KECCover PagePage 1 of 1
.Rev. 8
.
KNOXVILLE EMERGENCY CENTER
NOTIFICATION DIRECTORY
Knoxville Emergency Center Phone Numbers: Local4
~
Bell
FTS
.
TVA Lease Lines
Tie Lines
_.
.
.
Entire Page Revised
8302030065 830128PDR ADOCK 05000259F PDR
- . -_. - - - - - . . , - . - . - . _ . . - . , - - _ - . ...---_.. . _ _ . - .
.
.
. .MMKECPage 1 of 1Rev. 8
KNOXVILLE EMERGENCY CENTER (KEC)EMERGENCY NOTIFICATION DIRECTORY
Table of Contents
Page No.
KEC Communication System 2
I. KEC Duty Officer 3
II. KEC Director 3
III. KEC Operations Manager 4
IV. Emergency. Response Team --Prime Contacts andAlternates 4
V. Emergency Response Team - Technical Support Contacts 6
1. Nuclear Engineering Branch 6
2. Electrical Engineering Support 7
3. Mechanical Engineering Support 8
4. Civil Engineering Support 9
5. Boiling Water Reactor Project Support 10
O. 6. Sequoyah, Watts Bar Design Project Support 10'
VI. Emergency Response Team - Administrative SupportContacts 11
1. Administrative Support 11
2. Management and Engineering Data Systems Support 12
3. Engineering Services 12
VII. TVA Emergency Centers 13
1. Knoxville Emergency Center (KEC) 13
2. Central Emergency Control Center (CECC) 13
3. Muscle Shoals Emergency Center (MSEC) 14
VIII. SELECTED NUMBERS OF INTEREST 14
IX. 0AK RIDGE NATIONAL LABORATORIES (ORNL)/ DEPARTMENT OFENERGY (DOE) EMERGENCY NOTIFICATION DIRECTORY 15
X. U.S. NUCLEAR REGULATORY COMMISSION 15
oEntire Page Revised
-1-
- - .
-e- "h - - --4- e e_ .,ew-. . , _ .
_
.
EE. .
KECPage 1 of 14Rev. 8
i
KNOXVILLE EMERGENCY CENTER (KEC) EMERGENCY NOTIFICATION DIRECTORY
KEC COMMUNICATION SYSTEM
1. TVA Knoxville Switchboard Operator - TVA extension
Bell number (._
The TVA Knoxville switchboard operator has a current copy of thisnotification directory and can assist in placing calls.
2. Bell System - All TVA extensions listed in this directory may bereached via the Bell telephone system by dialing.. plus thefour-digit extension. All area codes are unless otherwise noted.
3. FTS - The U.S. government FTS access code for Knoxville is TheTVA extensions listed may be reached by dialing plus the four-digitextension.
4. Dedicated Emergency Telephone Lines
The primary TVA emergency communication system consists of a networkof dedicated Bell point-to point ringdown circuits. This network isindependent of other telephone systems and is not susceptible tooverload conditions. The KEC has dedicated circuits to the followinglocations:
A. Division of Nuclear Power Emergency Center (DNPEC)
B. Muscle Shoals Emergency Center (MSEC)
C. Onsite Technical Support Center at each operating TVA nuclearplant (multiple point circuit includes DNPEC and MSEC).
.
Entire Page Revised-2-
_. ._-
w - e- +- - - . - - --m- , .-----m- a w w v m- w a - w---w- v'
1
'
REND.
KECPage 2 of 14Rev. 8
1
I1
KEC EMERGENCY NOTIFICATION DIRECTORY :l
TVA Home !
Position Name Extension Telephone
I. KEC Duty Officer
The individuals listed below serve rotating assignments as KEC DutyOfficers, and serve as the initial KEC contact point (s) in the eventof a radiological emergency. Duty Officers shall carry a pager whichcan be activated by the CECC Operations Duty Specialist. Two (2) KECDuty Officers shall be on duty at all times.
T. G. ChapmanR. F. ChristieD. T. CliftJ. F. CoxL. A. HaackH. L. JonesL. W. LauR. S. McKeehanP. D. MetcalfL. D. Proctor 744p
OggURg Op #OJ. A. Raulston PRONBgg ISR. C. Weir
D. W. Wilson ERIVAq DEg k407Dan W. Wilson
II. KEC Director_
Mgr., EN DES M. N. Sprouse
Alternates
1. Asst. Mgr., EN DES R. W. Cantrell| 2. Chief Nuclear Engineer J. A. Raulston
,
3. IIead Nuclear Engineer, D. W. WilsonNuclear Safety
|Systems
' 4. Asst. Mgr., EN DES D. B. Bowen
S. Project Mgr., TDP G. R. Hall|
| 6. Project Mgr., SWP J. C. Standifer
7. Project Mgr. , BLP R. M. Hodges|
8. Asst. Hgr., EN DES R. G. Domer
|
|
Entire Page Revised -3-
|
. -
-~ , , - _ - - , - , , - -- - , - - ,
E@-.
KECPage 3 of 14Rev. 8
\|#4,
KEC EMERGENCY NOTIFICATION DIRECTORY
TVA HomePosition Name Extension Telephone
III. KEC Operations Manager
*
Alternates1. J. J. Wilder2. T. C. Price3. D. L. Williams4. V. A. Bianco5. T. E. Haynes
Communications Team 1. C. B. Walles~2. H. D. Knight
IV. KEC Emergency Response Team - Prime Contacts and Alternates
These contacts, or their alternates, are normally notified by theKEC Operations Manager whenever the KEC is activated.
1. Assistant KEC Director (for Technical Coordination)'
g Chief Nuclear Engineer J. A. Raulston'
Ist Alternate D. W. Wilson .
2nd Alternate H. L. Jones3rd Alternate T. G. Chapman4th Alternate J. F. Cox
2. Design Project Manager of Affected Plant:
If Browns Ferry Nuclear Plant is involved:
TDP - Project Manager G. R. Hall1st Alternate N. R. Beasley
*2nd Alternate J. M. Marshall3rd Alterrate G. R. Owens4th Alternate R. D. Guthrie
| If Sequoyah Nuclear Plant is involved:!|
SWP - Project Manager J. C. Standifer1st Alternate H. B. Rankin2nd Alternate W. H. Brown3rd Alternate W. J. Crossley
B E D Bt%VAcy gyggE
Entire Page Revised-4-
.. .
'
REND.
KECPage 4 of 14Rev. 8
TVA Home
Position Name Extension Telephone
IV. KEC Emergency Response Team - Prime Contacts and Alternates (Cont.)
2. Design Project Manager of Affected Plant (Cont.):~
If Watts Bar Nuclear Plant is involved:
SWP - Project Manager J. C. Standifer1st Alternate J. C. Key2nd Alternate J. D. Collins3rd Alternate E. H. Cole
3. Chief, EEB F. W. Chandler1st Alternate G. T. Hall2nd Alternate A. F. Pagano3rd Alternate M. J. Scruggs
4. Mgr., OEDC G. H. Kimmons1st Alternate D. R. Patterson2nd Alternate D. R. Armentrout
5. Hgr., CONST H. H. Mull1st Alternate J. E. Wilkins2nd Alternate R. A. Pedde
6. Assistant KEC Director (for Administrative Coordination)
Asst. Manager, EN DES I. L. Burroughs
1st Alternate E. R. Armstrong2nd Alternate C. L. O' Dell3rd Alternate L. J. Cooney
4th Alternate C. E. Payne
*i'
7. TVA Knoxville within TVA dial *! Switchboard Operator Operator otherwise
8. TVA Knoxville PublicSafety C. A. Lane
L. C. HollowayC. L. Franks
TE ggNCY ER 21ggq
Entire Page Revised 5-
. . . . .
..
.
REND'
Diggg.
KEC~
7'Eg % OF Page 5 of 14
ONI NBEy'
#NACY EACT 2'E0'
TVA HomePosition Name Extension Telephone
V. KEC Imergency Response Team - Technical Support Contacts
These personnel comprise a pool of technical personnel that may becalled by the KEC director or designee depending on the specificnature of the emergency.
1. Nuclear Engineering Branch
Chief Nuclear Engineer John A. Raulston
Asst. to the Chief J. F. CoxNuclear Engineer
Staff Specialist, M. N. Bressler *
Codes and Materials .
Head Nuclear Engineer D. W. Wilson
Staff Specialist H. G. O'Brien
Staff Specialist D. T. CliftStaff Specialist H. L. JonesStaff Specialist R. M. JesseeStaff Specialist R. C. Weir
Supv., Preop Test R. S. McHeehanSection
Supv., Systems P. D. MetcalfAnalysis (SQN/WBN)
Supv., Systems Dan W. WilsonAnalysis (BFN)
Head Nuclear Engineer, T. G. ChapmanSMR
Staff Specialist E. R. TaylorSupv., Radwaste D. L. MichlinkSection.
Head Nuclear Engineer, L. W. Lau '
NALStaff Specialist G. E. Ge rmanStaff Specialist R. F. ChristieSupv., HVAC Section L. J. KlaesSupv., Radiation L. E. Stanford
Protection SectionStaff Specialist H. E. McConnell
Supv., Nuclear R. H. BryanAnalysis Section
Supv.-, Degraded Core F. A. KoontzAnalysis Section
Supv., Licensing D. L. WilliamsSection
Entire Page Revised-6-
.,.
e -
! ..
-
atNo-
. .
KEC- Page 6 of 14
Rev. 8s
; TVA HomePosition Name Extension Telephone
V. KEC Emergency Response Team - Technical Support Contacts (Cont.)
1. Supv., System Analysis L. A. HaackNuclear Engineer V. A. BiancoNuclear Engineer T. C. PriceNuclear Engineer J. J. Wilder
2. Electrical Engineerina Branch (EEB) Support
Chief, EEB F. W. ChandlerAsst. to the Chief, G. T. Hall
EEBHead Electrical A. F. Pagano
Engineer, I&C Group,
Principal Mechanical M. V. MillerEngineer, I&CComponents
Principal Electrical M. R. Belew,
; Engineer, I&C(Process Systems)
Principal Electrical M. C. Brickey ,
En'gineer, I&C ,
(Operator Interfaceand Computer Systems)
Senior Electrical L. T. PerryEngineer, I&C Systems
(BLN, SQN, WBN)Senior Electrical T. G. Robinson
Engineer, I&C Systems(BFN, HTN, PBN)
Senior Electrical B. J. LambEngineer, I&C Systems(Operator Interface)
* Head Electrical M. J. ScruggsEngineer, SystemEngineering LayoutGroup
Principal Electrical C. H. Sudduthi Engineer,
Physical ArrangementPrincipal Electrical J. H. BoehmsEngineer,Auxiliary and ControlPower Systems
Senior Electrical G. R. ReedDf3gEngineer,
Tgq. 7OstyggAuxiliary Power
IlBITED BggES jgg"W V Acy 4C7 T
Entire Page Revised 7
.
e e.e
.,-,m-, -- - -env- -- +w - -e-, - --~~~~e* <--w -g-+-w- , , ,,--, ,m--- -
.
DISQg REHD
gg . fgNCY ER Tiggi q
TVA HomePosition Name Extension Telephone
.
V. KEC Emergency Response Team - Technical Support Contacts (Cont.)
2. Electrical Engineering Branch (EEB) Support (Cont.)
Senior Electrical C. H. GillilandEngineer, ControlPower Systems andProtective RelaySystems
Head Electrical E. ChitwoodEngineer, EquipmentContract EngineeringGroup
Principal Electrical J. F. WagnerEngineer,Electrical Components(Relay Systems, Con-trol Boards, Cable,and MiscellaneousComponents)
Principal Electrical D. R. WebsterEngineer,Electrical Components(Switchgear, HeavyEquipment)
3. Mechanical Engineering Branch (MEB) Support
Chief, MEB C. A. ChandleyAsst. to the Chief, G. P. Cooper
HEB. Head Mech. Engineer, I. L. Beltz( Mech. Equip. Con ,l tract Engineering
Head Mech. Engineer, H. R. Corbett,
Heat Cycle Engineering& Equip.
Staff Specialist, Heat H. A. MahlmanCycle Engineering& Equip.
Supv., Water Chemistry J. R. Palatinusand EnvironmentSection
Staff Specialist, Heat L. W. BoydCycle Engineering& Equip.
Supv., TG & Heat Cycle J. W. WarrenSection #1
Supv., TG & Heat Cycle E. W. SteinhauserSection #2
Entire Page Revised og.
. . . . .
_,- -.v. ., - - - -
.
. RENDKEC
,
Page 8 of 14Rev. 8
-
s
TVA Home
Position Name Extension Telephone
V. KEC Emergency Response Team - Technical Support Contacts (Cont.)
3. Mechanical Engineering Branch (MEB) Support (Cont.)
Staff Specialist, Heat W. W. AvrilCycle Engineering& Equip.
Supv. , Heat Rejection S. E. GibsonRaw Water Equip.Section
Supv., Essential C. F. BowmanService Systems
Supv., Branch J. P. LittleEngineering Services
Supv., Testing and G. I. ArnoldMiscellaneous
Head Mechanical L. A. JohnsonEngineer, FacilitySupport and Service
Supv., Environmental W. M. PearseCompliance Section
Supv., HVAC Section G. A. Silver*
Supv., Potable Water H. E. Burtonand Sanitary WasteSection
Supv., Health and J. M. Singleton
Safety.SectionSupv., Fire Protection R. T. WimbrowSection
4. Civil Engineering Branch (CEB) Supporti
Chief, CEB R. O. BarnettAsst. to the Chief, J. W. McReynolds-
t CEBHead Civil Engineer R. O. Hernandez
,
(Civil Engineering)|
l Head Civil Engineer T. W. Roberts(StructuralEngineering)
Head Civil Engineer W. A. English(EngineeringMechanics)
Principal Mechanical P. A. EvansEngineer (EngineeringMechanics) DISCLgg
IE E BER Jg
#EIYACY sqIEE TiiEEntire Page Revised _g,
.
, , , . , _ _ - m-_ _ _... , , , _ . - - _ _ _ __
_ __ _
|.-
REND.
-
KEC ;
Page 9 of 14|Rev. 8 1
i
|l
TVA HomePosition Name Extension Telephone
V. KEC Emergency Response Team - Technical Support Contacts (Cont.)
4. Civil Engineering Branch Support (CEB) (Cont.)
Head Civil Engineer R. J. Hunt(Geology andGeotechnical)
Head Mechanical T. C. CruiseEngineer (PipingAnalysis)
5. Boiling Water Reactor (BWP) Project Support
BWP - Project Manager G. R. HallElectrical Design G. R. Owens
Project EngineerSenior Mechanical R. A. Montgomery
EngineerSenior Electrical T. L. Chandler
EngineerSenior Electrical R. L. Hair
EngineerCivil Design Project J. M. Marshall
EngineerSenior Civil Engineer C. N. SimmsMechanical Design N. R. BeasleyProject Engineer
Senior Electrical J. W. BlackEngineer
Senior Civil Engineer R. E. GainesSenior Mechnical A. C. Robertson
EngineerSenior Electrical J. R. Kellar
Engineer.
Senior Civil Engineer E. E. ColeProject Management R. D. GuthrieStaff Chief
Senior Civil Engineer B. G. Rossberg
6. Sequoyah, Watts Bar Desian Project Support
SWP - Project Manager J. C. StandiferAsst. to Project E. H. Cole
ManagerSQN Design Project H. B. Rankin
Engineer uccEO E NOQy
NEEV NAqy 4C7
gEntire Page Revised-10-
. . . . .
,_ , , _ _ _ , , _ _ - , . - _ _ _ . . - - - .e- _ , _ - _ _ _ __ __ _ _ _ _ _ _ - - - -
..
E}t 8,,
TVA Home |
Position Name Extension Telephone
V. KEC Emergency Response Team - Technical Support Contacts (Cont.)
6. Sequoyah, Watts Bar Design Project Support (Cont.)
WBN - Mech Design J. C. KeyProject Engineer
WBN - Elect Design J. D. CollinsProject Engineer
SQN - Senior Mech W. H. BrownEngineer
SQN - Senior Elect W. J. CrossleyEngineer
WBN - Senior Elect J. L. DorrisEngineer
WBN - Civil Design A. JonssonProject Engineer
7. Investment Recovery Project (IRP)
IRP - Project Manager R. J. OgleAsst. to IPR Project L. Tummel
ManagerIRP/EN DES - Project H. S. Beckner.
EngineerIPR /CONST - Project M. G. Ray
Engineer ,
VI. Emergency Response Team - Administrative Services Support
These personnel comprise a pool of primary administrative servicespersonnel who may be called by the KEC director or his designeedepending on the specific nature of the emergency.
1. Administrative Support .
.
Asst. Mgr., I. L. Burroughs
EN DESSupv., Procedures E. R. Armstrong
Control SectionChief, Management C. L. O' Dell
and EngineeringData SystemsBranch
Chief, Engineering L. J. Cooney
Services BranchAdministrative Officer S. O. DavenportSecretary W. R. Dial
Secretary W. B. Walker :Secretary P. K. Maples ;
Secretary P. Gilbert :~
Entire Page Revised,,
. - _ _ _ - _ . _ _ _ _ _
!
RENDKECPage 11 of 14Rev. 8
TVA HomePosition Name Extension Telephone
VI. Emergency Response Team - Administrative Services Support (Cont.)
2. Management and Engineering Data Systems Support
Chief, Management and C. L. O' DellEngineering DataSystems Branch
Supv., Office Support C. E. PayneSection
Supv., Systems D. E. CallowaySupport Section
Supv., TIC M. L. ScalfSupv., Document N. C. HarringtonProcessing Section
Supv., Stenographic E. L. Frenchand Word Processing
Subunit Supervisor B. W. CollinsSubunit Supervisor K. J. SharpSupv., Clerical C. W. NormanServices Unit
3. Engineering Services'
Chief, Engineering L. J. CooneyServices Branch
Supv., Engineering Y. J. Allan i
Graphics SectionSupv., Drafting V. C. Dishman
Support UnitSupv., Mechanical R. L. DouglassDrafting Unit
Supv., Electrical J. E. RouseDrafting Unit
Supv., Civil B. R. Sanders*
Draftir.g UnitSupv., Contract G. V. RogersServices Staff
Supv., Graphic Arts J. R. PorterCer.te r
blSq
O R
.
Entire Page Revised -12-
..
y_.
.. . . _ . ,..
.
~
RENDKECPage 12 of 14Rev. 8
VII. TVA Emergency Centers
1. KEC
a. KEU Horizon
Bell TVA Extension FTS
./
Horizon Position Horizon Station
KEC DirectorDNPEC CommunicatorESEC CommunicatorTSC CommunicatorKEC Communication OfficerKEC SwitchboardKEC Command ?eiter -
'KEC Opera.. .s Manager
i'
b. OEDC Gffice Complex --,
Note: The TVA phone numbers listed below are intendedfor emergency use only.
TVA Extension FTS,
,
;
,
TVAc, Telecopier (Panafax Location Extension
Telecopier (automatic)2,
Telecopier verification number
2. Central Emergency Control Center (CECC)
Duty SpecialistBell telephone number
2TelecopierTelecopier verification number
-
2All telecopy pages must be 8-1/2" x 11" and must include name, address, andtelecopier number of the recipient. If the copy to be transmitted issmaller than 8-1/2" x 11", it must be xeroxed to achieve the requiredsize. If it is too large it must be reduced (e.g., through the Xerox orIPB reduction feature) or cut to 8-1/2" x 11" pieces;
Entire Page Revised-13-
- . _ . - _ .... ._. . . .. .
.
.
RENDKECPage 13 of 14Rev. 8
s
VII. TVA Emergency Centers (Cont.)
3. MSEC
The numbers listed below are located in close proximity to thepresent MSEC, and at? intended to supplement the dedicated linefrom the KEC to the MSEC.
TVA Extension Bell FTS /I
,
2Telecopier number TVA pal 0BellFTS
Telecopier verification number TVA PAX OBell' v6FTS
,
VIII. Selected Numbers of Interest
TVA HomeExtension Telephone
TVA Eoard of Directors3
C. H. Dean, Chairman-
Richard M. Freeman, DirectorS. David Freeman, Director
.
-
1These individuals may be reached at their home numbers through theKnoxville TVA switchboard operator. When calling the TVA operator fromwithin TVA, dial "O." When calling the TVA operator from outside TVAdial s
2All telecopy pages must be 8-1/2" x 11" and must include name, address,and telecopier number of the recipient. If the copy to be transmitted issmaller than 8-1/2" :t 11", it must be xeroxed to achieve the requiredsize. If it is too large it must be reduced (e.g. , through the Xerox orIPB reduction feature) or cut to 8-1/2" x 11" pieces
Entire Page Revised
-14-..
_ _ _ _ _ _ - _
~
.
' '
DISczPlfo Op e 14 of 14
IllBlygg NU)yy NL' Rev. 8
% c t " y ri $A
VIII. Selected Numbers of Interest (Cont.)
TVA HomeExtension Telephone
Office of the General Manageri
William F. Willis, General Mr.aagerJohn S. Bynon, Asst. General ManagerG. F. Dilworth, Asst. General ManagerJ. G. Stewart, Asst. General Manager
Office of the General Counsel
Herbert S. Sanger, Jr., General CounselLewis E. Wallace, Deputy General Counsel
IX. Oak Ridge National Laboratories (ORNL)/ Department of Energy (DOE)Emergency Notification Directory
Oak Ridge Operations Office.
Emergency Preparedness Director
Security Operations Center .
Savannah River Operations Office
X. U.S. Nuclear Regulatory Commission
NRC-0IE Emergency Center, Atlanta, GA
NRC-NRR Emergency Center, Bethesda, MD
or.
l NRC Operator, Bethesda, MD
These individuals may be reached at their home numbers through the1
Knoxville TVA switchboard operator. When calling the TVA operator from'
within TVA, dial '' 4 en calling the TVA operator from outside TVAdial'..
~~