INTERACTIVE MEETING WITH NGOs & DFOs - …uppfmpap.org/uppfmpap/ARCDM/NGO MEETING_18.09.pdf ·...

Preview:

Citation preview

INTERACTIVE MEETING WITH NGOs & DFOsNGOs & DFOs

UTTAR PRADESH PARTICIPATORY FOREST MANAGEMENTFOREST MANAGEMENT

&POVERTY ALLEVIATION PROGRAMMEPOVERTY ALLEVIATION PROGRAMME

1

WHY THIS MEETING?• IMMEDIATE TASK AHEAD FOR NGOs

ESTABLISHMENT OF OFFICE IN THE DISTRICTFINDING SUITABLE FIELD LEVEL WORKERSCOLLECTION OF THEIR CVSUBMISSION OF CV TO DMU OFFICERS

• IMMEDIATE TASK AHEAD FOR DFOs

CREDENTIAL VERIFICATIONCREDENTIAL VERIFICATIONFINAL SELECTION OF FIELD LEVEL WORKERS

SIGNING OF CONTRACT BETWEEN NGOs & DMU OFFICERS

ORIENTATION TRAINING FOR FIELD COORDINATORS & CO-COORDINATORSCOORDINATORS

EXPERIENCE SHARING

Name of Division Number of Team members to be engaged by NGOs by 30.09.2014

Field Coordinator

Field Co-coordinator

Field Worker

Office Assistant

Pilibhit 1 1 3 1

N.Kheri 1 1 4 1

S.Kheri 1 1 5 1

Bahraich 1 1 3 1

Shra asti 1 1 4 1Shrawasti 1 1 4 1

Jhansi 1 1 7 1

Lalitpur 1 1 12 1Lalitpur 1 1 12 1

Mahoba 1 1 6 1

Hamirpur 1 1 3 1Hamirpur 1 1 3 1

Chitrakoot 1 1 5 1Contd……

Name of Division Number of Team members to be engaged by NGOs by 30 09 2014by NGOs by 30.09.2014

Field Coordinator

Field Co-coordinator

Field Worker

Office Assistant

Allahabad 1 1 7 1

Mirzapur 1 1 21 1

Obra 1 1 10 1

Sonbhadra 1 1 9 1

1 1 22 1Renukoot 1 1 22 1

Dudhwa 1 1 6 1

K t i h t 1 1 6 1Katarniaghat 1 1 6 1

Sohelwa 1 1 4 1

K hi 1 1 16 1Kashi 1 1 16 1

Kaimoor 1 1 7 1

FIELD LEVEL WORKERS- QUALIFICATIONSO S QU C O S

• EDUCATION-Minimum 50% marks in Graduation in Social Sciences/

Rural Development/ Agribusiness/Marketing, or related field from any recognized and reputed university or Institution.

• EXPERIENCE-• Minimum 5 years demonstrated work experience in forestry/

natural resources management linked poverty alleviationnatural resources management linked poverty alleviation projects or at least two years in UP PFMPAP.

• Preference would be given to those who have worked inPreference would be given to those who have worked in the project.

• AGE- NOT MORE THAN 45 YEARSG O O 5 S

Requirements for Field Level WorkersRequirements for Field Level Workers

• Good oral & written communication skills in Hindi and EnglishGood oral & written communication skills in Hindi and English.

• Skill in community facilitation and participatory methods.

• Experience in working with institutions like JFMCs/ EDCs SHGs• Experience in working with institutions like JFMCs/ EDCs, SHGs.

• Proven analytical and report writing skills.

K l d & bilit t t i ll MS Offi (MS• Knowledge & ability to use computers, especially MS Office (MS

Word, Excel, Power Point), and related software.

Abilit t k i d d tl ith t t i l t• Ability to work independently without any secretarial support.

• Understanding and working knowledge of the Forestry sector.

• Being able to work with diverse categories of stakeholders

MANDATORY CONDITIONMANDATORY CONDITION

• 30% OF STAFF SHOULD BE WOMEN30% OF STAFF SHOULD BE WOMEN

FIELD LEVEL WORKERS TO BE FROM• FIELD LEVEL WORKERS TO BE FROM THE ALLOTTED DISTRICT TO NGO or FROM NEARBY DISTRICT OF U PFROM NEARBY DISTRICT OF U.P.

CHECK LISTCHECK LIST• DATE OF BIRTH- NOT BORN BEFORE 31.12.1968

EDUCATIONAL QUALIFICATION GRADUATE ≥50%• EDUCATIONAL QUALIFICATION- GRADUATE ≥50%

• PLACE OF RESIDENCE- SAME /NEARBY DISTRICT OF U.P.

• EXPERIENCE- ≥ 5 YEARS

• EXPERIENCE IN UP-PFMPAP- ≥ 2 YEARS

• COMPUTER KNOWLEDGE- Knowledge & ability to use

computers, especially MS Office (MS Word, Excel, Power Point),computers, especially MS Office (MS Word, Excel, Power Point),

and related software.

SOLAR LIGHT UNDER IWMPIWMP--III III IN AURANGABAD DURING 2011IN AURANGABAD DURING 2011--1212

SOLAR LANTERN CHARGING STATION UNDER IWMP-I IN BANKA 2011-12

9

ANDHRA PRADESH- EPA ANIMAL HEALTH CAMP

Animal Health Camp Sheep Health Camp

10Trevis Drinking water Trough

Capacity Building 

Strengthening of S.H.G at  Sree Anandeswar Ws. Community Mobilization Training at Baba Kandhamal under  IWMP‐ I

y gDambasaru Ws,  Kandhamal IWMP‐ I

Orientation Training at Daringbadi, KandhamalIWMP II

Street Play in Mahulput Ws, MalkanagiriIWMP III

SELF HELP GROUPS AT WORK

12Zangna SHG members -Nagaland

Earthen Nala BundEarthen Nala Bund

Maharashtra , Village‐ Pohalewadi, Tal – Panhala Kolhapur‐IWMP‐3/ 2009‐10

(16°44’06.99’’ N 73°59’41.12’’ E)   13

Project‐ IWMP‐IIYear‐ 2009‐10Block‐ VikrampuraDistt.‐ JhansiMWS Code‐ 2C2B1k1aMWSCode 2C2B1k1a

Before

After

Loose Stone Check Dam, IWMP II, Block : Kumbhalgarh, District : Rajsamand

Gully Plug Structure in arable land, IWMP I, P.S. Girwa (District : Udaipur)

Project     ‐ IWMP‐VII/ 2010‐11Vill D d i fi

D rop ‐ Sp i l lwa y  

Village     ‐ DadrimafiBlock        ‐ ManikpurDistt.        ‐ Chitrakoot, UTTAR PRADESHLat/Long:  25°04.823’ N , 080°54.573’ E

B E F O R E

A F T E RA F T E R

17

EPA- Renovation of Bibarda Water Harvesting Structure under Paschim Medinipur -IWMP-1/2011-12 in Ergoda G.P , Block – Binpur-II of W. Bengal

Cost ‐ Rs 2.39 lakh,                    22⁰33’82.7” N,  86⁰49’63.1”  E

Before During

AfterAfter

Micro‐enterprise‐ Banamali in her Grocery Shop in Bolangir. Daily sale ranges from Rs 400‐500

Outcomes / Impact

• Regular Income• Nutritional Security to family• Improved health condition, reduced p ,expenditure on health

• Increased saving habitg• Better quality of life • Stopped migratingStopped migrating• Diversified livelihoods through petty business / pisciculture / diversified farming/ pisciculture / diversified farming 

Pulses production and marketing in GudvelaPulses production and marketing in Gudvelablock in Bolangir

Processing and Branding of Dal CollectiveProcessing and Branding of Dal‐Collectivemarketing

WE SHOULD STRIVE TO MAKE OUR VILLAGERS HAPPY

Recommended