Just a Piece in a Jigsaw Puzzle - Transport Canada fileJust a Piece in a Jigsaw Puzzle … Systems...

Preview:

Citation preview

29 April 2008 CASS 2008

Just a Piece in a Jigsaw Puzzle …

Systems Dynamics and Safety in Canadian Aviation

29 April 2008 CASS 2008

Overview

What is a system?How does it work?Why does it fail?

29 April 2008 CASS 2008

What is a System?

Nested decision-making

29 April 2008 CASS 2008

The WorkspaceThe Workspace

The CrewThe Crew

Constraining ActivityConstraining Activity

The Environment

Commercial ActivityCommercial Activity

What is a System?

29 April 2008 CASS 2008

Activity at the level of ‘Production’

PressureMax Temperature

Min

Conditional <79% N1

Continuous <94% N1

Continuous

29 April 2008 CASS 2008

PPPP

29 April 2008 CASS 2008

PPPPPrivate Processing + Public Performance

29 April 2008 CASS 2008

PPPPPrivate Processing + Public Performance

29 April 2008 CASS 2008

PPPPPrivate Processing + Public Performance

29 April 2008 CASS 2008

Task: Arrange 11 trees,To be planted in 6 rowsEach row to contain 4 trees

29 April 2008 CASS 2008

Task: Arrange 11 trees,To be planted in 6 rowsEach row to contain 4 trees

29 April 2008 CASS 2008

Activity at the level of ‘Organization’

Aircraft 1 Aircraft 2

29 April 2008 CASS 2008

GroundController

TowerController

BN2 DHC-8

29 April 2008 CASS 2008

29 April 2008 CASS 2008

29 April 2008 CASS 2008

OSTC

Operations

POI

CBAD

Certification

Province of Ontario

Operator

29 April 2008 CASS 2008

OSTC

Operations

POI

CBAD

Certification

Province of Ontario

Operator

29 April 2008 CASS 2008

OSTC

Operations

POI

CBAD

Certification

Province of Ontario

Operator

29 April 2008 CASS 2008

OSTC CBAD

Certification Operations

POI

Province of Ontario

Operator

29 April 2008 CASS 2008

OSTC CBAD

Certification Operations

POI

Operator

Province of Ontario

?

29 April 2008 CASS 2008

ExploitationPlanningDeicing

FacilitationCertification

Oversight

29 April 2008 CASS 2008

S

P

29 April 2008 CASS 2008

A

BP C

S

29 April 2008 CASS 2008

Production

• Technology• Procedures• Pilot ‘Knowing’

29 April 2008 CASS 2008

Representation of Information

Normal

(Green)

1173

1071

1020

660

RPM

Fuel Cut-off

Caution(Amber)

Max (Red)

Over-limit

1064 Overspeed Governor

Indication System

Condition Lever

PEC

29 April 2008 CASS 2008

29 April 2008 CASS 2008

Pilot’s Construction of Risk

• Feather Prop v Engine Shut down• No red lines• Situation stable• Viewed as technical problem, not an

operational problem

29 April 2008 CASS 2008

What the Safety Management System Said

Risk: If the event happens again the probability of a major accident is not increased or increased only under extreme circumstances

Seriousness: On this occasion the probability of a major accident was not increased but the event was indicative of a quality problem that could affect safety

29 April 2008 CASS 2008

System Dynamics

• Normalization of Deviance• Asynchronicity

29 April 2008 CASS 2008

System Dynamics

• Normalization of Deviance• Asynchronicity

29 April 2008 CASS 2008

Manufacturer

Operator

Authority

AOM

QRH

OM pt ‘B’

AFM

29 April 2008 CASS 2008

System Dynamics

• Normalization of Deviance• Asynchronicity

29 April 2008 CASS 2008

Conclusion

• Individuals act to create solutions to operational problems in real time

• Individuals act in a context driven by systems dynamics

• Safety is a product of people, not organizations

29 April 2008 CASS 2008

And finally …

Strategic decisions shape behaviour

29 April 2008 CASS 2008

And finally …

Strategic decisions shape behaviour

…but maybe not in the way you’d planned!

29 April 2008 CASS 2008

Thank you for your attention

Norman MacLeod

Recommended