3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit” in USA15. Kirill Egorov Indiana University. TS “Balcony unit”… Where is the balcony?. It’s here! USA15 level 3. Where is the compressor room to connect the “balcony unit”?. Keep in mind this white column!!!. - PowerPoint PPT Presentation

Citation preview

5th Thermosyphon Workshop 1

Kirill EgorovIndiana University

20 October, 2011

3D-modelling for hydraulic assembly

Preliminary design of the TS “Balcony unit” in USA15.

5th Thermosyphon Workshop 220 October, 2011

TS “Balcony unit”… Where is the balcony?

It’s here! USA15 level 3

5th Thermosyphon Workshop 320 October, 2011

Where is the compressor room to connect the “balcony unit”?

Keep in mind this white column!!!

…and this cable tray

5th Thermosyphon Workshop 420 October, 2011

The white column is a part of the

USA15 ventilation

system.

Where is the bottom part?

5th Thermosyphon Workshop 520 October, 2011

This is the bottom

part of the white

columnThis is

the botto

m part

of the cable tray

Compressor room

door

Keep in mind these two red

areas in front of and behind the

tank

12

5th Thermosyphon Workshop 620 October, 2011

The compressor room is found!

The compressor room entrance is under this

line

The tank is under this white area

1

23

5th Thermosyphon Workshop 720 October, 2011

…and without drilling of ceiling

3

3

30 cm

5th Thermosyphon Workshop 820 October, 2011

“Balcony unit” – 3D modelling of components31kW electric

heater

Filters

56kW heater

Dummy-load

Heat-exchanger for sub-cooling

Flowmeter

5th Thermosyphon Workshop 920 October, 2011

“Balcony unit” – 3D assembling

This assembling

doesn’t include a

support frame

There are ~760 3D-solids

here

5th Thermosyphon Workshop 1020 October, 2011

“Balcony unit” – 3D assembling

Blue pipes need thermal

insulation

5th Thermosyphon Workshop 1120 October, 2011

“Balcony unit” – 3D integration

1

2

3

4

There are four fixing point for

the balcony

The support #4 is standing on the roof of the

compressor room

~2450 kg without support frame

5th Thermosyphon Workshop 1220 October, 2011

“Balcony unit” – 3D integration

warm liquid to detecto

r

cold vapor to

condenser

warm vapor from

detector

cold liquid from

condenser

5th Thermosyphon Workshop 1320 October, 2011

“Balcony unit” – 3D integration

1,4 m

<1,2 m

>3 m

5th Thermosyphon Workshop 1420 October, 2011

Conclusion

• There are 3D models for all “Balcony unit” components.• The preliminary design is ready.• The design of the supporting frame will be ready soon after approval of all the components.• The strength of the balcony needs a confirmation from the CERN civil engineering.