LAND USE & LIVABILITY COMMITTEE
Wilburton DEIS Review & Discussion
DATE: Thursday, March 8, 2018
TIME: 12:00 p.m. – 1:30 p.m.
PLACE: Bellevue Downtown Association | Second Floor Conference Room
Co-Chairs: Brian Brand & Warren Koons
Guests: Bradley Calvert, Community Development Program Manager
BACKGROUND & OBJECTIVE
The City released the Wilburton Draft Environmental Impact Statement (DEIS)
earlier last month for public review and feedback. The deadline for public
comment is Monday, March 19.
The Wilburton DEIS presents three alternatives for consideration.
• No Action Alternative - from about 3.6 million square feet of
development to potential 4.2 million square feet of development.
• Alternative 1 - potential development growth to 13.1 million square feet
of development.
• Alternative 2 - potential growth could to 16.3 million square feet of
development.
AGENDA
1. Welcome and Introductions
2. Wilburton DEIS Review and Discussion
a. City Staff Presentation
b. Committee Feedback
ATTACHMENTS
• Maps of Alternatives – Heights, 3D Modeling, & Transportation Projects
• Fact Sheet Summary – Two-page review of the proposed Alternatives
1
DRAFT EIS ⋅ WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT
CHAPTER 1 ⋅ SummARy ⋅ FEBRuARy 2018
Exhibit 1–3 Building Form, Height, and Volume
NE 12th St.
NE 8th St .
NE 4th St.
Bellevue
Botanical Garden
East Main Station
Wilburton Station
Lake BellevueBellevue
DowntownStation
116th Ave. NE
112th Ave. NE
Eastside Rail Corridor 120th Ave. NEI-405
Main St.
No Action Alternative: Future BaselineBuilding Form About 4.2 Million Square Feet(0.6 Million Square Feet above Existing 3.6 Million Square Feet)
The No Action Alternative is required by SEPA, meaning future development could occur under current plans and codes. Assumed growth could be about 626,000 square feet of building space in addition to the 3.6 million square feet of development that exists in 2017.
NE 12th St.
NE 8th St .
NE 4th St.
Bellevue
Botanical Garden
East Main Station
Wilburton Station
Lake BellevueBellevue
DowntownStation
116th Ave. NE
112th Ave. NE
Eastside Rail Corridor 120th Ave. NEI-405
Main St.
Alternative 1: Medium13.1 Million Square Feet 2035 Space About 16.3 Million Square Feet Ultimate SpaceAbout 8.8 million square feet more than the No Action Alternative by 2035 and about 12.1 million square feet more than the No Action Alternative at buildout
Alternative 1 reflects CAC discussions about creating a cohesive urban form that capitalizes on regional investment in the light rail station and the Eastside Rail Corridor, and attracting a mix of land uses including office, retail and residential while respecting the lower intensity development that surrounds the Study Area.
NE 12th St.
NE 8th St .
NE 4th St.
Bellevue
Botanical Garden
East Main Station
Wilburton Station
Lake BellevueBellevue
DowntownStation
116th Ave. NE
112th Ave. NE
Eastside Rail Corridor 120th Ave. NEI-405
Main St.
Alternative 2: High16.3 Million Square Feet 2035 Space About 22.8 Million Square Feet Ultimate SpaceAbout 12.1 million square feet more than the No Action Alternative by 2035 and about 18.6 million square feet more than the No Action Alternative at buildout
Alternative 2 reflects the input of several property owner and stakeholders, as well as CAC discussions about creating a dense urban neighborhood along the Eastside Rail Corridor and near the light rail station, and greater intensity directly adjacent to the interstate.
Image Source: NBBJ, 2017
WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT ⋅ DRAFT EIS
FEBRUARY 2018 ⋅ CHAPTER 2 ⋅ AlTERNATIvES
NE 12th St.
NE 8th St .
NE 4th St.
Light Rail Guideway
Grand Connection
Bellevue
Botanical Garden
East Main Station
Wilburton Station
Lake Bellevue
Bellevue Downtown
Station
116t
h Av
e. N
E
112t
h Av
e. N
E
East
side
Rai
l Cor
ridor
120t
h Av
e. N
E
124t
h Av
e. N
E
I-405
Main St.
Exhibit 2–2 No Action Alternative Plan viewSource: NBBJ, 2017
Building Height 35’–55’
Building Height 70’–100’
Building Height 120’–160’
Building Height 200’–250’
Building Height 300’–450’
Building Height < 25’
2
WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT ⋅ DRAFT EIS
FEBRUARY 2018 ⋅ CHAPTER 2 ⋅ AlTERNATIvES
NE 12th St.
NE 8th St .
NE 4th St.
Light Rail Guideway
Grand Connection
Bellevue
Botanical Garden
East Main Station
Wilburton Station
Lake Bellevue
Bellevue Downtown
Station
116t
h Av
e. N
E
112t
h Av
e. N
E
East
side
Rai
l Cor
ridor
120t
h Av
e. N
E
124t
h Av
e. N
E
I-405
Main St.
Exhibit 2–3 Alternative 1 Plan viewSource: NBBJ, 2017
Building Height 35’–55’
Building Height 70’–100’
Building Height 120’–160’
Building Height 200’–250’
Building Height 300’–450’
Building Height < 25’
3
DRAFT EIS ⋅ WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT
CHAPTER 2 ⋅ AlTERNATIvES ⋅ FEBRUARY 2018
NE 12th St.
NE 8th St .
NE 4th St.
Light Rail Guideway
Grand Connection
Bellevue
Botanical Garden
East Main Station
Wilburton Station
Lake Bellevue
Bellevue Downtown
Station
116t
h Av
e. N
E
112t
h Av
e. N
E
East
side
Rai
l Cor
ridor
120t
h Av
e. N
E
124t
h Av
e. N
E
I-405
Main St.
Exhibit 2–4 Alternative 2 Plan viewSource: NBBJ, 2017
Building Height 35’–55’
Building Height 70’–100’
Building Height 120’–160’
Building Height 200’–250’
Building Height 300’–450’
Building Height < 25’
4
WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT ⋅ DRAFT EIS
FEBRUARY 2018 ⋅ SECTION 3.8 ⋅ AESThETICS
Exhibit 3.8–3 Overall View (Looking Southeast)—No Action AlternativeSource: NBBJ, CH2M, 2017
Exhibit 3.8–4 Overall View (Looking Southeast)—Alternative 1Source: NBBJ, CH2M, 2017
Exhibit 3.8–5 Overall View (Looking Southeast)—Alternative 2Source: NBBJ, CH2M, 2017
5
DRAFT EIS ⋅ WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT
SECTION 3.8 ⋅ AESThETICS ⋅ FEBRUARY 2018
Exhibit 3.8–6 Overall View (Looking Northwest)—No Action AlternativeSource: NBBJ, CH2M, 2017
Exhibit 3.8–7 Overall View (Looking Northwest)—Alternative 1Source: NBBJ, CH2M, 2017
Exhibit 3.8–8 Overall View (Looking Northwest)—Alternative 2Source: NBBJ, CH2M, 2017
6
DRAFT EIS ⋅ WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT
CHAPTER 1 ⋅ SummARy ⋅ FEBRuARy 2018
v
vc
4
Kaiser PermanenteMedical Center
OverlakeHospital
BellevueLibrary
MeydenbauerCenter
Transit Center
City Hall
WilburtonElementary
Kaiser PermanenteMedical Center
OverlakeHospital
BellevueLibrary
MeydenbauerCenter
Transit Center
City Hall
WilburtonElementary
124T
H A
VE
NE
124T
H A
VE
NE
124T
H A
VE
NE
NE 8TH STNE 8TH STNE 8TH ST
120T
H A
VE
NE
120T
H A
VE
NE
120T
H A
VE
NE
112T
H A
VE
SE11
2TH
AV
E SE
112T
H A
VE
SE
118T
H A
VE
SE11
8TH
AV
E SE
118T
H A
VE
SE
MAIN STMAIN STMAIN ST
116T
H A
VE
SE11
6TH
AV
E SE
116T
H A
VE
SE
NE 2ND STNE 2ND STNE 2ND ST
MAIN STMAIN STMAIN ST
NE 1ST STNE 1ST STNE 1ST ST
NE 4TH STNE 4TH STNE 4TH ST
114TH AV
E NE
114TH AV
E NE
114TH AV
E NE
114TH AVE SE
114TH AVE SE
114TH AVE SE
SE 6TH STSE 6TH STSE 6TH ST
SE 8TH ST
SE 8TH ST
SE 8TH ST 118TH AVE SE
118TH AVE SE
118TH AVE SE
108T
H A
VE
NE
108T
H A
VE
NE
108T
H A
VE
NE
108T
H A
VE
SE10
8TH
AV
E SE
108T
H A
VE
SE
BELLEVUE REDMOND RD
BELLEVUE REDMOND RD
BELLEVUE REDMOND RD
124T
H A
VE
NE
124T
H A
VE
NE
124T
H A
VE
NE
120T
H A
VE
NE
120T
H A
VE
NE
120T
H A
VE
NE
LAKE HILLS CONNECTORLAKE HILLS CONNECTORLAKE HILLS CONNECTOR
112T
H A
VE
NE
112T
H A
VE
NE
112T
H A
VE
NE
116T
H A
VE
NE
116T
H A
VE
NE
116T
H A
VE
NE
NE 12TH STNE 12TH STNE 12TH ST
NE 10TH STNE 10TH STNE 10TH ST
NE 10TH PL
NE 10TH PL
NE 10TH PL
NE 12TH ST
NE 12TH ST
NE 12TH ST
NE 6TH STNE 6TH STNE 6TH ST
110T
H A
VE
NE
110T
H A
VE
NE
110T
H A
VE
NE
124T
H A
VE
NE
124T
H A
VE
NE
124T
H A
VE
NE
NE 8TH STNE 8TH STNE 8TH ST
120T
H A
VE
NE
120T
H A
VE
NE
120T
H A
VE
NE
112T
H A
VE
SE11
2TH
AV
E SE
112T
H A
VE
SE
118T
H A
VE
SE11
8TH
AV
E SE
118T
H A
VE
SE
MAIN STMAIN STMAIN ST
116T
H A
VE
SE11
6TH
AV
E SE
116T
H A
VE
SE
NE 2ND STNE 2ND STNE 2ND ST
MAIN STMAIN STMAIN ST
NE 1ST STNE 1ST STNE 1ST ST
NE 4TH STNE 4TH STNE 4TH ST
114TH AV
E NE
114TH AV
E NE
114TH AV
E NE
114TH AVE SE
114TH AVE SE
114TH AVE SE
SE 6TH STSE 6TH STSE 6TH ST
SE 8TH ST
SE 8TH ST
SE 8TH ST 118TH AVE SE
118TH AVE SE
118TH AVE SE
108T
H A
VE
NE
108T
H A
VE
NE
108T
H A
VE
NE
108T
H A
VE
SE10
8TH
AV
E SE
108T
H A
VE
SE
BELLEVUE REDMOND RD
BELLEVUE REDMOND RD
BELLEVUE REDMOND RD
124T
H A
VE
NE
124T
H A
VE
NE
124T
H A
VE
NE
120T
H A
VE
NE
120T
H A
VE
NE
120T
H A
VE
NE
LAKE HILLS CONNECTORLAKE HILLS CONNECTORLAKE HILLS CONNECTOR
112T
H A
VE
NE
112T
H A
VE
NE
112T
H A
VE
NE
116T
H A
VE
NE
116T
H A
VE
NE
116T
H A
VE
NE
NE 12TH STNE 12TH STNE 12TH ST
NE 10TH STNE 10TH STNE 10TH ST
NE 10TH PL
NE 10TH PL
NE 10TH PL
NE 12TH ST
NE 12TH ST
NE 12TH ST
NE 6TH STNE 6TH STNE 6TH ST
110T
H A
VE
NE
110T
H A
VE
NE
110T
H A
VE
NE
Wilburton HillCommunity Park
SurreyDownsPark
McCormickPark
AshwoodPlayfield
LakeBellevue
BELLEVUEDOWNTOWN
STATION
SPRING DISTRICT/120TH STREET
STATION
WILBURTONSTATION
EAST MAINSTATION
GRANDCONNECTION
Easts
ide
Rail
Corr
idor
ft1,0005000 250
Exhibit 1–7 Potential Future Street Grid
Grand Connection
East Link Light Rail Stations
East Link Light Rail Route
Spring Blvd—Under Construction
Parks & Open Space
Buildings
New Signal
Pedestrian & Bicycle Path
Stairs
Local Street
Alley
Festival Street
Wilburton Study Area Boundary
NE 6th St—Under Construction
Note: New connection locations are illustrative only. Final locations will be determined upon site redevelopment.Source: Fehr & Peers, BERK, 2017
7
8
DRAFT EIS ⋅ WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT
FEBRUARY 2018
FACT SHEETPROJECT TITLEWilburton Commercial Area Land Use and Transportation Project
PROPOSED ACTION AND ALTERNATIVESThe Wilburton Commercial Area (Study Area) is located between two high growth centers in Bellevue—Downtown and BelRed. The City is now planning for the future of the Wilburton Commercial Area to create a new urban neighborhood with a unique design aesthetic, a mix of many uses, new streets to define small blocks, and additional transportation connections, including a light rail station, the Eastside Rail Corridor (non-motorized) and the Grand Connection that will define the Wilburton Commercial Area and establish new connections with Downtown. Based on a vision developed with the guidance of a Citizen Advisory Committee (CAC) that is currently in process, amendments to the City’s Comprehensive Plan, Land Use Code, and Zoning Map will be made for City Council consideration.
This Environmental Impact Statement (EIS) tests these land use and transportation proposals by examining a No Action Alternative and two action alternatives:
No Action Alternative: The No Action Alternative is required by the State Environmental Policy Act (SEPA) and assumes the current Comprehensive Plan, Land Use Code, and Zoning Map are retained. The Wilburton Commercial Area could grow from about 3.6 million square feet of development to 4.2 million square feet of development. Most of the growth could be in office and retail space with small amounts of hotel and residential use. This includes portions, north of NE 8th Street and east of 116th Avenue NE, that were part of the BelRed planning initiative and were rezoned under that process. Existing zoning allows for building heights in the range of 35 to 70 feet, with a small portion near the Medical Institution District that allows heights up to 200 feet. There would be no new design guidelines or development standards for the Study Area. City-planned transportation investments in the current Comprehensive Plan Transportation Element could be made. However, the Grand Connection would be assumed to not be developed
WILBURTON COMMERCIAL AREA LAND USE AND TRANSPORTATION PROJECT ⋅ DRAFT EIS
FEBRUARY 2018 ⋅ FACT SHEET
under the No Action Alternative. As a King County-led initiative, the Eastside Rail Corridor would be completed under the No Action Alternative.
Alternative 1: Under Alternative 1 the Wilburton Commercial Area Land Use & Transportation Project could encourage development of a more intense urban form and promote additional multimodal connections. New Land Use Code standards could increase allowable building heights and floor area ratios while providing custom design standards for buildings to create compatible urban forms. There could be a greater concentration of development and mix of uses, with an emphasis on adding housing, office/medical, retail, and hotel space. The amount of potential development could grow to 13.1 million square feet of development, or about 8.8 million square feet more than the No Action Alternative. The greatest intensity of land use could occur south of the new Wilburton light rail station, primarily between NE 8th Street to the north, NE 4th Street to the south, Interstate 405 to the west, and the Eastside Rail Corridor to the east. The Eastside Rail Corridor (ERC) could connect to the eastern terminus of the Grand Connection and could improve pedestrian and bicycle connections. Additional street connections could allow for smaller blocks different development patterns and opportunities. The range of building heights could be 35 feet to 250 feet, with a range between 120 feet and 160 feet being the most predominant building form.
Alternative 2: Alternative 2 is similar to Alternative 1 except that potential growth could be about one-third higher, up to 16.3 million square feet of development, or 12.1 million square feet more than the No Action Alternative, and the urban form could be more intense across the Study Area. Building heights between NE 8th Street, NE 4th Street, and west of 116th Avenue NE could reach 300 to 450 feet in height, with ranges between 200 and 250 feet, and 120 and 160 feet being the most predominant. Additional street connections could allow for smaller blocks and a different development pattern and opportunities from the No Action Alternative.
LOCATIONThe Wilburton Commercial Area Study Area is bound by NE 12th Street to the north, I-405 to the west, SE 5th Street to the south, 120th Avenue NE to the east, and a smaller area bound by NE 8th Street and 124th Avenue NE to the east.
9
Recommended