*Jodhpur Discom
Zone wise
JODHPUR DISCOM PROFILE
S.No.DISTRICT COVEREDJODHPUR ZONEBIKANER ZONEJODHPUR DISCOM
(1)AREA (SQ. km)117801647061.82 Lacs182507
POPULATION AS PER CENSUS 20011186801882255872.01 Cr.20093605
POPULATION DENSITY(PER SQ. KM)100.75127.12227.87110.0977222791
TEHSIL COVERED39317070
NO OF PANCHAYAT SAMITI44287272
NO OF GRAM PANCHAYATS1604107126752675
URBAN TOWNS25315656
NO OF VILLAGES (As per census 2001)575867741253212532
VILLAGE ELECTRIFIED UP TO 31.03.2011 (Including 206 Nos. UIV)521164571166811668
VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000
% ELECTRIFICATION90.5095.3293.1193.1056495372
(2)POWER NETWORK
NO OF 400KV GSS3255
NO OF 220KV GSS1792626
NO OF 132KV GSS6847115115
NO OF 33KV GSS (as on JULY. 2011)88651013961396
LENGTH OF 33KV LINE (KM) (as on JULY., 11)1166167261838718387
LENGTH OF 11KV LINE (KM) (as on JUNE 11)7395743367117324117324
NO. OF 11/04.KV S/S (as on JUNE, 11)14634068046214386214386
LENGTH OF LT LINE (KM) (as on JULY., 11)47096179446504065040
NOS. SINGLE PHASE TRANSFORMERS ( JUNE,11)20941130423398333983
A B CABLE IN KMS ( Upto JUNE, 11)20475140623453734537
% T & D LOSSES FOR 11-12 (UPTO JULY,11)18.4821.8719.8220.89
(3)Business Dimensions
Revenue Sub-Divisions7451125125
Total Active Consumers AS ON 30.06.20111393836102983224236682423668
(a) Domestic108053286679319473251947325
(b) Agriculture (Flat)3545465724202642026
(c ) Agriculture (Metered)1270745033817741217741281475
(D) Total Agriculture16252856910219438219438
(e) PHED5707402197289728
Annual Revenue (2010-11) (Rs. In Crores)1960.931143.183104.113104.1101
Monthly Average Revenue (Rs. In Crores)163.4195.27258.68258.6758416667
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered232610813407340722019
218210683250325035278
Villages getting 24 HRs. Supply489159571084810848
14413157157
Total 3 Phase Trans. To be installed as on 31.03.1062540237918633186331
Total 3 Phase Trans. installed up to JULY.116129423759850538505325275
BALANCE 3 Phase Trans. To be installed12463212781278012842
(5)RGGVY15847
Scheme costRGGVY31774.1111167.0642941.1742941.178372
AREP603.53904.541508.071508.07119633
No. of Unelectrifies/ Deelectrified villages coveredRGGVY9985271525152529931
AREP60157217217
No of villages electrifiedRGGVY53147010011001
AREP55157212212
(6)BPL Connections covered in Scheme (RGGVY)208974169695378669378669
Nos.of BPL connections released (upto JULY.11)119183139053258236258236
(7)AGRICULTURE
Agriculture Connections IN 2010-11DN ISSUED4171329674677471
DN DEPOSITED (Including Dep. As on 31.03.10)1468779672265422657
CONN. RELEASED1290073082020820210
BALANCE ( Deleting the Cancelled Appl.)157656521412142
Agriculture Connections IN 2011-12DN ISSUED JULY,111403192662329723298
DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,11796151411310213103
CONN. RELEASED UP TO JYLY,111262119424562458
BALANCE ( Deleting the Cancelled Appl.)656939471051610516
No of SC AG released During 2011-12 up to JULY,1158477013541354
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied (UP TO JULY,11)1294035281646816468
Total DN Issued to Groups (UPTO JULY,11)7784182996139613
Total DN Deposited (UPTO JULY 11)5790152273127312
Groups Electrified Upto 31.3.20115283139166746674
Groups Electrified in 2011-12 (UPTO JULY, 11)30195396396
TOTAL GROUP ELECTRIFIED5584148670707070
No. of Cluster Sanctioned/Domestic Applications Covered366466832832
2874372866026602
No. of Cluster Connections Released/Domestic Connections Released2000200200
1165011651165
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)207122329329
TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)3918097404892048920
(9)APDRP DETAILS000
TOTAL SCHEMES (NOS.)0077
COST OF SANCTIONED SCHEMES (RS. IN CRORE)00359.29359.29
EXPENDITURE INCURRED (RS. IN CRORE)00311.74311.74
barmer cir
BARMER CIRCLE PROFILE
S.NO.DISTRICT COVEREDBARMERJAISALMER
(1)AREA (SQ. km)2838738401
POPULATION AS PER CENSUS 20011964835508247
POPULATION DENSITY(PER SQ. KM)6913
TEHSIL COVERED83
NO OF PANCHAYAT SAMITI83
NO OF GRAM PANCHAYATS402128
URBAN TOWNS22
NO OF VILLAGES (As per census 2001)1941637
VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)1281562
VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)1950
% ELECTRIFICATION76.04%88.23%
(2)POWER NETWORK
NO OF 400KV GSS10
NO OF 220KV GSS31
NO OF 132KV GSS113
NO OF 33KV GSS (as on DEC. 2010)15544
LENGTH OF 33KV LINE (KM) (as on DEC., 10)26341653
LENGTH OF 11KV LINE (KM) (as on DEC,10)156326875
NO. OF 11/04.KV S/S (as on DEC.,10)265375604
LENGTH OF LT LINE (KM) (DEC,. 10)61511088
NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)2939305
A B CABLE IN KMS ( Upto DEC., 10)4317520
% T & D LOSSES FOR 10-11 UPTO NOV.,1013.28
(3)Business Dimensions
Revenue Sub-Divisions14
Total Active Consumers AS ON SEPTEMBER 1016099548107
(a) Domestic11589838021
(b) Agriculture (Flat)2875329
(c ) Agriculture (Metered)230133358
(D) Total Agriculture256103687
(e) PHED1349351
Annual Revenue (2009-10) (Rs. In Crores)286.42
Monthly Average Revenue (Rs. In Crores)23.87
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered478127
377127
Villages getting 24 HRs. Supply1264502
1010
Total 3 Phase Trans. To be installed as on 31.03.10145631785
Total 3 Phase Trans. installed up to DEC.10126191785
BALANCE 3 Phase Trans. To be installed19440
(5)RGGVY
Scheme costRGGVY20995.861338.78
AREP603.53
No. of Unelectrifies/ Deelectrified villages coveredRGGVY66898
AREP60
No of villages electrifiedRGGVY20798
AREP55
(6)BPL Connections covered in Scheme (RGGVY)6012410368
Nos.of BPL connections released (upto JAN.11)72056770
(7)AGRICULTURE
Agriculture Connections IN 2009-10DN ISSUED45062174
DN DEPOSITED (Including Dep. As on 31.03.09)47241497
CONN. RELEASED3198757
BALANCE ( Deleting the Cancelled Appl.)1514740
Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.20101268659
TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )27821399
25831261
BALANCE ( Deleting the Cancelled Appl.)188138
No of SC AG released During 2010-11 up to JAN.11446141
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied5407502
Total DN Issued to Groups1776214
Total DN Deposited1588154
Groups Electrified Upto 31.3.1047345
Groups Electrified in 2010-11 (UPTO DEC. 10)2106
TOTAL GROUP ELECTRIFIED68351
No. of Cluster Sanctioned/Domestic Applications Covered1260
8050
No. of Cluster Connections Released/Domestic Connections Released230
1890
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)905103
TOTAL DL CONNECTIONS RELEASED4529332
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)
COST OF SANCTIONED SCHEMES (RS. IN CRORE)
EXPENDITURE INCURRED (RS. IN CRORE)
JALORE
JALORE CIRCLE
S.NO.DISTRICT COVEREDJALORE
(1)AREA (SQ. km)10640
POPULATION AS PER CENSUS 20011448940
POPULATION DENSITY(PER SQ. KM)136
TEHSIL COVERED7
NO OF PANCHAYAT SAMITI8
NO OF GRAM PANCHAYATS268
URBAN TOWNS3
NO OF VILLAGES (As per census 2001)706
VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)706
VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)0
% ELECTRIFICATION100.00%
(2)POWER NETWORK
NO OF 400KV GSS0
NO OF 220KV GSS2
NO OF 132KV GSS14
NO OF 33KV GSS (as on DEC. 2010)157
LENGTH OF 33KV LINE (KM) (as on DEC., 10)1623
LENGTH OF 11KV LINE (KM) (as on DEC,10)14947
NO. OF 11/04.KV S/S (as on DEC.,10)38998
LENGTH OF LT LINE (KM) (DEC,. 10)10047
NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)4282
A B CABLE IN KMS ( Upto DEC., 10)3388
% T & D LOSSES FOR 10-11 UPTO NOV.,101.82
(3)Business Dimensions
Revenue Sub-Divisions12
Total Active Consumers AS ON SEPTEMBER 10196237
(a) Domestic135919
(b) Agriculture (Flat)18376
(c ) Agriculture (Metered)27063
(D) Total Agriculture45439
(e) PHED800
Annual Revenue (2009-10) (Rs. In Crores)203.84
Monthly Average Revenue (Rs. In Crores)16.99
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered480
463
Villages getting 24 HRs. Supply697
17
Total 3 Phase Trans. To be installed as on 31.03.1019078
Total 3 Phase Trans. installed up to DEC.1018841
BALANCE 3 Phase Trans. To be installed237
(5)RGGVY
Scheme costRGGVY2367.41
AREP
No. of Unelectrifies/ Deelectrified villages coveredRGGVY30
AREP
No of villages electrifiedRGGVY30
AREP
(6)BPL Connections covered in Scheme (RGGVY)54217
Nos.of BPL connections released (upto JAN.11)33719
(7)AGRICULTURE
Agriculture Connections IN 2009-10DN ISSUED4498
DN DEPOSITED (Including Dep. As on 31.03.09)4443
CONN. RELEASED2816
BALANCE ( Deleting the Cancelled Appl.)1515
Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.2010866
TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )2381
2135
BALANCE ( Deleting the Cancelled Appl.)203
No of SC AG released During 2010-11 up to JAN.11252
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied1337
Total DN Issued to Groups543
Total DN Deposited543
Groups Electrified Upto 31.3.10396
Groups Electrified in 2010-11 (UPTO DEC. 10)1
TOTAL GROUP ELECTRIFIED397
No. of Cluster Sanctioned/Domestic Applications Covered3
34
No. of Cluster Connections Released/Domestic Connections Released125
570
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)146
TOTAL DL CONNECTIONS RELEASED3729
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)
COST OF SANCTIONED SCHEMES (RS. IN CRORE)
EXPENDITURE INCURRED (RS. IN CRORE)
DISTT. WISE
JODHPUR DISCOM PROFILE
S.NO.DISTRICT COVEREDJODHPUR CITYJODHPUR DCPALISIROHIJALOREBARMERJAISALMERTOTAL JODHPUR ZONEBIKANERHNGH.SGGNR.Churu +PS LadnuBIKANER ZONEJODHPUR DISCOM
(1)AREA (SQ. km)228501238751361064028387384011178013028980551257813784647061.82 Lacs182507
POPULATION AS PER CENSUS 20113685688203853310371851830151260445367200811868018236774517796501969520210867282255872.01 Cr.20093605
POPULATION DENSITY(PER SQ. KM)161165202172921710178221157153127228110
TEHSIL COVERED795783398797317070
NO OF PANCHAYAT SAMITI1010588344678728727223761
NO OF GRAM PANCHAYATS339318149268402128160421925132028110712675267534645
URBAN TOWNS13953222546101131565613022
NO OF VILLAGES (As per census 2001)0106394946270619416375758875190530149806774125321253238763
VILLAGE ELECTRIFIED UP TO 31.03.20110106294346270614765625211779180329279486457116681166818005
VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000000000000009165
% ELECTRIFICATION----99.9199.37100.00100.0076.0488.2390.5089.0394.6597.1196.7395.3293.1193.11%137361
(2)POWER NETWORK036171
NO OF 400KV GSS1000113100125535101
NO OF 220KV GSS6223311732229262644773
NO OF 132KV GSS2210216144681889124711511543042
NO OF 33KV GSS43296107501701685288619289107122510139613963067
LENGTH OF 33KV LINE (KM)301307914236501748273917211166128519461365156467261838718387162154
LENGTH OF 11KV LINE (KM)7582046886484618152031688373797395718082709779031028543367117324117324299515
NO. OF 11/04.KV S/S2948428841538612215394272720262781463402557816695110621471168046214386214386
LENGTH OF LT LINE (KM)170113317975948621021261631082470963766517830085992179446504065040
NOS. SINGLE PHASE TRANSFORMERS075962988152244993917419209411491338248653304130423398333983
A B CABLE IN KMS19870082474136037774964694204752051175038536408140623453734537
% T & D LOSSES FOR 11-12 (UPTO JULY,11)19.1021.5418.3613.7516.3018.4823.3419.3616.8423.7321.8719.82
(3)Business Dimensions
Revenue Sub-Divisions1015231214741610131251125125
Total Active Consumers AS ON 30.06.20111938362535125162752075182226951393836251169247902261818268943102983224236682423668
(a) Domestic154418194920423013144940163241108053220158721016922363223140586679319473251947325
(b) Agriculture (Flat)011285328618159272435454346700310565724202642026
(c ) Agriculture (Metered)326261534129429142301591270741585716539842195215033817741217741281475
(D) Total Agriculture32637438445804730132883162528193241653984211262656910219438219438
(e) PHED194171512938001705570712964136011711402197289728
Annual Revenue (2010-11) (Rs. In Crores)456.35420.64527.10227.63329.211960.93427.08197.91293.03225.161143.183104.113104.1101
Monthly Average Revenue (Rs. In Crores)38.0335.0543.9218.9727.43163.4135.5916.4924.4218.7695.27258.68258.68
(4)FEEDER RENOVATION PROGRAM0
Total Rural Feeders Covered0777335129480478127232636822921427010813407340722019
0687335129480424127218236822921425710683250325035278
Villages getting 24 HRs. Supply0105891545569712645024891759162926239465957108481084825275
0900005401440001313157157012842
Total 3 Phase Trans. To be installed as on 31.03.10204381169550719078145631785625406064339750059325237918633186331
Total 3 Phase Trans. installed up to JULY.111967511695507190781408017856129460643397500592932375985053
BALANCE 3 Phase Trans. To be installed7630004830124600032321278
(5)RGGVY015847
Scheme costRGGVY--------2853.852981.291236.922367.4120995.861338.7831774.112333.903256.163498.462078.5411167.0642941.1742941.1744449.248372
AREP603.53603.53222.85681.69904.541508.071508.07119633
No. of Unelectrifies/ Deelectrified villages coveredRGGVY--------1732183066898998205132179115271525152529931
AREP60604611115721721725768
No of villages electrifiedRGGVY--------173158302079853118013215264701001100140580
AREP55554611115721221239689
(6)BPL Connections covered in Scheme (RGGVY)--------303652933424566542176012410368208974414813983534077543021696953786693786693057
Nos.of BPL connections released (upto JULY.11)--------21198366588246365899363712911918330744314333894037936139053258236258236139025
(7)AGRICULTURE
Agriculture Connections IN 2010-11DN ISSUED4172225264155872827041711193713703687329674677467
DN DEPOSITED (Including Dep. As on 31.03.10)35150104216522493290814421468737151707962158379672265422654
CONN. RELEASED2442795813832219262612871290033591501936151273082020820208
BALANCE ( Deleting the Cancelled Appl.)164863254229227155157629220516756521412141
Agriculture Connections IN 2011-12DN ISSUED JULY,111609296789229482365767140313819179110062650926623297
DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,111244453283220061753394796118731119842130751411310213102
CONN. RELEASED UP TO JYLY,1127784748132173841262494159109432119424562456
BALANCE ( Deleting the Cancelled Appl.)01649480781178115683106569137996073387539471051610516
No of SC AG released During 2011-12 up to JULY,11031623165914624584220113563817701354S
(8)Mukhymantri sabke liye Vidyut Yojana00
Total Nos. of Groups Applied (UP TO JULY,11)0542423238133754075021294027679510556135281646816468
Total DN Issued to Groups (UPTO JULY,11)039352173185925052377784126095105369182996139613
Total DN Deposited (UPTO JULY 11)03080163227301631164579010408399300152273127312
Groups Electrified Upto 31.3.20110298216322516145514552839098399300139166746674
Groups Electrified in 2011-12 (UPTO JULY, 11)039001719103019500095396396
TOTAL GROUP ELECTRIFIED03021163226871546145558410048399300148670707070
No. of Cluster Sanctioned/Domestic Applications Covered020829031260366389193622466832832
01599436034805028743112152288176372866026602
No. of Cluster Connections Released/Domestic Connections Released03514312523020000000200200
028611010570189011650000011651165
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)05900428719207122000122329
TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)0206771655241580796901110391806341780863175697404892048920
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)7
COST OF SANCTIONED SCHEMES (RS. IN CRORE)359.29
EXPENDITURE INCURRED (RS. IN CRORE)311.74
*DISCOM PROFILE
Zone wise
JODHPUR DISCOM PROFILE
S.No.DISTRICT COVEREDJODHPUR ZONEBIKANER ZONEJODHPUR DISCOM
(1)AREA (SQ. km)117801647061.82 Lacs182507
POPULATION AS PER CENSUS 20011186801882255872.01 Cr.20093605
POPULATION DENSITY(PER SQ. KM)100.75127.12227.87110.0977222791
TEHSIL COVERED39317070
NO OF PANCHAYAT SAMITI44287272
NO OF GRAM PANCHAYATS1604107126752675
URBAN TOWNS25315656
NO OF VILLAGES (As per census 2001)575867741253212532
VILLAGE ELECTRIFIED UP TO 31.03.2011 (Including 206 Nos. UIV)521164571166811668
VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000
% ELECTRIFICATION90.5095.3293.1193.1056495372
(2)POWER NETWORK
NO OF 400KV GSS3255
NO OF 220KV GSS1792626
NO OF 132KV GSS6847115115
NO OF 33KV GSS (as on JULY. 2011)88651013961396
LENGTH OF 33KV LINE (KM) (as on JULY., 11)1166167261838718387
LENGTH OF 11KV LINE (KM) (as on JUNE 11)7395743367117324117324
NO. OF 11/04.KV S/S (as on JUNE, 11)14634068046214386214386
LENGTH OF LT LINE (KM) (as on JULY., 11)47096179446504065040
NOS. SINGLE PHASE TRANSFORMERS ( JUNE,11)20941130423398333983
A B CABLE IN KMS ( Upto JUNE, 11)20475140623453734537
% T & D LOSSES FOR 11-12 (UPTO JULY,11)18.4821.8719.8220.89
(3)Business Dimensions
Revenue Sub-Divisions7451125125
Total Active Consumers AS ON 30.06.20111393836102983224236682423668
(a) Domestic108053286679319473251947325
(b) Agriculture (Flat)3545465724202642026
(c ) Agriculture (Metered)1270745033817741217741281475
(D) Total Agriculture16252856910219438219438
(e) PHED5707402197289728
Annual Revenue (2010-11) (Rs. In Crores)1960.931143.183104.113104.1101
Monthly Average Revenue (Rs. In Crores)163.4195.27258.68258.6758416667
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered232610813407340722019
218210683250325035278
Villages getting 24 HRs. Supply489159571084810848
14413157157
Total 3 Phase Trans. To be installed as on 31.03.1062540237918633186331
Total 3 Phase Trans. installed up to JULY.116129423759850538505325275
BALANCE 3 Phase Trans. To be installed12463212781278012842
(5)RGGVY15847
Scheme costRGGVY31774.1111167.0642941.1742941.178372
AREP603.53904.541508.071508.07119633
No. of Unelectrifies/ Deelectrified villages coveredRGGVY9985271525152529931
AREP60157217217
No of villages electrifiedRGGVY53147010011001
AREP55157212212
(6)BPL Connections covered in Scheme (RGGVY)208974169695378669378669
Nos.of BPL connections released (upto JULY.11)119183139053258236258236
(7)AGRICULTURE
Agriculture Connections IN 2010-11DN ISSUED4171329674677471
DN DEPOSITED (Including Dep. As on 31.03.10)1468779672265422657
CONN. RELEASED1290073082020820210
BALANCE ( Deleting the Cancelled Appl.)157656521412142
Agriculture Connections IN 2011-12DN ISSUED JULY,111403192662329723298
DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,11796151411310213103
CONN. RELEASED UP TO JYLY,111262119424562458
BALANCE ( Deleting the Cancelled Appl.)656939471051610516
No of SC AG released During 2011-12 up to JULY,1158477013541354
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied (UP TO JULY,11)1294035281646816468
Total DN Issued to Groups (UPTO JULY,11)7784182996139613
Total DN Deposited (UPTO JULY 11)5790152273127312
Groups Electrified Upto 31.3.20115283139166746674
Groups Electrified in 2011-12 (UPTO JULY, 11)30195396396
TOTAL GROUP ELECTRIFIED5584148670707070
No. of Cluster Sanctioned/Domestic Applications Covered366466832832
2874372866026602
No. of Cluster Connections Released/Domestic Connections Released2000200200
1165011651165
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)207122329329
TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)3918097404892048920
(9)APDRP DETAILS000
TOTAL SCHEMES (NOS.)0077
COST OF SANCTIONED SCHEMES (RS. IN CRORE)00359.29359.29
EXPENDITURE INCURRED (RS. IN CRORE)00311.74311.74
barmer cir
BARMER CIRCLE PROFILE
S.NO.DISTRICT COVEREDBARMERJAISALMER
(1)AREA (SQ. km)2838738401
POPULATION AS PER CENSUS 20011964835508247
POPULATION DENSITY(PER SQ. KM)6913
TEHSIL COVERED83
NO OF PANCHAYAT SAMITI83
NO OF GRAM PANCHAYATS402128
URBAN TOWNS22
NO OF VILLAGES (As per census 2001)1941637
VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)1281562
VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)1950
% ELECTRIFICATION76.04%88.23%
(2)POWER NETWORK
NO OF 400KV GSS10
NO OF 220KV GSS31
NO OF 132KV GSS113
NO OF 33KV GSS (as on DEC. 2010)15544
LENGTH OF 33KV LINE (KM) (as on DEC., 10)26341653
LENGTH OF 11KV LINE (KM) (as on DEC,10)156326875
NO. OF 11/04.KV S/S (as on DEC.,10)265375604
LENGTH OF LT LINE (KM) (DEC,. 10)61511088
NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)2939305
A B CABLE IN KMS ( Upto DEC., 10)4317520
% T & D LOSSES FOR 10-11 UPTO NOV.,1013.28
(3)Business Dimensions
Revenue Sub-Divisions14
Total Active Consumers AS ON SEPTEMBER 1016099548107
(a) Domestic11589838021
(b) Agriculture (Flat)2875329
(c ) Agriculture (Metered)230133358
(D) Total Agriculture256103687
(e) PHED1349351
Annual Revenue (2009-10) (Rs. In Crores)286.42
Monthly Average Revenue (Rs. In Crores)23.87
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered478127
377127
Villages getting 24 HRs. Supply1264502
1010
Total 3 Phase Trans. To be installed as on 31.03.10145631785
Total 3 Phase Trans. installed up to DEC.10126191785
BALANCE 3 Phase Trans. To be installed19440
(5)RGGVY
Scheme costRGGVY20995.861338.78
AREP603.53
No. of Unelectrifies/ Deelectrified villages coveredRGGVY66898
AREP60
No of villages electrifiedRGGVY20798
AREP55
(6)BPL Connections covered in Scheme (RGGVY)6012410368
Nos.of BPL connections released (upto JAN.11)72056770
(7)AGRICULTURE
Agriculture Connections IN 2009-10DN ISSUED45062174
DN DEPOSITED (Including Dep. As on 31.03.09)47241497
CONN. RELEASED3198757
BALANCE ( Deleting the Cancelled Appl.)1514740
Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.20101268659
TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )27821399
25831261
BALANCE ( Deleting the Cancelled Appl.)188138
No of SC AG released During 2010-11 up to JAN.11446141
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied5407502
Total DN Issued to Groups1776214
Total DN Deposited1588154
Groups Electrified Upto 31.3.1047345
Groups Electrified in 2010-11 (UPTO DEC. 10)2106
TOTAL GROUP ELECTRIFIED68351
No. of Cluster Sanctioned/Domestic Applications Covered1260
8050
No. of Cluster Connections Released/Domestic Connections Released230
1890
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)905103
TOTAL DL CONNECTIONS RELEASED4529332
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)
COST OF SANCTIONED SCHEMES (RS. IN CRORE)
EXPENDITURE INCURRED (RS. IN CRORE)
JALORE
JALORE CIRCLE
S.NO.DISTRICT COVEREDJALORE
(1)AREA (SQ. km)10640
POPULATION AS PER CENSUS 20011448940
POPULATION DENSITY(PER SQ. KM)136
TEHSIL COVERED7
NO OF PANCHAYAT SAMITI8
NO OF GRAM PANCHAYATS268
URBAN TOWNS3
NO OF VILLAGES (As per census 2001)706
VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)706
VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)0
% ELECTRIFICATION100.00%
(2)POWER NETWORK
NO OF 400KV GSS0
NO OF 220KV GSS2
NO OF 132KV GSS14
NO OF 33KV GSS (as on DEC. 2010)157
LENGTH OF 33KV LINE (KM) (as on DEC., 10)1623
LENGTH OF 11KV LINE (KM) (as on DEC,10)14947
NO. OF 11/04.KV S/S (as on DEC.,10)38998
LENGTH OF LT LINE (KM) (DEC,. 10)10047
NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)4282
A B CABLE IN KMS ( Upto DEC., 10)3388
% T & D LOSSES FOR 10-11 UPTO NOV.,101.82
(3)Business Dimensions
Revenue Sub-Divisions12
Total Active Consumers AS ON SEPTEMBER 10196237
(a) Domestic135919
(b) Agriculture (Flat)18376
(c ) Agriculture (Metered)27063
(D) Total Agriculture45439
(e) PHED800
Annual Revenue (2009-10) (Rs. In Crores)203.84
Monthly Average Revenue (Rs. In Crores)16.99
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered480
463
Villages getting 24 HRs. Supply697
17
Total 3 Phase Trans. To be installed as on 31.03.1019078
Total 3 Phase Trans. installed up to DEC.1018841
BALANCE 3 Phase Trans. To be installed237
(5)RGGVY
Scheme costRGGVY2367.41
AREP
No. of Unelectrifies/ Deelectrified villages coveredRGGVY30
AREP
No of villages electrifiedRGGVY30
AREP
(6)BPL Connections covered in Scheme (RGGVY)54217
Nos.of BPL connections released (upto JAN.11)33719
(7)AGRICULTURE
Agriculture Connections IN 2009-10DN ISSUED4498
DN DEPOSITED (Including Dep. As on 31.03.09)4443
CONN. RELEASED2816
BALANCE ( Deleting the Cancelled Appl.)1515
Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.2010866
TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )2381
2135
BALANCE ( Deleting the Cancelled Appl.)203
No of SC AG released During 2010-11 up to JAN.11252
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied1337
Total DN Issued to Groups543
Total DN Deposited543
Groups Electrified Upto 31.3.10396
Groups Electrified in 2010-11 (UPTO DEC. 10)1
TOTAL GROUP ELECTRIFIED397
No. of Cluster Sanctioned/Domestic Applications Covered3
34
No. of Cluster Connections Released/Domestic Connections Released125
570
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)146
TOTAL DL CONNECTIONS RELEASED3729
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)
COST OF SANCTIONED SCHEMES (RS. IN CRORE)
EXPENDITURE INCURRED (RS. IN CRORE)
DISTT. WISE
JODHPUR DISCOM PROFILE
S.NO.DISTRICT COVEREDJODHPUR CITYJODHPUR DCPALISIROHIJALOREBARMERJAISALMERTOTAL JODHPUR ZONEBIKANERHNGH.SGGNR.Churu +PS LadnuBIKANER ZONEJODHPUR DISCOM
(1)AREA (SQ. km)228501238751361064028387384011178013028980551257813784647061.82 Lacs182507
POPULATION AS PER CENSUS 20113685688203853310371851830151260445367200811868018236774517796501969520210867282255872.01 Cr.20093605
POPULATION DENSITY(PER SQ. KM)161165202172921710178221157153127228110
TEHSIL COVERED795783398797317070
NO OF PANCHAYAT SAMITI1010588344678728727223761
NO OF GRAM PANCHAYATS339318149268402128160421925132028110712675267534645
URBAN TOWNS13953222546101131565613022
NO OF VILLAGES (As per census 2001)0106394946270619416375758875190530149806774125321253238763
VILLAGE ELECTRIFIED UP TO 31.03.20110106294346270614765625211779180329279486457116681166818005
VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000000000000009165
% ELECTRIFICATION----99.9199.37100.00100.0076.0488.2390.5089.0394.6597.1196.7395.3293.1193.11%137361
(2)SYSTEM NETWORK036171
NO OF 400KV GSS1000113100125535101
NO OF 220KV GSS6223311732229262644773
NO OF 132KV GSS2210216144681889124711511543042
NO OF 33KV GSS43296107501701685288619289107122510139613963067
LENGTH OF 33KV LINE (KM)301307914236501748273917211166128519461365156467261838718387162154
LENGTH OF 11KV LINE (KM)7582046886484618152031688373797395718082709779031028543367117324117324299515
NO. OF 11/04.KV S/S2948428841538612215394272720262781463402557816695110621471168046214386214386
LENGTH OF LT LINE (KM)170113317975948621021261631082470963766517830085992179446504065040
NOs. SINGLE PHASE TRANSFORMERS075962988152244993917419209411491338248653304130423398333983
A B CABLE IN KMS19870082474136037774964694204752051175038536408140623453734537
% T & D LOSSES FOR 11-12 (UPTO JULY,11)19.1021.5418.3613.7516.3018.4823.3419.3616.8423.7321.8719.82
(3)Business Dimensions
Revenue Sub-Divisions1015231214741610131251125125
Total Active Consumers AS ON 30.06.20111938362535125162752075182226951393836251169247902261818268943102983224236682423668
(a) Domestic154418194920423013144940163241108053220158721016922363223140586679319473251947325
(b) Agriculture (Flat)011285328618159272435454346700310565724202642026
(c ) Agriculture (Metered)326261534129429142301591270741585716539842195215033817741217741281475
(D) Total Agriculture32637438445804730132883162528193241653984211262656910219438219438
(e) PHED194171512938001705570712964136011711402197289728
Annual Revenue (2010-11) (Rs. In Crores)456.35420.64527.10227.63329.211960.93427.08197.91293.03225.161143.183104.113104.1101
Monthly Average Revenue (Rs. In Crores)38.0335.0543.9218.9727.43163.4135.5916.4924.4218.7695.27258.68258.68
(4)FEEDER RENOVATION PROGRAM0
Total Rural Feeders Covered0777335129480478127232636822921427010813407340722019
0687335129480424127218236822921425710683250325035278
Villages getting 24 HRs. Supply0105891545569712645024891759162926239465957108481084825275
0900005401440001313157157012842
Total 3 Phase Trans. To be installed as on 31.03.10204381169550719078145631785625406064339750059325237918633186331
Total 3 Phase Trans. installed up to JULY.111967511695507190781408017856129460643397500592932375985053
BALANCE 3 Phase Trans. To be installed7630004830124600032321278
(5)RGGVY015847
Scheme costRGGVY--------2853.852981.291236.922367.4120995.861338.7831774.112333.903256.163498.462078.5411167.0642941.1742941.1744449.248372
AREP603.53603.53222.85681.69904.541508.071508.07119633
No. of Unelectrifies/ Deelectrified villages coveredRGGVY--------1732183066898998205132179115271525152529931
AREP60604611115721721725768
No of villages electrifiedRGGVY--------173158302079853118013215264701001100140580
AREP55554611115721221239689
(6)BPL Connections covered in Scheme (RGGVY)--------303652933424566542176012410368208974414813983534077543021696953786693786693057
Nos.of BPL connections released (upto JULY.11)--------21198366588246365899363712911918330744314333894037936139053258236258236139025
(7)AGRICULTURE
Agriculture Connections IN 2010-11DN ISSUED4172225264155872827041711193713703687329674677467
DN DEPOSITED (Including Dep. As on 31.03.10)35150104216522493290814421468737151707962158379672265422654
CONN. RELEASED2442795813832219262612871290033591501936151273082020820208
BALANCE ( Deleting the Cancelled Appl.)164863254229227155157629220516756521412141
Agriculture Connections IN 2011-12DN ISSUED JULY,111609296789229482365767140313819179110062650926623297
DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,111244453283220061753394796118731119842130751411310213102
CONN. RELEASED UP TO JYLY,1127784748132173841262494159109432119424562456
BALANCE ( Deleting the Cancelled Appl.)01649480781178115683106569137996073387539471051610516
No of SC AG released During 2011-12 up to JULY,11031623165914624584220113563817701354S
(8)Mukhymantri sabke liye Vidyut Yojana00
Total Nos. of Groups Applied (UP TO JULY,11)0542423238133754075021294027679510556135281646816468
Total DN Issued to Groups (UPTO JULY,11)039352173185925052377784126095105369182996139613
Total DN Deposited (UPTO JULY 11)03080163227301631164579010408399300152273127312
Groups Electrified Upto 31.3.20110298216322516145514552839098399300139166746674
Groups Electrified in 2011-12 (UPTO JULY, 11)039001719103019500095396396
TOTAL GROUP ELECTRIFIED03021163226871546145558410048399300148670707070
No. of Cluster Sanctioned/Domestic Applications Covered020829031260366389193622466832832
01599436034805028743112152288176372866026602
No. of Cluster Connections Released/Domestic Connections Released03514312523020000000200200
028611010570189011650000011651165
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)05900428719207122000122329
TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)0206771655241580796901110391806341780863175697404892048920
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)7
COST OF SANCTIONED SCHEMES (RS. IN CRORE)359.29
EXPENDITURE INCURRED (RS. IN CRORE)311.74
Zone wise
JODHPUR DISCOM PROFILE
S.No.DISTRICT COVEREDJODHPUR ZONEBIKANER ZONEJODHPUR DISCOM
(1)AREA (SQ. km)117801647061.82 Lacs182507
POPULATION AS PER CENSUS 20011186801882255872.01 Cr.20093605
POPULATION DENSITY(PER SQ. KM)100.75127.12227.87110.0977222791
TEHSIL COVERED39317070
NO OF PANCHAYAT SAMITI44287272
NO OF GRAM PANCHAYATS1604107126752675
URBAN TOWNS25315656
NO OF VILLAGES (As per census 2001)575867741253212532
VILLAGE ELECTRIFIED UP TO 31.03.2011 (Including 206 Nos. UIV)521164571166811668
VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000
% ELECTRIFICATION90.5095.3293.1193.1056495372
(2)POWER NETWORK
NO OF 400KV GSS3255
NO OF 220KV GSS1792626
NO OF 132KV GSS6847115115
NO OF 33KV GSS (as on JULY. 2011)88651013961396
LENGTH OF 33KV LINE (KM) (as on JULY., 11)1166167261838718387
LENGTH OF 11KV LINE (KM) (as on JUNE 11)7395743367117324117324
NO. OF 11/04.KV S/S (as on JUNE, 11)14634068046214386214386
LENGTH OF LT LINE (KM) (as on JULY., 11)47096179446504065040
NOS. SINGLE PHASE TRANSFORMERS ( JUNE,11)20941130423398333983
A B CABLE IN KMS ( Upto JUNE, 11)20475140623453734537
% T & D LOSSES FOR 11-12 (UPTO JULY,11)18.4821.8719.8220.89
(3)Business Dimensions
Revenue Sub-Divisions7451125125
Total Active Consumers AS ON 30.06.20111393836102983224236682423668
(a) Domestic108053286679319473251947325
(b) Agriculture (Flat)3545465724202642026
(c ) Agriculture (Metered)1270745033817741217741281475
(D) Total Agriculture16252856910219438219438
(e) PHED5707402197289728
Annual Revenue (2010-11) (Rs. In Crores)1960.931143.183104.113104.1101
Monthly Average Revenue (Rs. In Crores)163.4195.27258.68258.6758416667
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered232610813407340722019
218210683250325035278
Villages getting 24 HRs. Supply489159571084810848
14413157157
Total 3 Phase Trans. To be installed as on 31.03.1062540237918633186331
Total 3 Phase Trans. installed up to JULY.116129423759850538505325275
BALANCE 3 Phase Trans. To be installed12463212781278012842
(5)RGGVY15847
Scheme costRGGVY31774.1111167.0642941.1742941.178372
AREP603.53904.541508.071508.07119633
No. of Unelectrifies/ Deelectrified villages coveredRGGVY9985271525152529931
AREP60157217217
No of villages electrifiedRGGVY53147010011001
AREP55157212212
(6)BPL Connections covered in Scheme (RGGVY)208974169695378669378669
Nos.of BPL connections released (upto JULY.11)119183139053258236258236
(7)AGRICULTURE
Agriculture Connections IN 2010-11DN ISSUED4171329674677471
DN DEPOSITED (Including Dep. As on 31.03.10)1468779672265422657
CONN. RELEASED1290073082020820210
BALANCE ( Deleting the Cancelled Appl.)157656521412142
Agriculture Connections IN 2011-12DN ISSUED JULY,111403192662329723298
DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,11796151411310213103
CONN. RELEASED UP TO JYLY,111262119424562458
BALANCE ( Deleting the Cancelled Appl.)656939471051610516
No of SC AG released During 2011-12 up to JULY,1158477013541354
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied (UP TO JULY,11)1294035281646816468
Total DN Issued to Groups (UPTO JULY,11)7784182996139613
Total DN Deposited (UPTO JULY 11)5790152273127312
Groups Electrified Upto 31.3.20115283139166746674
Groups Electrified in 2011-12 (UPTO JULY, 11)30195396396
TOTAL GROUP ELECTRIFIED5584148670707070
No. of Cluster Sanctioned/Domestic Applications Covered366466832832
2874372866026602
No. of Cluster Connections Released/Domestic Connections Released2000200200
1165011651165
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)207122329329
TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)3918097404892048920
(9)APDRP DETAILS000
TOTAL SCHEMES (NOS.)0077
COST OF SANCTIONED SCHEMES (RS. IN CRORE)00359.29359.29
EXPENDITURE INCURRED (RS. IN CRORE)00311.74311.74
barmer cir
BARMER CIRCLE PROFILE
S.NO.DISTRICT COVEREDBARMERJAISALMER
(1)AREA (SQ. km)2838738401
POPULATION AS PER CENSUS 20011964835508247
POPULATION DENSITY(PER SQ. KM)6913
TEHSIL COVERED83
NO OF PANCHAYAT SAMITI83
NO OF GRAM PANCHAYATS402128
URBAN TOWNS22
NO OF VILLAGES (As per census 2001)1941637
VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)1281562
VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)1950
% ELECTRIFICATION76.04%88.23%
(2)POWER NETWORK
NO OF 400KV GSS10
NO OF 220KV GSS31
NO OF 132KV GSS113
NO OF 33KV GSS (as on DEC. 2010)15544
LENGTH OF 33KV LINE (KM) (as on DEC., 10)26341653
LENGTH OF 11KV LINE (KM) (as on DEC,10)156326875
NO. OF 11/04.KV S/S (as on DEC.,10)265375604
LENGTH OF LT LINE (KM) (DEC,. 10)61511088
NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)2939305
A B CABLE IN KMS ( Upto DEC., 10)4317520
% T & D LOSSES FOR 10-11 UPTO NOV.,1013.28
(3)Business Dimensions
Revenue Sub-Divisions14
Total Active Consumers AS ON SEPTEMBER 1016099548107
(a) Domestic11589838021
(b) Agriculture (Flat)2875329
(c ) Agriculture (Metered)230133358
(D) Total Agriculture256103687
(e) PHED1349351
Annual Revenue (2009-10) (Rs. In Crores)286.42
Monthly Average Revenue (Rs. In Crores)23.87
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered478127
377127
Villages getting 24 HRs. Supply1264502
1010
Total 3 Phase Trans. To be installed as on 31.03.10145631785
Total 3 Phase Trans. installed up to DEC.10126191785
BALANCE 3 Phase Trans. To be installed19440
(5)RGGVY
Scheme costRGGVY20995.861338.78
AREP603.53
No. of Unelectrifies/ Deelectrified villages coveredRGGVY66898
AREP60
No of villages electrifiedRGGVY20798
AREP55
(6)BPL Connections covered in Scheme (RGGVY)6012410368
Nos.of BPL connections released (upto JAN.11)72056770
(7)AGRICULTURE
Agriculture Connections IN 2009-10DN ISSUED45062174
DN DEPOSITED (Including Dep. As on 31.03.09)47241497
CONN. RELEASED3198757
BALANCE ( Deleting the Cancelled Appl.)1514740
Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.20101268659
TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )27821399
25831261
BALANCE ( Deleting the Cancelled Appl.)188138
No of SC AG released During 2010-11 up to JAN.11446141
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied5407502
Total DN Issued to Groups1776214
Total DN Deposited1588154
Groups Electrified Upto 31.3.1047345
Groups Electrified in 2010-11 (UPTO DEC. 10)2106
TOTAL GROUP ELECTRIFIED68351
No. of Cluster Sanctioned/Domestic Applications Covered1260
8050
No. of Cluster Connections Released/Domestic Connections Released230
1890
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)905103
TOTAL DL CONNECTIONS RELEASED4529332
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)
COST OF SANCTIONED SCHEMES (RS. IN CRORE)
EXPENDITURE INCURRED (RS. IN CRORE)
JALORE
JALORE CIRCLE
S.NO.DISTRICT COVEREDJALORE
(1)AREA (SQ. km)10640
POPULATION AS PER CENSUS 20011448940
POPULATION DENSITY(PER SQ. KM)136
TEHSIL COVERED7
NO OF PANCHAYAT SAMITI8
NO OF GRAM PANCHAYATS268
URBAN TOWNS3
NO OF VILLAGES (As per census 2001)706
VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)706
VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)0
% ELECTRIFICATION100.00%
(2)POWER NETWORK
NO OF 400KV GSS0
NO OF 220KV GSS2
NO OF 132KV GSS14
NO OF 33KV GSS (as on DEC. 2010)157
LENGTH OF 33KV LINE (KM) (as on DEC., 10)1623
LENGTH OF 11KV LINE (KM) (as on DEC,10)14947
NO. OF 11/04.KV S/S (as on DEC.,10)38998
LENGTH OF LT LINE (KM) (DEC,. 10)10047
NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)4282
A B CABLE IN KMS ( Upto DEC., 10)3388
% T & D LOSSES FOR 10-11 UPTO NOV.,101.82
(3)Business Dimensions
Revenue Sub-Divisions12
Total Active Consumers AS ON SEPTEMBER 10196237
(a) Domestic135919
(b) Agriculture (Flat)18376
(c ) Agriculture (Metered)27063
(D) Total Agriculture45439
(e) PHED800
Annual Revenue (2009-10) (Rs. In Crores)203.84
Monthly Average Revenue (Rs. In Crores)16.99
(4)FEEDER RENOVATION PROGRAM
Total Rural Feeders Covered480
463
Villages getting 24 HRs. Supply697
17
Total 3 Phase Trans. To be installed as on 31.03.1019078
Total 3 Phase Trans. installed up to DEC.1018841
BALANCE 3 Phase Trans. To be installed237
(5)RGGVY
Scheme costRGGVY2367.41
AREP
No. of Unelectrifies/ Deelectrified villages coveredRGGVY30
AREP
No of villages electrifiedRGGVY30
AREP
(6)BPL Connections covered in Scheme (RGGVY)54217
Nos.of BPL connections released (upto JAN.11)33719
(7)AGRICULTURE
Agriculture Connections IN 2009-10DN ISSUED4498
DN DEPOSITED (Including Dep. As on 31.03.09)4443
CONN. RELEASED2816
BALANCE ( Deleting the Cancelled Appl.)1515
Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.2010866
TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )2381
2135
BALANCE ( Deleting the Cancelled Appl.)203
No of SC AG released During 2010-11 up to JAN.11252
(8)Mukhymantri sabke liye Vidyut Yojana
Total Nos. of Groups Applied1337
Total DN Issued to Groups543
Total DN Deposited543
Groups Electrified Upto 31.3.10396
Groups Electrified in 2010-11 (UPTO DEC. 10)1
TOTAL GROUP ELECTRIFIED397
No. of Cluster Sanctioned/Domestic Applications Covered3
34
No. of Cluster Connections Released/Domestic Connections Released125
570
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)146
TOTAL DL CONNECTIONS RELEASED3729
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)
COST OF SANCTIONED SCHEMES (RS. IN CRORE)
EXPENDITURE INCURRED (RS. IN CRORE)
DISTT. WISE
JODHPUR DISCOM PROFILE
S.NO.DISTRICT COVEREDJODHPUR CITYJODHPUR DCPALISIROHIJALOREBARMERJAISALMERTOTAL JODHPUR ZONEBIKANERHNGH.SGGNR.Churu +PS LadnuBIKANER ZONEJODHPUR DISCOM
(1)AREA (SQ. km)228501238751361064028387384011178013028980551257813784647061.82 Lacs182507
POPULATION AS PER CENSUS 20113685688203853310371851830151260445367200811868018236774517796501969520210867282255872.01 Cr.20093605
POPULATION DENSITY(PER SQ. KM)161165202172921710178221157153127228110
TEHSIL COVERED795783398797317070
NO OF PANCHAYAT SAMITI1010588344678728727223761
NO OF GRAM PANCHAYATS339318149268402128160421925132028110712675267534645
URBAN TOWNS13953222546101131565613022
NO OF VILLAGES (As per census 2001)0106394946270619416375758875190530149806774125321253238763
VILLAGE ELECTRIFIED UP TO 31.03.20110106294346270614765625211779180329279486457116681166818005
VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000000000000009165
% ELECTRIFICATION----99.9199.37100.00100.0076.0488.2390.5089.0394.6597.1196.7395.3293.1193.11%137361
(2)SYSTEM NETWORK036171
NO OF 400KV GSS1000113100125535101
NO OF 220KV GSS6223311732229262644773
NO OF 132KV GSS2210216144681889124711511543042
NO OF 33KV GSS43296107501701685288619289107122510139613963067
LENGTH OF 33KV LINE (KM)301307914236501748273917211166128519461365156467261838718387162154
LENGTH OF 11KV LINE (KM)7582046886484618152031688373797395718082709779031028543367117324117324299515
NO. OF 11/04.KV S/S2948428841538612215394272720262781463402557816695110621471168046214386214386
LENGTH OF LT LINE (KM)170113317975948621021261631082470963766517830085992179446504065040
NOs. SINGLE PHASE TRANSFORMERS075962988152244993917419209411491338248653304130423398333983
A B CABLE IN KMS19870082474136037774964694204752051175038536408140623453734537
% T & D LOSSES FOR 11-12 (UPTO JULY,11)19.1021.5418.3613.7516.3018.4823.3419.3616.8423.7321.8719.82
(3)Business Dimensions
Revenue Sub-Divisions1015231214741610131251125125
Total Active Consumers AS ON 30.06.20111938362535125162752075182226951393836251169247902261818268943102983224236682423668
(a) Domestic154418194920423013144940163241108053220158721016922363223140586679319473251947325
(b) Agriculture (Flat)011285328618159272435454346700310565724202642026
(c ) Agriculture (Metered)326261534129429142301591270741585716539842195215033817741217741281475
(D) Total Agriculture32637438445804730132883162528193241653984211262656910219438219438
(e) PHED194171512938001705570712964136011711402197289728
Annual Revenue (2010-11) (Rs. In Crores)456.35420.64527.10227.63329.211960.93427.08197.91293.03225.161143.183104.113104.1101
Monthly Average Revenue (Rs. In Crores)38.0335.0543.9218.9727.43163.4135.5916.4924.4218.7695.27258.68258.68
(4)FEEDER RENOVATION PROGRAM0
Total Rural Feeders Covered0777335129480478127232636822921427010813407340722019
0687335129480424127218236822921425710683250325035278
Villages getting 24 HRs. Supply0105891545569712645024891759162926239465957108481084825275
0900005401440001313157157012842
Total 3 Phase Trans. To be installed as on 31.03.10204381169550719078145631785625406064339750059325237918633186331
Total 3 Phase Trans. installed up to JULY.111967511695507190781408017856129460643397500592932375985053
BALANCE 3 Phase Trans. To be installed7630004830124600032321278
(5)RGGVY015847
Scheme costRGGVY--------2853.852981.291236.922367.4120995.861338.7831774.112333.903256.163498.462078.5411167.0642941.1742941.1744449.248372
AREP603.53603.53222.85681.69904.541508.071508.07119633
No. of Unelectrifies/ Deelectrified villages coveredRGGVY--------1732183066898998205132179115271525152529931
AREP60604611115721721725768
No of villages electrifiedRGGVY--------173158302079853118013215264701001100140580
AREP55554611115721221239689
(6)BPL Connections covered in Scheme (RGGVY)--------303652933424566542176012410368208974414813983534077543021696953786693786693057
Nos.of BPL connections released (upto JULY.11)--------21198366588246365899363712911918330744314333894037936139053258236258236139025
(7)AGRICULTURE
Agriculture Connections IN 2010-11DN ISSUED4172225264155872827041711193713703687329674677467
DN DEPOSITED (Including Dep. As on 31.03.10)35150104216522493290814421468737151707962158379672265422654
CONN. RELEASED2442795813832219262612871290033591501936151273082020820208
BALANCE ( Deleting the Cancelled Appl.)164863254229227155157629220516756521412141
Agriculture Connections IN 2011-12DN ISSUED JULY,111609296789229482365767140313819179110062650926623297
DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,111244453283220061753394796118731119842130751411310213102
CONN. RELEASED UP TO JYLY,1127784748132173841262494159109432119424562456
BALANCE ( Deleting the Cancelled Appl.)01649480781178115683106569137996073387539471051610516
No of SC AG released During 2011-12 up to JULY,11031623165914624584220113563817701354S
(8)Mukhymantri sabke liye Vidyut Yojana00
Total Nos. of Groups Applied (UP TO JULY,11)0542423238133754075021294027679510556135281646816468
Total DN Issued to Groups (UPTO JULY,11)039352173185925052377784126095105369182996139613
Total DN Deposited (UPTO JULY 11)03080163227301631164579010408399300152273127312
Groups Electrified Upto 31.3.20110298216322516145514552839098399300139166746674
Groups Electrified in 2011-12 (UPTO JULY, 11)039001719103019500095396396
TOTAL GROUP ELECTRIFIED03021163226871546145558410048399300148670707070
No. of Cluster Sanctioned/Domestic Applications Covered020829031260366389193622466832832
01599436034805028743112152288176372866026602
No. of Cluster Connections Released/Domestic Connections Released03514312523020000000200200
028611010570189011650000011651165
BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)05900428719207122000122329
TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)0206771655241580796901110391806341780863175697404892048920
(9)APDRP DETAILS
TOTAL SCHEMES (NOS.)7
COST OF SANCTIONED SCHEMES (RS. IN CRORE)359.29
EXPENDITURE INCURRED (RS. IN CRORE)311.74
Background performance of JODHPUR DISCOM*
INDEX
Senior / Circle Officers Meeting Formats & details of Presenting Officer
Format No.ParticularsTo be presented by ZCEs in IDCF MeetingsTo be presented by the officer in Sr. Officer`s MeetingsTo be presented by the officers in circle Meetings
GOR-10Performance at a glanceZCEs
SOM-1Background performance of Circle -year wiseSE(O&M)AEN (O&M)
SOM-2Electrification of Villages & Dhanies FY 08-09ZCEsSE(O&M)AEN (O&M)
SOM-3Status of release of DL connections in Rural areas during FY 08-09ZCEsSE(O&M)AEN (O&M)
SOM-4Status of release of BPL connections during 2008-09ZCEsSE(O&M)AEN (O&M)
SOM-5Status of AG. DN deposited & connections Released during FY 08-09ZCEsSE(O&M)AEN (O&M)
SOM-6Progress of feeder RenovationZCEsSE(O&M)AEN (O&M)
SOM-7Villages getting 24 Hrs supply / withdrawn and restoration of supplyZCEsSE(O&M)AEN (O&M)
SOM-8Action Taken report on Feeder Manager's Reports FY 08-09SE(O&M)AEN (O&M)
SOM-9Zonal Feeder Vigilance Officers checkings & action taken on ZFVO reports during FY 08-09ZCEsZonal CesZonal Vigilance Officer
SOM-10Energy audit reports of Rural feeders, Urban & Industrial areasZCEsSE(O&M)AEN (O&M)
SOM-11Sub-division wise T&D Loss and ATC other than HT consumersZCEsSE(O&M)AEN (O&M)
SOM-11AAction Taken report of selected Sub-division for performance improvementSE(O&M)AEN (O&M)
SOM-12Urban Focus Programme : District H.Q. Muncipal Town wise T & D Losses other than HT FY 08-09ZCEsSE (O&M)AEN (O&M)
SOM-13Urban Focus Programme : Villages having More than 5000 population & T & D Losses Other than HT consumers FY 08-09SE(O&M)AEN (O&M)
SOM-14Sub division Wise Revenue analysis FY 2008-09SE(O&M)AEN (O&M)
SOM-15Monitoring of the Reduction of O/S >10000, >20000, >50000, >1Lac on regular consumersSE(O&M)AEN (O&M)
SOM-16Analysis of rate of burning of distribution transformers in rural area FY 08-09ZCEsSE(O&M)AEN (O&M)
SOM-17Analysis of Power Transformers Failure & ATR by M&P wing for FY 08-09ZCEsSE(M&P)XEN(M&P)
SOM-18Progress of 11kV Feeder Metering as on reporting monthZCEsSE(M&P)XEN(M&P)
SOM-19Theft of 3 & 1 Phase transformers, Conductors, Oil and other materialZCEsASP vig.XEN (Vig.)
SOM-20PROGRESS OF VIGILANCE CHECKING up to Reporting Month FY 2008-09ZCEsASP vig.XEN (Vig.)
SOM-21Status of Consumers Grievances Redressal in ChhaupalsZCEsSE(O&M)AEN (O&M)
SOM-22Progress of Various Capital Works (10 point progress)SE(O&M)AEN (O&M)
SOM-23Installation of small DTs in Urban areas for Agriculture consumersSE(O&M)AEN (O&M)
SOM-24Renovation of 11 kV feeders having industrial load as urban focus programme (G-Type)SE(O&M)AEN (O&M)
SOM-25Status of defective meterZCEsSE(M&P)XEN(M&P)
GOR-7Compliance of Honble CM Visits & Budget AnnouncementsZCEs
Background- som 1 (2)
Jodhpur Vidyut Vitran Nigam Limited
Background performance of JODHPUR DISCOM
Reporting Month:-July,11
S.N.ActivityUnit2003-042004-052005-062006-072007-082008-092009-102010-112011-12 up to July 11
123456789101112
1Total ConsumersNos185164419196432017671211423122540802461433264422728040612847672
2RegularNos158511615844861659525173800618743042077773223809323859842423668
3PDCNos266528335157358146376225379776383660406134418077424004
Energy Available721958236090027904579936111026312650513423648440
4Energy SaleLac unit4263347385526546077772209805169586510720538840
5Growth in sale Vs last year%11.1411.1215.4318.8111.5019.0611.8312.02
Energy Available to HTLac unit78978395986912071122071246512389139654910
Energy Sale to HTLac unit78978395986912071122071246512389139654910
64298739658015878386871549779811411612027143530
347363899042785487066000268051834769324033930
6% T&D loss other than HT consumers%45.9847.2946.6237.8631.1530.4226.8522.4822.05
6A% T&D loss with HT consumers%40.9542.4741.5132.8127.3326.9824.2220.1419.82
6A% T&D loss with HT consumers%40.9542.4741.5132.8127.3326.9824.2220.1419.82
7Reduction in losses V/s last year%1.52-0.95-8.70-5.48-0.35-2.76-4.08
8AssessmentLac Rs137372154510186530207087228988248138277344310411113737
9Growth in assessment V/s last year%12.4820.7211.0210.588.3611.7711.92
10RealisationLac Rs13437714925717974420692722255024016926203731210499097
11% Realisation%97.8296.6096.3699.9297.1996.7994.48100.5587.13
12ATC%42.2344.4243.6432.8629.3729.3228.4019.7030.14
13Out standingLac Rs170082213329871298893563043510583205616570759
Note : - Where HT metered consumer not on dedicated feeder, energy supplied in respect to HT consumers deducted as Units billed of Consumers on H.T. metering plus 2 % of energy billed.
ATC= (100 - (100- % energy loss) X % realisation / 100 )
Signature of presenting officer, name, seal
Background- som 1
Jodhpur Vidyut Vitran Nigam Limited
Background performance of JODHPUR DISCOM
Reporting Month:-July,11
S.N.ActivityUnit2003-042004-052005-062006-072007-082008-092009-102010-112011-12 up to July 11
123456789101112
1Total ConsumersNos185164419196432017671211423122540802461433264422728040612847672
2RegularNos158511615844861659525173800618743042077773223809323859842423668
3PDCNos266528335157358146376225379776383660406134418077424004
4Energy AvailableLac unit721958236090027904579936111026312650513423648440
5Energy SaleLac unit4263347385526546077772209805169586510720538840
6Growth in sale Vs last year%11.1411.1215.4318.8111.5019.0611.8312.02
7% T&D loss other than HT consumers%45.9847.2946.6237.8631.1530.4226.8522.4822.05
7A% T&D loss with HT consumers%40.9542.4741.5132.8127.3326.9824.2220.1419.82
8Reduction in losses V/s last year%1.52-0.96-8.70-5.48-0.35-2.76-4.08-0.14
9AssessmentLac Rs137372154510186530207087228988248138277344310411113737
10Growth in assessment V/s last year%12.4820.7211.0210.588.3611.7711.928.99
11RealisationLac Rs13437714925717974420692722255024016926203731210499097
12% Realisation%97.8296.6096.3699.9297.1996.7994.48100.5587.13
13ATC%42.2444.4343.6432.8629.3729.3328.4019.7030.14
14Out standingLac Rs170082213329871298893563043510583205616570759
Note : - Where HT metered consumer not on dedicated feeder, energy supplied in respect to HT consumers deducted as Units billed of Consumers on H.T. metering plus 2 % of energy billed.
ATC= (100 - (100- % energy loss) X % realisation / 100 )
Signature of presenting officer, name, seal
RGGVY som-2 old
Jodhpur Vidyut Vitran Nigam Limited: JODHPUR
SOM-2
Electrification of Villages & Dhanies FY 08-09
Reporting MonthJUNE.08
Sr.noDistrict & CircleElectrification of DhaniesElectrification of Villages
IN MMSLVIN RGGVYIN RGGVY
No. of DhaniesSanctionedElectirfiedTargetsElectirfiedTargetsWork done
During the Monthup to the MonthDuring the Monthup to the MonthDuring the Monthup to the Month
1234567891011
1City Circle
2Distt. Circle25933501111000000
Jodhpur Distt.25933501111000000
3Jalore Distt./Circle4465233521614654000
Pali Distt.163000173002100
Sirohi Distt.05000000000
4Pali Circle1635000173002100
Barmer Distt599207611000000
Jsm. Distt.660006900000
5Barmer Circle6652076116900000
Jodhpur Zone3867659507440346542100
6Bikaner Distt./Circle17617610102400900
7Hngh.Distt./Circle5319110002500
8Sggnr.Distt./Circle3524390003500
Churu Distt.3454001400000
0000100000
9Churu circle3454001500000
Bikaner Zone609223142039006900
Total Discom4476882649444246549000
Zix RGGVY-2
_______ Vidyut Vitran Nigam Limited
SOM-2
Electrification of Villages & Dhanies FY 08-09
To be presented by SE (O&M)Reporting Month
Sr.noDistrictElectrification of DhaniesElectrification of Villages
IN MMSLVIN RGGVYIN RGGVY
Eligible Dhanies ( 5000 populationIndustrial areas
Total (nos)>20% Loss feeders (Nos)% defects {(4/3)*100}No of feeders getting < 18 hrs domestic supply% defects {(6/3)*100}Total (Nos)No of DTsNo of DTs having T&D loss > 10% other than HT*% defects {10/9)*100}Total Nos of Industrial AreasNo of Ind. Areas in which T&D loss > 3%% defects {(13/12)*100}
1234567891011121314
1City Circle
2Distt. Circle
Total JU Distt.
3Jalore Distt/Circle
Pali Distt.
Sirohi Distt.
3Pali Circle
Barmer Distt
Jsm. Distt.
4Barmer Circle
Jodhpur Zone
5Bikaner Distt./circle
6Hngh.Distt./circle
7Sggnr.Distt./circle
Churu DisttSignature of presenting officer, name, seal
P.S. Ladnu
8Churu ircle
Bikaner Zone
Total Discom
Sub_Div LT T&D-11
SOM-11
Jodhpur Vidyut Vitran Nigam Limited
Sub-division wise T&D Loss and ATC other than HT consumers
To be presented by SE(O&M)Up to Reporting Month:-
Sr. NoName of Sub-division, Division, circleLast Year (upto reporting month)This Year (upto reporting month)
Energy Supplied (in LU)Energy Sold (in LU)% T&D loss% Realisation% ATCEnergy Supplied (in LU)Energy Sold (in LU)% T&D loss% Realisation% ATC
123456789101112
Circle Total
Note : - Where HT metered consumer not on dedicated feeder, energy supplied in respect to HT consumers deducted as Units billed of Consumers on H.T. metering plus 2 % of energy billed.
ATC= (100 - (100- % energy loss) X % realisation / 100 )
Signature of presenting officer, name, seal
Sub-division-11A
JODHPUR VIDYUT VITRAN NIGAM LIMITED
Action Taken report of selected Sub-division for performance improvement
To be presented by SE (O&M)SOM-11A
Reporting month
S noActivityProgress/Report/Action taken
1234567
1Name of Sub-division :Name of AEN :
2Total No of consumersDomesticNDSAGindustrialothers
Total no of consumers ( )
3Energy drawl in UnitsEnergy drawl in UnitsEnergy sold other than HT consumersEnergy sold of HT consumersEnergy loss other than HT consumersEnergy loss with HT consumers
Rural area other than 5000 population villages
Urban areas ( MTs/City)
Urban areas ( > 5000 villages)
Total
4Action Taken for reduction of T&D losses
4aVigilance effortsNo of checkingTheft detectedAssessmentAmount realisedFIR lodged
O&M wing
Vig wing
FIR lodged
4bSustainability of FRP/Urban FocusNo of cable cutsNo of DTs damagedNO of damage of single phase transformersNo of meters found tamperedNo of FIR lodged
No of instances detected
4cNo of feeders checked by Feeder ManagerNo of defaults detectedNo of cases pending for action on Feeder manager's report
Signature of presenting officer, name, seal
UFP LT-som12
SOM-12
Jodhpur Vidyut Vitran Nigam Limited
Urban Focus Programme : District H.Q.,Muncipal Town wise T & D Losses other than HT
To be presented by SEs (O&M)Reporting Month:-
Sr. No.Name of Sub-division/ DivisionName of M.Town/Distt.H.Q.No. of Consumerup to reporting month Last yearup to reporting month This year
Energy Supplied (in LU)Energy Sold (in LU)% LossEnergy Supplied (in LU)Energy Sold (in LU)% Loss
12345678910
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
Total0.000.00
Signature of presenting officer, name, seal
UFP 5K- som13
SOM-13
Jodhpur Vidyut Vitran Nigam Limited
Urban Focus Programme : Villages having More than 5000 population & T & D Losses Other than HT consumers
To be presented by SE(O&M)Reporting Month:-
Sr. No.Name of Sub-division/ DivisionNo of Villages having more than 5000 populationTotal No. of Consumerup to reporting month Last yearup to reporting month This year
Energy Supplied (in LU)Energy Sold (in LU)% LossEnergy Supplied (in LU)Energy Sold (in LU)% Loss
12345678910
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
Total0.000.00
Signature of presenting officer, name, seal
SD Revenue-14
SOM-14
Jodhpur Vidyut Vitran Nigam Limited
Sub division Wise Revenue analysis FY 2008-09
To be presented by SE (O&M)Reporting Month
S.No.Name of Sub-Div/Div/CircleAssessment in Lacs Rs.Realisation in Lacs Rs.% RealisationOutstanding in Lacs Rs.
during the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearAs on 31 st Mar-08at the end of reporting month
12345678910111213141516
1CITY CIRCLE
2DISTT. CIRCLE
3JALORE
4PALI
5BARMER
JODHPUR ZONE
6BIKANER
7HANMUNGARH
8SGGNR.
9CHURU
BIKANER ZONE
TOTAL DISCOM
Signature of presenting officer, name, seal
SD Revenue-14 A
SOM-14(A)
Jodhpur Vidyut Vitran Nigam Limited
Sub division Wise Revenue analysis FY 2008-09 (other than HT)
To be presented by SE (O&M)Reporting Month
S.No.Name of Sub-Div/Div/CircleAssessment in Lacs Rs.Realisation in Lacs Rs.% RealisationOutstanding in Lacs Rs.
during the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearAs on 31 st Mar-08at the end of reporting month
12345678910111213141516
1CITY CIRCLE
2DISTT. CIRCLE
3JALORE
4PALI
5BARMER
JODHPUR ZONE
6BIKANER
7HANMUNGARH
8SGGNR.
9CHURU
BIKANER ZONE
TOTAL DISCOM
Signature of presenting officer, name, seal
O-S-som15
SOM-15
Jodhpur Vidyut Vitran Nigam Limited
Monitoring of the Reduction of O/S >10000, >20000, >50000, >1Lac on regular consumers
To be presented by circle SE (O&M)Reporting Month( Amount in Lacs )
Sr. no.Name of Sub-division / DivisionRs.10,000/- to 20,000/- (AEN)Rs.20,000/- to 50,000/- (XEN)Rs.50,001/- to 1,00,000/-(SE)More than Rs. 1,00,000/- (ZCE)Total
No.of Cases at the end of last monthNo.of Cases at the end of repo. monthDues in lacs RsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacs
12345678910111213141516171819
1CITY CIRCLE
2DISTT. CIRCLE
3JALORE
4PALI
5BARMER
JODHPUR ZONE
6BIKANER
7HANMUNGARH
8SGGNR.
9CHURU
BIKANER ZONESignature of presenting officer, name, seal
TOTAL DISCOM
DT Fail-som 16
SOM-16
Jodhpur Vidyut Vitran Nigam Limited
Analysis of rate of burning of distribution transformers in rural area Fy 08-09
To be presented by SE(O&M)Reporting MonthJUNE 08
Name of Sub-division/ DivisionThree phase transformersSingle phase transformers
S. NO.No of three Ph transformers Installed as on 31.03.08No of DT Failed up to the reporting month% of DT FailureNo of single Ph transformers Installed as on 31.03.08No of DT Failed up to the reporting month% of DT Failure
Last yearThis yearLast yearThis yearLast yearThis yearLast yearThis year
123456789101112
1City Circle236941660.600.93
2Distt. Circle278484555950.590.71322932630.330.65
Total JU Distt.302174966610.590.73322932630.330.65
3Jalore221323885380.690.81226516270.240.40
Pali Distt.121931812210.500.60282732490.380.58
Sirohi Distt.65991171490.610.75909590.180.33
3Pali Circle187922983700.540.66373637580.330.52
Barmer Distt17444172990.330.192312470.060.10
Jsm. Distt.390861460.560.39297000.000.00
4Barmer Circle213522331450.370.232609470.050.09
Jodhpur Zone92493141517140.550.6211839891550.250.44
5Bikaner147163402680.860.61700000.000.00
6Hngh.111642351500.620.45330538720.380.73
7Sggnr.92181831750.670.63325262620.640.64
Churu Distt94042271800.850.6424035150.070.21
P.S. Ladnu124624140.680.37325550.510.51
8Churu ircle106502511940.830.61272810200.120.24
Bikaner Zone4574810097870.750.5799851101540.370.51
Total Discom138241242425010.620.60218241993090.300.47
Pow Tr Fail- som 17
Jodhpur Vidyut Vitran Nigam Limited
RevisedSOM-17
Analysis of Power Transformers Failure & ATR by M&P wing for FY 08-09
To be presented by SE (M&P)Reporting MonthJUNE 08
S NoCirclePower TransformersNo of Transformers checked by M&P wingNo of S/s at which defaults detectedNo of Power transformers burnt where defects remained un-attemptedwhere draft charge sheet served to AEN & XEN
Installed as on 31st Mar 08 (Nos)Failed up to the reporting month (Nos)% Failed up to the monthNo of S/s at which all defects rectifiedNo of Balance S/s
Last yearThis yearLast yearThis year
1234567891011
1City Circle61211.210.550000
2Distt. Circle264140.140.510000
Total JU Distt.325350.340.510000
3Jalore154250.481.080000
Pali Distt.1170100.280000
Sirohi Distt.66120.521.010000
4Pali Circle183130.190.550000
Barmer Distt144100.240.000000
Jsm. Distt.380201.750000
5Barmer Circle182120.190.370000
Jodhpur Zone8447150.30.590000
6Bikaner170230.410.5910000
7Hngh.91110.380.379000
8Sggnr.127200.530.0015000
Churu Distt105521.630.6310000
P.S. Ladnu10100.370.000000
9Churu ircle115621.80.5810000
Bikaner Zone5031160.750.4044000
Total Discom134718210.470.5244000
Fed met- som18
Jodhpur Vidyut Vitran Nigam Limited
SOM-18
Progress of 11kV Feeder Metering as on reporting month
To be presented by SE(M&P)Reporting MonthJUNE 2008
S NoCircleTotal No of 11 kV FeedersMetering Equipments Installed as on 31.03.08Metering Equipments Installed in FY - 2008-09Total Metering Equipments Installed at the end of reporting monthBalance for Installation of metering equipments (5-9)No of defective (out of col. 9)
As on 31.03.08Add up to the monthTotal (3+4)During the monthUpto the monthCTPTsMeters
123456789101112
1City Circle184018418400184004
2Distt. Circle9750975952213965105236
3Jalore Circle56905695690056905833
4Pali Circle61506156141161501411
5Barmer Circle67406746551365816670
Jodhpur Zone301703017297441729912619184
6Bikaner Circle5070507502225043041
7HNGH. Circle30123324301113022200
8SGGNR. Circle356035635600356000
9Churu Circle3660366366003660150
Bikaner Zone15302315531525331528251541
DISCOM45472345704499720451951206125
ASP Vig-19
JODHPUR VIDYUT VITRAN NIGAM LIMITEDSOM-19
Theft of 3 & 1 Phase transformers, Conductors, Oil and other material
Presented by ASP vig.Reporting MonthJUNE 2008
S NoCircleThree phase transformers theft casesSingle Phase transformers theft casesOil Theft casesConductor Theft cases
During the monthupto the monthDuring the monthupto the monthDuring the monthupto the monthDuring the monthupto the month
No. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR Lodged
123456789101112131415161718
1CITY CIRCLE0000000000000000
2DISTT. CIRCLE0033008800110077
3JALORE0000000000000000
3PALI0066002020001515004040
4BARMER0011114311110000
JODHPUR ZONE001010113231111717004747
5BIKANER0000000000000000
6HNGH.0000000000110000
7SGGNR.0000000000000000
8CHURU0000338800003131
BIKANER ZONE0000338800113131
DISCOM001010444039111818315048
Vig- som 20
SOM-20
JODHPUR VIDYUT VITRAN NIGAM LIMITED
PROGRESS OF VIGILANCE CHECKINGS up to Reporting Month FY 2008-09
To be Presented by: ASP Vig.Reporting MonthJUNE 2008
SnoName Circle/Zone/CVS & TotalTarget of Checking FY 07-07 (One Month)Monthly targets of CheckingTotal CheckingTheft DetectedAssessment in Lac Rs.Realisation in Lac Rs.Complaint / FIRChallan This Year
Last YrThis YrLast YrThis YrLast YrThis YrLast YrThis YrLast YrThis Yr
123456789101112131415
1CITY CIRCLE13004103556211223.0614.1813.646.80010
2DISTT.CIRCLE1770177310451117.1814.076.677.04381
3JALORE1130547357293214.5211.335.703.411270
4PALI230040789756628.7343.277.3110.52260
5BARMER1600670408554225.1512.3714.567.35260
JODHPUR ZONE81002211232724735978.6495.2247.8835.128481
6BIKANER220036250313830011.3318.477.1410.48660
7HNGH.14953624992513609.2916.184.2210.4973300
8SGGNR.1825110193280756534.6329.6118.5715.151720
9CHURU14952434251172577.3716.792.475.101341
BIKANER ZONE7015206823591313148262.6281.0532.441.22109421
CVS/ZONAL/M&P/APTPS80953892420215.6154.866.3039.060180
DISCOM151954374507515842043156.87231.1386.58115.401171082
Grivances som-21
SOM-21
Jodhpur Vidyut Vitran Nigam Limited
Status of Consumers Grievances Redressal in Chaupals
To be presented by SE (O&M)Reporting MonthMAY 08
Name of Sub-division/Division/Circle33/11 kV s/sProgress of Chaupals organised during the monthProgress of Chaupals organised upto the month
No of chaupals heldGrievances receivedRedressalNo of chaupals heldGrievances receivedRedressal
Related to billsOthersRelated to billsOthersRelated to billsOthersRelated to billsOthers
1234567891011
City Circle36
Distt. Circle20530129591295449159114159109
Total JU Distt.24130129591295449159114159109
Jalore119691387713877118206166206166
Pali Distt.80621108911059126208180208180
Sirohi Distt.38254218842188467620776207
Pali Circle11887152277152247172284387284387
Barmer Distt121222415520131713028727234
Jsm. Distt.326827822451219812137
Barmer Circle1532832182281531164248539371
Jodhpur Zone63121445159544753145569111526881033
Bikaner135162772772548274827
Hngh.6518253525353260586058
Sggnr.85276264626456124153124153
Churu Distt7920133513354125822582
P.S. Ladnu8204044110110
Churu ircle8722133913394526922692
Bikaner Zone37283127145127145158258330258330
Total Discom100329757874057467661394914829461363
Capital-22
JodhpurVdyut Vitran Nigam Limited
Progress of Various Capital Works (10 point progress)
SOM-22
To be presented by SE (O&M)Up to Reporting month:
S NoSub-Div/Div/Circle1.Providing of interconnections as perthe sanction issued from SE (Plan)2a. Providing 33 KV breakers.2b.Providing of 11 kV breakers on all 33 KV sub-stations3.Laying of Neutral wire in kmsLaying of neutral wire.4.Laying of Rabbit Conductor upto first tapping point in kms.5.SIP renovation programme i.e. one consumer one transformer (Rural areas).6.Water Works renovation programme (Rural areas)7.Replacement of 25 KVA, 3 phase new transformers by 10/16 KVA where single connection exists8.Replacement of one phase 10/25 KVA transformers by one phase 5 MVA transformer9.Providing of additional poles in long span lines.10.Guarding of road crossing.
Identified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completed
123456789101112131415161718192021222324
1City Circle
2Distt. Circle
3Jalore Circle
4Pali Circle
5Barmer Circle
Jodhpur Zone
6Bikaner Circle
7HNGH. Circle
8SGGNR. Circle
9Churu Circle
Bikaner Zone
DISCOM
Total
Identified targets: Work to be carried out/ balance / incomplete / sanctioned as on 31.03.08 in (Nos.)
Note: Action on the point 7 may be keep pending till sufficient availability of DTs
Copy to : SE Plan
Signature of presenting officer, name, seal
DT urban 23
Jodhpur Vidyut Vitran Nigam Limited
Installation of small DTs in Urban areas for Agriculture consumers
To be presented by SE (O&M)Reporting Month :SOM - 23
Nos.Name of sub-division.div/CircleName of City/MTsNo of Ag. ConsumersNo of small DTs with meterslikely date of completion
To be installedInstalled during the monthInstalled up to the month
12346789
City Circle
Distt. Circle
Total JU Distt.0000
Jalore
Pali Distt.
Sirohi Distt.
Pali Circle0000
Barmer Distt
Jsm. Distt.
Barmer Circle0000
Jodhpur Zone0000
Bikaner
Hngh.
Sggnr.
Churu Distt
P.S. Ladnu
Churu ircle0000
Bikaner Zone0000
Total Discom0000
Signature of presenting officer, name, seal
G-Type 24
Jodhpur Vidyut Vitran Nigam Limited
Renovation of 11 kV feeders having Intensive Industrial load as urban focus programme ( G-Type )
To be presented by SE (O&M)Reporting Month :SOM - 24
Nos.Name of sub-division.div/CircleName of feedersFeeder codeName of locatilty feededConsumers on the feederWork Completed / likely date of completion
IndustrialAg.Others
123456789
Total
Signature of presenting officer, name, seal
GOR 7
JODHPUR DISCOM : JODHPUR
GoR - 7
ekuuh; eq[;ea=h egksn;k }kjk dh xbZ ?kks"k.kkvksa dh fdz;kfUofr fLFkfr
-lftys dk uke?kks"k.kk dk LFkkufnukad?kks"k.kk@vk'oklu dk fooj.kfdz;kfUofr@dh xbZZ dk;Zokgh dk fooj.kfdz;kfUofr dh fLFkfr
;fn gka rks fdz;kfUofr dh frfFk;fn ugha rks fdz;kfUofr dh laHkkfor frfFk
12345678
1tks/kiqjtks/kiqj15&8&07twu 2008 rd izns'ktks/kiqj esa 777Nhtr de gksus
ds 3500 xkWoksa dksxkzeh.k QhMjksa dkds dkj.k 1112
Nhtr de gksus ijlq/kkj dk;Z iw.kZxkWoksa dks 24?kaVs
24 ?kaVs fo|qr vkiwfrZfo|qr vkiwfrZ dh
fd;k tkuk aAtk jgh gS A
2tks/kiqjtks/kiqj2008lkykokl tks/kiqj16 [kEHksa [kM+s dj
esa 33@11 ds-oh-ykbZu [kspuss dk
lc&LVs'ku fuekZ.kdk;Z izkjEHk
dh ?ksk"k.kk A
3tkykSj&&&&
4ckM+esjckykssrjk15&12&0733@11ds-oh- fcBwtk ,oanksuks mipkSfd;kW31 tqykbZ 2008 rd
ikVksnhLohd`r gks pqdh gS Adk;Z iw.kZ dj
mipkSfd;ksa ds fuekZ.kfdz;kfUor fd;k tkosxk
dh ?kks"k.kk dh xbZ A
5ckM+esjflokuk04&05&08ftys esa fofHkUu l~Fkkuksadk;Z Lohd`rlkeku miyC/k gksus ds
ij 04 33 ds-oh-gks pqdk gS Ackn gh lEHkkfor frFkh
1- lSyk?kskf"kr dh tk ldrh gS
2- djekokl
3- pkS/kfj;ksa dh
*
*
*
*AG,DL & BPL CONNECTIONS
Status of AG. DN deposited & connections Released (2011-12)*
Name GOR-D
GOR-D
1 TO 11 For The Month of July, 2011
Jodhpur Discom
GOR-D-01
Progress of Distribution Companies ( JODHPUR DISCOM)
Status of AG. DN deposited & connections Released Revised
Upto the Month:-July.2011July,11GOR-D-01
Sr. No.Name of DistrictNo of DN issued During 2011-12DN depositedAg. Connections released During 2011-12 out of Colmn. 8% Connection Released of Col.8Cancelled after D.N. Deposited During 2011-12Balance Pending for connection
Pending As on 31.03.11During 2011-12Total
GENERAL CATEGORYOTHERSDuring the monthUpto the month
123456678811910
1Jodhpur557152260936496221796244546378031.90161649796
2Pali93136967635546953211478.835480241
3Sirohi6802128922541315788327485.773781177
4Jalore2769179294822980017772006501326.58931781269
5Barmer1794571236522790815261753741739.87121568250
6Jaisalmer7244376715594239394628421.32031033
Jodhpur Zone124691563140321577261063857962667126415.8812965691766
7Bikaner2729106337922923621581187311949426.3701379634
8HMH170586179120551191411191815914.210960201
9SGNR768238100613058418427010912.950733364
10Churu14137832196664201225129124443233.460859537
11Nagaur (Ps.Ladnu)17118121516000.0001612
Churu Cir.14307842214674221240130724443233.460875549
Bikaner Zone663221718803565160045765141451119423.23039471748
Total Discom191013734228352142421010961131031118245818.76129105163514
Note:-D.N. issued Figures of Bikaner and Churu Circles as per their RE formats of July, 2011.
GOR-D-2
JODHPUR DISCOM
Status of release of DL connections during FY 2011-12Tentative
Upto the Month :-July,11GOR-D-02
S.NoName of Distt./CircleApplication for DL connections pendingApplication for DL connections pendingconnections released During 2011-12Cancelled up the monthPending at the end of Reporting month
As on 31.03.11Received during FY 2011-12RuralUrbanTotalRuralUrbanTotal released
RuralUrbanRuralUrbanDuring the monthup to the monthDuring the monthup to the monthDuring the monthup to the month% ReleasedRuralUrbanRuralUrbanBPL DURING monthAPL DURING monthBPL DURING 2011-12APL DURING 2011-12
12345634567896789101112
1City Circle Jod.021101847020582058003321704332170482.800003540000
2Distt. Circle Jod.176201244018212216383362197421154265951862210445120.83575331679811711919963143951
Total JU Distt.1762033540182059216382394240322115426542718902542615526.28575331679847111919963143951
3Pali Distt.38585105027115588851665105501251396827810131529498154.3613186935995830125103968
4Sirohi Distt.653101109739617504972247369917113341482125858.11493378412303690917
5Jalore Distt.62511262572367882349393165943252117294711354642.068563047151691544404272825
6Barmer Distt3753925619284543946771040177515259411632663129207.3334319365303653082074002194
7Jsm. Distt.35761520291357644340190127518053077.671053439258000127
Total Barmer Cir.41115408192874543043115344196515272112150663632277.363532439969623
Jodhpur Zone694971480146424722841396202903414844151231056404459001916722.03315118965865196958142630114113982
8Bikaner73606492737835100971484115811921460106892298235220.372588612584019201460
9Hanumangarh2226313327710485503136168647193078248871967394961.36388402037450071903078
10Sriganganagar337120441021328747315329005658257735812251016380250.4014035934932480658772500
11Churu37518152343130760942122821650819252521144760306940.385031133666865050801925
12Nagaur (Ladanu)127221421176169319718901276432914915679243.687349774401270643
Total Churu Cir.502383627641483778723191010663525682811293916386141.025761174643909063502568
Bikaner Zone1798020021288046943086066963755622049683993428131971396439.97239222418785219102204779606
Total Discom874773482275229416114999128981278977048248062049832590973313127.1755434138465041605816467121823588
Note:- Bikaner Zone Information not Received
GOR-D-03
Progress of Distribution Companies ( JODHPUR DISCOM)
Status of release of BPL connections FY 2011-12
Upto the Month:-July,11GOR-D-03
Sr. NoName of DistrictBPL families as per Notification of GoR 2002Total BPL/Kutir Jyoti connections released as on 31.03.11Progress of release of BPL Connections FY 2011-12BPL AS ONRURAL DURING MONTH
TargetReleasedBalanceTOTAL GoR-D-2APLBPL
During the monthUpto the monthMMSLVYOTHER
12345678
1Jodhpur35658279280119314-31428242211541992119
2Pali53140482330000482331251012510
3Sirohi297091355200001355236903690
4Jalore58655429770154427-42743404594325115154
5Barmer74843225285091530840050515229285150207308
6Jaisalmer15931104330000104330000
Jodhpur Zone2679361656515091558111414977416679248443293934581
7Bikaner848424084100004084119201920
8Hanumangarh43386367611101900110193676171907190
9SGNGR6345646530924807791714660765806580
10Churu656505087200005087250805080
11Nagaur (Ps. Ladnu)328833170000331712701270
Total Churu Cir.689385418900005418963506350
Bikaner Zone26062217832120267077201901783982204022040
Total Discom5285583439727118258112186996434519070483296138581
* Recently sanctioned by REC
** Pending for sanction with REC183368
APRIL,102023
852
GOR-D-04(a) Dist. Wise
Progress of Distribution Companies ( JODHPUR DISCOM)
RGGVY Financial Status
Upto the Month:-July,11GOR-D-04 (a)
S.No.Name of Distrcit/DiscomNo. of SchemesSanctioned Cost (Rs. Lacs)Amount Released (in Lacs Rs.)Utilisation (in Lacs Rs.) (Tentavive)% Utilised
1234567
A. Sanctioned Before to Feb-08
1HN.Garh (AREP)1222.85133.72211.95158.50
2SG.Nagar (AREP)1681.69409.01520.84127.34
3Jaisalmer (AREP)1603.53181.06593.00327.52
4Jaisalmer11338.781144.251377.01120.34
5Bikaner12333.901851.602047.76110.59
6Sirohi11236.92963.30998.34103.64
7Jalore12367.411805.321856.00102.81
8Jodhpur12853.852385.922454.84102.89
9Churu11962.481457.311583.14108.63
10Nagaur(P.S Ladnu)1116.0687.5780.0091.36
Jodhpur Discom(A)1013717.4710419.0611722.88112.51
B. Sanctioned After Feb-08
1Hanumangarh13256.161634.391533.7693.84
2Sriganganagar13498.462042.10913.3944.73
3Pali (PGCIL)12981.292496.622787.00111.63
4Barmer (PGCIL)120995.8612420.3712055.0097.06
Jodhpur Discom(B)430731.7718593.4817289.1592.99
G.Total (A+B)1444449.2429012.5429012.03100.00
1Jodhpur12853.852385.922454.84102.89
2Pali12981.292496.622787111.63
3Sirohi11236.92963.3998.34103.64
4Jalore12367.411805.321856102.81
5Barmer120995.8612420.371205597.06
6Jaisalmer21942.311325.311970.01148.65
Jodhpur Zone732377.6421396.8422121.19103.39
7Bikaner12333.91851.62047.76110.59
8Hanumangarh23479.011768.111745.7198.73
9SGNGR24180.152451.111434.2358.51
10Churu11962.481457.311583.14108.63
11Nagaur (Ps. Ladnu)1116.0687.578091.36
Total Churu Cir.22078.541544.881663.14107.65
Bikaner Zone712071.67615.76890.8490.48
Total Discom1444449.2429012.5429012.03100.00
GOR-D-04(b) Dist. Wise
Progress of Distribution Companies ( JODHPUR DISCOM)
Coverage & Progress under AREP & RGGVY Progress
Upto the Month:-July,11GOR-D-04 (b)
S.No.Name of DiscomNo. of SchemesCoverage ( Nos)Progress As on Month (Nos)% Achievement
Electrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.Dhanies
123456789101112131415161718
A. Sanctioned Before to Feb-08
1HN.Garh (AREP)14605163760460313322730100.000.00607.17604.520.00
2SG.Nagar (AREP)1111012964701110400031620100.000.003100.78488.720.00
3Jaisalmer (AREP)16002561237055035326091.670.0013.6726.350.00
4Jaisalmer19834810112839869983227094690662100.0092.5370.1582.2389.86
5Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00
6Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04
7Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00
10Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00
9Churu11184351488244787683135298319538754.5598.5868.561305.80100.00
8Nagaur(P.S Ladnu)1097281426090962638505390.0098.9793.751943.46100.00
Jodhpur Discom(A)10742387421604492562394707364814897516079538695.2894.1768.96173.7297.97
B. Sanctioned After Feb-08
1Hanumangarh1132157639319317042132525283002481532100.0033.3171.98782.8176.19
2Sriganganagar1179250544133217253715262034940170902684.9224.7579.1778.6770.27
3Pali (PGCIL)12191529334805517315913366583134713071.4399.78124.97389.1675.14
4Barmer (PGCIL)1668123060124587313782071679363160262230.9913.5815.57272.881.60
Jodhpur Discom(B)41000622617291038823163050622251092618927821050.6035.7463.19229.9612.88
G.Total (A+B)1417421010038895413138520241213587325823625007359669.6358.1566.39190.3429.45
Note:-Figures shown in shaded of column No. 6 (Coverage of Conn. to BPL) have been changed due to actual survey.
1Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.