Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
2
December 8, 2015
15 School Lane, Suite 200
Au Sable Forks, NY 12912
Phone: (518) 647-8198
Fax: (518) 647-5457
Attention: James C. Atkins, President
Subject: The Meco-Rotterdam #10 115kV CCR Project
Contract #: 4400005642 & Funding Number C048678
Dear Mr. Atkins,
Pursuant to the procurement authorized Letter of Intent, awarding the Meco-Rotterdam #10
Conductor Clearance Project, to you, Northline Utilities, LLC, are the contract agreement
documents for execution by an authorized representative of Northline Utilities, LLC. An original
copy of each invoice is to be forwarded to the “Bill to” address as listed in each Purchase Order
and to the attention of the Owner’s Project Manager, (Ken Gavurnik) referencing the current,
invoice matched Purchase Order Number, SAP Contract # 4400005642 to: 40 Sylvan Rd,
Waltham, MA, 02451,
I may be contacted at 781.907.4027 or Kayla.rice@nationalgrid.com should there be any
questions regarding these documents. Your prompt execution and return of the noted documents
will be appreciated.
Best Regards,
Kayla Rice
Electric Construction Substation | Buyer Enclosures
pc: PO File
Don Schaefer Kayla Rice PM Ken Gavurnik
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
3
Contract Agreement
Between
Niagara Mohawk Power Corporation (d/b/a National Grid)
And
To provide
Materials, Equipment & Construction Services
For the
Meco-Rotterdam #10 Conductor Clearance
Refurbishment Project
Contract # 4400005642
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
4
December 8, 2015
TABLE OF CONTENTS
AGREEMENT
Article 1: Scope of Work
Article 2: Contract Documents
Article 3: Schedule
Article 4: Contract Price
Article 5: Invoicing/Payments
Article 6: Notices
Article 7: Term of Agreement
Article 8: Entire Agreement
CONTRACT DOCUMENTS
Exhibit A: Scope of Work / Design Packages
Exhibit B: Pricing Summary & Bid Response Workbook
Exhibit C: Contractor Safety Requirements
Exhibit D: Environmental Guidance & Permitting
Exhibit E: Security & Background Checks
Exhibit F: Supplier Code of Conduct
Exhibit G: Work Approach, Project Schedule, Assumptions and
Clarifications
Exhibit H: Certificate of Insurance
APPENDICIES
LOI: National Grid Letter of Intent dated 11/30/2015
NDA: Signed Non-Disclosure Agreement
T&Cs: 0700 Terms and Conditions for Construction Rev. 13 Oct.2015
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
5
AGREEMENT
This Agreement made and entered into on the date when signed by the party signing last in time,
by and between Niagara Mohawk Power Corporation d/b/a National Grid (herein referred to
as Owner), and Northline Utilities, LLC (herein referred to as Contractor), a New York Based
Electrical Contractor, having its principal place of business at 15 School Lane, Suite 200
Au Sable Forks, NY 12912, for the provision of materials, equipment, and construction services
for the Meco-Rotterdam #10 115kV Conductor Clearance Refurbishment Project and
general description of work identified as:
This agreement provides for the Contractor to deliver to the Owner: The focus of this project is to provide clearance improvements on the T5390 Meco – Rotterdam #10
115kV transmission line. The Meco - Rotterdam #10 Line is a 115kV transmission line located between
Meco 318 Substation in Johnstown, NY and Rotterdam 138 Substation in Rotterdam, NY, a distance of
approximately 32.5 circuit miles. The line is generally supported on dual-circuit steel flex towers and
square-based deadend towers, shared with the Stoner-Rotterdam #12 Line. The 3.75 mile section of the
#10 Line closest to Meco Substation is supported on single-circuit wood H-frame structures.
In order to increase the clearances of existing substandard spans, the scope of work is to: replace 13
existing double-circuit steel flex towers with new double-circuit wood 2-pole davit arm structures;
replace one (1) wood H-frame suspension structures in kind; install three (3) new double-circuit wood 2-
pole davit arm intermediate structures; and convert six conductors to floating deadends at one (1)
double-circuit tower.
The Scope of Work is meant to supplement the project drawings and other project-specific construction
documents provided in the project bid package. This documentation together with relevant National Grid
construction standards, specifications and procedures forms the basis of the contract binding the
Contractor to the successful completion of the project. All provided on the Ariba Event Doc628705508.
Conflicts between the Scope of Work and the project drawings were resolved by the Contractor prior to
submitting a bid. The Project Drawings shall supersede any discrepancies found within other scope
documentation.
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
6
ARTICLE 1 - SCOPE OF WORK
The Contractor hereby agrees to meet all requirements of the full scope of work as defined in the
Contract Documents (see Exhibits) and the complete Request for Proposal Doc628705508 in
Ariba, inclusive of all Technical Specifications, Standards, Guidance, Notes, Addenda items,
Message Board Responses, and Clarifications, as well as documented correspondence and
written responses related to post bid Questions & Answers and negotiations.
ARTICLE 2 - CONTRACT DOCUMENTS
The following documents, including all attached schedules, appendices, exhibits or other
attachments thereto, are incorporated by reference as if fully set forth herein, and are hereinafter
referred to collectively and individually as the "Contract Documents" or the “Agreement":
Exhibit A: Scope of Work/Design Packages
Exhibit B: Pricing Summary & Bid Response Workbook
Exhibit C: Contractor Safety Requirements
Exhibit D: Environmental Guidance Procedures
Exhibit E: Security Background Check
Exhibit F: Supplier Code of Conduct
Exhibit G: Work Approach, Project Schedule, Assumptions and Clarifications
Exhibit H: Certificates of Insurance
Appendices:
NDA: Non-Disclosure Agreement
Terms & Conditions: 0700 Terms and Conditions for Construction Rev. 13 Oct.2015
Letter of Intent: National Grid Letter of Intent dated 11/30/2015
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
7
ARTICLE 3 - SCHEDULE
The Contractor agrees to commence any Work to be performed under this Agreement at the time
specified by Owner, and to carry it on continuously with such diligence that the Work will be
completed on schedule. Any planned, contemplated, or unforeseen changes to project schedule
must be documented in detail by the Contractor, inclusive of all cascading effects, particularly
any change to the project end date. This information must be presented to and discussed with the
Owner and must be approved in writing by the Owner’s Project Manager Ken Gavurnik.
ARTICLE 4 - CONTRACT PRICE
The Contract Price is an agreed upon as the total Lump Sum Value of $
, for the Work on the Meco-Rotterdam #10 115kV Conductor Clearance
Refurbishment Project. Lump Sum value is based on the best and final Lump Sum Bid proposal
submitted by the Contractor. Contract price is inclusive of the full Scope of Work as identified in
Article 1. The contract price also includes the cost of a dedicated project Safety Representative. The
only change orders accepted will be the ones initiated by a change in Scope from National Grid.
ARTICLE 5 - INVOICING / PAYMENTS
The Contractor agrees to submit invoices as detailed herein. An original copy is to be forwarded
to the “Bill to” address referenced in the Purchase Order to the attention of the Owner’s Project
Manager including Purchase Order Number, SAP Contract # 4400005642, and Project Name &
Funding Number C048678. A “preliminary” invoice is to be e-mailed to the Project Manager for
review and to obtain the necessary PO Number information 5 days prior to mailing the invoice to
Accounts Payable.
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
8
As per National Grid’s Terms and Conditions a 5% retainer will be held for each submitted
invoice until satisfactory completion of the Project. Invoices are to contain completed work with
itemized detail specific to work scope / units completed.
Invoices shall not include any Sales Tax assessment (see Terms and Conditions Payment and
Taxes Section).
Upon satisfactory completion of the project, including the close out of any “punch list” items and
submittal of a signed contractor’s lien release, releasing the Owner from all claims and liens by
the Contractor, their Suppliers, and Subcontractors, the Contractor will request written approval
from the Owner’s Project Manager to proceed with final invoicing. Upon receipt of this written
approval, the Contractor can proceed with invoice submittal to collect the remaining 10%
retainage.
ARTICLE 6 – NOTICES
Notices required or permitted under this Agreement shall be addressed to:
Contractor Owner
Northline Utilities LLC
Attn: James C. Atkins, President
15 School Lane, Ste. 200
Au Sable Forks, NY 12912
Ph: 518-647-8198
Email: jatkins@northlinellc.com
National Grid
Kayla Rice | Global Procurement |
Buyer
nationalgrid | 40 Sylvan Road |
Waltham, MA 02451 | 781-907-4027
E-mail: Kayla.rice@nationalgrid.com
and;
Ken Gavurnik | Lead Project
Manager
nationalgrid | 300 Erie Blvd W |
Syracuse, NY 13202 | 315.428.5347
E-mail:
kenneth.gavurnik@nationalgrid.com
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
9
ARTICLE 7 - TERM OF AGREEMENT
The Term of this Agreement shall commence on the start of construction, and ending upon
completion of all applicable contract deliverables as approved by National Grid, and acceptance
of Final Invoice.
ARTICLE 8 - ENTIRE AGREEMENT
This Agreement, including all Contract Documents, constitutes the entire Agreement between
the Owner and the Contractor, with respect to the Work specified, and all previous
representations relative thereto, not included in this contract, either written or oral are hereby
annulled and superseded. No modification of any of the provisions of this Agreement shall be
binding unless committed to in writing and signed by a duly authorized representative of each
party hereto.
IN WITNESS WHEREOF, each party hereto has caused this Agreement to be executed by its
duly authorized representative on the day and year set forth below.
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline Utilities, LLC for The MeeD-Rotterdam #10 Conductor Clearance Refurbishment Project
Contractor:
Northllne Utilities, LLC
Name
Title
Date
PAUL-- Q (J(CL<..
I 7
P 1~E:c7{/ (f... oF
off.RA-rloA/ 5:.
Owner:
Niagara Mohawk Power Corporation d/b/a
National Grid
-Don Schaefer Name
Category Manager, Procurement Title
December 8, 2015
10
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
11
The following applicable Scope of Work / Design Packages with supporting
documents are referenced and incorporated as part of this contract agreement and
are archived in the Ariba sourcing event Doc628705508:
Ariba RFP Section Section Title & Subsections
21 Specifications and Requirements Inclusive of
Sub-Section 21.1
Messages Inclusive of all Bidder Inquiries and Requests
for Clarification and all Replies Issued to all
Bidders
EXHIBIT A: SCOPE OF WORK / DESIGN PACKAGE
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
12
EXHIBIT B: PRICE SUMMARY & BID
RESPONSE WORKBOOK
Description of work Unit of measure Qty Unit Price Labor/Hrs per unit Cumulative Price Labor Environmental CivilOverhead/per
diemInsurance *Risk Fuel Equipment
Replace 9 double - circuit flex steel tower
suspension structures with double - circuit
wood 2-pole davit arm suspension structures
per drawing D-40783. Per Structure 9 $ 166
Replace 4 double - circuit flex steel tower
suspension structures with double - circuit
wood 2-pole davit arm suspension structures
per drawing D-40782. Per Structure 4 $ 170
Replace one wood single circuit H-Frame
suspension structures per drawining D-40780 Per Structure 1 $ 120
Install 3 double - circuit wood 2-pole davit arm
intermediate suspension sructures per
drawing D-40782. Per Structure 3 $ 151
Convert all suspension phases (6) at one
structures to a floating deadend per drawing D-
40785. Per Structure 1 $ 132
$
Transmission Line Construction Contractor pricing template
nationalgrid | NG Procurement
Project Name: Meco - Rotterdam #10 115kV CCR Project
NG Procurement Buyer information: Kayla Rice
Date of Issuance to Contractors: 10/20/2015
Date Returned by Contractor
Project Narrative: The focus of this project is to provide clearance improvements on the Meco – Rotterdam #10 115kV transmission line. the scope of
work is to:
• replace 13 existing double-circuit steel flex towers with new double-circuit
wood 2-pole davit arm structures
• replace 1 wood H-frame suspension structure in kind
• install 3 new double-circuit wood 2-pole davit arm intermediate structures
• convert all phases of two circuits at one suspension structure to a floating deadend
Description of work broken down in sections by Article
Contractor Pricing Template | nationalgrid
Contractor Name: Northline Utilities
ARTICLE-1 | Structure Installation
Cumulative price
Total value | $$
LUMP SUM PRICE SUMMARY
ARTICLE-1 - Structure Installation
TOTAL PROJECT LUMP SUM PRICE
Major Cost Driver/s: Total Project Value % of project value
Total Labor
Total Equipment
Total Environmental
Erosion controls, (wet-land protection SWPPP mitigation, etc)
Swamp MattingCivil, (road building, stone aprons, etc)
Overheads, (per-diem's, lodging, etc)Project Risks / Contingencies
Fuel
Insurance
Description of work Unit of measure Qty Unit Price
Rock Coring - 6ft Diameter per ft 1 $
Rock Coring - 8ft Diameter per ft 1 $
Rock Coring - 36" Diameter per ft 1 $
for continuous outage work day 1 $
for daily outage work day 1 $
for continuous outage work day 1 $
for daily outage work day 1 $
Silt fence installation 50' N/A $
Hay and/or straw bale installation 50' N/A $
Stone Apron 16' x 20' EA 1 $
Seed & Mulch 50 sq ft N/A $
Swamp Mat (approx. 16'x4'x1') linear ft N/A $
Structure Work Pad sq ft N/A $
Grounding (out of scope situations)
Install up to Ground Rods at Structure,
Structure is a new install EA 1 $
Install 4 150 ft. strips counterpoise at
structure, Structure is a new install EA 1 $
Install up to 8 Ground Rods at Structure,
Structure is existing EA 1 $
Install 4 150 ft. strips counterpoise at
structure, Structure is existing EA 1 $
Notes
For Non-Outage DaysUnit cost for non-outage work shall NOT be applicable to adverse weather days when work would not take place regardless of outage situation
Non-outage days shall be applicable when Contractor is given notice of seven calendar days or less that outage will not be available as listed in applicable outage plan
If outage unavailability is expected to be for extended duration, Owner reserves the right to suspend work indefinitely; demobilization & mobilization charges shall be incurred as appropriate to stop & start work,
respectively; a new mutually agreed unit pricing scheme shall be negotiated if appropriate.
Environmental controls (out of scope situations)
MISC: ALTERNATIVE PRICING ITEMS
Non-outage day
Non-outage day when other "non-outage" work is available (as determined by Contractor &
Owner)
Non-outage day when other "non-outage" work is NOT available (as determined by
Contractor & Owner)
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
13
The following applicable Contractor Safety Requirements with supporting
documents are referenced and incorporated as part of this contract agreement and
are archived in the Ariba sourcing event Doc628705508:
Ariba RFP Section Section Title & Subsections
20 Specifications and Requirements Inclusive of
Sub-Sections 20.1.1-20.1.3
Messages Inclusive of all Bidder Inquiries and Requests
for Clarification and all Replies Issued to all
Bidders
EXHIBIT C: CONTRACTOR SAFETY
REQUIREMENTS
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
14
This Section includes the most current revision of National Grid Environmental
Procedure No. 6 Contracted Services. Also attached here as part of this contract are
other Environmental requirements including Environmental Guidance documents
included in the National Grid Environmental Documents Section 20 of the Ariba
RFP including Sub-Sections 20.2 thru 20.2.5.
EXHIBIT D: ENVIRONMENTAL GUIDANCE
PROCEDURES
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
15
The following applicable Security Background Checks with supporting documents
are referenced and incorporated as part of this contract agreement and are archived
in the Ariba sourcing event Doc628705508:
Ariba RFP Section Section Title & Subsections
4 Specifications and Requirements Inclusive of
Sub-Sections 4.1-4.5
Messages Inclusive of all Bidder Inquiries and Requests
for Clarification and all Replies Issued to all
Bidders
EXHIBIT E: SECURITY BACKGROUND
CHECK
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
16
The following applicable Supplier Code of Conduct with supporting documents are
referenced and incorporated as part of this contract agreement and are archived in
the Ariba sourcing event Doc628705508:
Ariba RFP Section Section Title & Subsections
5 Specifications and Requirements Inclusive of
Sub-Sections 5.1-5.2
Messages Inclusive of all Bidder Inquiries and Requests
for Clarification and all Replies Issued to all
Bidders
EXHIBIT F: SUPPLIER CODE OF CONDUCT
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
17
EXHIBIT G: WORK APPROACH, PROJECT
SCHEDULE, ASSUMPTIONS AND CLARIFICATIONS
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
18
EXHIBIT H: CERTIFICATES OF INSURANCE
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
21
LETTER OF INTENT
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
19
NON DISCLOSURE AGREEMENT
Contract between Niagara Mohawk Power Corporation d/b/a National Grid and Northline
Utilities, LLC for The Meco-Rotterdam #10 Conductor Clearance Refurbishment Project
20
The following applicable Terms and Conditions (700 Construction Terms and
Conditions rev Oct 13 2015) with supporting documents are referenced and
incorporated as part of this contract agreement and are archived in the Ariba
sourcing event Doc628705508:
Ariba RFP Section Section Title & Subsections
23 Specifications and Requirements Inclusive of
Sub-Section 23.1
Messages Inclusive of all Bidder Inquiries and Requests
for Clarification and all Replies Issued to all
Bidders
TERMS AND CONDITIONS
Recommended