INTERFACE SYSTEM MAPPING B PILLAR RR INNER LH/RH

DETAILS ISSUES REMARKS Data Required by Date RESP

1 Underbody

Rear floor Flange Joining details REF.REQUIRED Not available

Catia V5 R

Sill Middle Flange Joining details REF.REQUIRED Not availableCatia V5 R

2 Trims Pillar trim

Pillar tim mtg details REF.REQUIRED Not available

Catia V5 R

3 Body

B pillar front

Flange Joining details REF.REQUIRED Not available

Catia V5 YSanjay Kale

Reinf B pillar front

Flange Joining details REF.REQUIRED Not available

Catia V5 YSanjay Kale

Reinf B-Pillar rear

Flange Joining details REF.REQUIRED Not available

Catia V5 RSanjay Kale

Cantrail inner

Flange Joining details REF.REQUIRED Not available

Catia V5 R

Reinf Spool Belt

REF.REQUIRED Not available

Catia V5 Y

4

Striker Mtg

Tentavie Data Available ----

Catia V5 Y

BNR BNR flange details

Tentavie Data Available Partially Available

Catia V5

Sanjay Kale

5 Electricals

Wiring Harness

REF.REQUIRED

----- Catia V5 G

6 CAE

BIW CAE REF.REQUIRED Partially Incorporated.

Y

Stiffness

Analysis for stiffness REF.REQUIRED Partially Incorporated.

Y

7

Seats

REF.REQUIRED

----- Catia V5 G

8 MFG Formability Formability input

REF.REQUIRED----- Y

SR.NO.

MAIN INTERFACING

SYSTEM

INTERFACING SUB SYSTEM

VALUE/MODE

OF DATA

StatusR/

Y/G

Vijay Bagade

Vijay Bagade

vivek Sharma

Reinf Required around the Cutout of ELR Unit.

Hemanth Vankawre

Door Assembly

Striker Mtg details on the Pnls

Data of wiring harness routing & fixing

Analysis data for crash worthiness. CAE

ReportSuhas Kangde

CAE Report

Suhas Kangere

Seat belt Mounting assembly & Clearences

Mounting & Clearences to be Checked. Hemanth

Vankawre

CAE Report

Shahaji/ Morade

9 NVH NVH Input need to be incorporated.

REF.REQUIREDY Atul Miskin

NVH input Partially Incorporated.

NVH Report

INTERFACE SYSTEM MAPPING REINF B PILLAR RR INNER LH/RH

DETAILS ISSUES REMARKS Data Required by Date RESP

1 Underbody

Floor Flange Joining details REF.REQUIRED NOT Available

Catia V5 R

2 Trims Anchorage Mtgs

Mtgs. & Cutout Details Tentavie Data Available ----

Catia V5 R

3

Door

BNR BNR flange details

Tentavie Data Available Partially Available

Catia V5

Sanjay Kale

4 Body

Reinf B Pillar front

Flange Joining details Tentavie Data Available Available

Catia V5 RSanjay Kale

B-Pillar RR Inner

Flange Joining details REF.REQUIRED Available

Catia V5 RSanjay Kale

B-Pillar RR Outer

Flange Joining details REF.REQUIRED Available

Catia V5 RSanjay Kale

5 Electricals

Wiring Harness

REF.REQUIRED NOT Available

Catia V5 R

6 CAE

BIW CAE WIP Partially Implemented.

R

Stiffness

Analysis for stiffness WIP Partially Implemented.

R

7 MFG Formability Formability input

REF.REQUIRED -----R

8 NVH NVH Input need to be incorporated.

-----R Atul Miskin

SR.NO.

MAIN INTERFACING

SYSTEM

INTERFACING SUB SYSTEM

VALUE/MODE OF

DATA

StatusR/Y/G

Vijay Bagade

Data of wiring harness routing & fixing

Analysis data for crash worthiness. CAE

Report

CAE Report

CAE Report

NVH input Partially Incorporated.

NVH Report

Recommended