Markham Live - Mobility Hub Technical and Functional Study

Preview:

DESCRIPTION

City of Markham | Adamson Associates Architects | Metrolinx | GO Transit | VIVA | York Region Transit | MTO 407 TransitwayMarkham Centre Mobility Hub Station Study - Markham Centre Mobility Hub Presentation - July 12, 2011Mobility Hubs in the Greater Toronto Area - Markham Centre Mobility Hub Presentation - July 12, 2011Regional Rapid Transit Network in the GTHA - Markham Centre Mobility Hub Presentation - July 12, 2011Key Elements of a Mobility Hub Guidelines - Markham Centre Mobility Hub

Citation preview

markham centre mobility hub station studyMarkham Centre Mobility Hub

Presentation - July 12, 2011

Town of Markham | Adamson Associates Architects | Metrolinx | GO Transit | VIVA | York Region Transit | MTO 407 Transitway

Markham Centre Mobility HubPresentation - July 12, 2011

Mobility Hubs in the Greater Toronto Area

Markham Centre Mobility HubPresentation - July 12, 2011

Regional Rapid Transit Network in the GTHA

Markham Centre Mobility HubPresentation - July 12, 2011

Key Elements of a Mobility Hub Guidelines

• New roads utilize raised levels above existing grades to slope at approximately 3% incline to crossover existing train track

• Street and development parcel plan was endorsed by DSC in March 2011

• Incorporates a balanced development with respect to parking, traffic, land use and density options

• Revised transit plans and related infrastructure

• Established framework of urban Infrastructure

adamson associates concept planMarkham Centre Mobility Hub

Presentation - July 12, 2011

Markham Centre Mobility HubPresentation - July 12, 2011

Markham Centre Aerial Photo Year 2009

Site Diagram of Raised Road Level above Existing Grade

Markham Centre Mobility HubPresentation - July 12, 2011

Street and Development Parcel Plan (Endorsed by DSC March 2011)

Markham Centre Mobility HubPresentation - July 12, 2011

• Master Site Plan

• Site Section Concept Diagrams

• Floor Plan Level +170.0 – TRANSIT LEVEL

• Floor Plan Level +180.0 – CONCOURSE LEVEL

• Floor Plan Level +190.0 – GALLERIA LEVEL

• Detail Floor Plan and Section VIVA / YRT TRANSIT at Level +170.0

• Detail Floor Plan and Section MTO 407 TRANSITWAY at Level +170.0

• Detail Floor Plan and Section METROLINX GO TRANSIT at Level +180.0

Markham Centre Mobility HubPresentation - July 12, 2011

mobility hub concept plan

Markham Centre Mobility HubPresentation - July 12, 2011

Mobility Hub Concept Master Site Plan

Markham Centre Mobility HubPresentation - July 12, 2011

Site Section Concept Diagram

Markham Centre Mobility HubPresentation - July 12, 2011

Site Section Concept Diagram

Markham Centre Mobility HubPresentation - July 12, 2011

Floor Plan Level +170.0 – TRANSIT LEVEL

Markham Centre Mobility HubPresentation - July 12, 2011

Floor Plan Level +180.0 – CONCOURSE LEVEL

Markham Centre Mobility HubPresentation - July 12, 2011

Floor Plan Level +190.0 – GALLERIA LEVEL

Markham Centre Mobility HubPresentation - July 12, 2011

Detail Floor Plan & Section VIVA / YRT TRANSIT at Level +170.0

Markham Centre Mobility HubPresentation - July 12, 2011

Detail Floor Plan & Section MTO 407 TRANSITWAY at Level +170.0

Markham Centre Mobility HubPresentation - July 12, 2011

Detail Floor Plan & Section METROLINX GO TRANSIT at Level +180.0

• Sequential examination of floor levels

• Massing identifies relationship between transit modes

• Connectivity within framework of established urban infrastructure

Markham Centre Mobility HubPresentation - July 12, 2011

mobility hub concept 3D visualization

• Relationship of concept framework of urban infrastructure and parallel development with MTO 407 Transitway EA alignment

Markham Centre Mobility HubPresentation - July 12, 2011

MTO 407 transitway EA alignment

Markham Centre Mobility HubPresentation - July 12, 2011

MTO 407 Transitway EA alignment

Markham Centre Mobility HubPresentation - July 12, 2011

markham live concept plan proposed alignment

• Third alternative option for the MTO 407 Transitway alignment proposes configuration along new road to minimize impact on development

Markham Centre Mobility HubPresentation - July 12, 2011

new road alternate alignment

Markham Centre Mobility HubPresentation - July 12, 2011

markham live street alternative 407 transitway alignment

Deadline for submitting questions Monday July 18, 2011

Deadline for responding to questions Wednesday July 20, 2011

Closing Date and time Friday July 29 2011

Project Start Date September 2011

Project Completion Date Spring 2012

Markham Centre Mobility HubPresentation - July 12, 2011

next steps / anticipated schedule

Recommended