8.10792 STONE BASKET ISLAND
REPORT ON A MAGNETIC SURVEYANOMALY GRID "A"
NTS 42 N/12
BY
J.A.FOWLER
Thunder Bay, Ontario
RECEIVED
FE8 02 1988
MINING LANDS SECTION
010
DFCIARATION
I, Jonathan A. Fowler, certify that I completed an Honours Bachelor of Science (Special) degree in geology in 1968 from the University of London in the United Kingdom. Subsequently, I obtained a Master of Philosophy degree in geology in 1976, and a Doctor of Philosophy degree in geology in 1982 from the same uni versi ty.
I have been involved in geological exploration, evaluation and mine geology since 1968 for the Anglo American Corporation of South Africa Limited and for Monopros Limited, together with their associated companies.
J. A.Fowler.
l 1ST OF MAPS TO ACCOMPANY THIS REPORT
1. Locality plan.
2. Total field magnetic readings.
3. Contoured total field values.
4. Locality plan for Pionjar holes.
5. Locality plan for Winkie drill hole.
1. INTRODUCTION
A programme of staking, line cutting and ground rnagnetometry was carried out during January, February and March, 1987, on a series of anomalies selected from airborne geophysical surveys of northern Ontario. The work was performed under contract by Phantom Exploration under the supervision of Mr I. Spence and the overall direction of J.A. Fowler. The claims are held by Mr D. Gagne of 2418 Glenwood School Drive, Unit 18, Burlington, Ontario.
The area of interest is centred approximately 150 kilometres from Nakina (see locality map).
2. CLAIMS
The group of claims, referred to as "Grid A", is located within the Porcupine Mining Division. Grid A consists of a single block of 25 claims,near Bog Lake on Claim Map G-15M5, some 25 kilometres east of Ogoki Post.
Access to the claims was by ski-equipped aircraft from Nakina. Summer access is only possible by helicopter as the lake is too shallow for the safe use of float equipped aircraft in most years.
3. GROUND MAGNETIC SURVEY
Grids were cut over each claim block with a 100 metre line spacing. Stations were established every 25 metres along the lines. Each grid consisted of north-south tie lines and an east-west base line. All distances were chained out from the base line.
The magnetometer survey was carried out using EDA PPM-375 units with an EDA PPM-375 or OMNI-IV base station. The data was corrected automatically by linking the field and base station units to correct for diurnal variation. All instruments read out the total magnetic field with an accuracy of 0.1 nanoteslas (nT).
The map of total field readings shows the positions and values of the stations, white the map of total field contoured values shows the contoured results.
RESUITS
The ground magnetic survey defines a circular anomaly in the cast, centered at station Lll+OOE 2+25 S, and a smaller oval anomaly in the west centred on L2+OOW 0-*00. Both of these were covered by a single airborne anomaly.
The larger eastern anomaly peaks at 59012.1 nT, about 112 nT above the background of 58600 nT. The western anomaly is less pronounced and peaks at 58736.7 nT.
RECOMMENDATIONS
Drilling of the larger, eastern anomaly at LllnOOE 2+OOS to a depth of at least 162 metres is recommended. Depending upon the source of this anomaly, it may be necessary to drill a second hole on the smaller, western anomaly at L2+OOW 1+OON to a similar depth.
6. GROUND WORK
In preparation for diamond drilling, the sites for the proposed drill holes were probed with soil sampling rods attached to a gasoline-powered Pionjar to establish the thickness of muskeg and overburden, and possibly bedrock type. At both proposed drill holes on this grid, the test holes were abandoned in frozen till without reaching bedrock. The Pionjar was incapable of penetrating the frozen till layer, and recovery of the rods was slow and tedious. In order to pull up the drill rods, it was necessary to fabricate a special platform to spread the load from the extractor jack on the muskeg so that the rods could be retrieved.
The drilling progress and man days are recorded in the following table.
East Bog Lake, /I2N/12-01, Grid AWorkers B. Wood, M. Watt, E. Cox,
S. ParkerDate of Work August 10 and 13, 1987 No. Pionjar Holes 2 Hole Diameter 25mm Thickness of Muskeg 1.0m, 1.0m Total Depth of Hole 7.5m, 7.5m Distance to Nearest Water Resource. 0.9 km
West Bog Lake, 42N/12-01, Grid AWorkers B. Wood, M. Watt, E. Cox,
K. McCaughey, S. ParkerDate of Work August 10 and 14, 1987 No. of Man Days A No. Pi onjar Holes l Hole Diameter 25mm Thickness of Muskeg 4.0m Total Depth of Hole 7.Om Distance to Nearest Water Resource. 0.3 km
7. DRILLING
Probe drilling was undertaken at East Bog Lake under contract hy Terraphysics Ltd. using a OK Smit JKS15 Winkie Drill equipped with an EX core barrel (which gave a 38rnm diameter hole).
Drilling proceeded through muskeg, overburden and clays to AA.S metres (146 feet) at which depth the hole was abandoned as the drill was incapable of further penetration in overburden. No core was retrieved, but pieces of clast? which were intersected within the hole indicate that much of the overburden contains glacier derived fragments, some of which are in excess of 100mm in thickness.
The drill log is appended.
8. RECOMMENDATIONS
Both drill targets should be investigated by drilling using a larger drill rig.
J.A. FowlerThunder Bay, Ontario
l •r* l•8* l
•4*
Bi JS21
Ogoki i
, Woblmdj Loll*
10 20 30 40
Seal*km
MONOPROS LIMITEDNORTHERN ONTARIO
LOCATION MAP
Author: J.A. Fowler
Drawn: l. Schmitt
Seal*: l: 1,000,000
Dot*: January 1086
Ontario
Ministry of t
GEOPHYSICAL - GEOI TECHNICAL I
42N12NE8881 2.18798 STONE BASKET ISLAND
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
900
Type of Survey (s). Township or Area. Claim Holder(s)—
M ACNE To M C TRY
e 6. ASKeT - 1 *-4-S~
Survey Company- Author of Report. Address of Author P-o- &QX (o '
gXPloRftrte.^ l
X A - -Fe,^ C S R
P?C 4VS'
Covering Dates of Survey..
Total Miles of Line Cut —
i ,i*m48
(linccutting to office)
SPECIAL PROVISIONS CREDITS REQUESTED±2Z Geoph
RECEIVE^, . , hysical
DAYS per claim.
ENTER 40 days (includesline cutting) for first p{[Q Q2survey. —Radiometric.
ENTER 20 days MHimfi LANDS SEGUOH——additional survey using Geological^ same grid.
AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)
Magnetometer. .Electromagnetic. . Radiometric(enter days per claim)
AutJiai-*Mfeport or Agent
Res. Geol.. .Qualifications.
Previous Surveys File No. Type Date Claim Holder
MINING CLAIMS TRAVERSED List numerically
TB(prefix) (number)
i
6. ST
TOTAL CLAIMS-
837 (5/79)
GEOPHYSICAL TECHNICAL DATA
GROUND SURVEYS - If more than one survey, specify data for each type of survey
Number of Stations
Station interval
Profile scale Contour interval
•val *^ ^ A^ CTrt ES Line sparinp l*"* K6-rft.es
-r val 5^0 ft 1
25 C
Instrument
Accuracy — Scale constant ____* O l Diurnal correction method flurbM.fr-rtc.
8.0Base Station check-in interval (hours)Base Station location and value &QOM&TR6S
{Lo SCco^b
of
O InstrumentS2oQo;L.,
W
Coil configurationToil separation
Accuracy .Method:
Freauencv
f f ;'j -., ,-' i . .; "^ : ; .'; CD Fixed transmitter di Shoot back 1 ' Q In line"' CD Parallel line
Parameters measured.{specify V.L.F. station)
o
Instrument.
Scale constant —Corrections made.
Base station value and location .
Elevation accuracy.
ol—(5NI-H
^
O o.QWuD Q 'z.
Instrument .———-——.-- Method D Time Domain Parameters - On time .——
— Off time ^—-.— Delay time ————
— Integration time.
[ l Frequency Domain _ Frequency _____
_ Range ________
Power.Electrode array — Electrode spacing .
Type of electrode
l
Instrument________________________________________ Range.Survey Method ——————————-————^—-——————.——.-..—..———^^—.-.—
Corrections made.
RADIOMETRIC
Instrument ——.^Values measured —Energy windows (levels) -—————^-———-———————————^—.—^——————Height of instrument————--..——..—-———-—-—..-——..—————Background Count.Size of detector———-——-———.^—.—-————-——-—.—.—....——--——-..^—-...——.
Overburden .-^-.——^^-^^^-——^^——^——^^-——^——^..^——-——^-^^—^(type, depth — include outcrop map)
QJJiEJRS (SEISMIC, DRILL WELL LOGGING ETC.)
Type of survey———-——.——-.---—--—.—-—--—————.
Instrument -——-———.————..-.—.-———-^—-.-—— Accuracy.—^—————^—————————^—————Parameters measured.
Additional information (for understanding results).
Type of survey(s)
Instrument(s) —(specify for each type of survey)
Accuracy__________________{specify for each type of survey)
Aircraft used—-————-———-—^-—--——.-————.^——.-——..—.—Sensor altitude-—-——————..-——————
Navigation and flight path recovery method.
Aircraft altitude______________________________Line Sparing Miles flown over total area________________________Over claims only.
GEOCHEMICAL SURVEY - PROCEDURE RECORD
Numbers of claims from which samples taken.
Total Number of Samples. Type of Sample.
(Nature of Material)
Average Sample Weight———————Method of Collection,-——————-
Soil Horizon Sampled.
Horizon Development. Sample Depth————
Terrain ,———————
Drainage Development——^—————-——
Estimated Range of Overburden Thickness.
ANALYTICAL METHODSValues expressed in: per cent
p, p. m. p. p. b.
D Dn
Cu, Pb,
Others—
Zn, Ni, Co, Ag, Mo, As.-(circle)
Field Analysis (.Extraction Method. Analytical Method- Reagents Used__
Field Laboratory Analysis
No. ————————
SAMPLE PREPARATION(Includes drying, screening, crushing, ashing)
Mesh size of fraction used for analysis ————
Extraction Method.
Analytical Method .
Reagents Used -—.
Commercial Laboratory (-
Name of Laboratory—
Extraction Method——
Analytical Method——
Reagents Used -—~——
.tests)
.tests)
.tests)
GeneraL General
Ministry ofNaturalResources
Ontario
Report of Work(Geophysical, Geological, Geochemical and Expenditures)
P
DOCUMENT No.
U) 8806-
Mining Act
Instructions: — Please type or print.— If number of mining claims traversed
exceeds space on this form, attach a list.Note: — Only days credits calculated in the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
— Do not use shaded areas below.Type of Survey(s)
Claim Holder(s)
Township or Area ^ j *l A
J Prospector's Licence No.
A 4*1635"Address
ifc, c**j-rfHl\o.Survey Company
Name and Address of Author (of Geo-Technical report)
Date of Survey (from 81 to)0-7 02. 87 t y. 03 g7Day-J Mo. [ Yr. Day j Mo. ^Yr.,
Total Miles of line Cut
44
Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total(s) here
RECEIVED
MAR 07 1988
AINING LANDS SECTiOAirborne Credits
Note: Special provisions credits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
^Geochemical
Electromagnetic
Magnetometer
Radiometric
Days perClaim
M-
Days perClaim
if
V
Days per Claim
Expenditures (excludes power stripping)Type of Work Performed
Performed on Gtaimls")"
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Date Recorded Holder or Agent (Signature)
Certification Verifying Report oTWork
Mining Claims Traversed (List in numerical sequence)
| E CO l? D E D
JAN
claims covered by this report of work.
For Office Use OnlyTotal Days Cr. Date Recorded Recorded
WDate Approved as Recorded
l hereby certify that l have a personal and intimate knowledge of the f.icts set forth in the Report of Work annexed IHMCIO, having performed the work or witnessed same during and/or after us completion and the annexed report is true.
Name and Postal Address ot Person Certifying
1362 (SIY9/
MONOPROS LIMITED
January 28, 1988
P.O. BOX 6 THUNDER BAY "F",©NT,REG? IVflD
f.V'fO' !l fv'ANCH
FBB O 2 1988ri
SrC
J. R.
U.W SCO f
The Direcbr L^.-^ Land Management Branch JW.FJ Ministry of Natural Resources | R.J. r-iCMi-, ; - 6643 Whitney Block Toronto, Ontario M7A 1W3
Dear Sir:
Enclosed please find assessment reports, in duplicate for Stonebasket Island, Anomaly Grid "A", NTS 42N/12.
If you have any questions or require any further details, please contact us.
Thank you.
,R1O P7C 4V5 O7) 622-4585
I. Tomchick Office Secretary RECEIVED
FEB 02 1938
MINING UNDS SECTION
REFERENCES
AREAS WITHDRAWN FROM DISPOSITION
M.R.O. - MINING RIGHTS ONLY
t.R.O. -SURFACE RICK .SONLY
M.+ S. - MINING AND SURFACE RIGHTS
' OrdwNo. DM* P^odHon f Ut
85*45*00*
5I 0 45'00" ——
5I 0 37'30" ——
830 30 00"
Stonebasket
SI 0 45'00"
38
5I 0 37*30'
l850 43'00' 44' 43' 42 41' 40' 39' 38* 37' 36' 35' 34'
3332' 31' 850 30'00'
42N12NE00et 2.1*79* STONE BASKET ISLAND S00
LEGEND
HIGHWAY AND ROUTE No
OTHER ROADS
TRAILS
SURVEYED LINES:TOWNSHIPS, BASE LINES. ETCLOTS, MINING CLAIMS, PARCELS, ETC
UNSURVEYED LINES:LOT LINESPARCEL BOUNDARYMINING CLAIMS ETC.
RAILWAY AND RIGHT OF WAY
UTILITY LINES
NON-PERENNIAL STREAM
FLOODING OR FLOODING RIGHTS
SUBDIVISION OR COMPOSITE PLAN QCCC p VAT!ONS
ORIGINAL SHORELINE
MARSH OR MUSKEG
MINES
TRAVERSE MONUMENT
y////.','//,
DISPOSITION OF CROWN LANDS
TYPE OF DOCUMENT
PATENT, SURFACE St MINING RIGHTS .
" .SURFACE RIGHTS ONLY......
.MINING RIGHTS ONLY ......
LEASE, SURFACE A MINING RIGHTS...
" . SURFACE RIGHTS ONLY........
" .MINING RIGHTS ON L Y......,,..
LICENCE OF OCCUPATION .....,.......
ORDER IN COUNCIL ............... ....
RESERVATION ..................... ..
CANCELLED __.....,.-...,,.. .....
SAND&GRAVEL ..................
SYMBOL
Ba T
oc
0NOTE: MINING WIGHTS IN PARCELS PATtNTEO PRIOR TO MAY G
l*1i. VtSTEO IN ORIGINAL PATENTEE BV THE D '^ B L ' C LANDS ACT WSO 1970 CMAP 360. SEC 63 SuBSEC '
SCALE: 1 INCH * 40 CHAINS
f EET10OO 2OOO 60OO
O 200 MSTRES
l DOO 1 KM 1
20OO 2 KM
AREA
STONEBASKET IS.M.M.R.ADM ISTRATIVE DISTRICT
GERALDTONMINING DIVISICr
PORCUPINELAND TITLES/ REG'STFY DIVISION
KENORA PATRICIA PORTION/COCHRANE
Ministry of Ministry ofNatural Northern DevelopmentResources and toir3s
Ontario
Dan MARCH, 1967Number
G-1245
e 4- oo
7 -t 00 N
6 4- 00 N
5 * 00 N
4 * 00 N
3 4- 00 N
2 -f- 00 N
00 N
B.L. 0 + 00
l 4- 00 S
2 4- Op S
3 4- 00 S
4 * 00 S
5 4 00 S
6 * 00 S
7 4- 00 S
8 * 00 S
9 4 00 S
10 4- 00 S
11 -i- 00 S
12 * 00
o O•f o
CU
4-
OJ
UJ
n-I
u
-J
LJ UJ Ul Ul
4
CO
Ul Ul
4-
o
Oo
UJ Ul LJ
O
UJo
If)
UJ
K 136.4 H-134J
- 130.3
OO
o o4-
(\J
OO
o o
LJ
t W
Ul Ul UlOo
in
UJ Uo o4-
00
-J
o o4-
O•-t
-J
LJ
Oo4-
a
UlOO
Ul
8 4- 00 N
7 4- 00 N
6 * 00 N
5 4- 00 M
4 -f 00 N
3 4- 00
2 4- 00 N
00
B.L. 0 + 00
00 S
2 4- 00 S
3 4- 00 S
4 4 00 S
5 H- 00 S
6 4- 00 S
7 4 00 S
e *- oo s
9 4 00 S
10 4- 00 S
11 4- 00 S
la 4- oo s
55' 35'
r r il 963098 l 965096 965100 l 965201 l 965202
l
965207 l l 965204
965208 l 965209 1\ 965210 I 965211 l l
965217 l 965216 l 9&5215 l 965214
Oen "CM
l 965203
965212 l l
l 965213 l l
l 965218 l 965219 l 9652
U—U-4LOCATION MAP
l 965222 l
U-4SCALE: 1:15000
LEGENDMAGNETOMETER SURVEY
INSTRUMENT: EDA PPM-375 DATUM: 60,ooo NANOTESLAS SENSITIVITY: 0.1 NANOTESLAS CONTOUR INTERVAL: 50 NANOTESLAS MAGNETIC LOW: *Z^
BASE STATION RECORDER INSTRUMENT: EDA PPM-3^5 RECORDING INTERVAL: 20 SECONDS
TOPOGRAPHY
CLAIM POST
RIVER
STREAM
SWAMP
LAKE SHORE
GRID "A"
PROTON MAGNETOMETERSCAUt B4R too too 300 400 MSTRSS
DATE: FEB. 1987 SCALE: 1:5000 N.T.S. 42-N-\2
PHANTOM EXPLORATION SERVICES LTD.42N12NE0001 2.10790 STONE BASKET ISLAND 210
o o
m
>o o
oo
OJ
Ul
s f cu
Ut
t o
U UJoo
m
Ul
g+ so
Ui Ul
CO ffi -l
o o
UJ
ftj^^
-I
Ul
4
CO
Ul Ul
IT)r-*
-J
vD
8 * 00 N
7 * 00 N
6 * 00 N
5 * 00 N
4 * 00 N
3 4 00
2 * 00 N
8 * 00 N
00 N
00 N
00 N
B,L, 0+00
l i- 00 S
2 4 00 S
3 t 00 S
4 t 00 S
5 * 00 S
6 -f 00 S
7 * 00 S
8 -f 00 S
9 * 00 S
10 * 00 S
U * 00 S
12 4 00 S
-ISM \6O 6 4 00 S
-138.6
M-138J
P-134J
- 130.3
00
o o
OoUJ Ul
* SUJ
3
CO OJ ftj
UI
in
ui ui Ul
4
CO
Ul Ul Uloo
ft
Ul
sPI
Ul
85' 35'
965301
l 965205 l 965204 l 965203 l l
l 965X198 l 96509:*
l 965207 l V965206
l 965202 l l l
965210 l 965211 l 965212 l l
l 965214 l 965213 l l l
l 965218 l 965219 f 965220 l 965221 l 965222 l
U—L—--U~-LL—U~-1LOCATION MAP SCALE: 1:15000
LEGENDMAGNETOMETER SURVEY
INSTRUMENT: EDA PPM-375 DATUM: 6O,ooo NANOTESLAS SENSITIVITY: 0.1 NANOTESLAS CONTOUR INTERVAL: 50 NANOTESLAS MAGNETIC LOW: C^
BASE STATION RECORDER INSTRUMENT: EDA PPM-375 RECORDING INTERVAL: 20 SECONDS
TOPOGRAPHY
CLAIM POST
RIVER
STREAM
SWAMP
LAKE SHORE
PROPOSED DRILL HOLE Q
GRID A" PROTON -MAGNETOMETER
SCUM BAR too too 300 400 MXTRXS
DATE: FEB. 1987 SCALE: 1:5000 N.T.S. 42-N-12
PHANTOM EXPLORATION SERVICES LTD.42N12NE008I 2.1*79* STONE BASKET ISLAND 220