Kingston Bridge Level Profile

Preview:

Citation preview

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

10

0

11

0

12

0

13

0

14

0

15

0

16

0

17

0

18

0

19

0

20

0

21

0

22

0

-0.34

-0.32

-0.3

-0.28

-0.26

-0.24

-0.22

-0.2

-0.18

-0.16

-0.14

-0.12

-0.1

-0.08

-0.06

-0.04

-0.02

0

0.02

0.04

0.06

0.08

0.1

0.12

WEST BRIDGE LEVEL SURVEYDEFORMATION PROFILE FROM BASE 1970 SURVEY

1971 Sep 1993 1995 1996 Feb 1997 Aug 1997 Jul 1998May 1999 09-Jun-99 23-Jun-99 23-Aug-99 06-Sep-99 30-Jan-00 23-Apr-0019-Nov-00 16-Sep-01 29-Jun-02

Distance from South Pier (m)

Def

orm

atio

n (

m)

Note: South Pier zero Datum adjusted by 20mm for bridge lift for 30-Jan-00 surveyand 23-Apr-00 survey

SP NP

Levels taken at 10 ft ctrs tocoincide with construction pour

Recommended