PROJECTS MADE IN MARINE ENGINEER CORP, BRANCH VERACRUZ

YEAR 2013GENERAL AND PROJECT MANAGER: NELSON AGUIRRE B.

MR AGUIRRE IS A CHILEAN NAVAL ELECTRICAL ENGINEER (RETIRED OFFICER OF CHILEAN NAVY), PLANNER AND LEADER OF WORKING TEAM, WITH 25 YEARS WORKING IN THE CHILEAN NAVY. EXPERIENCE IN PLANNING, COORDINATION, SUPERVISION AND CONTROL OF WORKS, WORKING IN THE DIRECTION AND PLANNING OF LOGISTIC PROCESSES AND MANAGEMENT.

PATROL VESSEL “TABOGA”LOA : 31.2 MTSBEAM: 7.31 MTSDWT : 167 TONS

PATROL VESSEL “TABOGA” AFTER ARRIVE TO SHIPYARD

STARTING THE SANDBLASTING

SANDBLASTING COMPLETE(WITH NEW PILOT HOUSE)

DISMANTLING THE OLD PILOT HOUSE

OLD PILOT HOUSE

MAKING THE NEW PILOT HOUSE

REPLACING PART OF THE SHELL PLATE

VERIFYING DEFLECTION OF THE TAIL SHAFT

REPLACING BOTH PROPELLERS FOR NEW ONES, ACCORDING WAS DESIGNED

PAINTING THE WHOLE VESSEL

UNDOCKING MANEUVERING

PATROL VESSEL “TABOGA” READY TO SAIL

PASSENGER VESSEL “PACIFIC QUEEN”LOA : 36.84 MTSBEAM: 7.74 MTS

PACIFIC QUEEN, ARRIVING TO SHIPYARD

CONDITION OF THE HULL AT THE ARRIVING

RENWING PART OF THE SHELL PLATE

REPAIRING VALVES

REPAIRING THE LINE SHAFT

REPAIRING AND POLISHING PROPELLERS

UNDOCKING MANEUVERING OF PACIFIC QUEEN

LANDING CRAFT “GENERAL ESTEBAN HUERTAS”LOA : 38 MTSBEAM: 11 MTSDWT : 313 TONS

GENERAL DEL “ESTEBAN HUERTAS” ARRIVING TO SHIPYARD

CONDITION OF HATCHES

DISALIGNMENT OF SHAFT LINE IN PORT AND STARBOARD SIDE.THE STRUT AND STERN TUBE, WAS MACHINED

REPLACING PIPE IN BAD CONDITION

BASES OF WINCH AND CRANE IN BAD CONDITION, WAS MADE NEW.

REPLACING THE MAIN ENGINES AND GENERATORS

REPLACING MORE THAN 38 TONS OF STEEL, FROM THE HULL AND MAIN DECK

REPLACING MORE THAN 38 TONS OF STEEL, FROM THE HULL AND MAIN DECK

NEW KEEL COOLERS WERE MADE

STEEL REPLACED

STEEL REPLACED

STEEL REPLACED

DISMANTLING THE OLD STRUCTURE

NEW STRUCTURE FINISHED

INSIDE OF THE STRUCTURE, BEFORE TO STAR WORKING

INSIDE AFTER TO FINISH

UNDOCKING MANEUVERING

BARGE INTERCOASTAL “IMI 102”LOA : 54.86 MTSBEAM: 16.4 MTSDWT : 1,063 TONS

BARGE ARRIVING TO SHIPYARD

CONDITION OF THE HULL BEFORE TO START WORKING

WASHING WITH H.P WATERJET

AFTER TO WASH THE BARGE

REPLACING STEEL PLATE

REPLACING STEEL PLATE

COMPLETE SANDBLASTING SA 2

PAITING THE WHOLE BARGE

CLEANING INSIDE THE TANKS

BARGE, PAITED AND FINISHED

UNDOCKING MANEUVERING

SUPPLY VESSEL “CÉBACO BAY”LOA : 29.6 MTSBEAM: 7.9 MTSDWT : 86 TONS

ARRIVING TO SHIPYARD

CONDITION OF THE HULL BEFORE TO START WORKING

SCRAPPING THE HULL

CONDITION OF THE VESSEL AFTER TO WASH WITH H.P. WATERJET

MAKING SANDBLASTING

PAINTING THE WHOLE VESSEL

STEEL WORK

MAKING NEW EXPANSION TANKS FOR THE MAIN ENGINES

FINISHING THE JOB

UNDOCKING MANEUVERING