Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Steering Committee Meeting
13th of May 2009
Institutional Support to the Ministry of
Environment and Spatial Planning (MESP)
and River Basin Authorities
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
1 - Information system for water resource management
Data capture and storage, exchange
Laboratory analysis
Reference data - GIS
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 1 - Information System for Water Resource Management
-
Activities Progress
Pilot project : water status assessment
Preparation of biological analyses, recruitment of experts
Data collection/ needsData catalogue and portal
Priority ground water needs better identifiedProblem of access to data catalogue on MESP web site, web portal not well developed
Quality management of lab analysis and
Hydrological data
Study tour in France well appreciated, follow up mission mid-May 09 with quality management expert approved
WISKI tool: data are loaded but not yet checkedRating curves little progress
SQL database- GIS supportMonitoring database
Permit data base client/server application in development, test with users started, data not yet transferredAgreement for developing a monitoring database with WD contribution on Access software,
Flow Duration Curve - Drelaj(1/10 mean annual flow = 0.43 m3/s)
0.1
1
10
100
0.00 0.20 0.40 0.60 0.80 1.00
Exceedence Frequency (%)
Flow
m3/
s
Q90
% =
0.7
m3/
s
Q95
% =
0.61
m3/
s
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Study tour on quality management for laboratory analyses
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 1 : Problems / risks, plan for next period
Problems/ shortcomings Conditions/risks Plan for response
Limited availability and exchange of data:especially for ground water
Rainfall data insufficient
Info. available and transparent
Info shared among project partners
Give back information produced by project to data holders to get more data
Specific project might be needed on rainfall data
Maintenance of data catalogue, problem of security (hacker)WISKI software routine use Work on GIS
Partners sufficient resource and capacity
More regular contacts with partners to assess work done
additional training where appropriate
Creation of rating curves Partners sufficient resource and capacity
Study tour in Nimes to improve capability and knowledge of equipment : specific project might be needed
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
2- Monitoring system
Monitoring
system Laboratory analysis
Insure the quality of data
Programme of surveillance
(WFD)
Storage and control in the Hydrometerological institute (HMIK) or other institutions
Hydrology
WISKI software
River
Lakes
Ground Water
Protected zones
Physico-chemistry-
biology
Monitoring database
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Monitoring strategy– step by step approach
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 2 - Monitoring network improved
-
Activities Progress
Review of existing surface monitoring and proposal for improvement
Monitoring system strategy discussed for water surface, phase plan proposed
Ground water acquisition plan for Drini River Basin and proposal for a ground water monitoring system
Arrival of new KE3 , delineation of ground water bodies, strategy for ground water monitoring proposed, collection of data started (in March 09)
ToR for procurement and installation of new equipment/infrastructure and training needs
First proposal regarding resource and monitoring development.
ToR for works on contract Drilling investigation
More basic data on ground water needed in the first place
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 2 : Problems / risks / plan for next period
Problems/ shortcomings Conditions/risks Plan
Ground water information notavailable
Importance of monitoring understood
Continue negotiation with data holders,
Pilot project on ground water on data acquisition
Elaboration of ToR for ground water monitoring and for drilling contract
Sufficient detail and quality informed
decisions for the design TOR
After first data acquisition, propose standard drilling contracts for each type of drilling ( shallow, profound)
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
3 - Modeling for water resource planning
Possible Water Diversions from Upper Decan River
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Months
Dive
rsio
ns (m
3/s)
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
Rive
r dis
char
ge (m
3/s)
Minimum permissable flow Monthly potable water supplies to Decan Canal intake Radoniqi
Monthly irrigation supplies to Decan Standard Years
Data capture and storage, exchange
Data use for planning, decision
inputs
Synthetic information for public and stakeholders
Indicators,
Water quality evaluation
Tools box of models Assumptions, scenario
Water demand,
water balance,
Realistic objectives and Plans
Permit Issuing
Feasibility,
Involvement of stakeholders
River Basin Authorities
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
What if more irrigation areas are developed (with same irrigation
efficiency)?
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 3 – Modeling tools for water management planning
Activities Progress
Hydrological study and preparation of data for modelling
Almost completed, old data are of sufficient quality
Setting up the model for Drini River Basin Test of the model on Radoniqi sub-basin Calibrate model
Test and calibration done
Estimate water balance and water demand Water balance and water demand assessed on Drini River Basin and pilot area, (end Feb 09)
Involvement of stakeholders for improved water management planning
Training on scenarios building and result analyses carried out
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 3 : Problems / risks / plan for next period
Problems/ shortcomings Conditions/risks Plan to response
Use of model after project end
Availability of staff with sufficient modelling
background
To develop a manual and propose frequent opportunities for training and practices (additional days to the expert for training)
Recent hydrological data are not sufficient and of adequate quality to be used for modelling
Quality of recent and future data
Use old data series Technique of data generation Pilot project to collect more accurate data on demand
Opportunities to introduce outputs in Municipal plans
Effective collaboration and commitment at
national and municipal level
Field trip with stakeholders, develop realistic options for Radoniqi water system
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
4 - Modeling for flood risks plans
Data capture and storage, exchange
Data use for planning, decision
inputs
Synthetic information for public and stakeholders
Indicators,
Water quality evaluation
Tools box of models
Flood risk
Vulnerable areas
Realistic objectives and Plans
Flood risk maps and plans
Feasibility,
Involvement of stakeholders
River Basin Authorities
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Selection of flooding zone - Skenderaj
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 4 – Flood risk mapping and planning
Activities Progress
Assessment of basin wide flood risks,Pilot project in Skenderaj to develop methodology for flood risk.
First mapping of flooding zone in Skenderaj and for Drini river available (end Feb 09)
Develop a sub-basin flood management plan
Gaps for development of management plan identified, quality of GIS database
Elaborate a flood management action plan
Contact with Municipality of Skenderaj
ToR for Water Supply and Sanitation Investment Plan in Kosovo
A draft ToR produced for a Water Supply and Sanitation Investment Plan
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Pilot zone area
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Near a bridge
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Flooding at river basin level
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Mapping of flooding zone
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 4 : Problems / risks / plan for next period
Problems/ shortcomings Conditions/risks Plan to response
Follow up of ToR , each donor has his own policy
A consensus on content of the works scope
Coordinate with other partners
Delineate the inundated areas with sufficient accuracy with GIS tools
Accurate and recent Digital Elevation Model
Work on quality of the GIS data
Lack of rainfalls dataLack of recent hydrological dataData on water demand inaccurate
Use of specific techniques for estimation.Collect information in the field during the summer
Opportunities to introduce outputs in Municipal plans
Effective collaboration and commitment at
national and municipal level
Meetings in Municipalities and awareness campaigns.
Availability and quality of data
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
5- Legislative institutional aspects
Acquis Communautaires :
Water Directives
Institutions for river basin approach
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 5 – Institutional support to River Basin Dist. Auth.
Activities Progress
Proposal of functions and responsibilities of Riv. Bas. Dist. Authorities
Review of water act and subsidiary acts, shortcomings identified
Draft a subsidiary act Advantages and limits of options for river Basin District Authorities analysedJSTE to be recruited, possible follow up with TAIEX
Study tour to learn about River Basin Organisation
Study tour to be organised in neighbouring country (Bulgaria) in following months
Propose a Drini RBDA capacity development plan
Progress on this issue, regarding staff needed
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 5 : institutional aspects
Review of the water law and subsidiary act by international
expert
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 5 : Problems / risks / plan for next period
Problems/ shortcomings Conditions/risks Plan to response
Willingness to progress in this issue
Political commitment is ensured
Further discussion on this issue in MESP
Change of Permanent secretary
Relationship between the Water
Department and the RBDA are clarified at
high level.
Continue to inform the high level through Director of the water department and direct contact
Resource to be devoted and staffing of the RBDA Insufficient human
and financial resources, low
priority
Evaluation of the financial need and the possibility to raise additional resource using the polluter pays principle ( study tour including economical aspects)
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
6- Training Aspects
Watersurfaceprofiles
ArcGIS
Geometricdata
ParametersSchematic
Flowdischarge
Hydrology Hydraulic model
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 6 – Training activities – visibility – events
Activities Progress
Organise formal training on specific subjects
GIS training, English training completedWISKI training on hydrological database
Organise studies tours, participation to conferences
Study tour in a private laboratory for 8 technician and engineers of HMIK for 8 days
Evaluation of training Evaluation sheets : high level of satisfaction for study tourevaluation for English on-goingWISKI training follow up not sufficient
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
RESULT 6 : Problems / risks / plan for next period
Problems/ shortcomings Conditions/risks
Plan to response
Application of methodologies not possible because of inadequate equipment in WD
Model and GIS tools can be run by the
WD staff
New equipment is ordered
Practice of the methodology has to be developed
Time consuming Production of manuals, On-the-job in small groups including application of methodologies in practical case
For the use of sophisticated tools, a long practice is needed before the tools can be used properly.
The technical background of the
staff is sufficient for the use of the tools
Prepare ToR for sub-contracting when needed, work to be done using modellingFollow up missions
Absorption capacity is not high ( little number of persons among partners organisation)
Recruitment of qualified new civil servants
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Outputs done in 2008 / Outputs to be done in 2009
Feb-Apr 08
Mai-July
08
Aug-
Oct
08
Nov 08
Janv
09
Feb-May 09
Wk
GpG
ACTIVITIES - RESULTS
Information System
Monitoring network
Modeling tool box
Flood/ WasteWater Treatment Plant
Institutional support River Basin Auth.
Training
Data catalogue
Data status report
Codification -database
Pilot Project Strategy monitoring
Pilot project Model set up and tested Water balance
Pilot project (PP)
Flood risks mapping and
plans
Training plan report
Outputs done
Contribution
RBDA
development
On going
Draft WSS investment Plan
Data acquisition
Groundwater
ToR Monitoring
system
Pilot project
GIS Data quality
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
ACTIVITIES PLANNED FORNEXT PERIOD
Feb 09 – end May 09
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Subjects with progress expected Feb to end May 2009 (1)
INFORMATION SYSTEM
- Sql /GIS database prototype for permitting,
- Ground water acquisition pilot exercise preparation (equipment, methodology, recruitment, place)
- Biological analysis pilot exercise started in Prizren sub-basin
- Web protal improvement
- databases for measurements data developed with WD involvement
MODELING WITH WEAP – River basin management
- Involvement of planners (field visit)
- Training and preparation of manuals, steps for sustainabilityMODELING FLOODING RISKS
- Preparation of data acquisition
- Improvement of GIS data
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Subjects with progress expected Feb to end May 2009 (2)
WATER SUPPLY AND WASTEWATER INVESTMENT PLAN
Coordination through information of other actors
LEGISLATION - INSTITUTIONS
Analyse and proposal for improvement of water acts and subsidiary acts
TRAINING
Preparation of training tours
a) Institutions (Bulgaria June 09)
b) Hydrology ( Nimes –France June 09)
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
MANAGEMENT ISSUES - CONCLUSIONS
• mid-term review of the project with the partners provide opportunities to propose step to increase project impact : sustainability plan proposed to be developed (October 09)
• KE3 replaced, ground water aspects will progress
• Demand from the partner to practice more the methodologies and tools developed through on the job training in small groups with project experts
• First study tour was very much appreciated other study tours are planned on institutional aspects, hydrology
• New pilot exercises for summer 2009 – flooding risks mapping, – ground water acquisition, – biological analyses, – acquisition of data for modelling
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Mid-term review
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Commission Office in Kosovo
THE END
Thank you for your attention