Long Term Facilities Plan

Preview:

DESCRIPTION

Long Term Facilities Plan. Barnstable Public Schools January 25, 2011. CORE VALUES. All children have the right to every opportunity to achieve their highest potential. Each person deserves to be treated with dignity and respect. - PowerPoint PPT Presentation

Citation preview

Long Term Facilities Plan

Barnstable Public Schools

January 25, 2011

CORE VALUES All children have the right to every

opportunity to achieve their highest potential.

Each person deserves to be treated with dignity and respect.

Integrity and personal responsibility are the hallmarks of our daily interactions.

Question ? Should all children in Barnstable

experience learning environments that are safe, current, and educationally conducive to learning?

Should all staff have respectful, safe and educationally conducive environments within which to teach and work?

Our Goal To provide all students with safe, current and

purposeful learning environments.

SAFE

CURRENT

PURPOSEFUL

FISCALLY RESPONSIBLE

Enrollment Trends

0

1000

2000

3000

4000

5000

6000

7000

8000

1998 2000 2002 2004 2006 2008 2010 2012

Population

Facilities Studies

Merrimac Education Center 2001 TAMS 2003 McCredie 2004 SBA Audit 2006 STV Assessment 2009

A Quick Overview

“Although we are projecting a decrease in elementary enrollments, we see a definite need to replace and update some of the existing elementary facilities to bring them up to contemporary educational standards.

Therefore, we are of the opinion that Barnstable should begin the process of considering additions and renovations to several elementary schools.”

2001 MEC

TAMS 2003

Generally, the buildings have been well maintained. However, after a 40-50 year life, most of the components of the buildings are in need of repair, replacement or renovation. Architecturally, the exterior envelopes are deteriorating and require ongoing attention, while the interiors require upgrading of finishes which have worn out. … In general, the mechanical, fire protection, electrical and plumbing systems are outdated and are in need of some level of replacement.

School Building Authority Audit1. Good condition with few or no building issues.

2. Generally, good condition, few systems need attention.

3. Generally moderate condition, some systems need attention.

4. Poor condition, possible candidate for replacement.

Summary Overview

1 2 3 4

BHSBISHyannis West

West Villages

BHMCS

Centerville

Osterville

Barnstable Community

BWB

OBay

Marstons Mills

Cotuit

Hyannis East Portables

1 BWB Portable

Osterville Modular

The eight (8) statutory funding priorities listed on theStatement of Interest

Order of Priority

1. Replacement or renovation of a building which is structurally unsound or otherwise in a condition seriously jeopardizing the health and safety of school children, where no alternative exists, as determined in the judgment of the Authority;

2. Elimination of existing severe overcrowding, as determined in the judgment of the Authority;

3. Prevention of loss of accreditation, as determined in the judgment of the Authority;

4. Prevention of severe overcrowding expected to result from increased enrollments, which must be substantiated, as determined in the judgment of the Authority;

5. Replacement, renovation or modernization of the heating system in any schoolhouse to increase energy conservation and decrease energy related costs in the schoolhouse, as determined in the judgment of the Authority;

6. Short term enrollment growth, as determined in the judgment of the Authority;

7. Replacement or addition to obsolete buildings in order to provide a full range of programs consistent with state and approved local requirements, as determined in the judgment of the Authority;

8. Transition from court-ordered and approved racial balance school districts to walk-to, so-called, or other school districts, as determined in the judgment of the Authority.

Our Areas of Relevance

1. Replacement or renovation of a building which is structurally unsound or otherwise in a condition seriously jeopardizing the health and safety of school children, where no alternative exists, as determined in the judgment of the Authority;

5. Replacement, renovation or modernization of the heating system in any schoolhouse to increase energy conservation and decrease energy related costs in the schoolhouse, as determined in the judgment of the Authority;

Actions Taken Prioritizing Need

Barnstable Community Horace Mann Charter Public School

Heating System Barnstable High School

Track & Field

Replacement of60 Year Old Heating System

Unacceptable Field Conditions

Dangerous Track

Like Nothing Else ….

Systematic Prioritization of

Maintenance & Upgrades

Past & Current Facilities Processes Systematic Use of CIP Process

Past Capital Override

MSBA

Long Term Facilities Plan Use of proceeds from sale of building(s).

Systematic Use of CIP Process

Future Capital Override

TAMS I Nine to Five

Osterville Hyannis West Marston’s Mills East Centerville Barnstable/West Barnstable

Off Line = Cotuit, MM Elementary, O-Bay, Hyannis East June 2004 - June 2012 $75,000,000.-

Current Status Hyannis East = Barnstable Community HMCPS Hyannis West West Villages Centerville Barnstable/West Barnstable Off Line = Cotuit, MM Elementary*, O-Bay, Osterville Sell Osterville Bay, Lease Cotuit, Osterville, MM Elementary ? BHMCS, BIS, BHS

Marston’s Mills Elementary

Create an Early Childhood Center & Professional Development Complex

Lease to Cape Cod Collaborative Lease to Cape Cod Collaborative & &

Professional Development Complex Lease to Cape Cod Collaborative & Share Site House District Technology & PD Center Alternative High School Program

THE PLAN

Recognizing the work of the : School Facility Advisory Committee

Tony Lacina Patricia Grenier Dave Anthony Ken Keenan Janice Barton Tom McDonald Rick Berry Jeff Morassi Joe Dugas Noel Spillane

THE PLANBWB    

  Window Replacement 965,000.00

  HVAC Upgrades  DONE

  Waterproofing 28,000.00

  Exterior Masonry Repairs 45,000.00

  Exterior Painting 20,000.00

  Interior Painting 40,000.00

  Replace/Upgrade 1 Boiler/Natural Gas 200,000.00

  Remove 2 Portable Classrooms 20,000.00

  Flooring Replacement 55,000.00

  Reconstruct Sidewalks 20,000.00

  Abate asbestos/Exterior Gables 20,000.00

  Electrical Upgrade 55,000.00

  Security upgrade 75,000.00

  Plumbing upgrade 95,000.00

 Total   1,638,000.00

Multi-Year Renovation Projects

Total Cost = $$19,195,400.- 11 Buildings to 7 (8) buildings 2011-2020 Annual CIP Prioritization Utilization of Proceeds from Sale of Bay Capitalizing on current debt expiration 2015 = 11 million borrowed Replace one loan with another loan Neutral Impact on Tax Rate Consistent filing with MA School Building Authority Garner Community Support

Town Of BarnstableDebt Financing

2015 BHMCS Loan Repaid

2020 BHS Loan Repaid

2021 BMS Loan Repaid

Recommended