View
0
Download
0
Category
Preview:
Citation preview
Project
Number Project Description Page #
77123 Alder Drive at EID Canal - Bridge Replacement 266115 Bass Lake Frontage Improvements-Silver Springs 466109 Bass Lake Road Full Improvements - Phase 1A 6GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B 877128 Bassi Road at Granite Creek - Bridge Replacement 1077132 Bayne Road at Dutch Creek - Bridge Maintenance Project 1277119 Blair Road at EID Canal - Bridge Replacement 1477116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation 16GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road 1873150 Cameron Park Drive/Green Valley Road Intersection Improvements 2072367 Cameron Park Widening - Durock Road to Coach Lane 22
72309
Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to
Pleasant Grove Middle School 2477139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2677138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2873360 Cold Springs Road Realignment 3077133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance 32GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd 34GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 36
GP126
Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills
Specific Plan Boundary 3872375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4072334 Diamond Springs Parkway - Phase 1B 42GP171 Durock Road Widening - Robin Lane to South Shingle Road 44GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 4672332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment 4897012 El Dorado Trail - Los Trampas to Halcon 5071358 Francisco Drive Right-Turn Pocket 5277127 Green Valley Road at Indian Creek - Bridge Replacement 5477136 Green Valley Road at Mound Springs Creek - Bridge Replacement 5677109 Green Valley Road at Tennessee Creek - Bridge Replacement 5877114 Green Valley Road at Weber Creek - Bridge Replacement 6073151 Green Valley Road Traffic Signal Interconnect 62GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road 64GP178 Green Valley Road Widening - Francisco to Salmon Falls Road 66GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 6876114 Green Valley Road/Deer Valley Road West Intersection Improvements 7077137 Greenstone Road at Slate Creek - Bridge Replacement 7277135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477125 Hazel Valley Road at PG&E Canal - Bridge Replacement 7671375 Headington Road Extension - Missouri Flat Road to El Dorado Road 7872369 Hollow Oak Road Drainage 8077131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8231202 Intelligent Transportation System (ITS) Improvements 8466116 Latrobe Connection 8673359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) 88
72350
Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to
Investment Boulevard 90
GP154
Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek
(Suncast Lane) 92OP005 Metal Beam Guardrail Installation - Various Locations 94GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd 96GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza 98
Section 8.1 - West Slope Road and Bridge Projects
Index by Project Name
13-0082 3E 1 of 31
77126 Mosquito Road Bridge at South Fork American River 100GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road 10273307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements 10477129 Mount Murphy Road at South Fork American River - Bridge Replacement 10677130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project 10877122 Newtown Road at South Fork of Weber Creek - Bridge Replacement 11072304 Northside School Class I Bike Path - Phase 1 (SR193) 11272306 Northside School Class I Bike Path - Phase 2 (SR49) 11477134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873358 Pleasant Valley Road at Oak Hill Road Intersection Improvements 120
GP173
Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond
Springs 122GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road 124GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 126GP175 Ponderosa Road Widening from North Shingle Road to Meder Road 12873152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills 13077117 Rubicon Trail at Ellis Creek - Bridge Replacement 132GP130 Runnymeade Drive Realignment at El Dorado Road 13473362 Salmon Falls Road South of Glenesk Lane Realignment 13671324 Saratoga Way Extension - Phase 1 138GP147 Saratoga Way Extension - Phase 2 140GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization 14277124 Silver Fork Road at South Fork American River - Bridge Replacement 14476108 Silver Springs Pkwy to Bass Lake Rd (south segment) 14676107 Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd 14877115 Sly Park Road at Clear Creek Crossing - Bridge Replacement 150
GP177
State Route 49 Passing Lanes from SR193 (in Cool) to the northern County
Line 152GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road 154
TIM Prog TIM Fee Program Projects 156TSI Traffic Signal and Intersection Operational Improvements 158
53118 Transit Service Improvements 160GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa 162
53115
U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch
Road 16453116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road 16653124 U.S. 50 HOV Lanes Phase 0 16853120 U.S. 50 Mainline Widening at El Dorado Hills 17071330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 172GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 17471332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 176GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 17872361 U.S. 50/Cameron Park Drive Interchange Improvements 18071319 U.S. 50/Camino Area Parallel Capacity/Safety Study 18271340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing 18471323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 18671347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 18871376 U.S. 50/El Dorado Road Interchange Phase 2 19071359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 192
71346
U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian
Restoration 19471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 19671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 19871333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 20071328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 202
71345
U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary
Lanes on U.S. 50 204
13-0082 3E 2 of 31
77118 Wentworth Springs Road at Gerle Creek - Bridge Replacement 206
GP152
White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley
Parkway Interchange 212
GP137
White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento
County Line 208
72374
White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva
Valley Parkway Interchange 210
95961 Abrasives Study 3
73120 Apache Avenue/US 50 Intersection Signalization 4
95153 Boulder Mountain Erosion Control Project 6
95174 Chiapa Erosion Control Project 8
95190 Christmas Valley Phase 2C Erosion Control Project 10
95191 Country Club Heights Erosion Control Project 12
95196 CSA # 5 Upper Area Erosion Control Project 14
95157 CSA #5 Erosion Control Project 16
95169 Echo View 2 Erosion Control Project 18
95195 Forest View Water Quality Project 20
95180 Glenridge Erosion Control Project 22
95176 Golden Bear Erosion Control Project 24
95708 Highway 89 Class 1 Trail 26
95186 Lake Tahoe Boulevard Bike Trail Project 28
95163 Lake Tahoe Boulevard Erosion Control Project 30
95175 Lake Tahoe Boulevard SEZ Project 32
95179 Meyers Erosion Control Project 34
95155 Montgomery Estates Area 1A Erosion Control Project 36
95193 Montgomery Estates Area 1B Erosion Control Project 38
95170 Montgomery Estates Area 2 Erosion Control Project 40
95172 Montgomery Estates Area 3 Erosion Control Project 42
95166 North Upper Truckee SEZ Restoration Project 44
95838 Passenger Facility 46
95165 Sawmill 2A Bike Path & Erosion Control Project 48
95192 Sawmill 2B Bike Path and Erosion Control Project 50
95168 South Upper Truckee I Erosion Control Project 52
95171 Tahoe Hills Erosion Control Project 54
93523 Airport Layout Plan 2018 Update - Georgetown 293520 Construction of AWOS 4
93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes 6
93527
Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger
Taxilanes; Change Runway End ID 8
93533 Nested Hangars 1093528 Update Airport 2013 Layout Plan with Program Narrative Report 1293534 Update Pavement Maintenance/Management Program 1493531 West Access Road 1693525 West Side Development Phase 1 1893529 West Side Development Phase 2 2093524 West Taxiway Phase 1 22
93532 West Taxiway Phase 2 24
Section 8.2 - Tahoe EIP Projects
Section 8.3A - Georgetown Airport Projects
13-0082 3E 3 of 31
93128 13 Unit Nested Tee Hangar 293132 Airport Layout Plan Update - Placerville 4
93129
Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger
Taxilanes 693130 Taxiway Edge Lights 893126 Tee Hangar Site Development Phase 2 1093131 Update Pavement Maintenance/Management Program 1293122 Water Line and Fire Hydrant to New Apron Area 14
72186 Overlay - Francisco Drive 2Roadway
Section 8.3B - Placerville Airport Projects
Section 8.4 - CORP Projects
13-0082 3E 4 of 31
Project
Number Project Description Page #
31202 Intelligent Transportation System (ITS) Improvements 84
53115
U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch
Road 16453116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road 16653118 Transit Service Improvements 16053120 U.S. 50 Mainline Widening at El Dorado Hills 17053124 U.S. 50 HOV Lanes Phase 0 16866109 Bass Lake Road Full Improvements - Phase 1A 666115 Bass Lake Frontage Improvements-Silver Springs 466116 Latrobe Connection 8671319 U.S. 50/Camino Area Parallel Capacity/Safety Study 18271323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 18671324 Saratoga Way Extension - Phase 1 13871328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 20271330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 17271332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 17671333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 20071338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 19671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 19871340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing 184
71345
U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary
Lanes on U.S. 50 204
71346
U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian
Restoration 19471347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 18871358 Francisco Drive Right-Turn Pocket 5271359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 19271375 Headington Road Extension - Missouri Flat Road to El Dorado Road 7871376 U.S. 50/El Dorado Road Interchange Phase 2 19072304 Northside School Class I Bike Path - Phase 1 (SR193) 11272306 Northside School Class I Bike Path - Phase 2 (SR49) 114
72309
Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to
Pleasant Grove Middle School 2472332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment 4872334 Diamond Springs Parkway - Phase 1B 42
72350
Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to
Investment Boulevard 9072361 U.S. 50/Cameron Park Drive Interchange Improvements 18072367 Cameron Park Widening - Durock Road to Coach Lane 2272369 Hollow Oak Road Drainage 80
72374
White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva
Valley Parkway Interchange 21072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4073150 Cameron Park Drive/Green Valley Road Intersection Improvements 2073151 Green Valley Road Traffic Signal Interconnect 6273152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills 13073307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements 10473320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873358 Pleasant Valley Road at Oak Hill Road Intersection Improvements 12073359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) 8873360 Cold Springs Road Realignment 3073362 Salmon Falls Road South of Glenesk Lane Realignment 136
Section 8.1 - West Slope Road and Bridge Projects
Index by Project Number
13-0082 3E 5 of 31
76107 Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd 14876108 Silver Springs Pkwy to Bass Lake Rd (south segment) 14676114 Green Valley Road/Deer Valley Road West Intersection Improvements 7077109 Green Valley Road at Tennessee Creek - Bridge Replacement 5877114 Green Valley Road at Weber Creek - Bridge Replacement 6077115 Sly Park Road at Clear Creek Crossing - Bridge Replacement 15077116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation 1677117 Rubicon Trail at Ellis Creek - Bridge Replacement 13277118 Wentworth Springs Road at Gerle Creek - Bridge Replacement 20677119 Blair Road at EID Canal - Bridge Replacement 1477122 Newtown Road at South Fork of Weber Creek - Bridge Replacement 11077123 Alder Drive at EID Canal - Bridge Replacement 277124 Silver Fork Road at South Fork American River - Bridge Replacement 14477125 Hazel Valley Road at PG&E Canal - Bridge Replacement 7677126 Mosquito Road Bridge at South Fork American River 10077127 Green Valley Road at Indian Creek - Bridge Replacement 5477128 Bassi Road at Granite Creek - Bridge Replacement 1077129 Mount Murphy Road at South Fork American River - Bridge Replacement 10677130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project 10877131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8277132 Bayne Road at Dutch Creek - Bridge Maintenance Project 1277133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance 3277134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11677135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477136 Green Valley Road at Mound Springs Creek - Bridge Replacement 5677137 Greenstone Road at Slate Creek - Bridge Replacement 7277138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2877139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2697012 El Dorado Trail - Los Trampas to Halcon 50GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 36GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd 34
GP126
Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills
Specific Plan Boundary 38GP130 Runnymeade Drive Realignment at El Dorado Road 134
GP137
White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento
County Line 208GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road 18GP147 Saratoga Way Extension - Phase 2 140GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 174GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 178GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa 162
GP152
White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley
Parkway Interchange 212
GP154
Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek
(Suncast Lane) 92GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road 102GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 68GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 126GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd 96GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza 98GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B 8GP171 Durock Road Widening - Robin Lane to South Shingle Road 44
GP173
Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond
Springs 122GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road 124GP175 Ponderosa Road Widening from North Shingle Road to Meder Road 128GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road 154
13-0082 3E 6 of 31
GP177
State Route 49 Passing Lanes from SR193 (in Cool) to the northern County
Line 152GP178 Green Valley Road Widening - Francisco to Salmon Falls Road 66GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road 64GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization 142GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 46OP005 Metal Beam Guardrail Installation - Various Locations 94
TIM Prog TIM Fee Program Projects 156TSI Traffic Signal and Intersection Operational Improvements 158
73120 Apache Avenue/US 50 Intersection Signalization 4
95153 Boulder Mountain Erosion Control Project 6
95155 Montgomery Estates Area 1A Erosion Control Project 36
95157 CSA #5 Erosion Control Project 16
95163 Lake Tahoe Boulevard Erosion Control Project 30
95165 Sawmill 2A Bike Path & Erosion Control Project 48
95166 North Upper Truckee SEZ Restoration Project 44
95168 South Upper Truckee I Erosion Control Project 52
95169 Echo View 2 Erosion Control Project 18
95170 Montgomery Estates Area 2 Erosion Control Project 40
95171 Tahoe Hills Erosion Control Project 54
95172 Montgomery Estates Area 3 Erosion Control Project 42
95174 Chiapa Erosion Control Project 8
95175 Lake Tahoe Boulevard SEZ Project 32
95176 Golden Bear Erosion Control Project 24
95179 Meyers Erosion Control Project 34
95180 Glenridge Erosion Control Project 22
95186 Lake Tahoe Boulevard Bike Trail Project 28
95190 Christmas Valley Phase 2C Erosion Control Project 10
95191 Country Club Heights Erosion Control Project 12
95192 Sawmill 2B Bike Path and Erosion Control Project 50
95193 Montgomery Estates Area 1B Erosion Control Project 38
95195 Forest View Water Quality Project 20
95196 CSA # 5 Upper Area Erosion Control Project 14
95708 Highway 89 Class 1 Trail 26
95838 Passenger Facility 46
95961 Abrasives Study 3
93520 Construction of AWOS 493523 Airport Layout Plan 2018 Update - Georgetown 293524 West Taxiway Phase 1 2293525 West Side Development Phase 1 18
93527
Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger
Taxilanes; Change Runway End ID 893528 Update Airport 2013 Layout Plan with Program Narrative Report 1293529 West Side Development Phase 2 2093531 West Access Road 1693532 West Taxiway Phase 2 2493533 Nested Hangars 1093534 Update Pavement Maintenance/Management Program 14
93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes 6
Section 8.2 - Tahoe EIP Projects
Section 8.3A - Georgetown Airport Projects
13-0082 3E 7 of 31
93128 13 Unit Nested Tee Hangar 293132 Airport Layout Plan Update - Placerville 4
93129
Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger
Taxilanes 693130 Taxiway Edge Lights 893126 Tee Hangar Site Development Phase 2 1093131 Update Pavement Maintenance/Management Program 1293122 Water Line and Fire Hydrant to New Apron Area 14
72186 Overlay - Francisco Drive 2Roadway
Section 8.3B - Placerville Airport Projects
Section 8.4 - CORP Projects
13-0082 3E 8 of 31
Project
Number Project Description Page #
77123 Alder Drive at EID Canal - Bridge Replacement 277128 Bassi Road at Granite Creek - Bridge Replacement 1077132 Bayne Road at Dutch Creek - Bridge Maintenance Project 1277119 Blair Road at EID Canal - Bridge Replacement 1477116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation 1677139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2677138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2877133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance 3277127 Green Valley Road at Indian Creek - Bridge Replacement 5477136 Green Valley Road at Mound Springs Creek - Bridge Replacement 5677109 Green Valley Road at Tennessee Creek - Bridge Replacement 5877114 Green Valley Road at Weber Creek - Bridge Replacement 6077137 Greenstone Road at Slate Creek - Bridge Replacement 7277135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477125 Hazel Valley Road at PG&E Canal - Bridge Replacement 7677131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8277126 Mosquito Road Bridge at South Fork American River 10077129 Mount Murphy Road at South Fork American River - Bridge Replacement 10677130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project 10877122 Newtown Road at South Fork of Weber Creek - Bridge Replacement 11077134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11677117 Rubicon Trail at Ellis Creek - Bridge Replacement 13277124 Silver Fork Road at South Fork American River - Bridge Replacement 14477115 Sly Park Road at Clear Creek Crossing - Bridge Replacement 15077118 Wentworth Springs Road at Gerle Creek - Bridge Replacement 206
72369 Hollow Oak Road Drainage 80
TSI Traffic Signal and Intersection Operational Improvements 158GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa 16253124 U.S. 50 HOV Lanes Phase 0 16871330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 172GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 17471332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 176GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 17872361 U.S. 50/Cameron Park Drive Interchange Improvements 18071319 U.S. 50/Camino Area Parallel Capacity/Safety Study 18271323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 18671347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 18871376 U.S. 50/El Dorado Road Interchange Phase 2 190
71346
U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian
Restoration 19471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 19671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 20071333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19671328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 198
71345
U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary
Lanes on U.S. 50 204
Section 8.1 - West Slope Road and Bridge Projects
Index by Project Type
Drainage
Bridge
Interchange
13-0082 3E 9 of 31
73150 Cameron Park Drive/Green Valley Road Intersection Improvements 2073151 Green Valley Road Traffic Signal Interconnect 6276114 Green Valley Road/Deer Valley Road West Intersection Improvements 6473307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements 10473320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873358 Pleasant Valley Road at Oak Hill Road Intersection Improvements 12073152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills 130GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization 142
97012 El Dorado Trail - Los Trampas to Halcon 50
72309
Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to
Pleasant Grove Middle School 2472304 Northside School Class I Bike Path - Phase 1 (SR193) 11272306 Northside School Class I Bike Path - Phase 2 (SR49) 11471340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing 18471359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 192
66115 Bass Lake Frontage Improvements-Silver Springs 466109 Bass Lake Road Full Improvements - Phase 1A 6GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B 8GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road 1872367 Cameron Park Widening - Durock Road to Coach Lane 2273360 Cold Springs Road Realignment 30GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd 34GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 36
GP126
Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills
Specific Plan Boundary 3872375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4072334 Diamond Springs Parkway - Phase 1B 42GP171 Durock Road Widening - Robin Lane to South Shingle Road 44GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 4672332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment 4871358 Francisco Drive Right-Turn Pocket 52GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road 64GP178 Green Valley Road Widening - Francisco to Salmon Falls Road 66GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 6871375 Headington Road Extension - Missouri Flat Road to El Dorado Road 7866116 Latrobe Connection 8673359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) 88
72350
Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to
Investment Boulevard 90
GP154
Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek
(Suncast Lane) 92OP005 Metal Beam Guardrail Installation - Various Locations 94GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd 96GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza 98GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road 102GP173 Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond 122GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road 124GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 126GP175 Ponderosa Road Widening from North Shingle Road to Meder Road 128GP130 Runnymeade Drive Realignment at El Dorado Road 13473362 Salmon Falls Road South of Glenesk Lane Realignment 136
Parks & Trails
Pedestrian Way and Bike Path
Roadway
Intersection
13-0082 3E 10 of 31
71324 Saratoga Way Extension - Phase 1 138GP147 Saratoga Way Extension - Phase 2 14076108 Silver Springs Pkwy to Bass Lake Rd (south segment) 146
76107
Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd
Intersection Signalization 148GP177 State Route 49 Passing Lanes from SR193 (in Cool) to the northern County 152GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road 154
53115
U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch
Road 16453116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road 16653120 U.S. 50 Mainline Widening at El Dorado Hills 170
GP152
White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley
Parkway Interchange 212
GP137
White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento
County Line 208
72374
White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva
Valley Parkway Interchange 210
31202 Intelligent Transportation System (ITS) Improvements 84TIM Prog TIM Fee Program Projects 156
53118 Transit Service Improvements 160
95153 Boulder Mountain Erosion Control Project 6
95174 Chiapa Erosion Control Project 8
95190 Christmas Valley Phase 2C Erosion Control Project 10
95191 Country Club Heights Erosion Control Project 12
95196 CSA # 5 Upper Area Erosion Control Project 14
95157 CSA #5 Erosion Control Project 16
95169 Echo View 2 Erosion Control Project 18
95195 Forest View Water Quality Project 20
95180 Glenridge Erosion Control Project 22
95176 Golden Bear Erosion Control Project 24
95708 Highway 89 Class 1 Trail 26
95186 Lake Tahoe Boulevard Bike Trail Project 28
95163 Lake Tahoe Boulevard Erosion Control Project 30
95175 Lake Tahoe Boulevard SEZ Project 32
95179 Meyers Erosion Control Project 34
95155 Montgomery Estates Area 1A Erosion Control Project 36
95193 Montgomery Estates Area 1B Erosion Control Project 38
95170 Montgomery Estates Area 2 Erosion Control Project 40
95172 Montgomery Estates Area 3 Erosion Control Project 42
95166 North Upper Truckee SEZ Restoration Project 44
95165 Sawmill 2A Bike Path & Erosion Control Project 48
95192 Sawmill 2B Bike Path and Erosion Control Project 50
95168 South Upper Truckee I Erosion Control Project 52
95171 Tahoe Hills Erosion Control Project 54
Intersection
73120 Apache Avenue/US 50 Intersection Signalization 4
Miscellaneous
95961 Abrasives Study 3
95838 Passenger Facility 46
Miscellaneous
Section 8.2 - Tahoe EIP Projects
13-0082 3E 11 of 31
93523 Airport Layout Plan 2018 Update - Georgetown 293520 Construction of AWOS 4
93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes 6
93527
Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger
Taxilanes; Change Runway End ID 893533 Nested Hangars 1093528 Update Airport 2013 Layout Plan with Program Narrative Report 1293534 Update Pavement Maintenance/Management Program 1493531 West Access Road 1693525 West Side Development Phase 1 1893529 West Side Development Phase 2 2093524 West Taxiway Phase 1 2293532 West Taxiway Phase 2 24
93128 13 Unit Nested Tee Hangar 293132 Airport Layout Plan Update - Placerville 4
93129
Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger
Taxilanes 693130 Taxiway Edge Lights 893126 Tee Hangar Site Development Phase 2 1093131 Update Pavement Maintenance/Management Program 1293122 Water Line and Fire Hydrant to New Apron Area 14
72186 Overlay - Francisco Drive 2Roadway
Section 8.3B - Placerville Airport Projects
Section 8.3A - Georgetown Airport Projects
Section 8.4 - CORP Projects
13-0082 3E 12 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 1 Projects2013 Capital Improvement Program
CORP72186 Overlay - Francisco Drive $293,912
West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210
53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch Road $2,809,337
53118 Transit Service Improvements $10,500,000
53120 U.S. 50 Mainline Widening at El Dorado Hills $2,160,594
53124 U.S. 50 HOV Lanes Phase 0 $18,592,350
66109 Bass Lake Road Full Improvements - Phase 1A $7,432,542
66115 Bass Lake Frontage Improvements-Silver Springs $1,501,316
71323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B $5,904,434
71324 Saratoga Way Extension - Phase 1 $11,541,347
71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $56,817,376
71330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 $16,532,164
71332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 $7,842,722
71340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing $6,782,817
71345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 50 $12,070,023
71358 Francisco Drive Right-Turn Pocket $250,000
72309 Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to Pleasant Grove Middle $320,000
72332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment $9,451,507
72369 Hollow Oak Road Drainage $683,364
73151 Green Valley Road Traffic Signal Interconnect $270,000
73152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills Boulevard/Saratoga Way $31,000
76107 Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd Intersection Signalization $7,638,695
76108 Silver Springs Pkwy to Bass Lake Rd (south segment) $7,346,497
76114 Green Valley Road/Deer Valley Road West Intersection Improvements $1,284,264
Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,126,948
Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $24,670,000
GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road $1,121,110
GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd $5,413,400
GP126 Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills Specific Plan Boundary $5,043,140
GP137 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento County Line $3,317,000
GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road $12,520,000
GP147 Saratoga Way Extension - Phase 2 $4,638,000
GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 $19,063,000
Friday, May 31, 2013 Page 1 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 13 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 1 Projects2013 Capital Improvement Program
GP154 Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek (Suncast Lane) $8,987,000
GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road $12,578,000
GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B $15,385,000
GP178 Green Valley Road Widening - Francisco to Salmon Falls Road $1,898,000
GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization $768,000
GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive $1,096,000
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $19,816,140
TIM Prog TIM Fee Program Projects $8,400,000
Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000
Friday, May 31, 2013 Page 2 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 14 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 2 Projects2013 Capital Improvement Program
West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210
53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch Road $2,809,337
53116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road $590,165
53118 Transit Service Improvements $10,500,000
66116 Latrobe Connection $19,445,008
71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $56,817,376
71330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 $16,532,164
71332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 $7,842,722
71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $16,338,606
71338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment $7,151,600
72350 Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to Investment Boulevard $3,516,394
72367 Cameron Park Widening - Durock Road to Coach Lane $7,337,985
72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interch $19,067,872
73358 Pleasant Valley Road at Oak Hill Road Intersection Improvements $1,178,996
73359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) $2,033,366
77115 Sly Park Road at Clear Creek Crossing - Bridge Replacement $5,380,292
77116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation $4,842,065
77130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project $443,033
77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $3,917,250
77138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement $4,585,250
77139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement $4,585,250
Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,126,948
Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $24,670,000
GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 $19,063,000
GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 $11,935,000
GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa $10,350,000
GP152 White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley Parkway Interchange $6,058,000
GP171 Durock Road Widening - Robin Lane to South Shingle Road $7,210,000
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $19,816,140
TIM Prog TIM Fee Program Projects $8,400,000
Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000
Friday, May 31, 2013 Page 3 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 15 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 3 Projects2013 Capital Improvement Program
Airports-Placerville93122 Water Line and Fire Hydrant to New Apron Area $172,000
93126 Tee Hangar Site Development Phase 2 $2,795,000
93128 13 Unit Nested Tee Hangar $1,279,000
93129 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger Taxilanes $314,000
93130 Taxiway Edge Lights $401,000
93131 Update Pavement Maintenance/Management Program $30,000
93132 Airport Layout Plan Update - Placerville $75,000
West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210
53118 Transit Service Improvements $10,500,000
71319 U.S. 50/Camino Area Parallel Capacity/Safety Study $2,000,000
71346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration $1,768,238
71347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 $2,891,532
71359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 $3,550,000
71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $10,416,718
72334 Diamond Springs Parkway - Phase 1B $27,335,675
72375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment $6,009,046
73307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements $7,782,420
73320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization $4,403,762
77114 Green Valley Road at Weber Creek - Bridge Replacement $10,214,487
77122 Newtown Road at South Fork of Weber Creek - Bridge Replacement $5,255,305
77123 Alder Drive at EID Canal - Bridge Replacement $2,962,147
77126 Mosquito Road Bridge at South Fork American River $30,584,369
77127 Green Valley Road at Indian Creek - Bridge Replacement $4,500,000
77134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement $3,960,250
77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $3,917,250
77137 Greenstone Road at Slate Creek - Bridge Replacement $3,512,875
97012 El Dorado Trail - Los Trampas to Halcon $527,957
Appr Reimb T 2-Approved Reimbursement Agreements-TIM Zones 1-7 $8,785,068
GP130 Runnymeade Drive Realignment at El Dorado Road $1,902,000
GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road $3,893,000
GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 $1,099,000
GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd $1,202,000
GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza $1,299,000
Friday, May 31, 2013 Page 4 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 16 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 3 Projects2013 Capital Improvement Program
GP173 Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond Springs $2,710,000
GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road $2,291,000
GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road $7,879,000
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $5,596,000
TIM Prog TIM Fee Program Projects $8,400,000
Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000
Friday, May 31, 2013 Page 5 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 17 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 4 Projects2013 Capital Improvement Program
Airports-Georgetown93520 Construction of AWOS $251,000
93523 Airport Layout Plan 2018 Update - Georgetown $75,000
93524 West Taxiway Phase 1 $131,000
93525 West Side Development Phase 1 $1,853,000
93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger Taxilanes; Change Runway $173,000
93528 Update Airport 2013 Layout Plan with Program Narrative Report $75,000
93529 West Side Development Phase 2 $1,484,000
93531 West Access Road $1,330,000
93532 West Taxiway Phase 2 $1,341,000
93533 Nested Hangars $1,097,000
93534 Update Pavement Maintenance/Management Program $40,000
93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes $131,000
West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210
53116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road $590,165
53118 Transit Service Improvements $10,500,000
71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $16,338,606
71339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment $5,020,254
71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $10,416,718
71376 U.S. 50/El Dorado Road Interchange Phase 2 $5,870,000
72304 Northside School Class I Bike Path - Phase 1 (SR193) $1,954,984
72306 Northside School Class I Bike Path - Phase 2 (SR49) $2,040,390
72361 U.S. 50/Cameron Park Drive Interchange Improvements $47,625,818
73150 Cameron Park Drive/Green Valley Road Intersection Improvements $6,980,182
73360 Cold Springs Road Realignment $1,744,416
73362 Salmon Falls Road South of Glenesk Lane Realignment $1,315,789
76114 Green Valley Road/Deer Valley Road West Intersection Improvements $1,284,264
77109 Green Valley Road at Tennessee Creek - Bridge Replacement $6,448,549
77117 Rubicon Trail at Ellis Creek - Bridge Replacement $1,512,677
77118 Wentworth Springs Road at Gerle Creek - Bridge Replacement $1,579,975
77126 Mosquito Road Bridge at South Fork American River $30,584,369
77127 Green Valley Road at Indian Creek - Bridge Replacement $4,500,000
77128 Bassi Road at Granite Creek - Bridge Replacement $4,003,610
77129 Mount Murphy Road at South Fork American River - Bridge Replacement $8,462,335
Friday, May 31, 2013 Page 6 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 18 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 4 Projects2013 Capital Improvement Program
77131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project $761,033
77132 Bayne Road at Dutch Creek - Bridge Maintenance Project $157,033
77136 Green Valley Road at Mound Springs Creek - Bridge Replacement $4,504,008
77137 Greenstone Road at Slate Creek - Bridge Replacement $3,512,875
Appr Reimb T 2-Approved Reimbursement Agreements-TIM Zones 1-7 $8,785,068
GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road $12,520,000
GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road $12,578,000
GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd $1,202,000
GP175 Ponderosa Road Widening from North Shingle Road to Meder Road $2,798,000
GP177 State Route 49 Passing Lanes from SR193 (in Cool) to the northern County Line $3,482,000
GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road $4,784,000
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $5,596,000
TIM Prog TIM Fee Program Projects $8,400,000
Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000
Friday, May 31, 2013 Page 7 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 19 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 5 Projects2013 Capital Improvement Program
Tahoe73120 Apache Avenue/US 50 Intersection Signalization $13,061,512
95153 Boulder Mountain Erosion Control Project $1,069,285
95155 Montgomery Estates Area 1A Erosion Control Project $1,900,756
95157 CSA #5 Erosion Control Project $770,822
95163 Lake Tahoe Boulevard Erosion Control Project $958,619
95165 Sawmill 2A Bike Path & Erosion Control Project $2,663,849
95166 North Upper Truckee SEZ Restoration Project $916,600
95168 South Upper Truckee I Erosion Control Project $523,921
95169 Echo View 2 Erosion Control Project $777,354
95170 Montgomery Estates Area 2 Erosion Control Project $965,218
95171 Tahoe Hills Erosion Control Project $788,929
95172 Montgomery Estates Area 3 Erosion Control Project $348,197
95174 Chiapa Erosion Control Project $2,083,600
95175 Lake Tahoe Boulevard SEZ Project $1,119,869
95176 Golden Bear Erosion Control Project $463,633
95179 Meyers Erosion Control Project $967,795
95180 Glenridge Erosion Control Project $2,832,300
95186 Lake Tahoe Boulevard Bike Trail Project $1,756,928
95190 Christmas Valley Phase 2C Erosion Control Project $1,305,342
95191 Country Club Heights Erosion Control Project $695,500
95192 Sawmill 2B Bike Path and Erosion Control Project $2,264,306
95193 Montgomery Estates Area 1B Erosion Control Project $679,936
95195 Forest View Water Quality Project $405,000
95196 CSA # 5 Upper Area Erosion Control Project $395,000
95708 Highway 89 Class 1 Trail $3,574,500
95838 Passenger Facility $133,357
95961 Abrasives Study $39,339
West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210
53118 Transit Service Improvements $10,500,000
77119 Blair Road at EID Canal - Bridge Replacement $3,682,985
77124 Silver Fork Road at South Fork American River - Bridge Replacement $4,560,875
77125 Hazel Valley Road at PG&E Canal - Bridge Replacement $2,634,407
77133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance Project $267,500
Friday, May 31, 2013 Page 8 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 20 of 31
Project # Description Total Cost
Community Development Agency, Transportation Division
Supervisor District 5 Projects2013 Capital Improvement Program
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
TIM Prog TIM Fee Program Projects $8,400,000
Friday, May 31, 2013 Page 9 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 21 of 31
Fig
ure
2-1
13-0082 3E 22 of 31
Lake Tahoe
Echo Lakes
Lake of the Woods
Angora Lakes
Angora LakesLake Aloha
Lily Lake
Susie Lake
Half Moon Lake Gilmore Lake
Dicks Lake
Fallen Leaf Lake
Cascade Lake
TAHOE KEYS
TAHOE KEYS
ALA W
AI
TAHOE MOUNTAI N
IBACHE
NADOWA
WASHOAN
WASH
OAN
MEEK
S BAY
LAKE TAHOE
OSG
OOD
SKI R
UN
LIGHTHOUSE SHORES
MOUNTAIN
FRIANT
POPE BEACH
POPE BEACH
HERITAGE
TALLAC POINT VALHALLA
VALH
ALLA
EDGEWOOD
BOBBY GREY
TWO RIN
G
SOUTH UPPER TRUCKEE
CORNELI AN
IROQU
OIS
PICKETT
TAHOE KEYS
FAIR MEADOW
SUNN
YVIEW
GLENRIDGE
C
POOEWIN
SAN JOSE
ROYAL
B
STATE HWY 89
STATE HWY 89
STATE HWY
89
STATE HWY 89
STATE HWY 89
STATE HWY 89
STATE HWY 89
STATE HWY 89
STATE HWY 89
BELLEVUE
RONTONI
KODIAK
MATTOLE
US HWY 50
US HWY 50
US HWY 50
US HWY 50
KOKANEE
KOKANEE
DEL N
ORTE
BLACK BART
PANKA
LODI
SIERRA
MT R
AINIER
VIEW
JICARILLASUSQUEHANA
HEKPA
HEKPA
ROCKY POINT
HEKP
A
ONNONTIOGA
HUNKPAPA
MINNICONJOU
MARSHALL
BONA
NZA
SI ERRA HOUSE
COLD CREEK
BLACK BART
REGINA
TALBOT
COLD CREEKDEL NORTE
DEL NORTE
GOLDEN BEAR
GOLDEN BEAR
BLACK BART
SHERMAN
NEED
LE PEAK
KELLER
ASPENWALD
KELLER
SADD
LEMATHESON
MATHESON
FREMONT
JOHNSON
JOBS PEAK
JUNI PER
SONOMA
CAPISTRANO
MERCED
OAKLAND
AL TAHOE
BROCKWAYRENO
SIERRA
STOCKTON
LODI
RIVER
LODI
STOCKTON
RENO P
INTER
SIERRA
CHARLES
RENO
LODI
LODI
WI LLIAM
CONESTOGA
SPRINGWOOD
SPRINGWOOD
COLLEGE
JAMES
PANTHER
13TH
PINE
CIRU
GU
SANTA FE
PLUMAS
CHIAPA
WEST SAN BERNARDINO
WINTOON
MEWUK
KIOWA
TEHAMA
KIOWA
MEWUKMEWUK
KIOWA
GRIZZLY MOUNTAIN
CHIAPA
MANDANSEMINOLE
LAKE TAHOE
MT RAINIER
LAKE TAHOE
VIEW
LAKE TAHOE
MODOC
HOPI
WASHOE
BAKERSFIELD
BAKERSFIELD
COUNTRY CLUB
VIEW
VI EW
ELKS CLUB
TAMOSHANTER
OFLYNG
MANDAN
EVELYN
CELIO
MANDAN
OJIBWA
MANDAN
ZAPOTEC
SKYLINE
COTO
GLEN EAGLES
KELLER
JUNEJUNE
DAVID
SONORA
MOSS
SONORA
WILDWOOD
FERN
MONTREAL
JANET
WALKUP
WOODBIN
E
TAMAR
ACK
VANDA LEE
SADD
LE
SPRU
CE
SPRUCE
WALKUP
JANET
RANCHO
LOS ANGELES
STATELINE
FRIDAY
PARK
PARK
HILL
PARK
MANZANITA
PINE
PINEAZURE
AZURE
MEADOW
EL DORADO
LOS ANGELES
13TH
GARDNER
SAWMILL
SAWMILL
SAWMILL
INDUSTRIAL
TATA
GLORENE
15TH
13TH EM
ERALD
BAY
G
13TH
CLEMENT
TATA
TATA
GLORE
NE
CLEMENT
LAMOR
ECHO VIEW
3RD4
TH
LUKINS
VENICE
VENICE
MELBA
MELBA
B
MELBA
4TH
3RD
3RD
SOUTH
BARTON
SOUTH
TRUCKEE
ELOISE
3RD
LINDA
TAHOE ISLAN
D
TAHO
E VISTA
TAHOE ISLAND
ELOISEWYOMING
TEXAS
COLO
RADO
WASHINGTON
BEAC
H
ALPINE
MARCONI
GARMISH
VENICE
CHRISTIE
VENIC
E
SPRIN
G CRE
EK
POMO
POMO
NICOLENO
MATTOLE
MATTOLE
BOULDER MOUNTAIN
NAHANE
RAINBOW
WASABE
NAHANE
WAILAKI
MOHICAN
APACHE
APACHEC
HEYEN
NE
IROQU
OISCHIPPEWA
JULIE
D D
DDD
BB
DEDI
DEDI
D
B
D
B
BONANZA
BONANZA
D
FALLEN LEAF
UPLANDS
UPLAND
S
DUNDEE
DUNDEE
FALLEN LEAF
FALLEN LEAF
PRICE
FALLEN LEAF
WATERHOUSE
FALLEN LEAF
FALLEN LEAF
SCENIC
LUPINE
BROOK
MOUNTAIN
LAKEVIEW
LAKERIDGE
SIERRA S
IERRA
BEACH
SWEETWATER
LAKEVIEW
ALICE
ALICE
OAK
ALDER
HARRIS
ALDERALDER
NINTH
NINTH
PINE
CHAMPLAIN
TREEHAVEN
ONE RIN
G
DE LISI
LOG CABIN
STATE HWY 89
HAZELKONA
LILY
JACK BELL
CATHEDRAL
CATH
EDRA
L
ERIE
OSAGE
JEWELL
TOIYABE
HIGH M
EADO
WS
GOLDPAN
PONCA
TURNBACK
H
KYBURZ
UTAH
WARD
BAL BIJOU
CAVE ROCK
LYONS
MAPLE
BILL
PINECREST
DEER
TERRY
YOKUT
COCHISE
LUCERNE
BALBOA
CATALINA
MT TALLAC C
LAKEVIEW
HILO
MC KINNEYSPRINGS
CLIPPER
CLIFF
TAHOE MOUNTAIN
PIONE
ER
PIONEER
PIONEER
PIONEER
LAKE TAHOE
LAKE TAHOE
RAI NBOW
COLUSA
MEYERS
US HWY 50
KICKAPOO
KICKAPOO
SENECA
KORU
CAYU
GA
SHOS
HONE
ZUNI
LOOKOUT POINT
CHILIC
OTHE
CHOLULA
OAXACO
SHAWNEE
SHOSHONE
TETON
PI NEWOOD
LOST
APACHE
PEBBLE BEACH
ONEIDAS
PIONEER
AZTE
C
PAWNEE
APACHE
ARIKA
RA
OGLALA
ONEIDAS
GALLO
CRYSTAL AIR
SKYLINE
BEL AIRE
MINK
BOREN
NOTTAWAY
MINGWE
LUPINE
RIMROCK
SIERRA
GOLD DU
ST
HOMESTEAD
PLATEAU
CHINQUAPIN
SADDLE
STERLING
SADDLE
SADD
LE
SADDLE
KELLER
BIRC
H
PINE HILL
REGINA
RALPH
PIONEER
NORMA
APRIL
GLENWOOD
SADDLE
PRICE
WOODLAN
D
LEWIS
FAIRWAY
WILDWOOD
HAM
DEER PARK
STANFORD
NEVADA
FRESNO
TALLAC
LAKEVIEW
PINE
BEACH
BEACH
MODESTO
TALLAC
LAKEVIEW
SAN FRANCISCO
ALMA
CARSON
MARTIN
KNOX
BEECHER
BLUE LAKE
GARDNER
JULIE
JULIE
JULIE
TATA
TATA
TATA
FFF
TATA
EE
WI NNEMUCCA
RUTH
RAINBO
WLAPHAM
12TH
PATRICIA
ANITA
ANITA
ANITA
15TH
JAMESON BEACH
LASSEN
BEACH
CARSON
VENICE
ANGORA RIDGE
ANGORA RIDGE
ANGORA RIDGE
ANGORA RIDGE
EMIGRANT
EMIGRANT
FALLEN LEAF
UPPER CASCADE LAKE
LOWER EMERALD BAY
MT TALLAC A
MT TA
LLAC B
MT TALLAC
BALDWIN
HUPA
SMOKEY BEAR
BAY VIEW
GLENRIDG
E
QUIET W
ALK
FIRFIR
WILSON
FIFTH
SI XTH
FIR
OAK
PINE
PLACER
ANTELOPE
PINEPINE
Figure 2-2 13-0082 3E 23 of 31
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ayR
C =
Pla
nnin
g/E
nviro
nmen
tal
= D
esig
n =
Con
stru
ctio
n*
= B
ridge
Pro
ject
s
Proj
ect S
umm
ary
Tabl
e -
Wes
t Slo
pe
13/1
414
/15
15/1
616
/17
17/1
818
/19-
22/2
323
/24-
32/3
3
5312
4C
U.S
. 50
HO
V L
anes
Pha
se 0
18.5
91
7132
8R
CU
.S. 5
0/S
ilva
Val
ley
Par
kway
Inte
rcha
nge
- Pha
se 1
CC
C56
.72
271
346
CU
.S. 5
0/M
isso
uri F
lat R
oad
Inte
rcha
nge
Impr
ovem
ents
- P
hase
1C
Rip
aria
n R
esto
ratio
n 1.
603
7135
8D
CFr
anci
sco
Driv
e R
ight
-Tur
n P
ocke
t0.
254
7135
9D
RC
U.S
. 50/
Mis
sour
i Fla
t Roa
d In
terc
hang
e - P
hase
1B
.2C
3.55
572
304
CN
orth
side
Sch
ool C
lass
I B
ike
Path
- P
hase
1 (S
R19
3)1.
956
7230
6C
Nor
thsi
de S
choo
l Cla
ss I
Bik
e Pa
th -
Pha
se 2
(SR
49)
2.04
772
309
CC
lass
II B
ikew
ay -
Gre
en V
ally
Roa
d fro
m L
och
Way
to S
igna
lized
Ent
ranc
e to
Ple
asan
t Gro
ve
0.32
872
369
CH
ollo
w O
ak R
oad
Dra
inag
e0.
689
7237
5D
RC
Dia
mon
d S
prin
gs P
arkw
ay -
Pha
se 1
A -
SR
-49
Rea
lignm
ent
C6.
0110
7315
1P
DC
Gre
en V
alle
y R
oad
Traf
fic S
igna
l Int
erco
nnec
t0.
2711
7315
2C
Rad
ar S
igna
l Con
trolle
r Upg
rade
at I
nter
sect
ion
of E
l Dor
ado
Hills
Bou
leva
rd/S
arat
oga
Way
0.03
1273
320
CP
leas
ant V
alle
y R
oad
(SR
49)
/Pat
ters
on D
rive
Inte
rsec
tion
Sig
naliz
atio
n4.
4013
7335
8C
Ple
asan
t Val
ley
Roa
d at
Oak
Hill
Roa
d In
ters
ectio
n Im
prov
emen
ts1.
1814
7335
9C
Latro
be R
oad
Nor
th o
f Rya
n R
anch
Roa
d (M
ilepo
st 7
.0 -
7.35
)2.
0315
7336
0D
RC
Col
d S
prin
gs R
oad
Rea
lignm
ent
C1.
7416
7336
2D
RC
Sal
mon
Fal
ls R
oad
Sou
th o
f Gle
nesk
Lan
e R
ealig
nmen
tC
1.32
1776
107
CS
ilver
Spr
ings
Pkw
y to
Gre
en V
alle
y R
d (n
orth
seg
men
t)/G
reen
Vly
Rd
Inte
rsec
tion
Sig
naliz
atio
7.64
1876
114
CG
reen
Val
ley
Roa
d/D
eer V
alle
y R
oad
Wes
t Int
erse
ctio
n Im
prov
emen
ts1.
2819
7711
5*D
RC
Sly
Par
k R
oad
at C
lear
Cre
ek C
ross
ing
- Brid
ge R
epla
cem
ent
CC
5.38
2077
117*
CR
ubic
on T
rail
at E
llis C
reek
- B
ridge
Rep
lace
men
t1.
4821
7713
0*C
Mt.
Auk
um R
oad
at N
orth
For
k C
osum
nes
Riv
er -
Brid
ge M
aint
enan
ce P
roje
ct0.
4422
7713
3*D
CC
osum
nes
Min
e R
oad
at N
orth
For
k C
osum
nes
Riv
er -
Brid
ge M
aint
enan
ce P
roje
ctC
0.27
2397
012
PD
CE
l Dor
ado
Trai
l - L
os T
ram
pas
to H
alco
n0.
5324
7711
4*D
RG
reen
Val
ley
Roa
d at
Web
er C
reek
- B
ridge
Rep
lace
men
tC
CC
10.1
525
7712
3*P
DR
Ald
er D
rive
at E
ID C
anal
- B
ridge
Rep
lace
men
tD
RC
C2.
9326
7610
8P
DR
Silv
er S
prin
gs P
kwy
to B
ass
Lake
Rd
(sou
th s
egm
ent)
DR
DR
CC
7.35
2777
116*
PD
RB
ucks
Bar
Roa
d at
the
Nor
th F
ork
Cos
umne
s R
iver
- B
ridge
Reh
abilit
atio
nD
RD
CC
4.84
2877
119*
PD
Bla
ir R
oad
at E
ID C
anal
- B
ridge
Rep
lace
men
tD
RD
RC
C3.
6529
7712
4*P
DS
ilver
For
k R
oad
at S
outh
For
k A
mer
ican
Riv
er -
Brid
ge R
epla
cem
ent
DR
CC
4.56
3077
127*
PD
Gre
en V
alle
y R
oad
at In
dian
Cre
ek -
Brid
ge R
epla
cem
ent
PD
RD
RC
C4.
4731
7713
1*P
DIc
e H
ouse
Roa
d at
Jon
es F
ork
Silv
er C
reek
- B
ridge
Mai
nten
ance
Pro
ject
DC
0.76
3277
132*
PD
Bay
ne R
oad
at D
utch
Cre
ek -
Brid
ge M
aint
enan
ce P
roje
ctD
C0.
1633
7712
2*P
DN
ewto
wn
Roa
d at
Sou
th F
ork
of W
eber
Cre
ek -
Brid
ge R
epla
cem
ent
PD
RD
RC
C5.
2334
7712
5*P
DH
azel
Val
ley
Roa
d at
PG
&E
Can
al -
Brid
ge R
epla
cem
ent
DR
DR
C2.
6035
7712
8*P
DB
assi
Roa
d at
Gra
nite
Cre
ek -
Brid
ge R
epla
cem
ent
DR
DR
RC
C3.
9636
7712
9*P
DM
ount
Mur
phy
Roa
d at
Sou
th F
ork
Am
eric
an R
iver
- Br
idge
Rep
lace
men
tP
DD
RC
8.46
3777
136*
PG
reen
Val
ley
Roa
d at
Mou
nd S
prin
gs C
reek
- B
ridge
Rep
lace
men
tP
DD
RD
RC
4.47
3877
138*
PC
lear
Cre
ek R
oad
at C
lear
Cre
ek (P
M 1
.82)
- Br
idge
Rep
lace
men
tP
DP
DR
DR
C4.
5639
7713
9*P
Cle
ar C
reek
Roa
d at
Cle
ar C
reek
(PM
0.2
5) -
Brid
ge R
epla
cem
ent
PD
PD
RD
RC
4.56
40
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/31
/201
3 12
:32:
37 P
MP
age
1 of
7
13-0082 3E 24 of 31
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ayR
C =
Pla
nnin
g/E
nviro
nmen
tal
= D
esig
n =
Con
stru
ctio
n*
= B
ridge
Pro
ject
s
Proj
ect S
umm
ary
Tabl
e -
Wes
t Slo
pe
13/1
414
/15
15/1
616
/17
17/1
818
/19-
22/2
323
/24-
32/3
3
7233
4D
RD
iam
ond
Spr
ings
Par
kway
- P
hase
1B
DR
DR
DR
CC
27.3
041
7712
6*P
Mos
quito
Roa
d B
ridge
at S
outh
For
k A
mer
ican
Riv
erP
DP
DD
RC
C30
.58
4277
134*
PD
Oak
Hill
Roa
d at
Squ
aw H
ollo
w C
reek
- B
ridge
Rep
lace
men
tP
DR
PD
RD
RC
3.93
4377
135*
PD
Han
ks E
xcha
nge
at S
quaw
Hol
low
Cre
ek -
Brid
ge R
epla
cem
ent
PD
RP
DR
DR
CC
3.89
4477
137*
PD
Gre
enst
one
Roa
d at
Sla
te C
reek
- B
ridge
Rep
lace
men
tP
DR
PD
RD
RC
3.48
4531
202
Inte
llige
nt T
rans
porta
tion
Sys
tem
(ITS
) Im
prov
emen
tsP
DR
C5.
8346
5311
5U
.S. 5
0 A
uxilia
ry L
ane
Wes
tbou
nd -
El D
orad
o H
ills B
oule
vard
to E
mpi
re R
anch
Roa
dD
RC
2.81
4753
120
U.S
. 50
Mai
nlin
e W
iden
ing
at E
l Dor
ado
Hills
PD
RC
2.16
4866
109
Bas
s La
ke R
oad
Full
Impr
ovem
ents
- P
hase
1A
PD
RC
7.43
4966
115
Bas
s La
ke F
ront
age
Impr
ovem
ents
-Silv
er S
prin
gsP
DR
C1.
5050
6611
6P
Latro
be C
onne
ctio
nD
RC
19.4
551
7132
3U
.S. 5
0/E
l Dor
ado
Hills
Bou
leva
rd In
terc
hang
e Im
prov
emen
ts -
Pha
se 2
BD
RC
5.90
5271
324
Sar
atog
a W
ay E
xten
sion
- P
hase
1D
RC
11.5
453
7133
0U
.S. 5
0/B
ass
Lake
Roa
d In
terc
hang
e Im
prov
emen
ts -
Pha
se 1
PD
RC
16.5
354
7133
2U
.S. 5
0/C
ambr
idge
Roa
d In
terc
hang
e Im
prov
emen
ts -
Pha
se 1
PD
RC
7.84
5571
333
U.S
. 50/
Pon
dero
sa R
d/S
o. S
hing
le R
d In
terc
hang
e Im
prov
emen
tsD
RC
16.3
456
7133
8U
.S. 5
0/P
onde
rosa
Rd
Inte
rcha
nge
- Dur
ock
Rd
Rea
lignm
ent
DR
C7.
1357
7133
9U
.S. 5
0/P
onde
rosa
Rd
Inte
rcha
nge
- N. S
hing
le R
d R
ealig
nmen
tD
RC
4.96
5871
340
U.S
. 50/
El D
orad
o H
ills B
lvd
Inte
rcha
nge
- Ped
estri
an O
verc
ross
ing
DR
C6.
7859
7134
5U
.S. 5
0/S
ilva
Val
ley
Par
kway
Inte
rcha
nge
- Pha
se 2
- O
n R
amps
and
Aux
iliary
Lan
es o
n U
.S. 5
DR
C12
.07
6071
347
U.S
. 50/
El D
orad
o R
oad
Inte
rcha
nge
Impr
ovem
ents
- P
hase
1P
DR
C2.
8961
7137
5H
eadi
ngto
n R
oad
Ext
ensi
on -
Mis
sour
i Fla
t Roa
d to
El D
orad
o R
oad
PD
RC
10.3
662
7137
6U
.S. 5
0/E
l Dor
ado
Roa
d In
terc
hang
e P
hase
2P
DR
C5.
8763
7233
2E
l Dor
ado
Hills
Bou
leva
rd/F
ranc
isco
Driv
e In
ters
ectio
n A
lignm
ent
DR
C9.
4564
7235
0La
trobe
Roa
d W
iden
ing
(2 to
4 la
nes)
- G
olde
n Fo
othi
ll P
arkw
ay (s
outh
) to
Inve
stm
ent B
oule
var
DR
C3.
5265
7236
1U
.S. 5
0/C
amer
on P
ark
Driv
e In
terc
hang
e Im
prov
emen
tsP
DR
C47
.63
6672
367
Cam
eron
Par
k W
iden
ing
- Dur
ock
Roa
d to
Coa
ch L
ane
PD
RC
7.34
6772
374
Whi
te R
ock
Roa
d W
iden
ing
(2 to
4 la
nes)
- M
onte
Ver
de D
rive
to U
S 5
0/S
ilva
Val
ley
Par
kway
IP
DR
C19
.07
6873
150
Cam
eron
Par
k D
rive/
Gre
en V
alle
y R
oad
Inte
rsec
tion
Impr
ovem
ents
DR
C6.
9869
7330
7M
othe
r Lod
e D
rive/
Ple
asan
t Val
ley
Roa
d In
ters
ectio
n Im
prov
emen
tsP
DR
C7.
7870
GP
124
Cou
ntry
Clu
b D
rive
Ext
ensi
on -
Silv
er D
ove
Roa
d to
Bas
s La
ke R
oad
DD
RC
1.12
71G
P12
5C
ount
ry C
lub
Driv
e E
xt. -
Wes
t Bas
s La
ke H
ills S
P B
ound
ary
to S
ilver
Dov
e R
dP
DR
C5.
4172
GP
126
Cou
ntry
Clu
b D
rive
Rea
lignm
ent -
Bas
s La
ke R
oad
to e
ast B
ass
Lake
Hills
Spe
cific
Pla
n B
ound
PD
RC
5.04
73G
P13
0R
unny
mea
de D
rive
Rea
lignm
ent a
t El D
orad
o R
oad
DC
1.90
74G
P13
7W
hite
Roc
k R
oad
Wid
enin
g (2
to 4
lane
s) -
Man
ches
ter D
rive
to S
acra
men
to C
ount
y Li
neP
DR
C3.
3275
GP
144
Cam
eron
Par
k D
rive
Wid
enin
g - P
alm
er D
rive
to M
eder
Roa
dP
DR
C12
.52
76G
P14
7S
arat
oga
Way
Ext
ensi
on -
Pha
se 2
PD
RC
4.64
77G
P14
8U
.S. 5
0/B
ass
Lake
Roa
d In
terc
hang
e Im
prov
emen
ts -
Pha
se 2
PD
RC
19.0
678
GP
149
U.S
. 50/
Cam
brid
ge R
oad
Inte
rcha
nge
Impr
ovem
ents
- P
hase
2P
DR
C11
.94
79G
P15
0U
.S. 5
0 A
uxilia
ry L
ane
Eas
tbou
nd -
Cam
brid
ge to
Pon
dero
saP
DR
C10
.35
80
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/31
/201
3 12
:32:
38 P
MP
age
2 of
7
13-0082 3E 25 of 31
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ayR
C =
Pla
nnin
g/E
nviro
nmen
tal
= D
esig
n =
Con
stru
ctio
n*
= B
ridge
Pro
ject
s
Proj
ect S
umm
ary
Tabl
e -
Wes
t Slo
pe
13/1
414
/15
15/1
616
/17
17/1
818
/19-
22/2
323
/24-
32/3
3
GP
152
Whi
te R
ock
Roa
d W
iden
ing
- 4 to
6 L
anes
, Lat
robe
Roa
d to
US
50/S
ilva
Val
ley
Par
kway
Inte
rch
PD
RC
6.06
81G
P15
4La
trobe
Roa
d W
iden
ing
(4 to
6 la
nes)
- W
hite
Roc
k R
oad
to C
arso
n C
reek
(Sun
cast
Lan
e)P
DR
C8.
9982
GP
155
Mot
her L
ode
Driv
e - G
reen
ston
e R
oad
to P
leas
ant V
alle
y R
oad
PD
RC
3.89
83G
P15
9G
reen
Val
ley
Roa
d W
iden
ing
from
Sal
mon
Fal
ls R
oad
to D
eer V
alle
y R
oad
PD
RC
12.5
884
GP
160
Ple
asan
t Val
ley
Roa
d W
iden
ing
from
El D
orad
o R
oad
to S
tate
Rou
te 4
9P
DR
C1.
1085
GP
163
Mis
sour
i Fla
t Rd
Two-
Way
Lef
t Tur
n La
ne -
El D
orad
o R
d to
Hea
ding
ton
Rd
PD
RC
1.20
86G
P16
5M
isso
uri F
lat R
oad
Wid
enin
g, H
eadi
ngto
n R
oad
to P
rosp
ecto
r's P
laza
PD
RC
1.30
87G
P16
6B
ass
Lake
Roa
d W
iden
ing
- U.S
. 50
to S
ilver
Spr
ings
Par
kway
, Pha
se 1
BP
DR
C15
.39
88G
P17
1D
uroc
k R
oad
Wid
enin
g - R
obin
Lan
e to
Sou
th S
hing
le R
oad
PD
RC
7.21
89G
P17
3P
leas
ant V
alle
y R
oad
Wid
enin
g - P
earl
Pla
ce to
Big
Cut
Roa
d in
Dia
mon
d S
prin
gsP
DR
C2.
7190
GP
174
Ple
asan
t Val
ley
Roa
d W
iden
ing
from
Big
Cut
Roa
d to
Ced
ar R
avin
e R
oad
PD
RC
2.29
91G
P17
5P
onde
rosa
Roa
d W
iden
ing
from
Nor
th S
hing
le R
oad
to M
eder
Roa
dP
DR
C2.
8092
GP
176
Sta
te R
oute
49
Wid
enin
g fro
m P
leas
ant V
alle
y R
oad
to M
isso
uri F
lat R
oad
PD
RC
7.88
93G
P17
7S
tate
Rou
te 4
9 P
assi
ng L
anes
from
SR
193
(in C
ool)
to th
e no
rther
n C
ount
y Li
neP
DR
C3.
4894
GP
178
Gre
en V
alle
y R
oad
Wid
enin
g - F
ranc
isco
to S
alm
on F
alls
Roa
dP
DR
C1.
9095
GP
179
Gre
en V
alle
y R
oad
Wid
enin
g - D
eer V
alle
y R
oad
Eas
t to
Lotu
s R
oad
PD
RC
4.78
96G
P18
2S
ilva
Val
ley
Par
kway
/Gol
den
Eag
le L
ane
Inte
rsec
tion
Sig
naliz
atio
nP
DR
C0.
7797
GP
183
El D
orad
o H
ills B
oule
vard
Wid
enin
g - L
asse
n La
ne to
Par
k D
rive
PD
RC
1.10
98O
P00
5M
etal
Bea
m G
uard
rail
Inst
alla
tion
- Var
ious
Loc
atio
nsD
C0.
6799
5311
6D
U.S
. 50
HO
V L
anes
(Pha
se 3
) - P
onde
rosa
Roa
d to
Gre
enst
one
Roa
d0.
5910
071
319
U.S
. 50/
Cam
ino
Are
a P
aral
lel C
apac
ity/S
afet
y S
tudy
P2.
0010
177
109*
Gre
en V
alle
y R
oad
at T
enne
ssee
Cre
ek -
Brid
ge R
epla
cem
ent
6.41
102
7711
8*W
entw
orth
Spr
ings
Roa
d at
Ger
le C
reek
- B
ridge
Rep
lace
men
t1.
5510
3
*
Not
es: 1
. Pro
ject
531
18 -
Tran
sit S
ervi
ce Im
prov
emen
ts: $
10,5
00 is
incl
uded
in th
e
20-Y
ear p
rogr
am fo
r the
pur
chas
e of
bus
es fo
r the
Com
mut
er B
us
P
rogr
am fr
om P
lace
rvill
e to
Sac
ram
ento
.
2
. Pro
ject
771
09 -
Gre
en V
alle
y R
oad
at T
enne
ssee
Cre
ek -
Brid
ge R
epla
cem
ent:
P
roje
ct is
con
stru
cted
, and
will
be in
the
Env
ironm
enta
l Mon
itorin
g st
age
in F
Y 1
3/14
.
3
. Pro
ject
771
18 -
Wen
twor
th S
prin
gs R
oad
at G
erle
Cre
ek -
Brid
ge R
epla
cem
ent:
P
roje
ct is
con
stru
cted
, and
will
be in
the
Env
ironm
enta
l Mon
itorin
g st
age
in F
Y 1
3/14
.
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/31
/201
3 12
:32:
38 P
MP
age
3 of
7
13-0082 3E 26 of 31
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ayR
C =
Pla
nnin
g/E
nviro
nmen
tal
= D
esig
n =
Con
stru
ctio
n*
= B
ridge
Pro
ject
s
Proj
ect S
umm
ary
Tabl
e -
CO
RP
13/1
414
/15
15/1
616
/17
17/1
818
/19-
22/2
323
/24-
32/3
3
7218
6C
Ove
rlay
- Fra
ncis
co D
rive
0.29
104
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/31
/201
3 12
:32:
39 P
MP
age
4 of
7
13-0082 3E 27 of 31
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ayR
C =
Pla
nnin
g/E
nviro
nmen
tal
= D
esig
n =
Con
stru
ctio
n*
= B
ridge
Pro
ject
s
Proj
ect S
umm
ary
Tabl
e -
Airp
orts
-Pla
cerv
ille
13/1
414
/15
15/1
616
/17
17/1
818
/19-
22/2
323
/24-
32/3
3
9312
2D
CW
ater
Lin
e an
d Fi
re H
ydra
nt to
New
Apr
on A
rea
0.17
105
9312
9C
Cra
ck S
eal a
nd R
emar
k R
unw
ay 5
-23,
Tax
iway
s, A
pron
s an
d Te
e H
ange
r Tax
ilane
s0.
3110
693
130
Taxi
way
Edg
e Li
ghts
PD
C0.
4010
793
128
13 U
nit N
este
d Te
e H
anga
rD
C1.
2810
893
126
Tee
Han
gar S
ite D
evel
opm
ent P
hase
2P
DC
2.80
109
9313
1U
pdat
e P
avem
ent M
aint
enan
ce/M
anag
emen
t Pro
gram
D0.
0311
093
132
Airp
ort L
ayou
t Pla
n U
pdat
e - P
lace
rville
D0.
0811
1
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/31
/201
3 12
:32:
39 P
MP
age
5 of
7
13-0082 3E 28 of 31
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ayR
C =
Pla
nnin
g/E
nviro
nmen
tal
= D
esig
n =
Con
stru
ctio
n*
= B
ridge
Pro
ject
s
Proj
ect S
umm
ary
Tabl
e -
Airp
orts
-Geo
rget
own
13/1
414
/15
15/1
616
/17
17/1
818
/19-
22/2
323
/24-
32/3
3
9352
7D
CC
rack
Sea
l, Jo
int S
eal &
Mar
k R
unw
ay, T
axiw
ays,
Apr
ons
& T
ee H
ange
r Tax
ilane
s; C
hang
e R
u0.
1711
293
535
Cra
ck S
eal a
nd R
emar
k R
unw
ay, T
axiw
ays,
Apr
ons
and
Tee
Han
ger T
axila
nes
DC
0.13
113
9352
0C
onst
ruct
ion
of A
WO
SD
C0.
2511
493
525
Wes
t Sid
e D
evel
opm
ent P
hase
1D
C1.
8511
593
529
Wes
t Sid
e D
evel
opm
ent P
hase
2P
DC
1.48
116
9353
1W
est A
cces
s R
oad
DC
1.33
117
9353
2W
est T
axiw
ay P
hase
2P
DC
1.34
118
9353
3N
este
d H
anga
rsP
DC
1.10
119
9352
3A
irpor
t Lay
out P
lan
2018
Upd
ate
- Geo
rget
own
D0.
0812
093
524
Wes
t Tax
iway
Pha
se 1
D0.
1312
193
528
DU
pdat
e A
irpor
t 201
3 La
yout
Pla
n w
ith P
rogr
am N
arra
tive
Rep
ort
0.08
122
9353
4U
pdat
e P
avem
ent M
aint
enan
ce/M
anag
emen
t Pro
gram
D0.
0412
3
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/31
/201
3 12
:32:
39 P
MP
age
6 of
7
13-0082 3E 29 of 31
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ayR
C =
Pla
nnin
g/E
nviro
nmen
tal
= D
esig
n =
Con
stru
ctio
n*
= B
ridge
Pro
ject
s
Proj
ect S
umm
ary
Tabl
e -
Taho
e
13/1
414
/15
15/1
616
/17
17/1
818
/19-
22/2
323
/24-
32/3
3
Recommended