Measure H Bond Projects Update

Preview:

Citation preview

Measure H

Bond Projects Update_______________________________

Presented to the ACSS Division

8/28/2020

Veterans Support and Success Center

ProjectCompletedApril 2020

Veterans Support and Success Center

Lobby Entry andWater Wall Feature

Regional Public Safety Training Center – Phase Two

Classroom Building

Project Substantially

Complete

Regional Public Safety Training Center – Phase Two

FireAcademyClassroom

Regional Public Safety Training Center – Phase Two

Agency Building

Regional Public Safety Training Center – Phase Two

Agency BuildingClassroom &Locker Room

CTE Building

Project Substantially

Complete

CTE Building Interior

Skyfold WallWith

MarkerboardPanels

Classroom Interior

CTE Building Shop (Lab Area)

Advanced ManufacturingLab Equipment

CTE Quad Covered Storage

CIS Building

Project Start: 1/2020

Est. Completion:7/2021

CIS Building (continued)

Farm Building 4500 Shade Structure

Project Start: 6/2020

Est. Completion:9/2020

SC Main Campus Fiber Project

Project Start: 7/2020

Est. Completion:9/2020

SC Main Campus Fiber Project (continued)

Tehama Campus Student Services Building

Project Start: 9/2019

Est. Completion:10/2020

Tehama Campus Student Services Building (continued)

Downtown Redding Office Building Purchase

EstimatedBuilding

Completion:12/2022

Office Building

Parking Garage

Residential

FLOORS 2, 3 & 4

• Community Ed• FKCE• CalWORKs• EWD• NST

Wildland Fire Tree Trimming and Brush Removal Project

FUND 41 – CAPITAL OUTLAY PROJECT

ProjectSubstantially

CompleteNorth Entrance

Wildland Fire Tree Trimming and Brush Removal Project

FUND 41 – CAPITAL OUTLAY PROJECT

100 Building

View from Old Oregon Trail

Other Projects

179,000

TrinityCampus

Shasta CollegeMain Campus

61 miles51 miles

• Solar Project – East Parking Lot (waiting for PG&E)

• HSUC Security Office (located in entry rotunda)

• Network Switch Replacement (replacement of core switch and networkswitches in buildings on the main campus)

• Dorms Upgrade Project (WiFi, security systems, interior refresh)

• Main Campus Old Oregon Trail Security Fencing and Gates

• Main Campus Signage (Wayfinding) Project

• Landscaping Master Plan Development

Projects submitted for Potential State Funding

179,000

TrinityCampus

Shasta CollegeMain Campus

61 miles51 miles

Pre-Design Phase - FPPs and IPPs (State Funding)

• 200 Building (Library) Renovation: The 200 Building Final Project Proposal (FPP) is in process, and is subject to the following timeline:

June 2020 (postponed to September 2020): On the list for approval by the Board of Governors. Subject to their approval, it will then be forwarded to the Legislative Analyst’s Office.

November/December 2020: Legislative Analyst’s Office reviews FPP and notifies District of results. Subject to their approval, it will then be included in the Governor’s January 2021 initial budget, and should make it through to the final budget.

July 1, 2021: Funding becomes available (PROP 51).

• 800 Building Renovation: The FPP for this project was approved by the Governing Board on June 10, 2020 and has been submitted to the Chancellor’s Office.

Completed Projects

179,000

TrinityCampus

Shasta CollegeMain Campus

61 miles

• 200 Building Exterior Infrastructure/ADA Walkway/Patio Project

• 2400 Building Electrical Upgrade

• Athletic Fieldhouse with Restrooms

• Campus Safety Relocation – Interior Remodel

• Campus Safety Site Work and ADA Paths of Travel

• Gymnasium Air Conditioning

• HSUC Folding Wall Replacement

• Interior/Exterior Lighting Project – Prop 39 & Bond

• Northeast Campus Infrastructure

• Regional Public Safety Training Center – Phase One

• SC Main Campus Keying & Access Control

• SC Safety & Security Standards

Completed Projects (continued)

179,000

Shasta CollegeMain Campus

61 miles

• Shasta College Storage Building

• Summer 2019 Infrastructure Project

• Veterans Support & Success Center Building

26

For more information…

About / Campus Improvements / Measure H

Theresa Markword, Bond Program Managertmarkword@shastacollege.edu(530) 242-7699

Emily Booth,Bond Program Administrative Asst.ebooth@shastacollege.edu(530) 242-7747

Recommended