this document, together with the associated Forms and Templates, is stored on the Safety Managers computer.
Safety Manager/ officer are responsible of maintaining the document.
8
C
M V D
8. Definitions’
Carrying
C S W P 0 0 5
“manual hotherwise m
Note Manucomputer;
driving a tr
Example
P
M
M a n u a l H a
handling” meansmove, hold or res
ual handling alsousing a screwdr
ruck; leaning over
es of manual h
Pulling
Meuangvang Standard Wo Manu
a n d l i n g M
any activity requstrain a person, a
o includes any acriver) and any ac
r to make beds).
handling activi
Developmenorking Proceual Handling
M a y 2 0 0 8
iring the use of foanimal or thing.
ctivity involving rctivity where the2
ities include:
Pushing
nt Co.LTD edure 005
orce exerted by a p
epetitive and/or person must ma
Pa
person to lift, low
forceful movemeaintain constraine
Holding
age 3
wer, push, pull, car
ents (eg. keying ded or awkward po
Lifting
rry or
data into a ostures (eg.
Meuangvang Development Co.LTD Standard Working Procedure 005 Manual Handling
M V D C S W P 0 0 5 M a n u a l H a n d l i n g M a y 2 0 0 8
Page 4
9. Purpose and Expected Outcomes and Flowchart To provide a standard process for the creation, review, authorisation and issue of documents which require control, specifically those operational documents shown in the document structure below. To ensure a common format of documentation is followed, to eliminate duplication and to ensure accurate and current information is readily available to all employees. PROCESS FLOWCHART .
Meuangvang Development Co Ltd Safety Management Program
Meuangvang Development Co Ltd Policies and Rules
Meuangvang Development Co Ltd Standard Work Procedures
Meuangvang Development Co Ltd Risk Assessment Hazard Identification Training
Meuangvang Development Co Ltd Management Planning
Meuangvang Development Co Ltd Training,& Training Manuals
Competency Assessments
1
M V D
10. Tasks
Detail of each s
Basic Principle
C S W P 0 0 5
Task Sstep in the task, pre
es for Lifting
M
M a n u a l H a
Steps esented in a logical
Meuangvang Standard Wo Manu
a n d l i n g M
l sequence. Idethe
Ba Kn
Developmenorking Proceual Handling
M a y 2 0 0 8
Hazentification of any he task step.
ck injury from twi
ee injury from tw
nt Co.LTD edure 005
zards hazards involved w
isting while lifting
ist knee to turn
Pa
Additiowith Any other re
will assist wany requirem
, There are sKinetic Han
1.
2.
3.
4.
5.
6.
age 5
onal Information elevant detail or inf
with the performingments for risk mitig
six basic principlendling:
Position of FeePosition the feeas wide as the foot forward. Tbalance. Straight Back Lift with the legare stronger anfor the job. Correct Grip Use the base opalms of the hareduces stress Tuck Chin In Avoid turning thside. This helpspine and redushoulder and bElbows in to SidReduces stressshoulders.
Use Body WeigTo supplementplace of muscu
and Controls nformation that g of the task and gation.
es to follow in
et et apart, about hips, with one
This ensures
g muscles, these nd better suited
of the fingers and and. This in the arms.
he head to the ps to lock the ces stress in the ack muscles. de s on the
ght t or take the ular effort.
Meuangvang Development Co.LTD Standard Working Procedure 005 Manual Handling
M V D C S W P 0 0 5 M a n u a l H a n d l i n g M a y 2 0 0 8
Page 6
Reduce bending movements by:
• using lift tables, work dispensers and similar mechanical aids
• raising the work level • lowering the level of the person
lifting • providing all material at work level • keeping materials at work level (eg.
don’t lower that which must later be lifted)
• eliminating horizontal reaches over 400mm
Reduce twisting movements by:
• providing all tools and materials in front of the person lifting
• using conveyors, chutes, slides or turntables to change material flow direction
• providing adjustable swivel chairs • providing sufficient work-space for
the person’s whole body to turn • improving layout of the work area
Reduce reaching motions by:
• providing tools and machine controls close (less than 400mm) to the person
• placing materials, work pieces and other heavy objects as near to the person as possible
• enabling the object handled to be kept close
• reducing load or container size • enabling the person to walk around
the load or to rotate it • limiting stacking to shoulder height
Meuangvang Development Co.LTD Standard Working Procedure 005 Manual Handling
M V D C S W P 0 0 5 M a n u a l H a n d l i n g M a y 2 0 0 8
Page 7
Reduce lifting and lowering forces by: Eliminating the need to do this manually by:
• using lift tables, forklifts, cranes, hoists, balancers, drum and barrel dumpers, work dispensers, elevating conveyors and similar aids
• raising the work level • lowering the level of the person
lifting. • using gravity dumps and chute • changing from lifting to lowering, • lowering to carrying and carrying to
pushing
Reducing object weight by:
• reducing load size (specify to suppliers)
• reducing the capacity and weight of the container
• reducing the number of objects lifted or lowered at one time (administratively)
• using two or more persons Increasing object weight so that it must be handled mechanically by:
• using a unit or bulk load concept • using palletised loads
Reducing holding position away from the body by:
• changing object shape • providing suitable grips or handles • providing greater access to the load • improving work place layout
M V D
Detail of each s
Converting to
Pulling or.
pushing Reduce pushi
C S W P 0 0 5
Task Sstep in the task, pre
ng and pulling for
M
M a n u a l H a
Steps esented in a logical
rces by
Meuangvang Standard Wo Manu
a n d l i n g M
l sequence. Idethe
Developmenorking Proceual Handling
M a y 2 0 0 8
Hazentification of any he task step.
nt Co.LTD edure 005
zards hazards involved w
Pa
Additiowith Any other re
will assist wany requirem
: • eli• us• us• us
Reducing r
• red• us
• us
• pro
• us
• ch
Reducing th
• im• re
age 8
onal Information elevant detail or inf
with the performingments for risk mitig
minating the neesing powered consing powered trucsing slides, rollers
equired forces by
ducing load weigsing non-powered
bearings, ball cmonorails and s
sing four-wheel hatrolleys with golarge diameter
oviding good maiequipment and
sing mechanical ppullers
hange from pulling
he distance of pu
mproving work arelocating productio
area, or similar
and Controls nformation that g of the task and gation.
ed to push or pull veyors
cks or movers s or chutes
y:
ht d conveyors, air castor tables, similar aids and trucks and od bearings and
intenance of floor surfaces
pushers or
g to pushing
ush or pull by:
ea layout on or storage r system change
M V D
Detail of each s
Carrying
C S W P 0 0 5
Task S
step in the task, pre
M
M a n u a l H a
Steps
esented in a logical
Meuangvang Standard Wo Manu
a n d l i n g M
l sequence. Idethe
Developmenorking Proceual Handling
M a y 2 0 0 8
Haz
entification of any he task step.
nt Co.LTD edure 005
zards
hazards involved w
Pa
Additio
with Any other rewill assist wany requirem
Red
• usincastchut
• usinhan Redby:
• imp• relo
area
age 9
onal Information
elevant detail or infwith the performingments for risk mitig
duce carrying forc
ng conveyors, air tor tables, monortes and similar ai
ng forklifts, two ord trucks, trolleys
ducing carry or tra
roving work area cating storage ora, or similar charg
and Controls
nformation that g of the task and gation. ces by:
bearing, ball rails, slides, ids r four-wheel and similar
ansport distance
layout r production ge system
M V D
Detail of each s
Holding
C S W P 0 0 5
Task S
step in the task, pre
M
M a n u a l H a
Steps
esented in a logical
Meuangvang Standard Wo Manu
a n d l i n g M
l sequence. Idethe
Developmenorking Proceual Handling
M a y 2 0 0 8
Haz
entification of any he task step.
nt Co.LTD edure 005
zards
hazards involved w
Pa
Additio
with Any other rewill assist wany requirem
Reduce • redu
desc• redu• redu• Elim
fixtu• usin
unlo
age 10
onal Information
elevant detail or infwith the performingments for risk mitigholding forces by
ucing object weigcribed) ucing object sizeucing holding time
minating the use oures etc. ng mechanical loaoading
and Controls
nformation that g of the task and gation. y:
ght (as previously
e of jigs and
ading and
Meuangvang Development Co.LTD Standard Working Procedure 005 Manual Handling
M V D C S W P 0 0 5 M a n u a l H a n d l i n g M a y 2 0 0 8
Page 11
11. Written Assessment 1. Where can you reference more information on Manual Handling?
___________________________________________________________________
2. List six basic principles for safe Manual Handling?
___________________________________________________________________
3. List 3 mechanical equipment devices that can be used to for lifting?
___________________________________________________________________
4. How do you Position your Feet when preparing to lift and object?
5. If you have been asked to lift and move a box that is too heavy for you, what are you going to do? 6. Do you understand manual handling requirements?
I have read and understood this procedure and have had any questions in regard to this procedure thoroughly explained. Name: ____________________________________________________ Date: _______________________ Signature: ________________________________________________ Training Coordinator: ______________________________________ Date: _______________________
Meuangvang Development Co.LTD Standard Working Procedure 005 Manual Handling
M V D C S W P 0 0 5 M a n u a l H a n d l i n g M a y 2 0 0 8
Page 12
12. Improvement Suggestion
Possible Cause Corrective Action Additional Information
13. Approval
Revision 01
¥¿−¸−°øÉêö®ê¸− Approved by(position)
»ñ®»º¤Â©¨(ª¿ÁΤ)
Signature of Approver
쾨À§ñ−¢º¤°øÉ»ñ®»º¤
Date
¸ñ−ê†
Prepared by
¡½¡¼´Â©¨ P Brears Safety Consultant
Reviewed
Approved
Recommended