View
215
Download
1
Category
Preview:
Citation preview
1
INFORMATION UPLOADED ON WEBSITE OF EASTERN RAILWAYS 1: HOSPITALS IN EASTERN RAILWAYS
SN DIVISION / WORKSHOP
HOSPITALS BEDS NO. OF MED
OFFICERS
1 SEALDAH BR SINGH HOSP 465 70
2 HOWRAH HWH ORTHO HOSP 179 44
3 ASANSOL ASN DIV HOSP 220 28
4 ANDAL SUB-DIV HOSP 50 10
5 MALDA MLDT DIV HOSP 100 18
6 KANCHRAPADA KPA WORKSHOP HOSP 220 22
7 LILLUAH LLH WORKSHOP HOSP 101 16
8 JAMALPUR JMP WORKSHOP HOSP 252 22
9 METRO RLY METRO HOSP 30 4
TOTAL 1617 234
2: MEDICAL FACILITIES AVAILABLE IN BRSINGH HOSPITAL-SEALDAH (ER)
INDOOR BEDS=465
BURN UNIT
HBOT MONOPLACE
EXTRAPORPOREAL
SW LITHOPTRIPSY
MAJOR OT = 05NO
WITH CENTRAL
AC & HEPA
FILTERS,
C-ARM IMAGE
INTENSIFIER
ANAESTHIA
STATION
ICU-SURGICAL -10
BEDDED,
ITU-MED-10
BEDDED
ICCU-10 BEDDED
POST OP CTVS ICU-
05 BEDDED
NICU-03 BEDDED
ALL WITH AED
VENTILATOR &ABG
PATHOLOGY LAB
WITH BLOOD BANK
02 NOS AUTO
ANALYSERS &
IMMUNOASSAY
AUTO ANALYSER
WITH EQAS
SUPPORT FOR ALL
ROUTINE TESTS,
CANCER MARKER
RADIOLOGY WITH
1 DIGITAL X-RAY
06 NO -X-RAY
MACHINES
500 ma -02,
300 ma -02
100 ma-01
20 ma -01
USG with COLOUR
DOPPLER
ADVANCED CARDIAC
CENTRE WITH FACILITY
OF ANGIOGRAPHY &
ANGIOPLASTY
EP-STUDY,
BALOON MITRAL
VALVULOPLASTY
PERIPH. STENTING
2D ECHO DOPPLER,
PACE MAKER IMP, TMT
SUPER SPECIALTY
AVAILABLE
CARDIOLOGY
NEUROLOGY
URO SURG.
GASTROENTROLO
GY
ENDOCRINOLOGY
PULMONOLOGY
ALL ROUTINE
SURGICAL & G&O
SECONDARY CARE
OPERATIVE
PROCEDURE
TERTIARY CARE
OPERATIVE
PROCEDURE LIKE
ALL LAPROSOPIC
G&O SURGERY
IU INSEMINATION
PHACO SURGERY
FOR CATARACT &
AUTO REFRECTO
KERATO METERY,
CORNEA
RETREAVAL PROG
YAG LASER,
PERIMETRY,
SLIT LAMP
ENT WITH
COCHLEAR
IMPLANTN. &
TYMPANOPLASTY
HEARING AIDS
CENTRALLY AC
SURGICAL INDOORS
OPD BLOCK WITH
PLASMA TV &
DVD
CENTRAL MUSIC
& PA SYSTEM IN
WARDS & OT’S
PHYSIOTHERAPY
WITH DUAL
THERAPY UNIT
(IFT+ UST
DENTAL CHAIR
WITH DENTAL
X-RAY MACHINE &
ROOT CANAL
TREATMENT
HIMS COVERING
CENTRAL STORE,
DISPENSARY,
CASUALTY,
INDOORS,& OPD
REGISTRATION
CT & MRI TIE-UP
WITH M/S- NIROG
DIAGNOSTIC
CARDIAC TIE-UP BM
BIRLA HOSP
NEUROSURG TIE UP
RNT HOSPITAL
AMBULANCES
07 IN NOS
(3 DEPTT,4 HIRED)
MODULAR
HOSPITAL KITCHEN
WITH FACILITY OF
AUTOMATIC
DISWASHER,
CHIMNEY,DOUGH
KNEADING
MACHINES,HOT
CHAMBER FOOD
TROLLY
AC- MORTUARY
FOR 6 BODIES
MECHANIZED
CLEANING OF
HOSPITAL
PREMISES &
MECHANIZED
CLEANING
CONTRACT FOR
HOSPITAL LINEN.
2
3: PRIVATE HOSPITALS RECOGNISED FOR TREATMENT:
4. M&P ITEMS SANCTIONED BY RLY BD 2011-12 1 SDAH Anesthesia Work Station ** 2 DRF 3960(2800)
2 HWH Anaesthesia work station 2 DRF 4000
3 SDAH ICU Ventilator 1 DRF 1811
4 SDAH OT light ** 1 DF-2 3000
5 SDAH Holmium Laser System 1 DF-2 4880
6 SDAH ENT Operating Microscope with accessories 1 DF-2 4750
7 SDAH Combined Ultrasonic & Pneumatic Lithotripter 1 DF-2 2210
8 SDAH Arterial Blood Gas Machine. 1 DF-2 1560
9 SDAH 532 S Frequency Doubled Solid State Laser, Diode Pumped with accessories
1 DRF 3325
10 SDAH HD High Definition 3 chip camera, 1980 & 1024 native resolution high definition 26 inch flat panel monitor
1 DRF 2595
11 HWH Computerised Radiography System 2 nos. 1 DF-2 3000
12 ASN Fully Automatic horizontal High Pressure Steam Sterilizer
DF-2 1500
13 HWH Electro Hydraulic operating table with cable connected hand control
1 DRF 4900 (2500)
14 SDAH Computerised Radiography System 1 DF-2 2000
5: PERFORMANCE OF CARDIAC CENTRE BR SINGH HOSPITAL
MARCH-2011 to MARCH- 2012
SN PROCEDURES PERFORMED NO. OF
PROCEDURES
1 Angiographies- 212
2 Angioplasties with Stents 49
3 Peripheral stents- 3
4 Implantable Cardioverter Defibrillator 3
5 Bi-Ventricular Pacemaker (CRT 3
6 Balloon Mitral Valvuloplasty 10
7 Peripheral procedures 7
8 Permanent Pacemakers 204
9 EP Studies with RF ablation 28
S.N. Name of Hospital Recognized for Validity
From
To
1 PEERLESS HOSPITAL CARDIOLOGY SENT TO RB
2 APOLLO HOSPITAL CARDIOLOGY SENT TO RB
3 B.M.BIRLA HOSPITAL CARDIOLOGY 06/10/2011 05/10/2013
4 R.N.TAGORE HOSPITAL NEURO SURG 31/01/2012 30/01/2013
3
6: NO. OF OPERATIONS DONE-ER-2011
JAN-DEC-2011 TYPE OF SURG. Total GRAND TOTAL
GEN SURGERY SPECIAL OP 309 SPECIAL 916
MAJOR OP 2830 MAJOR 8421
MINOR OP 4557 MINOR 10118
TOTAL 7696 G.TOTAL 19455
ORTHOPEDICS SPECIAL OP 262
MAJOR OP 703 MONEY VALUE*
MINOR OP 2123 SPECIAL 73.28 lac
TOTAL 3088 MAJOR 421.00 lac
GYNAE SPECIAL OP 163 MNOR 202.00 lac
MAJOR OP 2025 TOTAL 6.9628 Crore
MINOR OP 1906
TOTAL 4094 SPECIAL* @8000
OPHTHALMOLOGY SPECIAL OP 150 MAJOR* @5000
MAJOR OP 2759 MINOR* @2000
MINOR OP 998
TOTAL 3907
ENT SPECIAL OP 32
MAJOR OP 104
MINOR OP 534
TOTAL 670
7: STATIONS WHERE SANITATION IS BEING MAINTAINED BY MEDICAL DEPT =25
HOWRAH SEALDAH ASANSOL MALDA
Howrah Sealdah Asansol Malda Town
Bandel Naihati Andal Sahibgunj
Burdwan Ranaghat Madhupur Bhagalpur
Rampurhat Halisahar Sitarampur Jamalpur
Azimgunj Kancharapada Barakar
Katwa Bangaon Panagarh -----
Liluah Barasat
--- Sonarpur ----- ----
7 8 6 4
8: HEALTH CHECK UP CAMPS
In the year 2010 In the year 2011
Health Check-up Camps 451 138
No. of Beneficiaries Checked
18581 10367
4
MULTI PURPOSE HEALTH CHECK UP CAMP RANAGHAT 12-8-2011
9: WATER SAMPLES TESTED BACTERIOLOGICAL & RES.CHLORINE-2011 A-Month-wise details of Bacteriological testing of water
Division JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total
SDAH
Collected 117 89 99 121 106 122 122 99 118 119 107 112 1331
Fit 108 80 93 116 102 118 115 95 113 111 99 105 1255
Fit % 92 90 94 96 96 97 94 96 96 93 93 94 94%
HWH Collected 149 136 115 128 97 109 143 123 136 135 102 46 1419
Fit 111 129 110 104 77 99 109 101 113 118 86 39 1196
Fit % 74 95 96 81 79 91 76 82 83 87 84 85 84%
ASN Collected 52 57 41 53 52 49 43 58 53 43 50 53 604
Fit 45 53 39 52 49 41 43 53 53 43 46 46 563
Fit % 87 93 95 98 84 84 100 91 100 100 92 87 93%
MLDT Collected 38 33 35 34 43 34 32 31 30 29 30 31 400
Fit 33 28 31 29 38 31 29 31 29 27 30 31 367
Fit % 87 85 89 85 88 91 91 100 97 93 100 100 92%
CLW Collected 04 - 14 06 06 06 06 06 04 - - - 52
Fit 04 - 14 06 06 06 05 06 04 - - - 51
Fit % 100 100 100 100 100 83 100 100 - - - 98%
G.Total Collected 360 315 304 342 304 320 346 317 341 326 289 242 3806
Fit 201 290 287 307 272 295 301 286 312 299 261 221 3332
Fit % 55.8 92 94.4 89.7 89.4 92.1 87 90.2 91.5 91.7 90.3 91.3 87.5%
5
B-Month-wise details of Residual chlorine testing of water Division JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total
SDAH
Samples 1734 1751 1715 1396 2071 1679 1557 1164 1536 1852 1800 1772 20027
Fit 955 976 923 574 582 526 589 633 543 1003 720 717 8741
Fit % 55 56 54 41 28 31 38 55 35 65 40 40 44%
HWH Samples 1740 1698 1523 995 1283 1125 1133 1450 1494 1522 1072 1422 16457
Fit 1560 1430 1270 848 974 972 1019 1267 1311 1245 1002 1239 14137
Fit % 90 84 83 85 76 86 90 87 88 82 93 87 86%
ASN Samples 2844 2886 1070 2971 3357 3022 3319 2803 3075 3344 3001 2906 34598
Fit 2539 2589 985 2775 3144 3745 3003 2473 2482 3136 2777 2756 32404
Fit % 89 90 92 93 94 91 90 88 81 94 93 95 94%
MLDT Samples 451 353 392 392 405 384 310 410 362 372 385 385 4229
Fit 418 300 360 356 343 302 262 351 306 328 255 339 3920
Fit % 93 85 92 91 85 79 85 86 85 88 66 88 93%
CLW Samples 199 208 200 258 232 240 222 246 214 - - - 2019
Fit 199 208 200 258 232 240 222 246 214 - - - 2019
Fit % 100 100 100 100 100 100 100 100 100 - - - 100%
G.Total Samples 6968 6896 4900 6012 7348 6450 6541 6073 6681 7090 6258 6485 77330
Fit 5671 5503 3738 4811 5275 5785 5095 4970 4856 5712 4754 5051 61221
Fit % 81.3 79.8 76.2 80.0 71.7 89.6 77.9 81.8 72.6 80.5 75.9 77.8 79%
10: INVALIDATIONS & ALTERNATIVE EMPLOYMENT ON MED GROUND 2011
DIVISIONS AEMG (Decat)
Due to Vision
Physical reasons
Invalidations
Sealdah 44 15 29 19
Howrah 67 24 43 13
Malda 29 9 20 15
Asansol 22 15 07 10
KPA workshop 05 2 03 05
JMP workshop 04 3 01 08
LLH workshop 01 0 01 04
TOTAL 172 68 104 74
6
11: POSITION OF SANCTIONED WORKS UNDER PINK BOOK-ER PH PB ITEM
NO YEAR OF SANCTION
DIV DETAILS OF WORK SANCTIONED
PH COST Rs. (THOUSAN
DS)
OUT LAY
2012-13
REMARKS
52 PB 12-13 606
06-07 SDAH B. R. Singh Hospital -Improvement
DF-2 198500 (2423000)
10000 G+5 planned Floor wise detailed drawing finalized. Detailed estimates vetted Relocation of Adm block undergoing. Demolition &construction composite tender is under preparation by CAO-Con-I
52 PB12-13 620
09-10 SDAH To open Nursing Colleges on Railway land at Kolkata on PPP model.
DF-2 199200 100000 Civil Engg. Construction of
College & hostel going on TDC for Nursing College July,2012 & Hostel Sept,2012 Medical:- M/s. Top Track
Consultancy appointed for PPP RFP Document sent to Rly Bd for approval on 17-1-2011 Approval for admitting 40 students per year received on 3.11.2010 Inspection by INC done in June,11 Permission for 50% seat reservation for wards of Railway employees granted by Director of Med Edu, WB on 20-12-11 Matter was discussed with Principal Health Secy.-WB on 12-4-2012. WB govt. is ready to run & operate the Nursing College if offered by Ministry of Railways. Matter is being referred after GM approval to RB for further guidance
52 PB 12-13 615
09-10 HWH Centralized AC plant for wards at HWH orthopedic Hosp
DF-2 39852 10000 Work Started on 08.11.2010 completed in Male, Female, Children ward, Burn Unit, Radiology Gen OPD and the job of Ortho & Gynae is under process. The work of AC Plant Room is 90% Completed.
52 PB 12-13 619
09-10 HWH Belur-Multi Speciality
hospital under Howrah
division
DF-2 275141 100 The work is allotted to IRCON Proposal for “Expression Of Interest” has been sent to Rly Bd. for detailed guidelines regarding PPP model on 16.07.2010 Rly Bd has approved for EOI on BOM basis. Draft EOI has been prepared by CHD-HWH & same will be sent to RB after finance vetting & GM’s approval.
52 PB12-13 609
09-10 MLDT Malda – Up gradation /Renovation of Railway Hospital with modern facilities
DF2 37567 5000 Work is under progress. Modular OT, Anaesthesia Work Station, Improvement of the Pathology Department with Auto Analyzer, 3 Part Cell Counter, Elisa Reader etc., Procurement of Digital X-Ray, Improvement of Labour Room.
9
STRENGTHS OF EASTERN RAILWAYS-MEDICAL DEPARTMENT 1(i) No. of indoor beds:
Eastern Railways provides Comprehensive healthcare to Railway beneficiaries through 1780 beds in 9 hospitals which constitutes 12.74% of total bed strength of all hospitals in Indian Railways
(ii) Prestigious training Centre in West Bengal (A) DNB Courses B.R.Singh Hospital-Sealdah which is 461 bedded hospital provides DNB training in seven subjects namely: a) General Medicine b) General Surgery c) Obstetrics & Gynaecology d) Anaesthesiology e) Ophthalmology f) Pediatrics & g) Pathology Live classes are conducted by IGNOU for DNB students via satellite in the library (B)MRCOG As a matter of pride, Department of Gynae & Obstetrics is also recognized for MRCOG training.
(C)Houseman ship & Internship Besides this, BRSH is also recognised for house job and internship in all major disciplines
(iii) Secondary & Tertiary Care Eastern Railways provides services in almost all general specialties & some Superspecialities like Cardiology, Neurology, Neuro-Surgery, Urology, Endocrinology, Pulmology, Gastro-enterology, Orthopaedic to patients from ER, SER, ECR, NFR, Metro Railways & CLW The Advanced Cardiac Centre of BRSH was opened on 30-1-2011 & performing Angioplasties with stent, Angiographies, Pacemaker implantation, Balloon Mitral Valvulotomy, EP studies & ICD insertions. Cardiac surgery is planned from June 2012
(iv) MR's budget speech items a) Eastern Railways is the first zone to have started the construction of a Nursing College at Majerhat in June-2010. b) Ambulances have been hired to be stationed at Howrah & Sealdah stations 24x7 c) Duranto trains ex HWH-NDLS & SDAH-NDLS have been provided with Medical teams & equipments & its manpower is outsourced d) Burn unit in BR Singh Hosp.Sealdah has been inaugurated by H'ble Minister of Railways on e) Tender has been opened & work awarded for 50 bedded patient's attendant dormitory near BRSH-Sealdah
10
OPENING OF BURN UNIT WITH HBOT CENTRE BY H'BLE MR ON 13-11-11
CARDIAC CATH LAB –BR SINGH HOSPITAL
11
(v) Maximum no. of Scientific papers & Conferences
ER has been hosting regular Annual CME's at Zonal level since 1971 (Total 40 in BRSH-Sealdah since 1971).
• 9 Scientific papers have been published by the Medical Officers of BRSH-Sealdah in 2011 in International, National & local journals.
• Dr Bhaskar Ghosh, Neurologist BRSH-Sealdah has distinction of having written 5 chapters of a book entitled “Movement Disorders – a clinical and therapeutic approach” published by Jaypee Brothers Medical Publishers (P) Ltd., 2009 edition. His pioneer work in use of Inj. Botulinum toxin is one of the rare achievements by any IRMS officer.
2. Areas where improvement has been shown in 2011 Eastern Railways has shown improvement in following 7 areas in 2011
(i) Only 268 (0.48% of IPD admissions) cases were referred for Secondary level care to Railway hospitals of other zones, Govt./Pvt hospitals during 2011
(ii) No. of Low birth weight babies out of total deliveries in Railway hospitals has been consistently falling (214 in 2009,154 in 2010 & 150 in 2011) & no. of LBWB in booked cases is also falling (128 in 2009,96 in 2010 & 83 in 2011)
(iii) There is substantial fall in local purchase (35% in 2009 vs. 8.01% in 2010 & 7.3% in 2011) versus value of bills passed on PO issued from Zonal Headquarter.
(iv) There is substantial fall in Man days lost on RMC & IOD in the year 2011 (2.4% in 2009, 2.31% in 2010 & 0.92% in 2011)
(v) The no. of Medical equipments costing >1 lac is 242 during 2011 (138 in 2009 & 228 in 2010)
(vi) There was improvement in percentage of PMEs done for A1 category and finalized within two days (58.50% in 2010 vs.60.7% in 2011).
(vii) There was improvement in percentage of PMEs done for A2 category and finalized within same day (56.39% in 2010 vs.63.69% in 2011)
3. Zonal Conferences/CMEs organized in 2011 National-3 Zonal -10 Local -31 4. Papers published in National/International Journals during 2011.
International -2 National -5 Local -2
5. Any Innovation done/New Technologies introduced/New Services areas started
during 2010
12
INNOVATIONS- i) B.R.Singh Hospital and all Divisional and Workshop Hospitals of Eastern Railway have opened their Website in “Indiaheartbeat.com” where all the details of each Hospital are available. ii) One Blog “http//cmdeasternrailwaysblogspot.com” has been created by CMD-ER for information to all Divisional in charges about specification of Medical Equipments, DAR rules, best practices in Hospitals etc. iii) Divisional Hospital like Asansol, Malda, Howrah, and Workshop Hospital like Kancharapara, Liluah have joined EQAS Scheme in Biochemistry with CMC/Vellore during the year 2010. iv) Innovations introduced at Howrah Orthopaedic Hospital -Advance method in Limb Lengthening and Deformity Correction. -Biomechanical correction of Arthritis Knee to reduce expenditure of total Joint Replacement. -Minimally invasive Fracture Fixation Technique by Locking Plates and Screw.
6. New Services Introduced i) Installation of Cath-Lab, Modular OT and EP Study Lab ii) Opening of modern Burn Unit with Hyperbaric Oxygen therapy unit ii) Opening of Emergency Room near Casualty for triage & immediate treatment iii) Eye donation & Cornea retrieval programme started in collaboration with Disha Eye Hospital, Barrack pore-Kolkata iv) Digital X-ray facility introduced in HWH Ortho hosp & BR Singh hosp Sealdah
Recommended