View
212
Download
0
Category
Preview:
Citation preview
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
22
Integrated Watershed Management Programme: West Bengal
Summary of DPR
SECTION A: PROJECT LOCATION DETAILS
Sl. No.
Particulars Details
1 Project Name Integrated Watershed Management Programme
2 Project Code BANKURA/IWMP 2/20 11-12
3 State West Bengal
4 District Bankura
5 CD Block Gangajalghati
6 Gram Panchyet Latiaboni, Lachhmanpur, Banashuria
7 Mouza (Village)
Block G P Name Jl. No. Village Code
Gangajalghati
Banashuria
Banashuria (p) 46 1993800
Beldanga (p) 48 1994000
Kusthalia (p) 49 1994100
Narayanpur (p) 50 1994200
Sudarsanpur (p) 51 1994300
Kalipur 52 1994400
Chhota Lalpur 53 1994500
Bhalukathal (p) 43 1993500
Chhota Nabagram (p) 54 1994600
Bisinda(p) 58 1995000
Paramanik Kunri (p) 59 1995100
Pachamba 37 1992900
Gopinathpur 39 1993100
Mukundabeid 45 1993700
Bara Kumira 47 1993900
Chak Rangametiya 60 1995200
Kelai 62 1995400
Kanthalya 63 1995500
Rangametiya 61 1995300
Lachhmanpur
Chururi (p) 55 1994700
Raidihi 56 1994800
Jenadihi 57 1994900
Rajamela (p) 64 01995200
Sidara (p) 66 01995800
Lachmanpur(p) 67 1995900
Latiaboni
Durlabpur (p) 33 1992500
Nidhirampur(p) 34 1992600
Dumuria (p) 40 1993200
Nandanpur 41 1993300
Deuli (p) 42 1993400
8 Watershed Committee Name Regd. No. Remarks
Shree Shree Ramkrishna Micro W.C
1) Shree Shree Ramkrishna Micro Watershed Association
S/2L/No.14527 of 2013-14
Maa Sarada Micro W.C 2) Maa Sarada Micro Watershed
Association S/2L/No.14533 of
2013-14
Swami Vivekananda Micro W.C 3) Swami Vivekananda Micro Watershed
Association S/2L/No.14528 of
2013-14
Netaji Subhas Chandra Bose Micro W.C
4) Netaji Subhas Chandra Bose Micro Watershed Association
S/2L/No.14532 of 2013-14
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
23
SECTION B: SOCIO ECONOMIC PROFILE OF THE PROJECT AREA
Sl. No Particulars Ref Table No. DPR
(Format) Details
1 Name of Project Implementing Agency (PIA)
Assistant Director Of Agriculture (Soil Conservation, Demonstration) Bankura
2 Nature of PIA (a) VO b) Pancheyat c) Others)
Others
3 Total Population in the Watershed 1
3.12 57069
4 Total Number of households 3.12.1 11631
5 Total Number of ST households 576
9 Micro watershed Description
Micro watershed
Block GP Name of Mouza Jl. No. Vill Code
Shree Shree Ramkrishna Micro watershed
Gangajalghati
Banashuria Banashuria (p) 46 1993800
Banashuria Beldanga (p) 48 1994000
Banashuria Kusthalia (p) 49 1994100
Banashuria Narayanpur (p) 50 1994200
Banashuria Sudarsanpur (p) 51 1994300
Banashuria Kalipur 52 1994400
Banashuria Chhota Lalpur 53 1994500
Banashuria Chhota Nabagram(p) 54 1994600
Lachhmanpur Chururi (P) 55 1994700
Lachhmanpur Raidihi 56 1994800
Lachhmanpur Jenadihi 57 1994900
Banashuria Bisinda(p) 58 1995000
Banashuria Paramanik Kunri (p) 59 1995100
Lachhmanpur Rajamela (p) 64 01995200
Lachhmanpur Sidara (p) 66 01995800
Lachhmanpur Lachhmanpur (p) 67 1995900
Maa Sarada Micro Watershed
Gangajalghati
Banashuria Pachamba 37 1992900
Banashuria Gopinathpur 39 1993100
Banashuria Mukundabeid 45 1993700
Banashuria Banashuria (p) 46 1993800
Banashuria Bara Kumira 47 1993900
Banashuria Beldanga (p) 48 1994000
Banashuria Kusthalia (p) 49 1994100
Swami Vivekananda Micro watershed
Gangajalghati
Latiaboni Durlabpur (p) 33 1992500
Latiaboni Nidhirampur (p) 34 1992600
Banashuria Gopinathpur (p) 39 1993100
Latiabani Dumuria (p) 40 1993200
Latiaboni Nandanpur 41 1993300
Latiaboni Deuli (p) 42 1993400
Banashuria Bhalukathal (p) 43 1993500
Banashuria Mukundabeid 45 1993700
Banashuria Banashuria (p) 46 1993800
Netaji Subhas Chandra Bose Micro watershed
Gangajalghati
Latiaboni Deuli (p) 42 1993400
Banashuria Bhalukathal (p) 43 1993500
Banashuria Banashuria (p) 46 1993800
Banashuria Bishinda(p) 58 1995000
Banashuria Paramanik Kunri (p) 59 1995100
Banashuria Chak Rangametiya 60 1995200
Banashuria Rangametiya 61 1995300
Banashuria Kelai 62 1995400
Banashuria Kanthalya 63 1995500
Lachhmanpur Rajamela (p) 64 01995200
10 Weight age (Table 1.3) 94.5 Out of 150
11 Project Cost ( Rs in Lakh) 600.00
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
24
{ST Population /(Total Population / Total Family)}
6 Total Number of SC households {SC Population /(Total Population / Total Family)}
4270
7 Total Number of BPL households 3.12.1 6050
8 Total Number of Small Farmer household
2
(appox) ( may be Computed from Agri Census 2005-06 and table 3.14)
3.15 2675
9 Total number of Marginal farmer household
3 (appox) ( may be Computed
from Agri Census 2005-06 and table 3.14)
3.15 7792
10 Total number of landless and asset less households (BPL + Landless families)
3.15 6631
11 Number of person days of seasonal migration
3.17 410850
SECTION C: OTHER DETAIL FROM BASE LINE SURVEY
Sl. No Description Ref Table No. DPR (Format) Particulars
1 Total geographical area (ha) Executive Summary 5501.34
2 Treatable area
1) Waste
land (ha)
Fit for agriculture
Executive Summary
328.22
Unfit for agriculture
87.98
Degraded and under utilised forest
492.4
2) Rain fed agriculture land (ha) Executive Summary 3091.4
3) Total Treatable Area (ha) {1+2}1 4000
4) Forest area Executive Summary 492.4
3 Total cropped area (ha) 2
Table 3.9 (Calculated) 3436
4 Net sown area (ha) 3
Table 3.8 & Table 3.9 3091.4
5 Average Cropping Intensity {Sl.3/Sl.4 x 100}
Table 3.8 111%
6 Total No. of water storage structure4
Table 3.3 189
7
Total storage capacity of water storage structure (cum) (Example, Volume-= length x breadth x avg. depth x no of water storage structures)
Table 3.3 212625
8 Total number of water extracting units 5
Table 3.4 74
9 Depth of ground water (bgl) in m
a) Pre monsoon 7.38 – 8.66
b) Post monsoon 2.54 – 6.21
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
25
SECTION D: YEAR WISE ACTION PLAN (PHYSICAL)
Sl. No.
Particulars Ref table of DPR Format
2013-14 2014-15 2015-16 2016-17 2017-18 Total
1 Watershed Development works 1.1 Land Development 1.1.1 A forestation (on wasteland) (ha)
(Plantation and nursery) 0 0 0 0 0 0
1.1.2 A forestation (on other land) 0 0 0 0 0 0
1.1.3 Horticulture (on waste land) (ha) MANGO PLANTATION
Table 10.3 0 8 12 10 0 30
1.1.4 Horticulture (on other land) (ha) 0 0 0 0 0 0
1.1.5 Agriculture (on waste land) (ha) 0 0 0 0 0 0
1.1.6 Agriculture (on other land) (ha) 0 0 0 0 0 0
1.1.7 Pasture Dev ( on waste land) (ha) Table 10.3 0 70 107.671 90 0 267.671
1.1.8 Pasture dev (on other land) 1.2 Soil and moisture conservation
1.2.1 Staggered Tranching (ha) 0 0 0 0 0 0
1.2.2 Contour Field Bunding (ha) Table 10.3 0 20 37 25 0 82
1.2.3 Graded Bunding (ha) 0 0 0 0 0 0
1.2.4 Bench terracing (ha) 0 0 0 0 0 0
1.2.5 (Land levelling) (ha) Table 10.3 0 7 15 9 0 31
1.3 Vegetative & Engg. Structure
1.3.1 Earthen Checks (cum) 0 0 0 0 0 0
1.3.2 Bush Wood Checks (m) 0 0 0 0 0 0
1.3.3 Gully Plugs (cum) 0 0 0 0 0 0
1.3.4 Loose boulders (cum) 0 0 0 0 0 0
1.3.5 Gabion Structures (cum) 0 0 0 0 0 0
1.3.6 Puccha Field channel (rmt) Table 10.3 0 100 100 100 0 300
1.4 Water harvesting structure (New)
1.4.1 Farm Pond (no,) Table 10.3 0 5 8 4 0 17
(Cum) Table 10.3 0 12258.8 19614 9807 0 41680
1.4.2 Check Bund (no,) 0 0 0 0 0 0
(cum) 0 0 0 0 0 0
1.4.3 Nullah Bund (no.) 0 0 0 0 0 0
(cum) 0 0 0 0 0 0
1.4.4 Percolation Tank (no.) 0 0 0 0 0 0
(Cum) 0 0 0 0 0 0
1.4.5 Ground water recharge structures. (no.) 0 0 0 0 0 0
(Cum) 0 0 0 0 0 0
1.4.6 Roof top water harvesting structure Table 10.3 0 1 2 1 0 4
(cum) 0 0 0 0 0 0
1.4.7 Masonary Dugwell Table 10.3 0 9 8 10 0 27
(Cum) Table 10.3 0 90000 80000 100000 0 270000
1.5 Water harvesting structure (renovated)
1.5.1 Farm Pond (no,) Table 10.3 0 45 51 45 0 141
(cum) Table 10.3 0 83733.75 94898.25 83733.75 0 262366
1.5.2 Check Bund (no,) 0 0 0 0 0 0
(cum) 0 0 0 0 0 0
1.5.3 Nullah Bund (no.) 0 0 0 0 0 0
(cum) 0 0 0 0 0 0
1.5.4 Percolation Tank (no.) 0 0 0 0 0 0
(cum) 0 0 0 0 0 0
1.5.5 Ground water recharge structures. (no.) 0 0 0 0 0 0
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
26
Sl. No.
Particulars Ref table of DPR Format
2013-14 2014-15 2015-16 2016-17 2017-18 Total
(cum) 0 0 0 0 0 0
1.5.6 Removal of Drainage Congestion 0 0 2 0 0 2
(cum) Table 10.3 0 0 5000 0 0 5000
2.0 Entry Point Activities
2.1.1 No. of EPA activities Table 5.2 20 0 0 0 0 20
2.1.2 No. of water extracting structures created
Table 5.2 2 0 0 0 0 2
3.0 Institution & capacity Building
3.1 SHG Formation ( Newly created)
Table 3.17 & Table 5.6.1 (new)
15 17 49 50 0 131
3.2 Existing SHG
Table 5.6.1 (new) 32 0 0 0 0 32
3.2.1 No. of SHGs to be assisted
Table 5.6.1 (new) 0 20 22 59 62 163
3.2.2 Total No, of SHG members
Table 5.6.1 (new)
720 338 742 770 0 2270
3.3 User group formation
3.3.1
Total no. of User Group
Table 3.16 7 0 0 0 0 7
3.3.2 Total No. of Members of User Groups Table 3.16 80 0 0 0 0 80
3.4 Formation of Federation
3.4.1 No. of Federation Table 5.6.1 (new)
0 0 0 5 4 9
3.4.2 Total number of members of federation Table 5.6.1 (new) 0 0 0 250 200 450
3.5 Capacity Building
3.5.1 No. of Training
New (Chap 10.3 capacity building)
09 40 10 16 0 75
3.5.2 No. of Persons to be trained
New (Chap 10.3 capacity building)
225 1000 250 400 0 1875
4.0 Livelihood Activities for asset less people (Enterprising Individual)
4.1 No. of Activities Table 5.6.1 (new)
0 0 11 12 0 23
4.2 No. of Beneficiaries Table 5.6.1 (new)
0 0 11 12 0 23
5.0 Production System & Microenterprise
5.1 Sericulture
5.1.1 No. of Activities 0 0 0 0 0 0
5.1.2 No. of Beneficiaries 0 0 0 0 0 0
5.2 Goetery
5.2.1 No. of Activities 0 8 11 15 0 34
5.2.2 No. of Beneficiaries 0 8 11 15 0 34
5.3 Poultry
5.3.1 No. of Activities 0 7 10 17 0 34
5.3.2 No. of Beneficiaries 0 7 10 17 0 34
5.4 Fisheries
5.4.1 No. of Activities 0 7 10 16 0 33
5.4.2 No. of Beneficiaries 0 7 10 16 0 33
5.5 Bio fuel Plantation
5.5.1 No. of Activities 0 0 0 0 0 0
5.5.1 No. of Beneficiaries 0 0 0 0 0 0
5.6 Improved farming
5.6.1 No. of Activities 0 9 9 18 0 36
5.6.2 No. of Beneficiaries 0 9 9 18 0 36
5.6.3 Vermi Compost(No)
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
27
Sl. No.
Particulars Ref table of DPR Format
2013-14 2014-15 2015-16 2016-17 2017-18 Total
5.6.4 No. of Activities 0 8 10 15 0 33
5.6.5 No. of Beneficiaries 0 8 10 15 0 33
5.6.6 Integrated of farming system
5.6.7 No. of Activities 0 8 10 12 0 30
5.6.8 No. of Beneficiaries 0 8 10 12 0 30
. SECTION D: YEAR WISE ACTION PLAN (FINANCIAL)
(Kindly fill in figures. i.e. 0.00 instead of NIL) (Rs. In lakh)
Sl. No. Particulars Ref
Annexure Unit Cost 2013-14 2014-15 2015-16 2016-17 2017-18 Total
1 Watershed Development works 1.1 Land Development 1.1.1 A forestation (on wasteland) (ha)
(Plantation and nursery)
0 0 0 0 0 0 0
1.1.2 A forestation (on other land) 0 0 0 0 0 0 0
1.1.3 Horticulture (on waste land) (ha) MANGO PLANTATION
0.3295 0 2.63600 3.95400 3.29500 0 9.88500
1.1.4 Horticulture (on other land) (ha) 0 0 0 0 0 0 0
1.1.5 Agriculture (on waste land) (ha) 0 0 0 0 0 0 0
1.1.6 Agriculture (on other land) (ha) 0 0 0 0 0 0 0
1.1.7 Pasture Dev ( on waste land) (ha) 0.02 0 1.4 2.15342 1.8 0 5.35342
1.1.8 Pasture dev (on other land) 0 0 0 0 0 0 0
1.2 Soil and moisture conservation
1.2.1 Staggered Trenching (ha) 0 0 0 0 0 0 0
1.2.2 Contour Field Bunding (ha) 0.19297 0 3.85940 7.13989 4.82425 0 15.82354
1.2.3 Graded Bunding (ha) 0 0 0 0 0 0 0
1.2.4 Bench terracing (ha) 0 0 0 0 0 0 0
1.2.5 Land levelling (ha) 0.40515 0 2.83605 6.07725 3.64635 0 12.55965
1.3 Vegetative & Engg. Structure
1.3.1 Earthen Checks (cum) 0 0 0 0 0 0 0
1.3.2 Bush Wood Checks (m) 0 0 0 0 0 0 0
1.3.3 Gully Plugs (cum) 0 0 0 0 0 0 0
1.3.4 Loose boulders (cum) 0 0 0 0 0 0 0
1.3.5 Gabion Structures (cum) 0 0 0 0 0 0 0
1.3.6 Pcchka Field Channel (rmt) 0.0194233
0 1.94233 1.94233 1.94233 0 5.82699
1.4 Water harvesting structure (New)
1.4.1 Farm Pond (no,)
(Cum) 2.0 0 10.0 16.0 8.0 0 34.0
1.4.2 Check Bund (no,)
(cum) 0 0 0 0 0 0 0
1.4.3 Nullah Bund (no.)
(cum) 0 0 0 0 0 0 0
1.4.4 Percolation Tank (no.)
(Cum) 0 0 0 0 0 0 0
1.4.5 Ground water recharge structures. (no.)
(Cum) 0 0 0 0 0 0 0
1.4.6 Roof top Water Harvesting Structure
0.67560 0 0.67560 1.35120 0.67560 0 2.70240
1.4.7 Masonary Dugwell 1.305 0 11.745 10.44 13.05 0 35.235
(Cum)
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
28
Sl. No. Particulars Ref
Annexure Unit Cost 2013-14 2014-15 2015-16 2016-17 2017-18 Total
1.5 Water harvesting structure (renovated)
1.5.1 Farm Pond (no,)
(cum) 1.5 0 67.5 76.5 67.5 0 211.5
1.5.2 Check Bund (no,)
(cum) 0 0 0 0 0 0 0
1.5.3 Nullah Bund (no.)
(cum) 0 0 0 0 0 0 0
1.5.4 Percolation Tank (no.)
(cum) 0 0 0 0 0 0 0
1.5.5 Ground water recharge structures. (no.)
(cum) 0 0 0 0 0 0 0
1.5.6 Removal of Drainage Congestion
(cum) 1.557 0 0 3.114 0 0 3.114
2.0 Entry Point Activities
2.1.1 EPA activities 24.0 0 0 0 0 24.0
2.1.2 water extracting structures created
0 0 0 0 0 0
3.0 Institution & capacity Building
3.1 SHG Formation ( Newly created)
3.2 Existing SHG
3.2.1 SHGs to be assisted Upto 0.25 0 3.75 4.25 12.15 12.25 32.4
3.2.2 Total No, of SHG members
3.3 User group formation
3.3.1 User Group
3.3.2 Members of User Groups Assisted 0 0 0 0 0 0
3.4 Formation of Federation
3.4.1 Federation Assisted Upto 2.00 0 0 0 9.0 7.2 16.2
3.4.2 Total number of members of federation
3.5 Capacity Building
3.5.1 Training 3.00 15.00 6.00 6.00 0 30.00
3.5.2 No. of Persons to be trained
4.0 Livelihood Activities for asset less people (Enterprising Individual)
4.1 No. of Activities
4.2 Beneficiaries Assisted 0 0 2.54205 2.85795 0 5.4
5.0 Production System & Microenterprise
5.1 Sericulture
5.1.1 No. of Activities
5.1.2 No. of Beneficiaries 0 0 0 0 0 0 0
5.2 Goetery
5.2.1 No. of Activities
5.2.2 No. of Beneficiaries 0.3 0 2.40 3.3 4.5 0 10.2
5.3 Poultry
5.3.1 No. of Activities
5.3.2 No. of Beneficiaries 0.3 0 2.1 3.0 5.1 0 10.2
5.4 Fisheries
5.4.1 No. of Activities
5.4.2 No. of Beneficiaries 0.3 0 2.1 3.0 4.8 0 9.9
5.5 Bio fuel Plantation
5.5.1 No. of Activities
5.5.1 No. of Beneficiaries
5.6 Improved farming
5.6.1 No. of Activities
5.6.2 No. of Beneficiaries 0.3 0 2.7 2.7 5.4 0 10.8
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
29
Sl. No. Particulars Ref
Annexure Unit Cost 2013-14 2014-15 2015-16 2016-17 2017-18 Total
5.6.3 Vermi Compost(No)
5.6.4 No. of Activities
5.6.5 No. of Beneficiaries 0.3 0 2.4 3.0 4.5 0 9.9
5.6.6 Integrated of farming system
5.6.7 No. of Activities
5.6.8 No. of Beneficiaries 0.3 0 2.4 3.0 3.6 0 9.0
SECTION E: YEAR WISE ACTION PLAN (FINANCIAL) (Rs in Lakh)
Sl. No. Particulars % 2013-14 2014-15 2015-16 2016-17 2017-18 Total
1 Administrative Cost 3.00 9.00 18.00 18.00 12.00 60.00
2 Monitoring 0.00 1.80 1.20 1.80 1.20 6.00
3 Evaluation 0.00 1.80 1.20 1.20 1.80 6.00
4 Watershed Development 0.00 102.59438 128.67209 104.73353 0.00 336.00
5 Entry Point activity 24.00 0.00 0.00 0.00 0.00 24.00
6 Preparation of DPR 6.00 0.00 0.00 0.00 0.00 6.00
7 Capacity and Institution Building 3.00 15.00 6.00 6.00 0.00 30.00
8 Livelihood activities for asset less persons 0.00 3.75 6.79205 24.00795 19.45 54.00
9 Production system and Microenterprise 0.00 14.1 18.0 27.9 0.00 60.00
10 Consolidation Works 0.00 0.00 0.00 0.00 18.00 18.00
Total 36.00 148.04438 179.86414 183.64148 52.45 600.00
SECTION F: YEAR WISE ACTION PLAN (CONVERGENCE)
F.I. Works to be taken up through convergence (Rs in lakh)
Sl. No. Particulars 2013-14 2014-15 2015-16 2016-17 2017-18 Total
1 Soil & Moisture Conservation Works 0.00 4.417 10.096 22.085 26.502 63.1
2 Plantations 0.00 0.00 0.00 0.00 0.00 0.00
3 Others 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 4.417 10.096 22.085 26.502 63.1
F.II WORKS TO BE TAKEN UP THROUGH CONVERGENCE UNDER VARIOUS SCHEMES * (Nos.)
Sl. No.
Particulars 2013-14 2014-15 2015-16 2016-17 2017-18 Total
1 MGNREGA 0 3 6 15 17 41
2 RKVY
3
4
5 Others
Total 0 3 6 15 17 41
Note * Additional rows may be inserted
SECTION G: LIKELY PROJECT OUTCOME
Sl. No.
Particulars Likely out come
1 Waste land likely to be converted to productive use (ha)
1.1 Total waste land likely to be taken up 416.2Ha
1.2 Total waste land likely to be brought under agriculture 113Ha
1.3 Total waste land likely to be brought under horticulture 30 Ha
1.4 Total wasteland likely to be brought under other productive uses 267.671 Ha
2 Cropping intensity
2.1 Likely cropping intensity after the project (%) 125%
2.2 Likely change in cropping intensity (% increase/ decrease) 14% increase
3 Water Storage Structure/ irrigation
Gangajalghati Damodar Watershed Project: Bankura/IWMP 2/2011-12 Summary of DPR
30
Sl. No.
Particulars Likely out come
3.1 Water Storage Structure (renovated) nos. 141
3.2 Water Storage Structure (created) nos. 17
3.3 Increase in storage capacity of water storage structure (cum) 309046
3.4 Increase in storage capacity of water storage structure (%) 45%
3.5 Additional water extracting units proposed to be created (nos) 29
3.6 Additional area proposed to be brought under irrigation (ha) 428.25
4 Likely Beneficiary related outcome
4.1 No. of beneficiary household 11631
4.1.1 Small farmers 1028
4.1.2 Marginal farmers 2880
4.1.3 Landless/ asset less 407
4.1.4 BPL 1749
4.2 Expected Flow of benefits ( in nos)
4.2.1 SC 1921
4.2.2 ST 345
4.2.3 Minority Nil
4.2.4 Others 2049
5 Employment likely to be generated
5.1 Total number of employment likely to be generated (Person days ) 238144
6 Likely change in Ground water table
6.1 Pre monsoon (bgl) To be assessed
6.2 Post monsoon (bgl) To be assessed
PART 2: EXPECTED FLOW OF BENEFITS (in nos.)
Sl. No.
Beneficiaries SHG UG Micro Total
M F Total M F Total M F Total M F Total
1 SC 989 330 1319 95 0 95 380 127 507 1441 480 1921
2 ST 157 52 209 15 0 15 91 30 121 259 86 345
3 Minority - - - - - - - - - - - -
4 Others 1057 413 1470 107 0 107 354 118 472 1537 512 2049
Total 2203 795 2998 217 0 217 825 275 1100 3237 1078 4315
Recommended