INAF-OATs WorkShop – Trieste - 21 June 2013

V.Baldini

MA05

INAF-OATs Workshop

ESPRESSO Control Electronics Status

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO quick overview

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO functions overview

INAF-OATs WorkShop – Trieste - 21 June 2013

Progress from the previous phase

I. Coretti, V. Baldini

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

• Provide power supply from SCP to each cabinet

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)

• Network

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)

• Network• HW choices - BOM (cabinets-racks, cables, connectors)

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)

• Network• HW choices - BOM (cabinets-racks, cables, connectors)

• PLC modules choice

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO Control Electronics Design

INAF-OATs WorkShop – Trieste - 21 June 2013

Beckhoff PLC as new control system

• Flexibility• Low cost• Decentralization features• Low space occupancy

– Lot of advantages

INAF-OATs WorkShop – Trieste - 21 June 2013

Beckhoff PLC as new control system

• Flexibility• Low cost• Decentralization features• Low space occupancy

– Lot of advantages

• Never used before in ESO permanent instruments

INAF-OATs WorkShop – Trieste - 21 June 2013

Function to control (example)

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO electrical drawings

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO electrical drawings

INAF-OATs WorkShop – Trieste - 21 June 2013

ESPRESSO electrical drawings

INAF-OATs WorkShop – Trieste - 21 June 2013

Schedule and FTE

• September 2013 - Delta FDR at ESO• Until end of 2013 - Phase C: procurement and

assembly• November 2015 - Phase D: system integration in

Geneva• End of 2015 - PAE• 2016 - Phase E: installation in Chile,

PAC

INAF-OATs WorkShop – Trieste - 21 June 2013

Schedule and FTE

• Control electronics:– I.Coretti (staff, 2.7 FTE)– V.Baldini (contractor, 2.3 FTE)– S.Galeotta (staff, 0.7 FTE)

INAF-OATs WorkShop – Trieste - 21 June 2013

Schedule and FTE

• Control electronics:– I.Coretti (staff, 2.7 FTE)– V.Baldini (contractor, 2.3 FTE)– S.Galeotta (staff, 0.7 FTE)

• Control Software– P.Di Marcantonio (staff, 1.6 FTE)– R.Cirami (staff, 1.8 FTE)– M.Mannetta (contractor, 1.5 FTE)– S.Galeotta (staff, 0.7 FTE)

INAF-OATs WorkShop – Trieste - 21 June 2013

Conclusion and Criticalities

• FDR successfully passed

• Ready for purchases– around 120,000 € (Beckhoff, Schroff, ESO, RS..), about

400 different items

• Manufacturing phase will require space for 6-7 cabinets

• Short on permanent staff