Making Green Happen

Greenstat is connecting industry, knowledge and politics, opening new, green market segments in Norway and abroad

Surplus and trapped renewable energy is stored, distributed and made accessible to growing zero emission markets

Oil production peaked in 2001

1970 1976 1982 1988 1994 2000 2006 2012 2018 2024 2030

Million barrels per day3,4

3,0

2,6

2,2

1,8

1,4

1,0

0,6

0,2

Source: Fractionflow.com

Norway in a unique position

⁃ 97 % renewable electricity production

⁃ >60 % overall renewable energy usage with a growing commitment to become 100 % fossil free

⁃ Surplus of renewable energy, annually ~20 TWh

⁃ Skilled resources laid off in the oil and gas industry

⁃ Limited grid capacity for export

⁃ Political will to support energy intensive industries

Final energy consumption (2014) - 227 TWh (Terawatt Hours)

Oil

CoalNatural Gas

Biofuel

Electricity

Heat

GREENSTAT AS(2015)

Greensight AS(2016)

Green Hydrogen AS

(2017)

«Local Energy AS»

(planned 2017)

Investments: - Glomfjord Hydrogen AS

(2016)

Company structure

Green Insight / Greensight AS

- Knowledge based

- Zero emission framing

- Based on publicly available data sources

- IEA

- NVE

- SSB

- Dynamic scenario modelling

- Frequent updates based on technology development and political changes

Understanding the historic and present energy situation

Ref: http://www.iea.org/sankey

Oil & Gas

Export

Hydropower

Industry

Private householdsPower Grid

Transport

Preparing for the future energy mix

Oil & Gas Export

Hydropower

Transport

Private households

Wind

Solar

ExportHydrogen

Power Grid

Industry

Local Energy

More complex local energy systems

Socket parity vs. Grid Parity- Today

0

0,2

0,4

0,6

0,8

1

1,2

1,4

Centralized Local Local with storage

Power Grid Storage

Socket parity

Grid parity

Negative margin

Negative margin

Socket parity vs. Grid Parity- Future

0

0,2

0,4

0,6

0,8

1

1,2

Centralized Local Local with storage

Power Grid Storage

Socket parity

Grid parity

Positive margin

Positive margin

Solar – Prices going down

0

10

20

30

40

50

60

70

80

90 $ US

PV cells in $ per installed Wp (Watt peak)

Wind – Prices going down

0

10

20

30

40

50

60 $ US

Price per KWh

Storage – Prices going down

0

5000

10000

15000

20000

25000

30000

35000 $ US

BEV batteries per KWh

Grid – Prices going up

0

20

40

60

80

100

120

140

19

75

19

77

19

79

19

81

19

83

19

85

19

87

19

89

19

91

19

93

19

95

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

Historical investments Future investments

MNOK

Hydrogen

National budget highlights related to hydrogen (october 2016)

⁃Incentives for H2 cars confirmed until 50 000 cars or until 2025

⁃H2 ferry to be built by 2021

⁃Electrical tax avoided on hydrogen production for transport

⁃ENOVA (funding scheme) to support hydrogen infrastructure roll out

Hydrogen production

Industry

Transport Land

Transport Sea

Export

SolarOcean Power

Hydro (small)Wind

Hydropower

Offshore Wind

Green Hydrogen value chain- From renewable energy to end consumer

Hydrogen for industrial use - TiZir

- TiZir titanium to replace coal with hydrogen at their facility in Tyssedal

⁃ 90 % reduction in CO2 emissions in the production

⁃ Further CO2 emission reduction by using Green Hydrogen compared to fossil H2 production

⁃ 121 000 tons CO2 saved yearly

⁃ First step: demonstration plant for hydrogen (2017-2019)

⁃ with Enova support (NOK 122 million)

⁃ Second step: full-scale pilot (2020)⁃ Up to 30 tons of hydrogen per day needed

High political focus due to major CO2 reduction

Hydrogen for industrial use - TiZir

⁃Break-even price⁃ 22 NOK/kg H2

⁃Life span⁃ 30 years

⁃Yearly revenues⁃ 250 MNOK

⁃Investment costs⁃ 550 MNOK-600 MNOK

-1000

0

1000

2000

3000

4000

5000

6000

7000

8000

Y1 Y3 Y5 Y7 Y9

Y11

Y13

Y15

Y17

Y19

Y21

Y23

Y25

Y27

Y29

Accumulated revenue Investment

Maintenance needed every 8-10 years

MNOK

Hydrogen for industrial use - TiZir

Production machinery

77 %

Start up commissioning

7 %

Building12 %

Power cables2 %

Projecting2 %

Investment costs

Maintanence production machinery

2 %

Labour costs2 %

Buffer OPEX1 %

Maintanence building

1 %

Grid rent3 %

Power91 %

Other OPEX6 %

Operational costs

Hydrogen for industrial use - Mongstad

⁃ Hydrogen to be used for oil refining

⁃ Equivalent in size to the TiZir project ~30 Ton H2 per day.

⁃ Hydrogen to be supplied “over the fence”.

⁃ H2 factory built according to industry standard to reduce cost.

Political drive to initiate the project

-500

0

500

1000

1500

2000

2500

3000

3500

4000

Y 1

Y 2

Y 3

Y 4

Y 5

Y 6

Y 7

Y 8

Y 9

Y 1

0

Y 1

1

Y 1

2

Y 1

3

Y 1

4

Y 1

5

Y 1

6

Y 1

7

Y 1

8

Y 1

9

Y 2

0

Accumulated revenue Investment

Maintenance needed every 8-10 years

MNOK

Demand 1,3 Tons H2 per hour 24/7

~20-25 NOK per kg H2 (competitive to steam reformed hydrogen)

0,20-0,30 NOK/KWh + net tariff

Max capacity 83 MW Normal load 80%, 66 MW

Hydrogen production facilityGrid power97% renewable

Mongstad Project summary

Hydrogen production plant - Glomfjord

- Former industrial buildings (REC) to be reused for hydrogen production

- Historical hydrogen production in the same area, 135 MW electrolysers (NEL)

- Local and national funding for job creation

- Potential for up to 8 ton daily production

- Starting with one electrolyser august 2017

-100

0

100

200

300

400

500

600

700

Y 1

Y 2

Y 3

Y 4

Y 5

Y 6

Y 7

Y 8

Y 9

Y 1

0

Y 1

1

Y 1

2

Y 1

3

Y 1

4

Y 1

5

Y 1

6

Y 1

7

Y 1

8

Y 1

9

Y 2

0

Accumulated revenue Investment

MNOK

Surplus region, ~7 TWh

Maintenance needed every 8-10 years

Hydrogen ships under development

⁃Strong political drive to decarbonize the maritime sector⁃ Ferries⁃ Fast going vessels⁃ Cruise⁃ Offshore vessels⁃ Yatch

⁃First electric ferry “Ampere” already in operation

⁃Two more electric ferries under construction

⁃First hydrogen ferry planned in 2020

Ferry projects

⁃ Average need of 1000 kg H2 per day, per ferry

⁃ Typically 2-3 ferries

⁃ Total of 54 ferries connected to the national road system + regional connections

⁃ Contracts, 8-14 years

⁃ Zero Emission solutions preferred

-100

-50

0

50

100

150

200

Y 1

Y 2

Y 3

Y 4

Y 5

Y 6

Y 7

Y 8

Y 9

Y 1

0

Y 1

1

Y 1

2

Y 1

3

Y 1

4

Accumulated revenue Investment

MNOK

Large number of tenders in the pipeline

Maintenance needed every 8-10 years

Hydrogen Viking

Sunseeker predator 95

Goals:

⁃45 knots June 2018

⁃Hybrid fuel cell/ battery

⁃Zero emission

Renewable hydrogen export (Norway/ Iceland)Norway - Hydropower

Iceland – Geothermal energy

LH2 carrier Export markets – Japan, US, Europe

Export projects

⁃ Transported by ship

⁃ Liquefied Hydrogen LH2

⁃ ~11 000 tons of hydrogen per ship

⁃ Could go through the North/East route when ice free

⁃ Research projects initiated

⁃ Ministry of Trade, Industry and Fisheries involved

-2000

0

2000

4000

6000

8000

10000

12000

Y 1 Y 3

Y 5

Y 7

Y 9

Y 1

1

Y 1

3

Y 1

5

Y 1

7

Y 1

9

Y 2

1

Y 2

3

Y 2

5

Y 2

7

Japan US Europe Other Investment

MNOK

Japan’s H2 strategy assumes 40 % hydrogen by 2050 in total energy mix

Hydrogen stations being built

Making Green ROI Happen

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Knowledge Energy Technology End market End to end services

Financial Model

Knowledge

⁃Long term, diversified portfolio

⁃Steady growth

⁃5-15% annual ROI

Investment model – co invest with the people of Norway

Greenstat AS

(later ASA)

GreensigthAS

Greenstat Hydrogen AS

GreenstatProjectCo 3

GreenstatProjectCo 4

GreenstatProjctCo nn

• National investors• The Norwegian people• Foreign investors• Government

• Local investors • City councils• Local community

Preferred ownership structure – Top company

⁃Diversified ownership

⁃No controlling owners

⁃Maximum ownership 20 %

⁃Desired investor groups⁃ Private investors (small)⁃ Private investors (big)⁃ Investments funds⁃ Greenfund AS (Norwegian governmental fund to be

established with a capital base of 20 Billion NOK)⁃ International investors⁃ Employees

Private (small)

Private (big)

Funds

Greenfund AS

International

Employees

Ownership structure - Project company

Example, Glomfjord Hydrogen AS

⁃Founded June 2016

⁃Ownership⁃ Meløy Næringsutvikling (local funding)

⁃ Meløy Energi (local utility)

⁃ NEL Hydrogen (technology partner)

⁃ Greenstat (hydrogen production)

⁃Expected investments 90 MNOK

⁃Expected yearly income ~20 MNOK

Meløy Næring

14 %

Meløy Energi28 %

NEL Hydrog

en29 %

Greenstat

29 %

Agreements made with key customers and industrial partners

⁃ Letter of intent, Hydrogen production, TiZir and regional utility

⁃ Partnership Agreement, Electrolyser technology, NEL Hydrogen

⁃ LOI to be signed for H2 ship, Vision of the fjords (Ship of the year 2016), Fjord1 and Brødrene AA

⁃ Ongoing studies with regional partners: ⁃ Lindås⁃ Høyanger⁃ Glomfjord⁃ Hardanger⁃ ++

⁃ Close dialogue with utility companies: ⁃ BKK⁃ SKL⁃ Lyse⁃ Varanger kraft⁃ Statkraft⁃ ++

⁃ More co-investments, partnership agreements and commercial agreements are in progress

Key peopleVegard Frihammer

Green Executive Officer

Vegard@Greenstat.no

@frihammer

Founder, engineer, green entrepreneur

- MEB, UWA, Perth, Australia

- MEE, Curtin, Perth, Australia

- Bachelor Automation, HIB, Bergen

- Background from oil & gas and maritime sector

- More than ten years experience from the renewable sector

- Six years at Christian Michelsen Research. Last position, Head of Renewable Energy

- Strong political and industrial network

Bernt Skeie

Chairman of the board

Bernt@Greenstat.no

@bernt_skeie

Co founder, economist, substantial network

- Executive MBA, NHH, Bergen

- BSc. Business, NHH, Bergen

- Background from oil & gas sector

- Proven track record when it comes to technology and business development

- CEO at CMR Prototech

- Multiple board positions

- Active involvement in Greenstat

Resources Key Partners

Tomas Fiksdal

Project Manager Hydrogen

Tomas@Greenstat.no

Kristian R. Fauske

Financial analyst

Kristian@Greenstat.no

Hilde Holdhus

Manager/ Energy Forecaster

Hilde@Greenstat.no

Tore Solheimslid

Energy analyst/ hydrogen

Tore@Greenstat.no

Knowledge

⁃ University of Bergen

⁃ NHH

⁃ Christian Michelsen Research

⁃ HIB

Network

⁃ NCE Maritime Cleantech (Cluster)

⁃ Bergen Chamber of Commerce

⁃ Climate partners Hordaland (network)

⁃ ByNature

Industry

⁃ Hellenes

⁃ Sunnhordland Kraftlag

⁃ Bergen Technology Transfer

⁃ Trond Mohn

Making Green Happen

Recommended