Maximo Scheduler &
Scheduler Plus
Robert Blain
Client Technical Professional
IBM Corporation
rblain@us.ibm.com
2
Please Note:
IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal without notice at IBM’s sole discretion.
Information regarding potential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision.
The information mentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be incorporated into any contract.
The development, release, and timing of any future features or functionality described for our products remains at our sole discretion.
Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon many factors, including considerations such as the amount of multiprogramming in the user ’s job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve results similar to those stated here.
3
1) What is Maximo Scheduler and what does it offer today?
2) Advanced capabilities that were being requested by clients
3) Introducing Scheduler Plus
- What is Scheduler Plus and how is it delivered?
- Review use cases
4) Demonstration
5) Roadmap
6) Extending Maximo to Field Workforce Management
7) Why IBM Weather?
8) October 18th eGA of Scheduler Plus Webinar
Agenda
4
Scheduler – embedded in Maximo
Maximo Scheduler
Maximo Asset Management
iLog
DOC Required only for
Optimization
• Add-on product to
Maximo EAM, code
embedded in core
Maximo therefore a
single install
• Requires a separate
license purchase
• Includes integration
adapter and optimization
engine and models
• Optional: clients may choose
not to use the optimization
capability and can skip the
DOC installation during the
install process
DOC Server
• 7.6.0.5 fix pack level
Roles We Cater To With Scheduler
5
6
Scheduler Pedigree
7
Scheduler 7.6.x Delivery Timeline
New capabilities built on a new technical foundation • Repair Facility Capacity
Planning • Repair Facility
Graphical Assignment Core Maximo PM costing • Includes Nested Job
Plans “Scheduler” application name change • New name: “Graphical
Scheduling”
Usability enhancements • Improved Gantt tools
and navigation
New Asset/Location scheduling capabilities built on a new technical foundation • Work Orders and PM
forecasts viewed by asset/location hierarchy
Multi-tenancy support Usability enhancements • Improved Gantt tools and
navigation
Port existing applications to the new technical foundation • Graphical Scheduling • Graphical Assignment • Dispatch
• Graphical Crew Management
Usability enhancements • Multi-column sort, search,
and filtering • Multi-craft/skill display • Undo / Redo • Expand / Collapse • Much more….
Addressing RFEs during these releases
8
Advanced use cases being requested by clients
• Ability to schedule customer appointments • Match customer's location and requirements with technician's skills and availability to schedule a service
appointment
• Model a complex project plan using real world interdependencies of tasks • A plant turnaround requires many dependent actions to shutdown the location, perform project work, and re-
start the location to bring it back to an operational stage
• Ensure resources with the right qualifications are assigned to work with special requirements • Supervisors need to ensure that technicians have valid certifications to do the work
• How do the current traffic conditions effect work in progress? • Incorporate real-time traffic conditions to better route technicians to their work locations
• Handle larger volumes of data • Many Maximo clients require the ability to manage a heavy volume of work orders be it for shutdowns,
turnarounds, outages, or for dispatching field technicians
9
Appointment booking
• Make customer appointments within a schedule window
• Customer notifications – cancel / reschedule
Managing large projects
• Model complex work order network dependencies
• Highlight critical path, backward pass, % complete
Weather integration
• Incorporate weather data into planning/scheduling and dispatching
• Weather alerts / notifications
Dynamic dispatching
• Auto refresh, re-optimization based on real-time progress
• Incorporate real-time traffic conditions
Introducing – Scheduler Plus!
Advanced work management solution, built on top of Maximo Scheduler
Now catering to the Customer Service Representative too
10
Scheduler Plus – also embedded in Maximo
• Advanced work
management solution
• Add-on product to
Maximo Scheduler, code
embedded in core
Maximo therefore still a
single install
• On-prem and via SaaS
• Requires a separate
license purchase
• Includes the
optimization models
11
Managing Complex Network Dependencies
Use Case - While planning a plant shutdown 100s to 1000s of tasks need to be completed in a specific order. Work order 1 must be completed before work order 2 can start.
Joe, the Planner, generates work orders from many job plans to make up one project; which may include an
Release 1
isolation/shutoff of a complex asset, multiple subassembly tasks such as replacement, firmware updates, PM work and lastly a return to service of the complex asset.
The planner pulls all this work into a schedule and graphically links the relationships between these various tasks to allow minimum down time and maximize productivity by allowing work to be started as soon as its prerequisites are satisfied.
12
Managing Projects
Use Case – Joe, the Planner, is managing a turnaround at an oil exploration site. Using the Pert Chart view in Scheduler Plus, he reviews all the work orders created for the project and updates the dependencies. He views the highlighted critical path of the network of dependencies and focuses on the important activities that have the biggest impact to the schedule finish. He then tracks the overall progress by looking at the percent complete data to ensure that things are moving as planned and starts the process of alerts and notifications on any exceptions he identifies.
Release 2
13
Appointment Booking
Use Case – John calls his local utility provider to request service. Liz, the customer service representative, looks up John’s address and selects the appropriate Job Plan for the required work. She looks up available appointment slots based on staffing and other commitments made. Liz provides John a few dates to choose from. Liz and John book Wednesday 10 AM. (The appointment can be rescheduled, if required).
This process automatically creates a scheduled work order for John’s premise and is ready for a Supervisor to assign technician(s) to.
Release 1
14
Using Weather w/ Appointment Booking
Use Case – John calls his local utility provider to request service. Liz, the customer service representative, determines that this will be a half day job that requires both indoor and outdoor work. She looks up available appointment slots. System Administrator has set up Scheduler Plus to visualize 10 days of basic weather forecast in all views that contain a geo code (asset/location). From this data, the system determines that Wednesday and Thursday mornings have the lowest probability of precipitation at John’s home location. Liz and John book Wednesday morning.
Release 1
15
Weather Integration (Graphical Scheduling)
Use Case - Joe, the Planner, configures the information that he wishes to see on his schedules for current, daily and hourly weather. He looks at a 2 week rolling schedule and decides to filter down to work orders on assets that could be affected by weather. He uses the tool tip on each row to see the formatted weather forecast for each asset on its scheduled date.
Release 1
From the daily forecast view, he elects to open the hourly view for the duration of the work. He feels confident that the crew can travel to, perform the required work, and return back without an adverse weather impact. Joe now approves the work and commits the scheduled dates.
16
Weather Integration (Graphical Assignment)
Use Case - Joe, the Planner, configures the information that users want to see on their schedule for things like current, daily, and hourly weather. Fred, the Supervisor, looks at tomorrow’s schedule and reviews work on assets that could be affected by weather. He uses the tool tip on each row to see the formatted weather forecast for each asset on its scheduled date. After looking at the hourly view for the duration of the work, he feels confident that the crews can travel to, perform the required work, and return back without an adverse weather impact. Fred now assigns the work and is ready for the morning crew meeting.
Release 1
17
Weather Impact on Assets
Use Case – Joe, the Planner, is responsible for equipment that is affected by weather. In Maximo, Joe has set up a job plan effected by key weather parameters with no go or alternate job plan that considers the weather condition. For a planned cell tower maintenance, high wind and storm conditions should be avoided when possible. Lightning must be strictly avoided. Scheduler Plus will search for Work Orders with this job plan and either reschedule the work for no go conditions or change to the alternate job plan. When Joe optimizes the schedule, weather is included as a constraining factor along with schedule windows and priority. The new plan Joe publishes now includes critical information that can lead to safer, more efficient operations.
Release 2
18
Dynamic Dispatching
Use Case - Tim, the field technician, is on his daily route that was optimized by Maximo Scheduler. A new emergency has come in and Frank, the dispatcher, identifies Tim as the most appropriate person to assign this work to in the work zone that Tim covers. Frank makes the assignment and Scheduler Plus automatically re-optimizes the remainder of Tim’s day so he can continue to accomplish priority work and return back on time.
Release 3
19
Weather Informed Dispatching
Use Case - Crew1 has finished cleaning the storm drains in county Sector A. They begin to proceed North to Sector B to work on the next job, but they and Frank, the dispatcher, receive alert notifications that Sector B is at risk of a tornado. Frank sees the updated map and re-routes them South where they can service assets near the vehicle depot and head to safety if needed. The tornado has created new emergent work and has impacted travel conditions. Additionally, planned work in Sector B must be rescheduled as well. Scheduler Plus will merge all the work and create street level routes based on this updated information. The Crew will now avoid the damaged roads and be expedited to priority work.
Release 3
20
Brief Demonstration
IBM Maximo Scheduler 7.6.3
21
22
Today’s Agenda, in IBM Maximo Scheduler!
23 23
Maximo Scheduler and Scheduler Plus – Roadmap
Notice: IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal at IBM’s sole discretion. Information regarding potential future
products is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information mentioned regarding potential
future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be
incorporated into any contract. The development, release, and timing of any future features or functionality described for our products remains at our sole discretion.
Weather − Configurable weather views − Enabled in Graphical Scheduling
and Graphical Assignment Appointment Scheduling
- Make customer appointments within a schedule window, see tech availability, incorporate weather
- Cancel, reschedule appointments
Network dependencies (Phase 1)
- Link across WOs and tasks
Weather impact on Assets / Locations − Asset configured to indicate when
weather will effect work to be done on them
− Go or No Go criteria will adjust the dates of work scheduled for the asset
− Applying work requirements due to weather will allow scheduled work to have Job Plan changed
− Current day automatic escalations to apply the assets configured weather conditions
Network dependencies (Phase 2)
- Backward pass - Highlight critical path - Introduce % complete - Pert chart
Excel Export Tool tip in Graphical Scheduling – resources required Start time for PMs – in GS and in generated work orders
Qualifications at WO & Task Level - Manual and Optimization
Weekly and Monthly planning buckets
- Alternative resource availability input Performance
Dynamic Dispatching − Auto refresh for improved tracking
of progress − Re-optimization based on real-time
progress, including emergent work − Real-time road conditions and traffic − Continuous weather updates and
weather event notifications − Everyplace template updates -
weather Weather based assignments
− Manual clearing of decks − Optimization – reschedule
planned and emergency
Enhanced resource availability − WO outside schedule, shifts/breaks
PM display − Constraint window − Compare PM scenarios − Emergency template (ex. Weather
event activity) Performance
Scheduler Scheduler Plus
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or
functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .
24
Scheduling, optimizing and assigning field technicians (daily, weekly, mid and long range)
Complete Mobilization of Technician to preform end to end task.
Ability to receive work requests from the field on a mobile devise
Field Supply Chain Management – Tools – Materials – Parts Management
Support all task/work models: reactive dispatch; routine maintenance; inspections;
preventive; condition-based; predictive; prescriptive
Routing and Route Optimization with directions and real-time traffic
Supporting online/offline maps and customer specific map GIS data
Support a Mobile Application User Experience with Mobile Work Flows
Weather Forecasts and real-time conditions which may effect work locations and field
assignments
Key Field Workforce Management Requirements
25
Field Workforce Management with Maximo
Scheduler/Scheduler Plus • Forecast and schedule work
• Incorporate weather data
• Optimization of work via resource
leveling or capacity planning
Planning of Work
Maximo
Asset
Management
Assignment of Work Mapping of Work
Completion of Work
Scheduler/Scheduler Plus • Optimize resource assignment
based on geolocation, craft, skill,
weather
• Monitor work and adjust based on
real-time field progress
• Plan and schedule appointments
Spatial/Anywhere/Plus • Optimization of work route on an
Esri/Google/Bing map along with
turn-by turn directions displayed
on a mobile device
• Incorporate real-time traffic
Anywhere • Technician receives work
orders in the field
• Provides real-time status
updates to dispatcher and the
back-office
• Receives weather
alerts/notifications
• More efficient work management with embedded weather data
I can see the value of weather but why YOUR Weather? I
see it for free on my browser….
• Because The Weather Company IS the Most Precise, Accurate & Timely Weather Source
Precision
100X Greater
Coverage
Accuracy
Rated Number One
Speed
Forecast Updates every 15 Minutes
26
Scheduler Plus, LIVE