Engineering, Procurement, Construction Maintenance since 1977&
Control & Applications EmiratesCorporate Pro�le
www.caeme.com
years of success
Contents
Copyright © 2017 Control & Applications Emirates. All rights reserved.
The Control & Applications Emirates logo and any alternative version thereof are trademarks and service marks of Control & Applications Emirates. The other names mentioned, registered or not, are the property of their respective companies. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness to any particular purposes. CAE reserves the right to revise or change this data at any time without further notice.
Message from the Chairman .............................................................................................................5
CAE story of success ............................................................................................................................ 6
Vision, mission & values ......................................................................................................................7
Sectors & services ................................................................................................................................. 8
Health, safety & environment ........................................................................................................ 10
Quality assurance ..................................................................................................................................11
Manpower ................................................................................................................................................12
Clients & partners .................................................................................................................................13
Major project references ...................................................................................................................14
Contact information .......................................................................................................................... 20
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 5
A carefully planned and executed expansion program has seen CAE’s presence strengthen in recent years, so that it can now take its right-ful place as a leading EPC contractor in the fields of mechanical, elec-trical, instrumentation, and control systems.
I am proud to have been associated with CAE during these recent developments, and firmly believe that the scope of the company’s services can be sensi-bly broadened without sa crificing any of the many positive elements that have contri buted to CAE’s
standing in the market.
I would also like to commend the company’s senior management for fostering a positive corporate spi rit and sense of ownership in every project that we complete.
Rashed Saif Bin Jabr Al SuwaidiChairman
MESSAGE FROM THE CHAIRMAN
Message from the Chairman
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com6
OUR STORY OF SUCCESS
Our story of success
Since our establishment in 1977, we’ve been writing our sto-
ry of success. Starting as an electrical and instrumentation
services provider, we have become one of the most reliable
engineering, procurement, construction and maintenance
(EPCM) contractors in the U.A.E.
We are now experts in onshore and o�shore mechanical,
electrical, control systems and instrumentation engineering
in the energy and infrastructure sectors.
In the past 40 years we have executed more than 500 proj-
ects in the United Arab Emirates, undertaking complex chal-
lenging projects and completing them successfully, and on
time.
Our experience of executing key projects in the U.A.E. has
helped us establish excellent working relationships with both
local and international contractors, and especially ADNOC
and its divisions.
We stand out with our excellent track record of projects for
ADNOC, where we’ve delivered every project on time and ac-
cording to the highest quality and HSE standards. This has
made us a preferred partner for such companies, as ADNOC,
ADWEA, Granite, Petrofac, and Borouge among others.
40 years of success
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 7
VISION, MISSION & VALUES
Vision, mission & values
Mission
Values
To complete every project safely, on time, with high quality, within budget and to the total satisfaction of the customer.
Vision To become a recognized engineering, procurement and construction company in the Middle East, executing EPCs and specialized construction projects in the fields of me-chanical, electrical, instrumentation, and control systems.
Quality We deliver each project with the
highest standards of quality.
InitiativeWe encourage our employees to
take initiative.
Integrity We are professional and trans-
parent in our service.
Commitment We are committed to our part-ners, customers and suppliers.
Teamwork We work together as a unit.
SafetyWe are committed to HSE
excellence.
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com8
SECTORS & SERVICES
Sectors & services
We are a vastly experienced engineering, procurement, con-
struction and maintenance (EPCM) contractor specialized in
mechanical, electrical, instrumentation, and control systems
works. We serve the energy and infrastructure industries of
the Middle East, with expertise in the U.A.E. oil and gas sector,
both onshore and o�shore.
Our services include engineering and design, procurement,
construction and installation, testing and commissioning,
maintenance and upgrade, turnkey projects, start-up, shut-
down, and hot changeover. We are happy to get involved in
the various stages of the project starting from the conceptual
design/FEED through to execution and commissioning.
We stand out with our excellent track record of projects for
ADNOC, where we’ve delivered every project on time and ac-
cording to the highest quality and HSE standards. This has
gained us an outstanding reputation within the industry over
the past 40 years.
40with over 500 projects in the U.A.E.
Oil & Gas Onshore and O�shore
Petrochemicals & Refineries
Power Nuclear, Thermal, and Renewable
years of success
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 9
SECTORS & SERVICES
Expertise
Electrical & Power Systems ▪ Cable works (LV/MV/HV) ▪ Power installations ▪ Lighting systems ▪ Earthing works
▪ Lightning protection
Mechanical & MEP ▪ Piping ▪ Structural erection ▪ Heavy equipment erection ▪ Firefighting ▪ Plumbing
▪ HVAC
Telecommunications & Low Current ▪ Fiber optic installations ▪ SMATV/CCTV systems ▪ Telephone systems ▪ Structured cabling ▪ Telemetry systems
▪ PA/GA system
Control & Instrumentation ▪ DCS ▪ SCADA ▪ PLC based systems ▪ Field instruments ▪ Emergency shutdown ▪ Fire & Gas
Water & Waste Water InfrastructureSpecial Projects
Ports, F1 Race Track, and Residential
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com10
HEALTH, SAFETY & ENVIRONMENT
Health, safety & environment
Corporate HSE Policy Statement
“We’re committed to delivering HSE excellence for our clients, contractors, employees, and shareholders.”
Our HSE Management System
Uses OHSAS 18001 and ILO-OSH 2001 as main guidelines.
Provides the measures to manage
HSE across CAE.
Is integrated into all functional areas
of operations.
Is extended to all subcontractors
and suppliers.
In every project we will strive to achieve:
▪ No accidents
▪ No harm to people
▪ No harm to the environment
▪ Continuous improvement in HSE performance
Our e�ective corporate HSE policy has insured excellent safety statistics and consistently low loss time incidents (LTI), resulting in numerous HSE awards from our clients.
We are committed to ensure a systematic approach to HSE Management in order to comply with AD-NOC Codes of Practices, Abu Dhabi and UAE laws and regulations, as well as all applicable international standards.
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 11
QUALITY ASSURANCE
Quality assurance
Corporate Quality Policy Statement
“To consistently meet and exceed customers’ expectations in service performance and delivery.”
We are a quality assured organization, and have been certified with:
Our Quality Management System
Controls all work performed through
all phases of the project.
Committed tohigh quality performance
and standards.
Continual compliance with contractual and
regulatory requirements.
Pyramidal document control used company-wide & for
project work.
▪ ISO 9001:2008
▪ ISO 14001:2004
▪ OHSAS 18001:2007.
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com12
Manpower
MANPOWER
Our engineers each have an average experience of over 15
years. Through the commitment of our experienced engi-
neers and highly trained construction personnel, we assure
our clients the highest quality, safety and timely completion
of projects.
Our project teams are renowned for their ability to proac-
tively respond to our clients’ requirements and o�er flexible
solutions. During project execution we maintain a strong
foundation of trust and mutual respect for clients and
sub-contractors, thereby ensuring the highest degree of pro-
fessional service and results.
In addition to qualified manpower resources, we use various
control and project management software applications to al-
low our clients and partners track all phases of the project
and monitor the implementation status and performance.
Our people,our greatest asset
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 13
Clients & partners
CLIENTS & PARTNERS
Major clients & partners
Major OEM’s
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com14
EPC for substation 19 upgrade at Maqta Maqta
▪ Feeders modification in 11kV switchgear. ▪ Supply & installation of 2 Nos. 11/0.415kV, 2MVA transformers, bus ducts, 415V,
3200A switchgears, 630kVA, containerized DG Set. ▪ Replacement of F&G system, modification of SMC system, LV, MV, FO cabling. ▪ Upgrade of Inergen shelter. ▪ Temporary DG and temporary LV switchgear during changeover. ▪ Civil works (rehabilitation of substation building, modification of transformer
foundations, sump pits, etc.). ▪ Miscellaneous works, such as demolition of some existing equipment.
MAJOR PROJECT REFERENCES
Major project references
Replacement of 42 LV switchgear & transformers
EPC for 33/11kV substation upgrade on Das Island
ZWSC & ZCSC
Das Island
▪ Replacement of 42 415V switchgears; supply and installation of 2 11kV/415V, 2 MVA dry type transformers.
▪ Engineering studies such as load flow, short circuit, relay coordination using ETAP Software.
▪ Replacement of 42 nos. LV switchgears on existing footprint after removing. existing switchgears, 11kV/415V, 2 MVA dry type transformers, 11kV switchgear modification in ZWAP, power and control cables (11kV and LV).
▪ Provided temporary LV switchgears and cables during above 42 nos. LV switch-gear replacement.
▪ Integrated protection, control and monitoring system for LV switchgears.
▪ Construction (EPC) of new 33/11kV Substation for shifting of 33kV & 11kV loads from existing substation to the new substation.
▪ Supply, installation, testing & commissioning of 33kV GIS, 11kV AIS & 0.415kV switchgear, 25 MVA, 33/11kV power transformers, and 11/ 0.415kV distribution transformers, modification of existing 33kV GIS Panel & GT-2 synchronization panel, and supply, laying and termination of 33kV, 11kV & LV cables.
▪ 11kV RMU, DC UPS & AC UPS; updating DCS System. ▪ Test & commissioning of new PMS / LMS systems / integration with existing
temporary power supply arrangement during changeover period. ▪ Civil works, HVAC works, fire alarm & fire fighting system, etc.
EPC for enhancement of fire & gas detection system in Asab-2 Asab
Type: EPCYear: 2017
Type: EPCYear: 2015
Type: EPCYear: 2014
▪ Installation of cable trays, and associated structural supports; laying and termi-nation of Instrument and power cables; installation of 125 no’s of new fire and gas detectors; relocation of 9 numbers of existing F&G detectors and demolition of 11 number of F&G detectors.
▪ Installation of new marshalling cabinet at IES-7, and modification of system and marshalling cabinet at IES-5 & IES-6.
▪ Modification of existing Yokogawa DCS and FGS system, Honeywell AMS (Alarm Management System), and existing HSSD system (TYCO).
▪ Sca�olding works for the installation of cable trays and F&G detectors. ▪ Civil works, such as cable trench works, foundation for the instrument supports.
Electrical & instrumentation works at O�shore Platforms O�shore Platforms
▪ Site survey, detail engineering, cost estimation, material supply, installation, and commissioning assistance for electrical and instrument works at o�shore platforms - on call o� basis.
▪ Supply items: electrical and instrument cables, JBs, tubing, fittings, valves, cable trays, tray accessories, supports, glands, termination kits, consumables and associated materials as per particular work requirement.
▪ Present contract is for 3 years, extendable by 2 years.
Client:
Client:
Client:
ADNOC Gas Processing (GASCO)
ADNOC Gas Processing (GASCO)
ADNOC LNG (ADGAS)
Client:
Client:
ADNOC O�shore (ADMA-OPCO)
ADNOC O�shore (ADMA-OPCO)
Type: EPCYear: 2016
Type: EPCYear: 2015
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 15
MAJOR PROJECT REFERENCES
Replacement of obsolete 11kV switchgear panels Dhabiyya and Rumaitha
▪ Supply & Installation of new 11kV switchgears and replacement of existing switchgear.
▪ EDSS, DCS modifications. ▪ FGS modifications. ▪ HV Power and control cable, 11kV switchgears, 11 KV/ 0.415kV transformers.
Supply and installation of Remote Telemetry Units on well head towers – o�shore ▪ Replacement of remote terminal units (RTUs) and SCADA at Umm Shaif and
Zakum West (o�shore) central complexes, and associated well head towers. ▪ Engineering, procurement, construction & commissioning. ▪ Instrumentation, electrical and piping modification works. ▪ SCADA upgrade / ESD console upgrade. ▪ Provision of new hydraulic shutdown system & TIM/solar systems. ▪ Structural deck extensions. ▪ Cabling & termination works. ▪ Pre-commissioning works & commissioning during shutdown.
Umm Shaif, Zakum (O�shore Platforms)
Rehabilitation of electrical distribution supervisory system at NEB Fields Al Dhabbi’ya & Rumaitha
▪ Detail Engineering. ▪ Supply of SEEFOX servers & application. ▪ Supply of SIS Gateway. ▪ Reconfiguration of communication network. ▪ Supply of master clock, time synchronization & reconfiguration of time servers. ▪ Communication check between PLC gateway & remote DCS. ▪ Re-establish OPC link at client workstation. ▪ Perform signal testing of field to DCS.
Replacement of obsolete 11kV switchgear Buhasa
▪ Engineering, procurement, construction & commissioning. ▪ 33/11kV power transformers & 11KV switchgear and shifting 3.3KV camp feeders
to 11kV network. ▪ Existing 33KV switchgear modifications. ▪ Modifications to existing SCMS, PMS, DCS. ▪ NER, NE transformer, RTCC panel. ▪ Construction of substation buildings and necessary cable trenches. ▪ Pre-commissioning, commissioning, training and handover.
Client:
Client:
Client:
ADNOC O�shore (ADMA-OPCO)
ADNOC Onshore (ADCO)
ADNOC Onshore (ADCO)
Type: EPCYear: 2012
Type: EPCYear: 2014
Type: EPCYear: 2013
Type: EPCYear: 2012
Client: ADNOC Gas Processing (GASCO)
EPC & Commissioning works for ABC+ control system in Sulphur Recovery Unit (SRU) Abu Dhabi Refinery
▪ Engineering, procurement, construction, pre-commissioning & commissioning works; developed a process control narrative for ABC+ control system by pro-cess licensor M/S Jacobs Netherlands.
▪ Development of PFD, P&ID, HAZOP, SIL reviews, basic detailed engineering data. ▪ 3 new online feed forward analysers with online sampling system, incl. shelter,
sampling hardware & HVAC. ▪ Separate analyser shelter mounted PLC running the ABC+ control logic/system
in a purged cabinet with a GPS time synchronization of the PLC with the DCS. ▪ 58 new instruments, modification of 19 existing instruments with 9 closed loops
and balance 68 open loops.
Client: ADNOC Refining (TAKREER)
Type: EPCYear: 2012
Polybed PSA unit revamp at Ruwais Refinery Ruwais
▪ Engineering, procurement, construction, pre-commissioning & commissioning works.
▪ Replacement of PSA unit control system by providing new Modicon PLC pro-cured through our subcontractor UOP.
▪ PSA unit piping modification works. ▪ Replace old butterfly valves (10 nos.) in PSA unit. ▪ DCS interface works.
Client: ADNOC Refining (TAKREER)
Type: EPCYear: 2011
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com16
Tank base heating & lighting maintenance services
Electro-mechanical works of IGD-E (Phase-1) package 3 onshore pipeline & Habshan modifications project
Ruwais
Habshan
▪ Tank base heater services include: preventive maintenance, emergency repair, trouble shooting, overhaul, minor modifications, testing, tools, and reporting; repair/replacement of heater with high deviation in current from the reference value, base heater control panel, preventive maintenance on control panel in all tanks.
▪ Lighting/small power system maintenance works including Isolation and de-iso-lation of lighting circuits.
▪ Maintenance activities as per GASCO approved job plan (such as, visual inspec-tion, cleaning, wiring check and tightening, emergency battery test, distribution boards, junction box maintenance, etc.); visual inspection of all lighting.
▪ Installation, testing, pre-commissioning and commissioning assistance for the following (brown & green field) electro-mechanical works in GASCO Habshan IGD area: ▫ Mechanical erection work. ▫ Fire proofing works. ▫ Insulation works. ▫ Electrical & cathodic protection works. ▫ Instrumentation works. ▫ Telecom system installation works. ▫ HSE system installation works.
MAJOR PROJECT REFERENCES
Replacement and upgrade of 415V switchgear Umm Shaif
▪ Replacement of seven 415V switchgears and supply and installation of two 110V DC UPS.
▪ Engineering, procurement, construction & commissioning. ▪ Power system study. ▪ Engineering to match footprints. ▪ Procurement and installation using temp boards. ▪ Hot changeover to new panels. ▪ Procurement and installation of two 100V DC UPS. ▪ Commissioning of UPS.
RTU SCADA replacement at Umm Shaif and Zakum fields Umm Shaif, Zakum (O�shore Platforms)
▪ ADMA awarded CAE-Telvent JV the EPC contract for replacement of remote terminal units (RTUs) and SCADA (supervisory control and data acquisition) at Umm Shaif and Zakum West Central complexes, and associated well head towers.
▪ Engineering, procurement, construction & commissioning. ▪ Instrumentation, electrical, and mechanical works. ▪ DCS upgrade, RTU / SCADA / hydraulic shutdown system replacement. ▪ Solar panels, telemetry interface. ▪ Field instrumentation and cabling works. ▪ Pre-commissioning and commissioning during hot changeover.
Implementation of SIL study recommendations for train - 1, 2, 3 & boilers 1 to 6 Das Island
▪ Engineering, procurement, construction pre-commissioning & commissioning works.
▪ Detailed engineering including SIL verification & validation. ▪ Implementation of HAZOP & SIL recommendations. ▪ Plan & procedures for SIL overall safety life cycle. ▪ Triconex ESD systems modifications. ▪ Field instrumentation works. ▪ Commissioning works carried out during plant turnaround.
Client: ADNOC O�shore (ADMA-OPCO)
Type: EPCYear: 2011
Type: EPCYear: 2010
Client: ADNOC Gas Processing (GASCO)
Client: ADNOC O�shore (ADMA-OPCO)
Type: EPCYear: 2007
Type: EPCYear: 2008
Client: ADNOC LNG (ADGAS)
Client: Tecnicas Reunidas / ADNOC Gas Processing (GASCO)
Type: ConstructionYear: 2016
Boilers 3,4,5 control system upgrade on Das Island Das Island
▪ Engineering, procurement, construction, pre-commissioning & commissioning. ▪ Detailed engineering for BMS/BCS control systems, utility PLC system, console &
field instrumentation; SIL verification, validation & implementation. ▪ New dual redundant GE-90-70 series PLC for burner management system
(BMS) and dual redundant GE-GMS PLC for boiler control system (BCS) with HMI (Wonderware).
▪ Replacement of existing pneumatic field instruments with smart electronic field instruments; replacement of local burner control panel.
▪ New redundant parallel load sharing 30 KVA UPS system. ▪ New UPS-Battery room; field instrumentation works.
Client: ADNOC O�shore (ADMA-OPCO)
Type: EPCYear: 2006
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 17
Integrated gas development project (IGD) (green field and brown field)
Ruwais refinery expansion – o�site and utilities (EPC 3)
Ruwais refinery expansion – package 4 storage tanks
Islands surface facilities (EPC 2) for UZ750
Khalifa Port special system project
Das Island
Ruwais
Ruwais
Upper Zakum South, North, and West Artificial Islands
Taweelah
▪ E&I construction works for green field & brown field for IGD project: ▫ Installation, testing & commissioning of MV/LV switchgears, power and
distribution transformers, as well as UPS; installation of 12 km cable trays. ▫ Below ground and above ground cabling – 720 km. ▫ Cable glanding & termination – 14,500 glands. ▫ Calibration, installation and pre-commissioning works for field instruments
– nos. 1600. ▫ Installation and pre-commissioning of IPCMS, PMS/LCS, DCS/ESD system. ▫ Lightning & earthing protection; heat tracing and cathodic protection.
▪ Electrical and instrumentation works for RRE project – o�site and utilities (Package D): ▫ Electrical works up to 33kV. ▫ Installation of grounding, lighting system, fire alarm system. ▫ Below ground and above ground cabling – 600 km. ▫ Glanding & termination – 8000 glands. ▫ Telephone, paging, CCTV / CATV and security access systems. ▫ Installation of analyzers, field instruments (3800 instruments). ▫ Cable trays, instrument cabling, instrument tubing/ piping. ▫ Pre-commissioning works and commissioning assistance.
▪ Instrumentation works for the tankages and its associated interconnecting piping: ▫ Calibration and installation of field instruments – 2800 instruments. ▫ Installation of cable trays – 86 km. ▫ Below ground and above ground cabling – 1200 km. ▫ Cable glanding & termination – 11,000 glands. ▫ Testing & pre-commissioning. ▫ Assistance during commissioning and performance testing.
▪ Electrical & instrumentation works islands surface facilities (EPC 2) for UZ750: ▫ Project management and construction engineering. ▫ Electrical, instrumentation, telecommunications, and cathodic protection
works. ▫ As-build documentation; electrical & instrumentation hook-ups. ▫ Installation of data network, PAGA, radio, telephone, hotline, CCTV, meteo-
rological system, fiber optic & telecom cable works. ▫ Testing and pre-commissioning. ▫ Assistance during commissioning and performance testing. ▫ Supply and installation of materials.
▪ Installation of all widgets and systems cabinets of security systems. ▪ Includes: PA, CCTV, fire detection, access control, WLAN, LAN, TETRA. ▪ Laying of the external fiber and copper cable – 836 km.
Type: ConstructionYear: 2011
Type: ConstructionYear: 2010
Type: ConstructionYear: 2010
Type: ConstructionYear: 2015
Client:
Client:
Client:
Client:
Page Europa / ADPC
Samsung / ADNOC Refining (TAKREER)
Daewoo / ADNOC Refining (TAKREER)
Petrofac-DSME / ADNOC O�shore (ZADCO)
Power upgrade project Zirku Island
▪ Complete electrical, instrumentation and telecom works for new GTGs. ▪ Installation of electrical equipment (MV/LV Transformers, MV/LV Switchgears,
Bus Ducts, UPS, NER, etc.), cable trays, conduits & supports, MV/LV power, instrumentation & telecom cables, workstations/server cabinets, DCS/PLC/ marshaling cabinets, F&G, PAGA, CCTV and telephone systems.
▪ Earthing, lighting and lightning works. ▪ Calibration and installation of field process instruments, F&G devices, analyzers. ▪ Pre-commissioning and commissioning assistance.
Client: Granite-ABB / ADNOC O�shore (ZADCO)
Type: ConstructionYear: 2014
Type: ConstructionYear: 2010
Client: Hyundai / ADNOC LNG (ADGAS)
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com18
Installation & commissioning for electrical and other works at Yas Marina Circuit
Electrical & instrumentation works for seawater desalination plant
Al Wathba & Al Lahamah waste water treatment plants
Modernization of SCADA & instruments / control systems (MOSAICS)
Yas Island
Fujairah
Al Wathba and Al Lahamah
Zirku Island and Zakum
▪ Major engineering, procurement and construction works for the lighting, small power, earthing, lightning protection, and fire alarm systems for all buildings in the Formula-1 race track.
▪ Engineering, procurement and construction works for all buildings. ▪ Installation of complete systems:
▫ Lighting, small power, earthing. ▫ Lightning protection. ▫ Fire alarm. ▫ Structured cabling for all systems.
▪ Electrical & instrumentation works for seawater desalination plant. ▪ Installation of transformers, UPS, 11kV & LV switchgears, MCC’s with VFD’s. ▪ Project management. ▪ Supply and installation of cable trays. ▪ Laying, glanding and termination of cables. ▪ Installation of equipment like transformers, panels, etc. ▪ Supply and installation of junction boxes. ▪ Pre-commissioning of the system.
▪ EPC works for all buildings; complete plant electrical and instrumentation works; residual engineering.
▪ Installation of electrical equipment (MV/LV Switchgears, power and distribution transformers, UPS, RMU, NER, workstations/server cabinets, marshaling cabinets and system panels.
▪ Supply & installation of cable trays, conduit and supports, MV/LV power, instru-mentation, communication and FO cables, earthing, lighting & lightning, tube fittings and sunshades.
▪ Calibration and installation of field process instruments, F&G devices and analy-zers; pre-commissioning and commissioning assistance.
▪ MOSAICS I at Zirku Island with Honeywell. ▫ DCS, F&G, ESD and HMIs replacement.
▪ MOSAICS IIA at ACPT Zakum with Invensys. ▫ Replacement of existing 11 F&G systems and detectors, hot changeover.
▪ MOSAICS IIB at ACPT ZAKUM with Honeywell. ▫ Replacement of TDC2000 Systems, MATRA SCADA Systems, ESD, F&G,
ERF, etc. hot changeover.
Type: ConstructionYear: 2008
Type: ConstructionYear: 2009
Client:
Client:
PKE Siemens / Aldar
OTV-Veolia /FEWA
Client:OTV / ADWEA
Type: ConstructionYear: 2010
Type: ConstructionYear: 2006
Client:Honeywell-Invensys /ADNOC O�shore(ZADCO)
MAJOR PROJECT REFERENCES
MEP works for expansion of storage facility Bab 13 Bab 13
▪ Modification in LV switchgear, lighting and small power for 4 nos. chemical storage sheds.
▪ Supply & installation of SMDB, DBs, lightning protection for 4 sheds. ▪ Fire alarm for 4 sheds and integration with existing FA system. ▪ Telephone and data system for o¯ce area and integration with existing system. ▪ HVAC system – split A/C and package A/C units and duct work for o¯ce area.
Type: MEPYear: 2016
Client:Khansaheb / ADNOC Onshore(ADCO)
Ruwais 4th NGL train instrumentation works Ruwais
▪ Complete instrumentation works including works in greenfield testing & pre-commissioning: ▫ Installation of cable trays – 75 km. ▫ Below ground and above ground cabling – 2500 km. ▫ Cable glanding & termination – 41,000 glands. ▫ Installation of junction boxes, marshalling/system cabinets. ▫ Calibration, installation, and pre-commissioning works for field instruments
– 6500 instruments. ▫ Assistance during commissioning and performance testing.
Type: ConstructionYear: 2010
Client:Petrofac-GS / ADNOC Gas Processing (GASCO)
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com 19
Type: MEPYear: 2015
Client:GTM / ADNOC Gas Processing(GASCO)
Permanent training centre and lab buildings on Das Island
New management & new auditorium buildings
E&I works for Asab accommodation facilities - phase 1 & 2
EPC works for electrical system at non-process buildings
Das Island
Asab
Ruwais
Buhasa
▪ Supply & installation of 11kV switchgear, MCC panels with VFD controls, 2 MVA 11kV transformers, and UPS.
▪ Electrical works. ▪ Electrical equipment. ▪ Substation equipment, transformer, switchgears. ▪ Power systems (cables, cable trays, glands etc.). ▪ Grounding works. ▪ Lighting.
▪ Complete MEP works for 4 buildings of the new management, and auditorium building, design, detailed engineering, testing, installation, and commissioning.
▪ Electrical works - design, engineering, procurement, construction, installation, and commissioning (including protection study) of : ▫ Electrical distribution network - 11kV substation (Total 5 MVA). ▫ 2 nos. 11/.415kV transformer. ▫ LV panels, cast resin bus ducts, central battery system, intelligent lighting
control system. ▪ Load transfer from existing substation to new substation. ▪ V&D system, HVAC and fire fighting works.
▪ Design, engineering, procurement, construction, installation, and commissioning of electrical network.
▪ Electrical distribution network-11kV substation (Total 10 MVA) with 11kV panel from ABB, 3 LV 5000 A panels from Comeca and 6 transformers, 10 KVA UPS.
▪ Earthing works, including a deep well earth (>60m) & lightning protection works.
▪ Supply & installation of 11kV switchgear, MCC’s, 3.15MVA transformers, bus ducts, UPS. ▪ Modification of existing 11kV feeder. ▪ New substation design with 11kV SWGR (ABB). ▪ Transformers (4 nos. 3.15 MVA).
▪ Design, engineering, procurement, construction, installation, and commissioning for buildings.
▪ Electrical works. ▪ Works related to 33kV substation including 2 nos. 25/30 MVA transformers, 11kV.
switchgears, MCC’s, 11kV transformers, and UPS. ▪ Electrical distribution network. ▪ 11kV equipment, LV power distribution. ▪ Internal and external electrification. ▪ Relocation of 25/30 MVA, 33kV transformers from operating plant to the new
substation without plant shutdown.
Type: MEPYear: 2008
Type: MEPYear: 2011
Client:
Client:
Granite /ADNOC O�shore(ADMA-OPCO), ADNOC LNG (ADGAS)
Al Fara’a / ADNOC Gas Processing(GASCO)
Al Fara’a / ADNOC Gas Processing(GASCO)
Granite / ADNOC Gas Processing(GASCO)
ASCON / ADNOC Gas Processing(GASCO)
Electrical works for accommodation extension Al Maha Camp Buhasa
▪ Scope related to new 33/0.415kV substation – supply, installation, testing, and commissioning of the following: ▫ 33kV switchgear, 33/0.415kV transformer, LV switchgear, LV bus ducts, LV
capacitor banks, UPS system, 33kV, LV power and control cables. ▪ Scope for additional building blocks – supply, installation, testing, and commis-
sioning of the following: ▫ MDB, SMDB and Final DBs, lighting and small power systems, LV cabling,
earthing and lightning protection.
MEP works for Habshan industrial facilities Habshan
▪ Complete MEP works for 16 buildings of industrial facilities (design, detailed engineering, testing, installation and commissioning).
▪ Electrical distribution network – 11kV substation (total 15MVA) with 11kV switch-gears, transformers, LV switchgears & bust ducts.
▪ Complete building electrification. ▪ Electrical control system, UPS, fibre optic backbone. ▪ Telecom system including voice & data system, PA system, access card reader
system, and CCTV system. ▪ HVAC. ▪ Fire alarm and fire fighting systems.
Type: MEPYear: 2010
Type: MEPYear: 2007 / 2010
Type: MEPYear: 2009
Client:
Client:
Client:
ENGINEERING, PROCUREMENT, CONSTRUCTION & MAINTENANCE SINCE 1977Control & Applications Emirates
www.caeme.com20
CONTACT INFORMATION
Contact information
Control & Applications Emirates10th - 12th and 15th Floors, Al Masraf Building, Sheikh Hamdan Street P.O. Box 3687, Abu Dhabi, United Arab Emirates
Telephone: +971 2 6767 965Fax : +971 2 6767 956
EmailGeneral: cae@caeme.comHR: hradmin@caeme.comSales: sales@caeme.comHSE: hse@caeme.comQA/QC: qaqc@caeme.comProcurement: procurement@caeme.comOperations: operations@caeme.comEngineering: engineering@caeme.comMarketing: marketing@caeme.com
www.caeme.com
Control & Applications Emirates
10th - 12th and 15th Floors, Al Masraf Building, Sheikh Hamdan Street P.O. Box 3687 Abu Dhabi, UAE
Tel: +971 2 6767 965Fax: +971 2 6767 956Email: cae@caeme.com
www.caeme.comGroupcontrol & applications
CAE is a part of
www.cagroup.ae
Copyright © 2017 Control & Applications Emirates. All rights reserved.
Recommended