View
214
Download
0
Category
Preview:
Citation preview
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
Work Package Leader:Energy Agency of PlovdivEnergy Agency of Plovdiv
MoMa.BIZ – WP 5
Local Actions - Mobility Plan:
the Base for the Boxed Solutions Methodology
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
WP5: Development and implementation ofMobility plans
WP2
Study of the BIZ
- Number of Enterprises
- Number of Employees/Enterprise
- Modal split of car user
- Infrastructures in the area
- Accessibility
- Alternative means of transport
WP3
Local Mobility Group
- Demands- Values- Inventory
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
In WP 5 we have:
1) Survey on Mobility Demand
2) Mobility Plans Implementation and Boxed Solutions Implementation
3) Development of Labelling System
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
5.1 Study on Mobility demand5.1.1. Scope of the survey (transport mode, travel time, activities on the way home, working environment, desire to change, personal data – age, sex, education, etc.)
5.1.2. Development of a questionnaire for data collection
5.1.3. Adaptation of the software for the surveys. Setting up the survey template.
5.1.4. Submission of the surveys to the employees
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
5.2. Behavioural & Statistical Analysis
- behavioural choices ~ choice of living place/ transport
- new acquaintances ~ mental and decisional processes
- defining policies ~ reduction of social costs of transportation systems & address sustainable use of resources
D 5a: 1 Report on the results of the surveys* 01.2011
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
5.3. Participatory Planning of the Mobility Plan - based on the Study of BIZ (WP2) and results of statistical and behavioral analysis
5.4. Actual implementation of the Mobility Plans5.4.1. Development of the Mobility Plan5.4.2. Reflection and evaluation after 9 months (or
earlier) by the Local Mobility Group, the area-mobility-manager and the e-support (WP4) according to the objectives/ values (WP3)
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
Standard Actions: base of the Boxed solutions
These actions will be proposed to the Local Mobility Group for implementation consideration.
– Interactions among companies – synchronisation, facilities sharing
– Flexible transport system – transport frequency– Increasing attractivity of bicycle – anti-barriers actions– Carpooling – cost effective, CO2 effective– Parking – parking lots– Public Transport - flexibility
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
5.5. Start-up phase of flexible transport system
5.5.1. Definition of the local flexible services (stops, time-ranges, lines, typology of service)
5.5.2. Development of the computer based database for the sites
5.5.3. Project Management for the adaptation of the computer based database from the project partners
5.5.4. Establishment of Call Centre for the Flexible/Innovative Services (in 6 BIZs)
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
Development of Databasewith standard actions towards
Box Solutions
• Bicycles• Trams• Trains• Buses
• Shuttles• Cars• Carpooling• Trainings*
e.g. http://www.sec-tools.net/
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
6. Preparation and leading the international session: Inspiring Exchange and Labelling System Set Up - Before the Definitive Mobility Plan
7. Set up of a mobility management labelling system
e.g. http://businesspark-sofia.com/?go=contacts&p=transportation
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
Sample Labelling system
Bike Train BusShuttle
BusMetro Carpool Car
A+ V V V V V V V
A V V V V V V
B V V V V V
C+ V V V V
D V V
+ is used when a bike option is available
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
Sample Timetable
D5.a: Report on the results of the survey – statistical analysis, behavioural analysisD5.b: 6 Local Mobility PlansD5.c: WebReport on the International Session: Inspiring Exchange and Labelling System Set Up- Before the definitive Mobility planD5.d: Mobility Labelling System
Kick-off meeting, 17-18.06.2010, Province of Asti, Italy
Thank you for your attention
Ina KarovaEnergy Agency of Plovdiv
139 Ruski Blv. Plovdiv 4000Tel: +359 32 62 57 56
Fax: +359 32 62 57 54ina.karova@eap-save.dir.bg
Recommended