Method of Statement for New Lift Pile Cap Design

Preview:

DESCRIPTION

method

Citation preview

Myanmar Aquarium Project ( Kan Daw Gyi )

Method of Statement for Lift Pile Cap Design at Block – A

1. Excavate Soil for Extension Portion.

2. Cut the Existing wall rebar ( left outer wall + partition wall ) with Glider.

3. Hack the Existing Pile Cap about 300 mm.

4. Splice the Existing Pile Cap Rebar with Extension Rebar by Welding Type.

5. For Partition Wall between Lifts, wall rebar will be installed by Anchor Fix Method.

6. Finally, Cast the Pile Cap.

Sai Thaung Nyunt

Project Engineer