IMPORTANT:As per the the discussion we had
on 06.08.2014withManglam Distillers & Bottling Industries
the Project is under Panning Stage.
The company is still waiting for Environmental clearances .
The project work is likely to start in by End of 2014.
The Project is Scheduled to be Completed
by December, 2015.
=======================================
So, this is the RIGHT TIMEto contact and Follow Upat following address
to obtain the detailed Enquiryof each product in timeand to
submit your quotation subsequently.
The Main Scope of Supply includes:
Boiler : *30 TPH
Fuel : **Coal/Rice Husk
(85 TPD /100 TPD)
Stack Height : 45 M
8/10/2019 Industrial Directory of India
4/47
Heat Exchanger, Air Pre-Heater/ Economiser.
* Actual Steam Requirement : 28 TPH
** Coal will be sourced from Assam & Biomass from nearbyarea.
===============================
Raw Materials :
1. Grains/Corn : 1
50 MT/day2. Alpha
Amylase : 30
Kg/ Day
3. Amyloglucosidase :
30 Kg/ Day
4. Yeast (Active Dry Yeast/ :
As per requirement
5. Sulphuric
Acid : 50 Kg
6. Urea :
60 kg/day
7. NutrientsAmmonia : 150
Kg/day
8. Antifoam :
0.6 kg per KL 36 kgs
9. Sulphuric
Acid : 50 Kg
10. Biocides :
30 kg
Vacuum Distillationmethod will be adopted forobtaining Ethanol.In vacuum distillation, ethanol is separatedand concentrated using principal of fractional distillation.This is based on difference in boiling points of
volatile compounds in mixture. There are six columns in the system Primary
column:1. Mash column,2. Rectifier column,
8/10/2019 Industrial Directory of India
5/47
3. Hydro extractive distillation column,
4. Refining column,
5. Aldehydes Column and6. Defuse Column.
Air Pollution Control Equipment :
Trima Cyclone
To control the particulate emissions from Coal Fired boiler will be controlled by Trima Cyclonewillbe installed as pollution control equipment with proper stack height
Steam generated from the boiler will be utilized in the generation of
3.0 MWPower and wili also be used for Boiler feed water heating andDistillery.
Flue gases after super heating the steam will pass through Economizer where they
will Pre-Heat the boiler Feed water before it enters the boiler drum. AfterEconomizer, flue will pass through Air Pre-Heaterswhere they will heat the airwhich will be fed to the boiler furnace for burning the fuel.
High pressure superheated steam from boiler will pass through a Steam Turbine
and at the lower pressure will go to the condenser.
The part of the steam will be extracted from the extraction points provided on the
turbine, which will be used for distillery.
The condensed steam will return to the steam boiler as condensate and will again
be boiled as steam.
While passing through the turbine, the high pressure and temperature steam will rotate theturbine rotor and an Electric Alternator mounted on the same shaft.
8/10/2019 Industrial Directory of India
6/47
Electric power will be generated by the alternator. This electric power generated will be consumedin house i.e. for running the distillery and utilities like boilers auxiliaries etc. and surplus powerwill be exported to the state grid.
Steam turbine
Coal handling system
Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
STORAGE OF GOODS OR MATERIALS
(Grains: Metal silo, Sulphuric Acid: MS Tank with lining,
Rectified Spirit: MS Tanks, Extra Neutral Alcohol: SS Tanks)
=======================
Manufacturing Process:
GRAIN CLEANING, MILLING AND FLOUR HANDLING :
The grain is lifted in Bu cket Elevators, screenedfollowed by removal of stones and ironmatter. Cleaned Grains are then milled using Dry Milling Processin Hammer Mil ls. The flouris fed through the bucket elevator and conveyed to the Batch Tipping Machinethrough a
Screw Conveyor. The flour addition is metered through the Batch Tipping Machine with load cell
8/10/2019 Industrial Directory of India
7/47
8/10/2019 Industrial Directory of India
8/47
8/10/2019 Industrial Directory of India
9/47
GRAIN STORAGE : The grain has to be lifted inBucket Elevators,
screened followed by removal of stones and iron matter.
8/10/2019 Industrial Directory of India
10/47
RJC Agros Limited plans to set up a 120 KLD Grain Based Distillery
along with 5 MWCaptive Power Plant (Coal / Biomass Based) at RekulakuntaVillage in Anantapur District, Andhra Pradesh.
It will produce Extra Neutral Alcohol, Rectified Spirit & Ethanol.
Capacity :
Distillery : 120 KLD
Captive Power Plant: 5 MW
(Coal/Biomass Based)
Botling Plant:
CO2 Recovery Plant:
CO2 generation will be 91.2 TPD and will be recovered in CO2 Recovery plant and will be
given to bottling units.
Location : Rekulakunta Village,Anantapur District
Andhra Pradesh.
As on August 06, 2014: The Project is under Planning Stage .
The unit would come up on about 20.92 Acres of Land.
Out of this 6.9 Acres of land The unitwill be developed as Green Belt.
8/10/2019 Industrial Directory of India
11/47
IMPORTANT:As per the the discussion we had
on 28.07.2014withRJC Agros Limited
the Project is under Panning Stage.
The company is still waiting for environmental clearance.
The project work is likely to start by November,2014.
The Project is Scheduled to be Completed
by December 2015.
So, this is the RIGHT TIMEto contact and Follow Upat following address to
obtain the detailed Enquiryof each product in timeand to
submit your quotation subsequently.
The Main Scope of Supply includes:
1. Boiler : 50 TPH
Fuel : Coal/Biomass
2. Boiler : 25 TPH
Fuel : Coal/Biomass
8/10/2019 Industrial Directory of India
12/47
Heat Exchanger, Air Pre- Heater/ Economiser
*Coal : Imported Coal (Indonesia / Australia)/
Indian Coal (Singareni Collieries Limited)/
Biomass (Local areas)
Raw Materials : The requirement of the Grain (Maize, Corn, Sorghum Grain,
Broken rice and Starch based grains etc) to produce 120 KLD ENA (Extra Neutral
Alcohol), RS (Rectified Spirit) & Ethanol has been estimated at 320 Tonnes/
Day.
Air Pollution Control Equipment :
Electrostatic Precipitators/ Bag Filter
To control the particulate emissions from Coal Fired boiler will be controlled by ESP/ High Efficiency
Bag Filterand emissions will be dispersed through appropriate Stack Height.
Steam generated from the boiler will be utilized in the generation of
5 MWPower and wil also be used for Boiler feed water heating and Distillery.
Flue gases after super heating the steam will pass through Economizer where they
will Pre-Heat the boiler Feed water before it enters the boiler drum. AfterEconomizer, flue will pass through Air Pre-Heaterswhere they will heat the air
which will be fed to the boiler furnace for burning the fuel.
After Air Pre Heaters flue gases will pass through an Electro Static
Precipitatorwhere the Dust Particles will be collected on charged electrodes.
8/10/2019 Industrial Directory of India
13/47
After passing through ESP, clean flue gases with dust particle concentration also
known as SPM level less than 50 mg/Nm3through a Chimneyof prescribedheight.
The dust will be collected from the bottom of the ESP.
High pressure superheated steam from boiler will pass through a Steam Turbine
and at the lower pressure will go to the condenser.
The part of the steam will be extracted from the extraction points provided on the
turbine, which will be used for distillery.
The condensed steam will return to the steam boiler as condensate and will again
be boiled as steam.
While passing through the turbine, the high pressure and temperature steam will rotate the
turbine rotor and an Electric Alternator mounted on the same shaft.
Electric power will be generated by the alternator. This electric power generated will be consumed
in house i.e. for running the distillery and utilities like boilers auxiliaries etc. and surplus power
will be exported to the state grid.
********************************************************
Manufacturing Process :
The following are the steps involved in the manufacturing Process for
Rectified Spirit/Ethanol/ENA:
1. Milling
2. Liquefaction
3. Saccharification
4. Fermentation
8/10/2019 Industrial Directory of India
14/47
Cleaning & Milling
The Grain is first pre-cleaned for removing stones, dust and foreign materials with the help
of Destonerand Magnetic Separators, before milling. Milling
involves processing grain through a Hammer Mill
(with screens between 3.2 to 4.0 mm) to production grain flour.
Liquefaction
The whole grain flour is slurred with water, and heat-stable enzyme (a-amylase) is added.
The slurry from the milling operation is cooked with steam and this is known as
liquefaction Liquefaction is accomplished using jet-cookers that inject steam into the grain
flour slurry to cook it at temperatures above 100C (212F).
Saccharification
After liquefaction, the slurry, now called Liquefied Grain Slurry, is cooled to approximately
30C (86F), and a second enzyme, Glucoamylase is added. Glucoamylase completes
the breakdown of the starch into simple sugar (glucose).
Fermentation
In the fermentation step, yeast is added to the grain mash to begin the process of
converting the simple sugars to ethanol. The other components of the grain (protein, oil,
etc.) remain largely unchanged during the fermentation process. Duration of fermentation is
around 48hrs.
DistillationThen the product will undergo vacuum distillation or multi-pressure distillation
(which has many advantages over conventional atmospheric distillation.
8/10/2019 Industrial Directory of India
15/47
Vacuum Distillation has lower energy requirement, consistently produces very high quality
alcohol and less scaling of distillation trays due to sludge.
********************************************************
Steam turbine : Capacity- 1500 KWH
Coal handling system
Ash handling system
Air Cooled Condenser
Power plant stack
Single Chimney
Fuel system
Cooling Tower
Cooled Condenser :
Use of Air Cooled Condenser to be used to reduce water
consumption.
All the Conveyorswill be covered with GI sheets to prevent the fugitive
dust emission into the atmosphere.
Other Equipment :
8/10/2019 Industrial Directory of India
16/47
Slurry Tank with Agitator and motor
..
Slurry Feed Pump with motor
Liquefaction Tank with agitator and motor
..
Pump for Initial Liquefaction Tank with motor
..
Condensate Tank
..
Condensate Transfer Pump
..
Final Liquefaction Tank with agitator & motor
..
Pump for final Liquefaction Tank with motor
..
Mash cooler
..
Enzyme Dosing System
..
CIP TANK
..
CIP transfer pump with motor
..
8/10/2019 Industrial Directory of India
17/47
Piping and valves & Instrumentation
..
Yeast Activation Vessel
..
Yeast Activation Vessel Recirculation
cum Transfer Pump with motor
..
Activation Vessel Cooler
..
Fermented wash Re circulation Pump with Motor
..
Beer well pumps
..
Air Blowers
..
Spent Wash pump with flame proof motor
..
DG set:(1 No.)will be installed for emergency power Back-up duringpower failure:
Water Treatment Plant
Oxidisation Chamber, IRF, R.O./D.M. Plant,
Pumps Valves, Custom Pipeline Work
The fresh water requirement of the proposed project is estimated as
8/10/2019 Industrial Directory of India
18/47
1000 m3/day. Water will be sourced from Ground Water.
Effluent Treatment Plant
Waste water will be generated from the plant. Domestic Effluent sent to soak pit.
Industrial effluent will be taken to ETP plant.
The boiler blow down & DM Plant& Softener regeneration water will be treated in aneutralization tank and after treatment it will be mixed with CT Blow down. All these treated effluent
streams will be stored in a Central Monitoring Basin (CMB).
8/10/2019 Industrial Directory of India
19/47
FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIESVisit : http://industrialdirectoryofindia.com/FAQ
(Helpline : +91-900 7158600)
Project UpdateAeidan Industries Plans To Set Up1040 Ton/MonthChemical Unit
---------------------------------------------
(Update: Ref Our Earlier Report on17.09.2013)
Aeidan Industries plans to set up a Synthetic Organic Chemical Production
Unithaving Capacity of 1040 Ton/Month at Jhagadia Industrial Estate,
Jhagadia in Bharuch, Gujarat.
Capacity: 1040 Ton/Month
Following Products will be manufactured in the proposed plant :
1. Meta phenoxy benzyl
alcohol : 120 Ton/Month
2. Para AnisicAlcohol : 60 Ton/Month
3. Cinnamic
alcohol : 30 Ton/Month
4. 3 Amino 9 Ethyl Carbazole
(AEC)
solution : 62 Ton/Month
1. 2,4 di methyl aniline
(2,4 xylidine)solution : 78 Ton/Month
1. Benzyl
acetone : 30 Ton/Mon
th
2. 2,5 Dichloro
aniline : 60 Ton/Month
http://www.industrialdirectoryofindia.com/downloadhttp://www.industrialdirectoryofindia.com/downloadhttp://www.industrialdirectoryofindia.com/downloadhttp://www.industrialdirectoryofindia.com/downloadhttp://www.industrialdirectoryofindia.com/downloadhttp://www.industrialdirectoryofindia.com/downloadhttp://www.industrialdirectoryofindia.com/download8/10/2019 Industrial Directory of India
20/47
8/10/2019 Industrial Directory of India
21/47
Boiler : 1 TPH - 1 No.Fuel : Briquette (250 kg/hr)Stack : 30 Meter (Dia : 500 mm)
Thermic Fluid HeaterCapacity : 15 Lakh Kcal - 1 No.
Fuel : Briquette (600 kg/hr)Stack : 30 Meter(Dia : 500 mm)
Heat Exchangers, Air Pre-heater/Economiser).
MANUFACTURING PROCESS
META PHENOXY BENZALCOHOL
To take 1000 Kg. Meta Phenoxy Benzaldehyde (MPBAD) in anAutoclave.
Then add 5 kg. Nickel (Ni) Catalyst into it.
Then 25 m3
N2 gas is purged in autoclave and O2 is removed from autoclave.
After this, pass 250 m3
hydrogen for 10 to 12 hr.
Then to collect 5 kg Ni collect into filter after filteration.
This spent Ni catalyst is sent back to the supplier.
Total 1000 Kg. Meta Phenoxy Benzyl alcohol (MPB Alcohol) is collected & packed in GI /
HDPE Barrels.
PARA ANISIC ALCOHOL
First o ttake 1000 Kg. Para Anisic Aldehyde in an autoclave.
Then add 3.5 kg. Nickel (Ni) Catalyst into it.
Then purge 25 m3
8/10/2019 Industrial Directory of India
22/47
N2 gas into autoclave and remove O2 from autoclave.
Now pass 240m3
hydrogen for 10 to 12 hr.
The pressure is maintained at 10 to 12 kg. Now check conversion.
When conversion is completed then to Filter Para Anisic Alcohol.
At this stage, 3.5 kg Ni is collected in filter after filteration.
This spent Ni catalyst is sent back to the supplier.
Total 1000 kg. Para AnisicAlcohol collected& packed in GI/HDPE Barrels.
ACETANILIDE
Take 700 kg. Aniline in a Reactor.
Then add 950 kg. Acetic acid & 5 kg toluene mixture slowly in a Reactor.
Heat up to 1200 Deg C
To Collect Dilute Acetic acid.
To Remove dilute acetic acid completely and then heat up 1200 Deg C to 1400
Deg C.
Once it reaches upto 1200 Deg C to 1400 Deg C temperature then maintains it for 12 to14 hrs.
After maintaining temperature rise the temperature upto 1400 Deg C to 1500 Deg C.
Then to add 45 kg. Acetic anhydrate in reactor carefully.
After addition rise the temperature upto 1500 Deg C to 1950 Deg C in vacuum condition.
When conversion is completed to Acetanilide, cool whole mass at room temperature.
Then to chillthe whole mass.
Then to pass from flakers and collect the flakes of Acetanilide.
Total 1000 kg. Acetanilide is collected & packed in 50 kg. PP woven/ HDPE Bags..
8/10/2019 Industrial Directory of India
23/47
************************
Other Equipments:
1. For Hydrogenation Plant:
SS Reactor : 4.0 KL---------------------------------------------
Autoclave : 4.0 KL---------------------------------------------
Autoclave : 3.0 KL---------------------------------------------
Pressure filter (1000 mm)
Qty : 2 Nos.---------------------------------------------Receiver S.S. tank : 3 KL
---------------------------------------------
Vaccum pump with S.S. Tank
Qty : 1 Nos.---------------------------------------------
Storage Tank : 10 kLQty : 4 Nos.--------------------------------------------
Safety valve(25 kg pr.)Qty : 2 Nos.--------------------------------------------
Chilling plant & pump : 40 TRQty : 1 No---------------------------------------------
Rapture Disc (27 kg pressure)Qty : 2 Nos.-----------------------------------------------
Flame arresterQty : 1 No.-----------------------------------------------
Cooling Tower with pumpCapacity : 100 TR
8/10/2019 Industrial Directory of India
24/47
Qty : 1 No.---------------------------------------------
FLP scale (300 kg max)Qty : 1 No.-------------------------------------------
G.C. shimadzuQty : 1 No.-------------------------------------------
Skid Lifter : 8 Tons----------------------------------------------
Drum Lifter : 1 Ton----------------------------------------------
Valve
---------------------------------------------Pipe line :---------------------------------------------
Fire hydrant---------------------------------------------
2. For Acetanilide Plant:
Reactor with distillation condenser
Capacity : 18KL---------------------------------------------Acetic acid pump
Qty : 1 No.---------------------------------------------
Aniline pumpQty : 1 No.
---------------------------------------------
Vaccum Pump
Qty : 2 Nos.---------------------------------------------
Storage Tank(50 kL, 25 kL x 2, 10 kL)
Qty : 4 Nos.
8/10/2019 Industrial Directory of India
25/47
--------------------------------------------
Dilute Acetic Acid pumpQty : 1 No.--------------------------------------------
Acetic Anhydrid...Show trimmed contentAttachments(1)
Jul2714.jpg26 KB View Download
Home/Technical Articles/ Electrical Thumb Rules You MUST Follow (Part 1)
Electrical Thumb Rules You MUST Follow (Part 1)
PostedAug 23 2013byjiguparmarinElectrical Lectures,Energy and Powerwith16 Comments
Electrical Thumb Rules You MUST Follow (Part 1)
https://groups.google.com/group/industrialdirectoryofindia/attach/c5b63e6e8087a282/Jul2714.jpg?part=0.1&view=1https://groups.google.com/group/industrialdirectoryofindia/attach/c5b63e6e8087a282/Jul2714.jpg?part=0.1&view=1https://groups.google.com/group/industrialdirectoryofindia/attach/c5b63e6e8087a282/Jul2714.jpg?part=0.1https://groups.google.com/group/industrialdirectoryofindia/attach/c5b63e6e8087a282/Jul2714.jpg?part=0.1http://electrical-engineering-portal.com/http://electrical-engineering-portal.com/http://electrical-engineering-portal.com/technical-articleshttp://electrical-engineering-portal.com/technical-articleshttp://electrical-engineering-portal.com/technical-articleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1http://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/category/energy-and-powerhttp://electrical-engineering-portal.com/category/energy-and-powerhttp://electrical-engineering-portal.com/category/energy-and-powerhttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#commentshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#commentshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#commentshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#commentshttp://electrical-engineering-portal.com/category/energy-and-powerhttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1http://electrical-engineering-portal.com/technical-articleshttp://electrical-engineering-portal.com/https://groups.google.com/group/industrialdirectoryofindia/attach/c5b63e6e8087a282/Jul2714.jpg?part=0.1https://groups.google.com/group/industrialdirectoryofindia/attach/c5b63e6e8087a282/Jul2714.jpg?part=0.1&view=1https://groups.google.com/group/industrialdirectoryofindia/attach/c5b63e6e8087a282/Jul2714.jpg?part=0.1&view=18/10/2019 Industrial Directory of India
26/47
Electrical Thumb Rules For:
Cable Capacity
Current Capacity of Equipment
Earthing Resistance
Minimum Bending Radius Insulation Resistance
Lighting Arrestor
Transformer
Diesel Generator
Current Transformer
Quick Electrical Calculation
Cable Capacity
For Cu Wire Current Capacity (Up to 30 Sq.mm) = 6X Size of Wire in Sq.mm
Ex. For 2.5 Sq.mm = 62.5 = 15 Amp, For 1 Sq.mm = 61 = 6 Amp, For 1.5 Sq.mm = 61.5 = 9Amp
For Cable Current Capacity = 4X Size of Cable in Sq.mm, Ex. For 2.5 Sq.mm = 42.5 = 9 Amp.
Nomenclature for cable Rating =Uo/U
where Uo = Phase-Ground Voltage, U = Phase-Phase Voltage, Um = Highest Permissible Voltage
Go to Content
Current Capacity of Equipment
1 Phase Motor draws Current = 7Amp per HP.
3 Phase Motordraws Current = 1.25Amp per HP.
Full Load Current of 3 Phase Motor = HPx1.5
Full Load Current of 1 Phase Motor = HPx6
No Load Current of 3 Phase Motor = 30% of FLC
KW Rating of Motor = HPx0.75
Full Load Current of equipment = 1.39xKVA (for 3 Phase 415Volt)
Full Load Current of equipment = 1.74xKw (for 3 Phase 415Volt)
Go to Content
Earthing Resistance
Earthing Resistance for Single Pit = 5, Earthing Grid = 0.5 As per NEC 1985 Earthing Resistanceshould be < 5. Voltage between Neutral and Earth
8/10/2019 Industrial Directory of India
27/47
Resistance between Neutral and Earth MCOV).
Go to Content
http://electrical-engineering-portal.com/glossary-of-medium-voltage-switchgear-termshttp://electrical-engineering-portal.com/glossary-of-medium-voltage-switchgear-termshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/megger-insulation-resistance-testhttp://electrical-engineering-portal.com/megger-insulation-resistance-testhttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/megger-insulation-resistance-testhttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/glossary-of-medium-voltage-switchgear-terms8/10/2019 Industrial Directory of India
28/47
Transformer
Current Rating of Transformer = KVA x 1.4
Short Circuit Current of T.C /Generator = Current Rating / % Impedance No Load Currentof Transformer =< 2% of Transformer Rated current
Capacitor Current (Ic) = KVAR / 1.732xVolt (Phase-Phase)
Typically the local utility provides transformers rated up to 500kVA For maximum connected
load of 99kW,
Typically the local utility provides transformers rated up to 1250kVA For maximum connected
load of 150kW.
The diversity they would apply to apartments is around 60%
Maximum HT (11kV) connected load will be around 4.5MVA per circuit.
4No. earth pits per transformer (2No. for body and 2No. for neutral earthing),
Clearances, approx.1000mm around TC allow for transformer movement for replacement.
Go to Content
Diesel Generator
Diesel Generator Set Produces = 3.87 Units (KWH) in 1 Litter of Diesel.
Requirement Area of Diesel Generator =for 25KW to 48KW = 56 Sq.meter, 100KW = 65
Sq.meter.
DG less than or equal to 1000kVA must be in a canopy.
DG greater 1000kVAcan either be in a canopy or skid mounted in an acoustically treated room DG noise levels to be less than 75dBA at 1 meter.
DG fuel storage tanks should be a maximum of 990 Litter per unit. Storage tanks above this level
will trigger more stringent explosion protection provision.
Go to Content
Current Transformer
Nomenclature of CT:
Ratio:input / output current ratio
Burden (VA):total burden including pilot wires. (2.5, 5, 10, 15 and 30VA.)
Class:Accuracy required for operation (Metering: 0.2, 0.5, 1 or 3, Protection: 5, 10, 15, 20, 30).
Accuracy Limit Factor:
Nomenclature of CT: Ratio, VA Burden, Accuracy Class, Accuracy Limit Factor.Example:1600/5,
15VA 5P10 (Ratio: 1600/5, Burden: 15VA, Accuracy Class: 5P, ALF: 10)
http://electrical-engineering-portal.com/transformer-routine-test-measurement-of-no-load-loss-and-currenthttp://electrical-engineering-portal.com/transformer-routine-test-measurement-of-no-load-loss-and-currenthttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/transformer-routine-test-measurement-of-no-load-loss-and-current8/10/2019 Industrial Directory of India
29/47
As per IEEE Metering CT:0.3B0.1 rated Metering CT is accurate to 0.3 percent if the connected
secondary burden if impedance does not exceed 0.1 ohms.
As per IEEE Relaying (Protection) CT:2.5C100 Relaying CT is accurate within 2.5 percent if the
secondary burden is less than 1.0 ohm (100 volts/100A).
Go to Content
Quick Electrical Calculation
1HP = 0.746KW Star Connection
1KW = 1.36HP Line Voltage = 3 Phase Voltage
1Watt = 0.846 Kla/Hr Line Current = Phase Current
1Watt = 3.41 BTU/Hr Delta Connection
1KWH = 3.6 MJ Line Voltage = Phase Voltage
1Cal = 4.186 J Line Current = 3 Phase Current
1Tone = 3530 BTU
85 Sq.ft Floor Area = 1200 BTU
1Kcal = 4186 Joule
1KWH = 860 Kcal
1Cal = 4.183 Joule
Go to Content
Recommended EE articles
Maintenance and inspection of the transformer bushings
August 1, 2014
http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/maintenance-and-inspection-of-the-transformer-bushingshttp://electrical-engineering-portal.com/maintenance-and-inspection-of-the-transformer-bushingshttp://electrical-engineering-portal.com/2014/08http://electrical-engineering-portal.com/2014/08http://electrical-engineering-portal.com/maintenance-and-inspection-of-the-transformer-bushingshttp://electrical-engineering-portal.com/2014/08http://electrical-engineering-portal.com/maintenance-and-inspection-of-the-transformer-bushingshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-ruleshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1#thumb-rules8/10/2019 Industrial Directory of India
30/47
What engineers should know about using conduits in power substation designs
July 25, 2014
An example how to calculate voltage drop and size of electrical cable
June 30, 2014
..
Electrical Thumb Rules You MUST Follow (Part 2)PostedAug 28 2013byjiguparmarinElectrical Lectures,Energy Efficencywith5 Comments
http://electrical-engineering-portal.com/what-engineers-should-know-about-using-conduits-in-power-substation-designshttp://electrical-engineering-portal.com/what-engineers-should-know-about-using-conduits-in-power-substation-designshttp://electrical-engineering-portal.com/2014/07http://electrical-engineering-portal.com/2014/07http://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/2014/06http://electrical-engineering-portal.com/2014/06http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-2http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-2http://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/category/energy-efficencyhttp://electrical-engineering-portal.com/category/energy-efficencyhttp://electrical-engineering-portal.com/category/energy-efficencyhttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-2#commentshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-2#commentshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-2#commentshttp://electrical-engineering-portal.com/how-to-measure-insulation-resistance-of-a-motorhttp://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/what-engineers-should-know-about-using-conduits-in-power-substation-designshttp://electrical-engineering-portal.com/how-to-measure-insulation-resistance-of-a-motorhttp://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/what-engineers-should-know-about-using-conduits-in-power-substation-designshttp://electrical-engineering-portal.com/how-to-measure-insulation-resistance-of-a-motorhttp://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/what-engineers-should-know-about-using-conduits-in-power-substation-designshttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-2#commentshttp://electrical-engineering-portal.com/category/energy-efficencyhttp://electrical-engineering-portal.com/category/electrical-lectureshttp://electrical-engineering-portal.com/author/jiguparmarhttp://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-2http://electrical-engineering-portal.com/2014/06http://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/2014/07http://electrical-engineering-portal.com/what-engineers-should-know-about-using-conduits-in-power-substation-designs8/10/2019 Industrial Directory of India
31/47
Electrical Thumb Rules You MUST Follow // PART 2 (on photo: Osprey Lunch Among TheElectrical Wires! by Kathleen Jackson via Flickr)
Continued from first part:Electrical Thumb Rules You MUST Follow (Part 1)
Useful Electrical Equations
For Sinusoidal Current: Form Factor =RMS Value/Average Value = 1.11
For Sinusoidal Current: Peak Factor =Max Value/RMS Value = 1.414
Average Value of Sinusoidal Current (Iav) = 0.637 x Im (Im = Max.Value)
RMS Value of Sinusoidal Current (Irms) = 0.707 x Im (Im = Max.Value) A.C Current = D.C Current/0.636.
Phase Difference between Phase = 360/ No of Phase (1 Phase=230/1=360, 2
Phase=360/2=180)
Short Circuit Levelof Cable in KA (Isc) =
(0.094 x Cable Dia in Sq.mm) / Short Circuit Time (Sec)
http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1http://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-1http://electrical-engineering-portal.com/download-center/electrical-software/short-circuit-current-calculation-ischttp://electrical-engineering-portal.com/download-center/electrical-software/short-circuit-current-calculation-ischttp://electrical-engineering-portal.com/download-center/electrical-software/short-circuit-current-calculation-ischttp://electrical-engineering-portal.com/electrical-thumb-rules-you-must-follow-part-18/10/2019 Industrial Directory of India
32/47
Max.Cross Section Area of Earthing Strip (mm2)= (Fault Current x Fault Current x OperatingTime of Disconnected Device ) / K
K = Material Factor, K for Cu = 159, K for Al = 105, K for steel = 58 , K for GI = 80
Most Economical Voltage at given Distance = 5.5 x ((km/1.6) + (kw/100)) Cable Voltage Drop (%) =
(1.732 x current x (Rcos+jsin) x 1.732 x Length (km) x 100) / (Volt(L-L) x Cable Run. Spacing of Conductor in Transmission Line (mm) = 500 + 18 x (PP Volt) + (2 x (Span in
Length)/50).
Protection radius of LighntingArrestor = h x (2D-h) + (2D+L).Where h= height of L.A, D-distance of equipment (20, 40, 60 Meter), L=V x t (V=1m/ms,
t=Discharge Time).
Size of Lightning Arrestor = 1.5x Phase to Earth Voltage or 1.5 x (System Voltage/1.732).
Maximum Voltage of the System = 1.1xRated Voltage (Ex. 66KV = 1.1 66 = 72.6KV)
Load Factor= Average Power/Peak Power
If Load Factor is 1 or 100% = This is best situation for System and Consumer both.
If Load Factor is Low (0 or 25%) = you are paying maximum amount of KWH consumption. Load
Factor may be increased by switching or use of your Electrical Application.
Demand Factor=Maximum Demand / Total Connected Load (Demand Factor 1)
Diversity factor should be consider for individual Load
Plant Factor (Plant Capacity) = Average Load / Capacity of Plant
Fusing Factor = Minimum Fusing Current / Current Rating (Fusing Factor>1).
Voltage Variation (1 to 1.5%) =((Average VoltageMin Voltage) x 100)/Average VoltageEx:462V, 463V, 455V, Voltage Variation= ((460455) x 100)/455 = 1.1%.
Current Variation (10%) =((Average CurrentMin Current) x 100)/Average CurrentEx: 30A,35A,30A, Current Variation = ((35-31.7) x 100)/31.7 = 10.4%
Fault Level at TC Secondary= TC (VA) x 100 / Transformer Secondary (V) x Impedance (%)
Motor Full Load Current = Kw /1.732 x KV x P.F x Efficiency
Recommended EE articles
An example how to calculate voltage drop and size of electrical cable
June 30, 2014
http://electrical-engineering-portal.com/how-distribution-systems-control-customer-loadshttp://electrical-engineering-portal.com/how-distribution-systems-control-customer-loadshttp://electrical-engineering-portal.com/demand-factor-diversity-factor-utilization-factor-load-factorhttp://electrical-engineering-portal.com/demand-factor-diversity-factor-utilization-factor-load-factorhttp://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/2014/06http://electrical-engineering-portal.com/2014/06http://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/2014/06http://electrical-engineering-portal.com/an-example-how-to-calculate-voltage-drop-and-size-of-electrical-cablehttp://electrical-engineering-portal.com/demand-factor-diversity-factor-utilization-factor-load-factorhttp://electrical-engineering-portal.com/how-distribution-systems-control-customer-loads8/10/2019 Industrial Directory of India
33/47
An example of calculating the technical losses of T&D lines
April 25, 2014
Heat vs. Current in a Resistor
October 4, 2013
Total Losses in Power Distribution and Transmission Lines (1)
August 19, 2013
..
5 of 99+
Home
http://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lineshttp://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lineshttp://electrical-engineering-portal.com/2014/04http://electrical-engineering-portal.com/2014/04http://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/2013/10http://electrical-engineering-portal.com/2013/10http://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/2013/08https://groups.google.com/forum/#!overviewhttp://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lineshttp://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lineshttp://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lineshttp://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lineshttp://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lineshttps://groups.google.com/forum/#!overviewhttp://electrical-engineering-portal.com/2013/08http://electrical-engineering-portal.com/total-losses-in-power-distribution-and-transmission-lines-1http://electrical-engineering-portal.com/2013/10http://electrical-engineering-portal.com/heat-vs-current-in-a-resistorhttp://electrical-engineering-portal.com/2014/04http://electrical-engineering-portal.com/an-example-of-calculating-the-technical-losses-of-td-lines8/10/2019 Industrial Directory of India
34/47
Click on a groups star icon to add it to your favorites
Recently viewed
tab2click
Recent searches
Recently posted to
Privacy-Terms of Service
tab2click
Fwd: Electrical Design Engineering1 post by 1 author
TAB2CLICK
1/4/11
Dear Professionals,
Admissions open for Electrical Design Engineering Training & Certification Program with 100%Job Opportunity in Oil & Gas /Petrochemicals/ Refineries/ Chemicals/ Energy & Power industries.
SmartBrains Institute of Engineering Design &
Researchis a leading training provider with several
years of experience in the Oil & Gas / Power /
Petroleum / Refineries / Petrochemical industries.
We are one of the largest Indian advanced training
providers in the areas of Design & Detailed
Engineering for Various departments of Oil &
https://groups.google.com/forum/#!forum/tab2click-http://www.google.com/intl/en/policies/privacy/http://www.google.com/intl/en/policies/privacy/http://www.google.com/intl/en/policies/terms/http://www.google.com/intl/en/policies/terms/http://www.google.com/intl/en/policies/terms/https://groups.google.com/forum/#!forum/tab2click-https://groups.google.com/forum/#!forum/tab2click-https://groups.google.com/forum/#!forum/tab2click-http://www.google.com/intl/en/policies/terms/http://www.google.com/intl/en/policies/privacy/https://groups.google.com/forum/#!forum/tab2click-8/10/2019 Industrial Directory of India
35/47
Gas/Power companies at our Training Centre in
Indirapuram, Ghaziabad.
We SmartBrainsare also a leading Manpower Placement Firm and we are catering to Oil & Gas/ Power/chemical/ Petrochemical / refinery/infrastructure/Cements & Metals etc from last 10 Years.
We have various customized courses for professionals, fresher & students.
Course Eligibility Duration Batches Batch Date
Electrical DesignEngineering
(Fee :Rs. 25000/- +10.3% service tax)
Degree/Diploma in ElectricalEngineering
3 Months Weekends
9th
Jan 2011
29th
Jan 2011
12th
Mar 2011
1 Month Weekdays
17th
Jan 2011
21st
Feb 2011
21st
Mar 2011
Electrical DesignEngineering
(Fee :Rs. 20000/-)
Degree/Diploma in ElectricalEngineering (Only forExperienced Professionals) 9 Days Daily 29
thJan 2011
15 Seats Available Only - Seats allotted on first come first serve basis.
Application Procedure:Please Visit SmartBrains office, along with your Academic Certificate Copy, and Registration fee of Rs.5000/-(Adjustable in Course Fee).For Further Details Please call at 0120-4104994, 9891108700/9810554003 or you can send email on
in...@smartbrains.in.Or Visit:www.smartbrains.inApply Online:http://www.smartbrains.in/registration.html
Course Contents:
Basics of Electrical Engineering
Single phase system and Polyphase system and their Importance
http://www.smartbrains.in/http://www.smartbrains.in/http://www.smartbrains.in/http://www.smartbrains.in/registration.htmlhttp://www.smartbrains.in/registration.htmlhttp://www.smartbrains.in/registration.htmlhttp://www.smartbrains.in/registration.htmlhttp://www.smartbrains.in/8/10/2019 Industrial Directory of India
36/47
Power Generation, Transmission, distribution and utilization.
Introduction of key electrical equipments used in projects
Coordination with Other Disciplines
Process Engineers
Mechanical Engineers
Civil Engineers
Instrument Engineers
Communication and safety Engineers.
Estimation of Plant Electrical Load
Preparation of Load Schedule
Determination of power Supply Capacity
Standby Capacity consideration
Rating of Generators In Relation To Their Prime Movers-Importance of max and min temp.
Rating Of Motors In Relation To Their Driven Machines
Development of Single Line Diagrams (SLD)
Key SLD
Detail SLD
Lighting system SLD
Small power SLD
Metering and Control diagram
Control Schematics
Introduction
Block Diagram
Typical Schematics for Motor Feeder
Typical Schematics for Power Feeder
Typical Schematics for Transformer Feeder
Selection and Sizing of Electrical Equipments
Emergency Generator
8/10/2019 Industrial Directory of India
37/47
Transformer
Neutral Grounding Resistor
HV/MV Switchgears
LV Switchgears
HV/MV/LV Capacitor Bank
DC Battery & Battery Charger
AC UPS
AC/DC Machines
CT/PT
Hazardous Area Classification and Selection of Equipments
Zone /Division Classification
Types Of Protection For Hazardous Areas
Hazardous source List Preparation
Certification Of Hazardous Area Equipment
Marking Of Equipment Nameplates
Hazardous Area Drawings / Layouts Preparation
System Studies and Calculation
Short Circuit Analysis (Fault Calculations and Stability Studies)
Load Flow Analysis
Motor Starting Study
Harmonics Study
Relay Coordination Study
Cable Selection and Sizing
Power and Control cable Introduction
Cable selection
Cable sizing for Low voltage system
Cable sizing for High voltage system
Voltage Drop Consideration
8/10/2019 Industrial Directory of India
38/47
Let through Energy consideration
Earth fault Loop Impedance consideration
Cable Schedule
Cable interconnection Schedule
Selection and Sizing of Cable Tray
Cable tray schedule
Cable Drum schedule
Conduit Selection
Conduit Sizing
Cable Routing
Cable routing Layout
Cable Tagging
Installation details
Earthing & Lightening Protection Design
Requirement of Earthing in Industrial Plants
Earthing Design calculations
Type of Earthing and Details
Earthing Installation Details
Earthing Layout Design
Lightening Protection Requirement
Lightening Protection Calculation
Lightening Installation Details
Lightening Layout Design
Illumination Design
Introduction
Type of Lighting Fixtures
Selection of Lighting Fixtures
Preparation Of Fixture Schedule
8/10/2019 Industrial Directory of India
39/47
Indoor Illumination Calculation
Outdoor Illumination Calculation
Calculation on Software
Lighting Layout Design
Lighting Installation Detail
Small Power selection
Lighting Board Schedule
Sub-Station design
Introduction
Type of Sub-Stations
General arrangement of substation
Equipment Layout
Electrical Equipment/System Specification
Transformer
Diesel Generator
HV /MV Switchgears
LV Switchgear
HV/LV Capacitor Bank
DC Battery Charger
AC UPS
Battery
VFD
Power Cables
Control Cables
Illumination
Earthing and Lightening Protection
Page Party system
CCTV system
8/10/2019 Industrial Directory of India
40/47
Telephone System
Etc.
Program Highlights:
Intensive training with extensive practical which will make person more perfect and very comfortablewith industry.
100 % Placement assistance to all students
Leading Placement and Training Provider
Expert faculties who are currently working with 15+ years of experience which help the participants toget real industry tips and feedback # Practical oriented Training program.
Live Engineering Project.
Excellent training material, case studies materials.
Accommodation is available for outstation candidates.
Placement Details:
SmartBrains Consultantsis Indias leading Manpower Consulting Company providing need basedrecruitment solutions in almost all functions to reputed organizations / establishments in wide range offields like Oil & Gas, Petrochemicals, Refineries, Process, Power, Energy, Infrastructure,Construction Engineering, Cement, Metals etc.
SmartBrains Consultants provides career Counseling and guidance, to all our students/trainee to identifytheir career path for achieving success in life.
Best Regards,
SmartBrains Engineers & Technologist Pvt. Ltd.
12-A, 2nd Floor, Ahinsa Khand II,
Indirapuram, Ghaziabad201010.
--------------------------------------------------
Mobile: 9810554003/9891108700
Tel: 01204104994--------------------------------------------------Email:info@smartbrains.inWeb:www.smartbrains.in
..
Niel A. Farrow
http://www.smartbrains.in/http://www.smartbrains.in/http://www.smartbrains.in/http://www.smartbrains.in/8/10/2019 Industrial Directory of India
41/47
2/17/03
Will be rewiring the house this week using some of the existing newer
cabling etc. Am thinking of a ring circuit for each of:
Upstairs and downstairs socketsKitchen/utility roomCookerImmersion heaterGarage
Which uses up the RCD protected MCBs, and:
Upstairs lightsDownstairs lightsSpare non-RCD protected for smoke alarms?
Does this look reasonable?Also, what size wires for the smoke alarm circuit?
Thank you,
Neil
Show trimmed content
use...@isbd.co.uk
2/17/03
Niel A. Farrow wrote:> Will be rewiring the house this week using some of the existing newer> cabling etc. Am thinking of a ring circuit for each of:>> Upstairs and downstairs socketsOK
> Kitchen/utility room
OK
> CookerNot a ring circuit, just a radial, probably wired with 4sq mm or 6sq mm cable. Doesn't need to be on the RCD side of the CU, in factit's better for it not to be as cooker elements can trip RCDs evenwhen not faulty.
8/10/2019 Industrial Directory of India
42/47
> Immersion heaterNot a ring circuit again, a radial, wired with 2.5sq mm generally (ifit's a normal size immersion heater). Again doesn't need to be on theRCD protected side of the CU.
> GarageNot a ring probably, total load in the garage can be quite happilysupplied by a 2.5sq mm radial protected by a 20 amp MCB unless you'rethinking of using serious amounts of power in the garage. It may wellalso make sense to run this from the non RCD side of the CU and havean RCD in the garage so that a fault in the garage won't disconnectthe main RCD protected circuits in the house.
There are *lots* of options for the garage, look at earlier threads onthis subject.
>> Which uses up the RCD protected MCBs, and:>> Upstairs lights> Downstairs lights> Spare non-RCD protected for smoke alarms?OK
--Chris Green (cgr...@x-1.net)
Show trimmed content
Christian McArdle
2/17/03
>Will be rewiring the house this week using some of the existing newer>cabling etc. Am thinking of a ring circuit for each of:> (...)> Garage
Is the garage attached or detached?
A simple ring for the garage if attached will be fine.
However, if it is detached, you should run a non-RCD circuit using armouredcable to a separate consumer unit in the garage with a separate earth rod,primary equipotential bonding and RCD on all circuits. This is called a TTsystem.
Christian.
8/10/2019 Industrial Directory of India
43/47
Show trimmed content
ben
2/17/03
On Mon, 17 Feb 2003 08:43:55 +0000 (UTC),n...@alumni.caltech.edu(NielA. Farrow) wrote:> Will be rewiring the house this week using some of the existing newer> cabling etc. Am thinking of a ring circuit for each of:>> Upstairs and downstairs sockets> Kitchen/utility room> Cooker> Immersion heater
> Garage
Ring circuits for the non-kitchen sockets, kitchen and garage seemlike a good plan to me. Use 32A MCBs.
What type of cooker do you have? If it's a modern electric oven with agas hob, then it might come with a 13A plug, as mine did. In thiscase, you probably could put it on a ring if you wanted.
However, if you've got an electric oven and an electric hob, you mightneed to run a radial from the CU using 6mm^2 cable. Use a cookerswitch and cooker connection unit in the kitchen, and put a 40A MCB inthe CU.
I've just rewired mine, for an oven with a 13A plug. However, I choseto run a 6mm^2 radial anyway, then put a cooker switch, then put adouble unswitched socket for the oven and gas hob ignitor. I did thisbecause we might rent this flat in the future, in which case I wouldswitch the gas hob for an electric, and so need the extra cablecapacity.
Next, I would say you probably don't need a ring circuit just for animmersion heater: instead, you could get away with just running aradial on 2.5mm^2 cable, and putting a 16A or 20A MCB in the CU. See:
http://www.tlc-direct.co.uk/Book/6.5.3.htm
...for more information.
> Which uses up the RCD protected MCBs, and:>> Upstairs lights> Downstairs lights> Spare non-RCD protected for smoke alarms?>> Does this look reasonable?
http://www.tlc-direct.co.uk/Book/6.5.3.htmhttp://www.tlc-direct.co.uk/Book/6.5.3.htmhttp://www.tlc-direct.co.uk/Book/6.5.3.htm8/10/2019 Industrial Directory of India
44/47
This all looks right to me. Use 6A MCBs for each of these.
> Also, what size wires for the smoke alarm circuit?
1mm^2 should be fine, since they take a nominal amount of power. Infact, you might find it difficult to get three wires into the
interconnect terminals, if you use anything bigger (if yours areanything like mine, then it's a stupid and fiddly job as it is).
You probably know, but you need to use three-core and earth for thewires between detectors. Don't be tempted to use the earth wire oftwin-and-earth as an interconnect!
Good luck with it,
Ben.
Show trimmed content
Christian McArdle
2/17/03
> Are you allowed to run the armoured cable from a RCD protected circuit> in the house to the garage? (Thereby doing away with the RCD in the> garage)>> Also, am I correct in thinking that the earth rod for the garage is
> also connected to the house earth (to create equipotential between> buildings)?
No. By running from the RCD side and connecting to the house earth, you areasserting that the garage is part of the house's equipotential zone and notrunning a TT system. This can be risky in some cases. It is better to run asa TT system, unless the garage is close by.
With a garage TT system you definitely do NOT connect the earth rod to thehouse earth. The only conductors from the armoured cable you use are thelive and neutral which go straight into the RCD housed in an insulatedcasing (not metal). You then run the earthing separately from a tested earthrod, including main bonding, such as the metal framework of the garage and
incoming services if any (i.e. water/gas pipes).
If the garage is close to the house you might be able to export the earth,but you should check first.
Christian.
8/10/2019 Industrial Directory of India
45/47
Show trimmed content
Christian McArdle
2/17/03
>Thanks very much for that reply. I had been wondering about that for>some time.
The main purpose of main equipotential bonding is not to reduce the earthimpedence. It is to ensure that under fault conditions, the structure of thebuilding and any pipework do not maintain a potential difference relative tothe earthing conductors (and hence the earth) and that the pipework andstructural members are sufficiently earthed themselves to produce sufficientfault current to trip the MCB or RCD.
Obviously, in the case of an RCD, the required fault current is a fractionof that required to blow the main breaker (i.e. 100mA instead of in excessof 100A for an instantaneous break). This is why the earthing conductors maybe much smaller in an RCD based installation.
>Does one need a dedicated instrument for testing the earth impedance>or is it possible to knock one up oneself? My garage is about 15>metres from the house but has no metal framework or pipes to help>reduce the earth impedance.
You need a dedicated calibrated instrument called an earth loop tester. Thisis able to determine lots of earth related parameters, such as earth loop
impedence and prospective fault current that are necessary to determine theefficacy of earthing arrangements and the choice of protective devices. Theyare NOT cheap. They pass a considerable current through the earthingarrangements to make sure they really work. The tiny currents and voltagesmeasured by a cheap multimeter do not really give any indication about howan earthing system will work at 230V passing many kA.
Rather than buying such an instrument, it may be cheaper to instruct anelectrician to do the final testing. In the meantime, you can do all thepolarity and continuity testing using a cheap meter to make sure you don'twaste their time for the final insulation and loop testing. You should beaiming for an earth electrode impedence massively below the recommended 200ohms for a TT system.
Christian.
venkatesh290487
7/13/13
8/10/2019 Industrial Directory of India
46/47
SmartBrains AN ISO 9001:2008 Certified (EPC) Engineering, Procurement, Construction trainingCompany
Dear Engineers,
SmartBrains, ISO 9001:2008Certified EPC Training Institute presents various customized
courses for working persons and fresher engineers.
Why US?
Job Oriented Training Program based on current Industry
Demands
EPC Project Based Training
Providing all Training Material and technical Drawing,documents and case study materials.
Expert and Experienced Faculty from the Industry. 5-10
Year Exp.)
Training on Computer Aided drafting (AutoCAD) and
Electrical Design (ETAP 12) Software
What you will learn ?
Fundamentals of Electrical Design & Load Estimation of Plants
Developments of Single Line Diagrams and Control Schematics
Electrical Equipments Selection Sizing and Protections
Cables Selection, Sizing and Cable Routing
Plant Lighting & Illumination Design
Fundamentals of Plant Earthing Design
Hazardous Area Classification
Substation / Switchyard Design
Electrical Design
Engineering
With AUTOCAD
Fee: Rs.20,000
( Including Tax )
Degree/Diploma in
Electrical
Engineering
(Fresher &
Experienced)
1.5
Months Weekdays
(Mon-Fri) 6th July
8/10/2019 Industrial Directory of India
47/47
Electrical Design
Engineering
With ETAP +
AutoCAD
Fee: Rs.35,000
( Including Tax )
3 Months Only Sunday 7th July
Registrations open from 5th June 2013at SmartBrains Offices.
Get 10% Discount on one time fee payment
and Get 10% more Discount on group registration of minimum 2 candidates
Hostel Accommodation:
We have Third party hostel accommodation available for the trainees @ Rs. 7,000/- for One Monthfor shared
accommodation and food .
For Further Details please call at
Ghaziabad: - 09891108002,0120-4104991/94
Or you can send email oninfo@smartbrains.in Or Visit:www.smartbrains.in
Apply online:http://smartbrains.in/enquiry.aspx
Best Regards,
SmartBrains Engineers & Technologist Pvt. Ltd.
12-A, 1st Floor Ahinsha Khand-II
Indrapuram
(Behind Shanti Gopal Hospital)
09891108002;0120-4104991/94.
Email:info@smartbrains.inWeb: www.smartbrains.in
http://www.smartbrains.in/http://www.smartbrains.in/http://smartbrains.in/enquiry.aspxhttp://smartbrains.in/enquiry.aspxhttp://smartbrains.in/enquiry.aspxhttp://www.smartbrains.in/http://www.smartbrains.in/http://www.smartbrains.in/http://smartbrains.in/enquiry.aspxhttp://www.smartbrains.in/Recommended