View
216
Download
1
Category
Tags:
Preview:
Citation preview
May 2005May 2005Radio Research LaboratoryRadio Research Laboratory
Ministry of Information and CommunicationMinistry of Information and Communication
Designation of Designation of Testing laboratoriesTesting laboratories
Designation of Designation of Testing laboratoriesTesting laboratories
Broadband IT Korea2
Testing Lab - Designation Testing Lab - Designation ProcedureProcedure
ApplicantApplicant ApplicantApplicant
ApplicationApplication
Application supplementApplication supplement
Testing ServiceTesting Service
Correction of
incompatibility
Correction of
incompatibility
RRLRRL RRLRRL
AcceptanceAcceptance
Review the applicationReview the application
Make up of assessment TeamMake up of assessment Team
On-site assessmentOn-site assessment
Document assessmentDocument assessment
Issue of designationIssue of designation
Asking correctionAsking correction
Correctionwithin 60 days
Correctionwithin 60 days
Asking supplementAsking supplement
Additional submit,correction
Additional submit,correction
O.K.O.K.
O.K.O.K.
O.K.O.K.
O.K.O.K.
Within
60
days
Within
60
days
Broadband IT Korea3
Testing LabsTesting Labs
Designation areas for testing lab Terminal Radio EMI EMS Electric Safety (for Telecommunications equipment) SAR
Criteria for Designation To be a corporation(legal entity)
According to ISO/IEC 17025
Criteria and Areas for DesignationCriteria and Areas for DesignationCriteria and Areas for DesignationCriteria and Areas for Designation
Broadband IT Korea4
Testing LabsTesting Labs
Document review General status of organization and personnel Business registration certificate List of testing equipment including report of its calibration A copy of quality management regulation Document on organization, personnel, facility and environment for testing
Lab Inspection Check the liability of the document Whether It is in line with ISO/IEC 17025 Quality of testing by the testing personnel Operational & maintenance status of the test facilities Proficiency test
Evaluation of the applicant labEvaluation of the applicant labEvaluation of the applicant labEvaluation of the applicant lab
Broadband IT Korea5
Lab AssessmentLab Assessment
Checklist for lab assessment in the following fields General requirements Terminal equipment Safety Radio equipment SAR EMI EMS
Same to that of ISO/IEC Guide 17025
Designation is valid until RRL suspends or cancel it.
7 Kinds of Lab checklist7 Kinds of Lab checklist 7 Kinds of Lab checklist7 Kinds of Lab checklist
Broadband IT Korea6
시험기관지정서Certificate
of Designated Testing Laboratory
지정번호 (No.) : KR0000시험기관명 : ( 주 ) 한국시험소
(Name of Lab.) (Korea Testing Lab,)주 소 :(Address)시험분야 및 범위 : EMI, EMS(Area & Category)
위 기관을 정보통신기기시험기관지정및관리등에관한규칙에 의해 정보통신기기시험기관으로 지정합니다 .
This is to certify that the above mentioned laboratory is designated
as the testing laboratory in accordance withthe Regulations on Designation of Testing Laboratory
for Information and Communication Equipment.
2002 년 (Year) 11 월 (Month) 2 일 (Date)
전 파 연 구 소 장Director General of Radio Research Laboratory
Ministry of Information and Communication
Republic of Korea
Testing LabsTesting Labs
Certificate of Certificate of DesignationDesignation
Certificate of Certificate of DesignationDesignation
Broadband IT Korea7
Testing LabsTesting Labs
Regular InspectionRegular Inspection Once every 2 years
Inspection procedures are the same as the first inspection
Irregular InspectionIrregular Inspection When petitions are raised by the users of the lab, foreign When petitions are raised by the users of the lab, foreign
partners of MRA or any relevant organizationspartners of MRA or any relevant organizations
When considered suspicious by RRL at it’s surveillance process When considered suspicious by RRL at it’s surveillance process
Lab Inspection after designationLab Inspection after designationLab Inspection after designationLab Inspection after designation
Broadband IT Korea8
Testing LabsTesting Labs
Measures Suspensions of maximum 6 months or cancellation of the
designation according to the violation case
The laboratory will have chance to appeal in case of suspension or cancellation
Cases of measures Designation obtained by inappropriate methods
Rejection of test application without reasonable cause
Incorrect testing by big mistake or intentionally
Any rejection, hindrance or avoidance of the Inspection or
failure to the Inspection
Criteria for Administrative MeasuresCriteria for Administrative MeasuresCriteria for Administrative MeasuresCriteria for Administrative Measures
Broadband IT Korea9
EMC Criteria for DesignationEMC Criteria for Designation
Technical requirements for Electromagnetic Interference (RRL Notice No.2004-69)
Technical requirements for Electromagnetic Susceptibility (RRL Notice No.2004-70)
Conformity assessment procedure for Electromagnetic Interference (RRL Notice No.2004-30)
Conformity assessment procedure for Electromagnetic Susceptibility (RRL No.2004-31)
Technical RequirementsTechnical RequirementsTechnical RequirementsTechnical Requirements
Broadband IT Korea10
EMC RequirementsEMC RequirementsEMC RequirementsEMC Requirements
EMI (CISPR/KN 16-1, CISPR/KN22) Technical requirements for Electromagnetic
Interference Conformity assessment procedure for
Electromagnetic Interference
EMS (IEC/KN 61000-4 Series) Technical requirements for Electromagnetic
Susceptibility Conformity assessment procedure for
Electromagnetic Susceptibility
EMC Criteria for DesignationEMC Criteria for Designation
Broadband IT Korea11
Measuring Devices Line Impedance Stabilization Network (LISN) Measured Devices for Electromagnetic Field or Spectrum Analyzer The vertical ground plane should be have an area of a least 2X2m All surfaces of floor-standing and table-top EUTs should be at least 8
0cm away from any grounded plane
Testing site Anechoic site for electromagnetic waves The environment should be at least 6dB lower than the limit value
※ Measuring devices should be calibrated by CISPR16-1 requirements Measuring devices should be calibrated by CISPR16-1 requirements each yeareach year
Conducted EmissionConducted Emission
Measuring Devices and Testing site for Measuring Devices and Testing site for EMIEMI
Broadband IT Korea12
Measuring Devices and Testing site for Measuring Devices and Testing site for EMIEMI
Measuring Devices Antenna (30MHz~1GHz) Measuring devices for Electromagnetic Field or Spectrum analyzer The height of antenna mast should be adjustable from 1m~4m in horizontal, ve
rtical direction. The testing table should be rotatable by 360 degree
Testing Site Open site or Large Space site(10m) The environment should be at least 6dB lower than the limit value The attenuation data from an open site should fall within ±4db Set up a Ground plan and enough space without reflection from the surroundin
gs
Radiated EmissionRadiated Emission
Broadband IT Korea13
Measuring Devices and Testing site for Measuring Devices and Testing site for EMSEMS
Measuring devices Electrostatic Discharge Generator
Connected with the reference ground plate, HCP, VCP
Climate conditions Ambient temperature : 15℃ ~ 35 ℃
Relative humidity : 30% ~ 60%
Atmospheric pressure : 86kPa(860mbar) ~106kPa(1060mbar)
Electrostatic Discharge (ESD)Electrostatic Discharge (ESD)
Broadband IT Korea14
Measuring Devices and Testing site for Measuring Devices and Testing site for EMSEMS
Measuring Devices RF signal generator(modulating the amplitude of s sine wave of
1khz to 80%)
Power amplifier
Electric field-generating antenna (80~1000MHz)
Electric field sensor (a dipole shorter than 0.1m)
Power level tester
Test Site 3m between the antenna and the EUT
Electric field in the defined area is within a range of –0dB ~+6dB
Radiated Susceptibility (RS)Radiated Susceptibility (RS)
Broadband IT Korea15
Measuring devices Electrical fast transient/burst generator (KN61000-4-4 6.1)
Capacitive coupling clamp
Climatic conditions Ambient temperature : 15℃ ~ 35 ℃
Relative humidity : 25% ~ 75%
Atmospheric pressure : 86kPa(860mbar) ~106kPa(1060mbar)
BurstBurst
Measuring Devices and Testing site for Measuring Devices and Testing site for EMSEMS
Broadband IT Korea16
Measuring Devices Combined (mixed waveform generator
Coupling/decoupling circuit network
Climatic conditions Ambient temperature : 15℃ ~ 35 ℃
Relative humidity : 10% ~ 75%
Atmospheric pressure : 86kPa(860mbar)~106kPa(1060mbar)
SurgeSurge
Measuring Devices and Testing site for Measuring Devices and Testing site for EMSEMS
Broadband IT Korea17
Measuring Devices and Testing site for Measuring Devices and Testing site for EMSEMS
Measuring Devices Test generator Coupling/decoupling equipment
Conducted Susceptibility (CS)Conducted Susceptibility (CS)
Measuring Devices Test generator Induction Coil (within a tolerance of 3dB)
Climatic conditions Ambient temperature : 15℃ ~ 35 ℃ Relative humidity : 25% ~ 75% Atmospheric pressure : 86kPa(860mbar) ~106kPa(1060mbar)
Measuring Devices Test generator Induction Coil (within a tolerance of 3dB)
Climatic conditions Ambient temperature : 15℃ ~ 35 ℃ Relative humidity : 25% ~ 75% Atmospheric pressure : 86kPa(860mbar) ~106kPa(1060mbar)
Power Frequency Magnetic FieldPower Frequency Magnetic Field
Broadband IT Korea18
Measuring Devices Test generator
Climatic conditions Ambient temperature : 15℃ ~ 35 ℃
Relative humidity : 25% ~ 75%
Atmospheric pressure : 86kPa(860mbar) - 106kPa(1060mbar)
Frequency of the test power : within 2% of the rated frequency
Voltage VariationVoltage Variation
Measuring Devices and Testing site for Measuring Devices and Testing site for EMSEMS
Broadband IT Korea19
Designation Process under MRADesignation Process under MRA
CABs in U.S Designated by NIST according to Korean regulations FCC will notice the designation to RRL RRL will review the notification and recognize the CAB
CABs in Korea Designated by RRL according to U.S. regulations RRL will notice the designation to FCC FCC will review the notification and recognize the CAB
CABs in U.S Designated by NIST according to Korean regulations FCC will notice the designation to RRL RRL will review the notification and recognize the CAB
CABs in Korea Designated by RRL according to U.S. regulations RRL will notice the designation to FCC FCC will review the notification and recognize the CAB
Mutual RecognitionMutual RecognitionMutual RecognitionMutual Recognition
Broadband IT Korea20
Certification Process under MRACertification Process under MRA
Product testing by designated and recognized labs in U.S. Test reports are issued by the lab
Application for certification Certification body : RRL Applicant can use a domestic agent Document in English are acceptable but may take longer time
Product testing by designated and recognized labs in U.S. Test reports are issued by the lab
Application for certification Certification body : RRL Applicant can use a domestic agent Document in English are acceptable but may take longer time
Product from U.S. to KoreaProduct from U.S. to KoreaProduct from U.S. to KoreaProduct from U.S. to Korea
Broadband IT Korea21
Designated Testing labsDesignated Testing labs
Designated labs in KoreaDesignated labs in KoreaDesignated labs in KoreaDesignated labs in Korea
1 Terminal lab 1 Radio lab 5 EMI labs 5 EMS labs 1 Safety lab
5 Terminal labs 6 Radio labs 26 EMI labs 27 EMS labs 23 Safety labs 9 SAR labs
Recognized labs in CanadaRecognized labs in CanadaRecognized labs in CanadaRecognized labs in Canada
- As of May 2005
Broadband IT Korea22
Contact Point
(For any questions of designation of testing labs)
Mr. Sangyeob Park (sypark@rrl.go.kr)
Mr. Sujin Song (songnice@rrl.go.kr)
www.rrl.go.kr
Recommended