View
2
Download
0
Category
Preview:
Citation preview
This project has received funding from the European Research Council (ERC) under the European
Union’s Horizon 2020 research and innovation programme (grant agreement No 951542)
THE GENIE PROJECT‣ 6-year $10m ERC
SYNERGY grant
‣ Comprehensive assessment of CDR and SRM
2
U. Aarhus
MCC-Berlin U. Wisconsin
IIASA
https://genie-erc.github.io
2021-2027
1. Costs potentials
2. Bottlenecks
3. Social acceptance
4
4. Learning, adoption
5. Risks
6. Policy support
7. Synthesis 8. Outreach
8 WORK PACKAGES
WORK PACKAGE 4: LEARNING, ADOPTION, AND SCALE UP
Motivation
1. GTs by 2050s
2. scale up lengthy
3. focus is on R&D
4. urgency for post-R&D innovation activities
5
Objectives
1. Inform scale up
2. Specify enablers
3. Identify barriers
4. Timing and pace
5. Insights for policy
‣ Innovation systems, transitions
‣ Energy technology innovation system
‣ Economics of innovation
‣ National innovation systems
GENIE, SCALING: THEORETICAL BASIS 6
‣ Accelerated = factor of 4 faster
‣ Operation Warp Speed was 4x faster
NEED ACCELERATED SCALE UP MODELS 8
FOCUS EFFORT ON:
‣ DYNAMIC TECHNOLOGIES
‣ SMALL UNIT SIZE
‣ MODULARITY IN LARGE UNITS
‣ ITERATIVE IMPROVEMENT
‣ LOCAL SYSTEM INTEGRATION
17
DYNAMIC INDUSTRIAL POLICY FOR CLIMATE CHANGE
1. urgency and acceleration as goals
2. multiple policies, strategic sequence
3. govt engages deeply in innovation
4. tech+ inclusivity, social acceptance
5. local learning and system integration
6. adaptive, learn from experiments
18
IMPLEMENTATION RISKS 19
‣ Rent seeking
‣ Selection, picking winners
‣ Information access
‣ Crowding out
‣ Risk aversion
Recommended